Page 1: Time Schedule Project Ubl

TIME SCHEDULEPEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNG

LOKASI : GEDUNG MENENG, BANDAR LAMPUNGTAHUN ANGGARAN : 2010

NO URAIAN PEKERJAAN

TAHUN 2010 TAHUN 2011

KET NOPEMBER DESESEMBER JANUARI PEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS

6/11 13/11 20/11 27/11 4/12 11/12 18/12 25/12 1/1 8/1 15/1 22/1 29/1 5/2 12/2 19/2 26/2 5/3 12/3 19/3 26/3 2/4 9/4 16/4 23/4 30/4 7/5 14/5 21/5 28/5 4/6 11/6 18/6 25/6 2/7 9/7 16/7 23/7 30/7 6/8 13/8 20/8

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

A PEKERJAAN PENDAHULUAN

B PEKERJAAN STRUKTUR - 0.022 - -

I BASEMENT

II LANTAI I

III LANTAI II

IV LANTAI III

V LANTAI IV

VI LANTAI DAK

C PEKERJAAN RANGKA DAN ATAP

###

SCHEDULE 0.90 0.40 0.21 3.71 3.71 0.02 0.28 6.57 3.51 1.44 1.44 1.44 7.46 1.66 1.66 2.05 2.05 8.30 3.38 2.09 2.09 9.38 3.59 2.38 2.47 10.59 3.55 1.52 1.43 3.81 1.72 1.75 1.62 1.82

ACUMULATIVE SCHEDULE - 0.90 1.31 1.52 5.23 8.94 8.95 9.24 15.81 19.32 20.76 22.19 23.63 31.09 32.75 34.40 36.45 38.50 46.81 50.19 52.28 54.37 63.75 67.34 69.72 72.20 82.79 86.34 87.86 89.29 93.10 94.82 96.57 98.18 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00

A C T U A L 0.55 0.95 0.30 0.02 -0.01 0.00 0.00 0.00 29.50 0.00 1.84 2.00 0.09 0.00 0.00 1.76 5.40 2.41 0.00 0.00 4.04 1.60 1.48 1.20 0.36 10.01 1.58 3.09 1.95 3.67 7.79 1.64 1.64 2.93 4.67 0.38 1.02 1.45 0.30 0.26 1.45 2.69

ACUMULATIVE ACTUAL - 0.55 1.50 1.80 1.83 1.82 1.82 1.82 1.82 31.31 31.31 33.15 35.16 35.25 35.25 35.25 37.01 42.41 44.82 44.82 44.82 48.86 50.46 51.94 53.15 53.51 63.52 65.09 68.18 70.13 73.80 81.59 83.23 84.86 87.79 92.45 92.83 93.85 95.30 95.60 95.86 97.31 100.00

D E V I A S I -0.35 0.19 0.28 -3.40 -7.12 -7.14 -7.42 -13.99 11.99 10.56 10.96 11.53 4.15 2.50 0.84 0.56 3.91 -1.99 -5.37 -7.46 -5.51 -13.29 -15.40 -16.58 -18.69 -19.27 -21.24 -19.68 -19.15 -19.30 -13.23 -13.34 -13.32 -12.21 -7.55 -7.17 -6.15 -4.70 -4.40 -4.14 -2.69 0.00

: ACTUAL

: SCHEDULE

Bandar Lampung, 20 Agustus 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

BOBOT

100 9080 7060 5040

30 2010

00

Page 2: Time Schedule Project Ubl

TIME SCHEDULEPEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNG

LOKASI : GEDUNG MENENG, BANDAR LAMPUNGTAHUN ANGGARAN : 2010

NO URAIAN PEKERJAAN BOBOT

TAHUN 2010 TAHUN 2011

KET NOPEMBER DESESEMBER JANUARI PEBRUARI MARET APRIL MEI JUNI

6/11 13/11 20/11 27/11 4/12 11/12 18/12 25/12 1/1 8/1 15/1 22/1 29/1 5/2 12/2 19/2 26/2 5/3 12/3 19/3 26/3 2/4 9/4 16/4 23/4 30/4 7/5 14/5 21/5 28/5 4/5 11/5 18/5 25/5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

A PEKERJAAN PENDAHULUAN

B PEKERJAAN STRUKTUR - 0.022 - -

I BASEMENT

II LANTAI I

III LANTAI II

IV LANTAI III

V LANTAI IV

VI LANTAI DAK

C PEKERJAAN RANGKA DAN ATAP

100.00

SCHEDULE 0.90 0.40 0.21 3.71 3.71 0.02 0.28 6.57 3.51 1.44 1.44 1.44 7.46 1.66 1.66 2.05 2.05 8.30 3.38 2.09 2.09 9.38 3.59 2.38 2.47 10.59 3.55 1.52 1.43 3.81 1.72 1.75 1.62 1.82

ACUMULATIVE SCHEDULE - 0.90 1.31 1.52 5.23 8.94 8.95 9.24 15.81 19.32 20.76 22.19 23.63 31.09 32.75 34.40 36.45 38.50 46.81 50.19 52.28 54.37 63.75 67.34 69.72 72.20 82.79 86.34 87.86 89.29 93.10 94.82 96.57 98.18 100.00

A C T U A L 0.55 0.95 0.30 0.02 -0.01 0.00 0.00 0.00 29.50 0.00 1.84 2.00 0.09 0.00 0.00 1.76 5.40 2.41 0.00 0.00 4.04 1.60 1.48 1.20 0.36 10.01 1.58 3.09 1.95 3.67 7.79 1.64 1.64 2.93

ACUMULATIVE ACTUAL - 0.55 1.50 1.80 1.83 1.82 1.82 1.82 1.82 31.31 31.31 33.15 35.16 35.25 35.25 35.25 37.01 42.41 44.82 44.82 44.82 48.86 50.46 51.94 53.15 53.51 63.52 65.09 68.18 70.13 73.80 81.59 83.23 84.86 87.79

D E V I A S I -0.35 0.19 0.28 -3.40 -7.12 -7.14 -7.42 -13.99 11.99 10.56 10.96 11.53 4.15 2.50 0.84 0.56 3.91 -1.99 -5.37 -7.46 -5.51 -13.29 -15.40 -16.58 -18.69 -19.27 -21.24 -19.68 -19.15 -19.30 -13.23 -13.34 -13.32 -12.21

: ACTUAL

: SCHEDULE

Bandar Lampung, 25 Juni 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

10090807060504030201000

Page 3: Time Schedule Project Ubl

TIME SCHEDULEPEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNG

LOKASI : GEDUNG MENENG, BANDAR LAMPUNGTAHUN ANGGARAN : 2010

NO URAIAN PEKERJAAN VOLUME SATUAN BOBOT

TAHUN 2010 TAHUN 2011

KET NOPEMBER DESESEMBER JANUARI PEBRUARI MARET APRIL MEI JUNO

6/11 13/11 20/11 27/11 4/12 11/12 18/12 25/12 1/1 8/1 15/1 22/1 29/1 5/2 12/2 19/2 26/2 5/3 12/3 19/3 26/3 2/4 9/4 16/4 23/4 30/4 7/5 14/5 21/5 28/5 7/5 14/5 21/5 28/5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.2000 0.200

0.100 0.100 - -

2 Direksikeet dan Gudang 30.00 m2 0.2250 0.112 0.112

0.112 0.112 - -

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.0375 0.037

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.0525 0.052

5 Pemindahan Tiang Listrik 1.00 Ls 0.1250 0.125

- - - -

$ 6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.1500 0.075 0.075

7 Pemasangan Bouwplank 160.00 m' 0.0220 0.022

B PEKERJAAN STRUKTUR - 0.022 - -

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.3307 0.083 0.083 0.083 0.083

0.066 0.066 0.198

2 Urugan tanah ex. Galian 320.00 m3 0.1260 0.126

0.025 0.025 0.076

3 Galian tanah level Basement 800.00 m3 0.6300 0.630

0.189 0.441 -

4 Urugan pasir bawah pondasi 12.00 m3 0.0375 0.019 0.019

- - 0.004

5 Urugan pasir bawah lantai 83.85 m3 0.2620 0.262

- - 0.026

6 Lantai Kerja 8.05 m3 0.1107 0.018 0.018 0.018 0.018 0.018 0.018

- - - -

7 Pas. Beton Foot Plat 71.78 m3 3.6374 1.819 1.819

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.3016 0.151 0.151

9 Pas. Beton Tangga K 250 4.41 m3 0.3476 0.087 0.087 0.087 0.087

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.1376 0.069 0.069

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.2263 0.113 0.113

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.3761 1.188 1.188

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.5488 0.274 0.274

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.2207 0.221

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.8889 1.889

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.4317 4.432

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.0320 0.032

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.1637 0.164

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.2728 0.273

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.8643 2.864

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.1330 0.133

22 Pas. Beton Kolom praktis 11/11 ( KP ) K 2 1.02 m3 0.0788 0.079

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.4250 0.285 0.285 0.285 0.285 0.285

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.3650 0.091 0.091 0.091 0.091

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.1547 0.077 0.077

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.2417 0.121 0.121

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.7068 1.353 1.353

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.1257 0.063 0.063

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 2 1.02 m3 0.0819 0.041 0.041

100

90

80

70

Page 4: Time Schedule Project Ubl

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.1845 0.046 0.046 0.046 0.046

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.9004 0.975 0.975 0.975 0.975

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.4152 0.104 0.104 0.104 0.104

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.8393 0.210 0.210 0.210 0.210

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.2823 0.071 0.071 0.071 0.071

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.1038 0.026 0.026 0.026 0.026

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.0165 0.004 0.004 0.004 0.004

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.6344 3.634

15 Pas. Plat bondek 760.35 m2 2.3951 2.395

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.3737 0.093 0.093 0.093 0.093

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.1584 0.158

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.7713 2.771

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.1287 0.129

5 Pas Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.0838 0.084

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.1889 0.063 0.063 0.063

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.9932 1.331 1.331 1.331

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.4251 0.142 0.142 0.142

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.8593 0.286 0.286 0.286

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.2890 0.096 0.096 0.096

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.1062 0.035 0.035 0.035

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.0169 0.006 0.006 0.006

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.7540 3.754

14 Pas Plat bondek 692.94 m2 2.3464 2.346

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.3824 0.096 0.096 0.096 0.096

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.1620 0.162

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.8357 2.836

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.1317 0.132

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 2 1.02 m3 0.0858 0.086

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.1932 0.064 0.064 0.064

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.0861 1.362 1.362 1.362

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.4349 0.145 0.145 0.145

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.8793 0.293 0.293 0.293

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.2957 0.099 0.099 0.099

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.1087 0.036 0.036 0.036

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.0173 0.006 0.006 0.006

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.8413 3.841

14 Pas. Plat bondek 912.41 m2 3.1614 3.161

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.3998 0.133 0.133 0.133

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.1694 0.169

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.9646 2.965

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.1376 0.138

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 2 1.02 m3 0.0897 0.090

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.2020 0.067 0.067 0.067

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.2718 1.424 1.424 1.424

60

50

40

30

Page 5: Time Schedule Project Ubl

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.4547 0.152 0.152 0.152

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.9192 0.306 0.306 0.306

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.3091 0.103 0.103 0.103

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.1136 0.038 0.038 0.038

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.0181 0.006 0.006 0.006

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.0159 4.016

14 Pas. Plat bondek 1,131.88 m2 4.1002 4.100

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.4084 0.102 0.102 0.102 0.102

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.1748 0.175

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.1625 1.163

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.1445 0.145

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 2 0.05 m3 0.0044 0.004

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.4428 0.814 0.814 0.814

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.0408 0.347 0.347 0.347

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.1930 0.064 0.064 0.064

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.2504 0.083 0.083 0.083

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.0529 0.018 0.018 0.018

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.0139 0.005 0.005 0.005

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.0313 1.031

13 Pas. Plat bondek 254.15 m2 0.9406 0.941

14 Water proofing 191.08 m2 0.2795 0.279

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.0805 0.040 0.040

2 2,466.80 kg 1.1100 0.555 0.555

3 852.07 kg 0.3834 0.192 0.192

4 Pas. Plat landas t.16 mm 335.70 kg 0.1259 0.063 0.063

5 72.00 Bh 0.0720 0.036 0.036

6 271.61 kg 0.1019 0.051 0.051

7 Pas. Gording C 150.50.20 3,076.50 kg 1.1537 0.577 0.577

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.7147 1.715

TOTAL 100.00

SCHEDULE 0.905 0.401 0.214 3.708 3.709 0.018 0.280 6.573 3.513 1.435 1.435 1.435 7.465 1.655 1.655 2.051 2.051 8.302 3.384 2.092 2.092 9.380 3.587 2.381 2.475 ### 3.550 1.520 1.427 3.811 1.722 1.749 1.616 1.817

ACUMULATIVE SCHEDULE - 0.905 1.306 1.519 5.227 8.936 8.955 9.235 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### 93.1 ### ### ### 100.0

A C T U A L 0.553 0.947 0.304 0.024 ### - - - ### - 1.838 2.003 0.091 - - 1.764 5.399

ACUMULATIVE ACTUAL - 0.553 1.500 1.804 1.828 1.818 1.818 1.818 1.818 ### ### ### ### ### ### ### ### ###

D E V I A S I

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

20

10

00

Page 6: Time Schedule Project Ubl

LAPORAN MINGGUAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNG MINGGU KE : I (SATU)

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 1 Nop - 7 Nop

No Uraian Pekerjaan VOLUME SATUAN BOBOT

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 - 0.10 0.10

2 Direksikeet dan Gudang 30.00 m2 0.22 - 0.11 0.11

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 - - -

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 - - -

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 - - -

$ 6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 - 0.06 0.06

7 Pemasangan Bouwplank 160.00 m' 0.02 - - -

TOTAL I 0.81 - 0.27 0.27

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 - 0.07 0.07

2 Urugan tanah ex. Galian 320.00 m3 0.13 - 0.03 0.03

3 Galian tanah level Basement 800.00 m3 0.63 - 0.19 0.19

4 Urugan pasir bawah pondasi 12.00 m3 0.04 - - -

5 Urugan pasir bawah lantai 83.85 m3 0.26 - - -

6 Lantai Kerja 8.05 m3 0.11 - - -

7 Pas. Beton Foot Plat 71.78 m3 3.64 - - -

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 - - -

9 Pas. Beton Tangga K 250 4.41 m3 0.35 - - -

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 - - -

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 - - -

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 - - -

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 - - -

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 - - -

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 - - -

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 - - -

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 - - -

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 - - -

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 - - -

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 - - -

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 - - -

22 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 - - -

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 - - -

Sub Total B.I 20.58 - 0.28 0.28

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 - - -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 - - -

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 - - -

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 - - -

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - -

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 - - -

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 - - -

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 - - -

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 - - -

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 - - -

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 - - -

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 - - -

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 7: Time Schedule Project Ubl

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - -

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 - - -

15 Pas. Plat bondek 760.35 m2 2.40 - - -

Sub Total B.II 15.45 - - -

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 - - -

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - - -

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 - - -

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - -

5 Pas Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 - - -

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 - - -

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 - - -

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 - - -

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 - - -

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 - - -

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - -

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - -

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 - - -

14 Pas Plat bondek 692.94 m2 2.35 - - -

Sub Total B.III 15.49 - - -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 - - -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - - -

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 - - -

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - -

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 - - -

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 - - -

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 - - -

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 - - -

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 - - -

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 - - -

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - -

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - -

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 - - -

14 Pas. Plat bondek 912.41 m2 3.16 - - -

Sub Total B.IV 16.62 - - -

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 - - -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 - - -

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 - - -

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 - - -

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 - - -

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 - - -

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 - - -

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 - - -

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 - - -

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 - - -

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - -

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - -

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 - - -

14 Pas. Plat bondek 1,131.88 m2 4.10 - - -

Sub Total B.V 18.17 - - -

Page 8: Time Schedule Project Ubl

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 - - -

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 - - -

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 - - -

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 0.05 m3 0.00 - - -

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 - - -

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 - - -

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 - - -

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 - - -

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 - - -

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 - - -

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 - - -

13 Pas. Plat bondek 254.15 m2 0.94 - - -

14 Water proofing 191.08 m2 0.28 - - -

Sub Total B.VI 8.14 - - -

TOTAL B 94.45 - 0.28 0.28

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 - - -

2 2,466.80 kg 1.11 - - -

3 852.07 kg 0.38 - - -

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 - - -

5 72.00 Bh 0.07 - - -

6 271.61 kg 0.10 - - -

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 - - -

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - -

SUB TOTAL C 4.74 - - -

TOTAL ### - 0.55 0.55

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 9: Time Schedule Project Ubl

LAPORAN MINGGUAN

: I (SATU)

: 1 Nop - 7 Nop

NILAI

50%

50%

0%

0%

0%

40%

0%

20%

20%

30%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

Page 10: Time Schedule Project Ubl

0%

0%

0%

-

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

-

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

-

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

Page 11: Time Schedule Project Ubl

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

Page 12: Time Schedule Project Ubl

LAPORAN MINGGUAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNG MINGGU KE : II ( Dua)

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE :

No Uraian Pekerjaan VOLUME SATUAN BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.10 0.10 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.11 0.11 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 - 0.04 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 - 0.05 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 - - - 0%

$ 6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.06 0.09 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 - 0.02 0.02 100%

TOTAL I 0.81 0.27 0.41 0.69

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.07 0.07 0.13 40%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.03 0.03 0.05 40%

3 Galian tanah level Basement 800.00 m3 0.63 0.19 0.44 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 - - - 0%

5 Urugan pasir bawah lantai 83.85 m3 0.26 - - - 0%

6 Lantai Kerja 8.05 m3 0.11 - - - 0%

7 Pas. Beton Foot Plat 71.78 m3 3.64 - - - 0%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 - - - 0%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 - - - 0%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 - - - 0%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 - - - 0%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 - - - 0%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 - - - 0%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 - - - 0%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 - - - 0%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 - - - 0%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 - - - 0%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 - - - 0%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 - - - 0%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 - - - 0%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 - - - 0%

22 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 - - - 0%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 - - - 0%

Sub Total B.I 20.58 0.28 0.53 0.81

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 - - - 0%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 - - - 0%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 - - - 0%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - - 0%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 - - - 0%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 - - - 0%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 - - - 0%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 - - - 0%

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 - - - 0%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 - - - 0%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 - - - 0%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 - - - 0%

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 13: Time Schedule Project Ubl

15 Pas. Plat bondek 760.35 m2 2.40 - - - 0%

Sub Total B.II 15.45 - - - -

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 - - - 0%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - - - 0%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 - - - 0%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - - 0%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 - - - 0%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 - - - 0%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 - - - 0%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 - - - 0%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 - - - 0%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 - - - 0%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 - - - 0%

14 Pas Plat bondek 692.94 m2 2.35 - - - 0%

Sub Total B.III 15.49 - - - -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 - - - 0%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 - - - 0%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 - - - 0%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 - - - 0%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 - - - 0%

14 Pas. Plat bondek 912.41 m2 3.16 - - - 0%

-

Sub Total B.IV 16.62 - - -

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 - - - 0%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 - - - 0%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 - - - 0%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 - - - 0%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 - - - 0%

14 Pas. Plat bondek 1,131.88 m2 4.10 - - - 0%

Sub Total B.V 18.17 - - -

Page 14: Time Schedule Project Ubl

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 0.05 m3 0.00 - - - 0%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 - - - 0%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 - - - 0%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 - - - 0%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 - - - 0%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 - - - 0%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 - - - 0%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 - - - 0%

13 Pas. Plat bondek 254.15 m2 0.94 - - - 0%

14 Water proofing 191.08 m2 0.28 - - - 0%

Sub Total B.VI 8.14 - - -

TOTAL B 94.45 0.28 0.53 0.81

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 - - - 0%

2 2,466.80 kg 1.11 - - - 0%

3 852.07 kg 0.38 - - - 0%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 - - - 0%

5 72.00 Bh 0.07 - - - 0%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 - - - 0%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 - - -

TOTAL ### 0.55 0.95 1.50

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 15: Time Schedule Project Ubl

LAPORAN MINGGUAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNG

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG

No Uraian Pekerjaan VOLUME SATUAN BOBOT

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.200

2 Direksikeet dan Gudang 30.00 m2 0.22 0.225

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.037

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.052

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 -

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.150

7 Pemasangan Bouwplank 160.00 m' 0.02 0.022

TOTAL I 0.81 0.687

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.132

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.050

3 Galian tanah level Basement 800.00 m3 0.63 0.630

4 Urugan pasir bawah pondasi 12.00 m3 0.04 -

5 Urugan pasir bawah lantai 83.85 m3 0.26 -

6 Lantai Kerja 8.05 m3 0.11 -

7 Pas. Beton Foot Plat 71.78 m3 3.64 -

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 -

9 Pas. Beton Tangga K 250 4.41 m3 0.35 -

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 -

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 -

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 -

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 -

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 -

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 -

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 -

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 -

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 -

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 -

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 -

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 -

22 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 -

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 -

Sub Total B.I 20.58 0.813

MINGGU LALU

Page 16: Time Schedule Project Ubl

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 -

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 -

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 -

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 -

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 -

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 -

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 -

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 -

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 -

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 -

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 -

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 -

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 -

15 Pas. Plat bondek 760.35 m2 2.40 -

Sub Total B.II 15.45 -

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 -

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 -

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 -

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 -

5 Pas Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 -

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 -

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 -

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 -

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 -

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 -

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 -

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 -

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 -

14 Pas Plat bondek 692.94 m2 2.35 -

Sub Total B.III 15.49 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 -

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 -

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 -

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 -

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 -

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 -

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 -

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 -

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 -

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 -

Page 17: Time Schedule Project Ubl

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 -

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 -

14 Pas. Plat bondek 912.41 m2 3.16 -

Sub Total B.IV 16.62 -

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 -

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 -

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 -

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 -

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 -

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 -

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 -

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 -

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 -

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 -

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 -

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 -

14 Pas. Plat bondek 1,131.88 m2 4.10 -

Sub Total B.V 18.17 -

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 -

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 -

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 -

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 0.05 m3 0.00 -

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 -

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 -

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 -

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 -

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 -

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 -

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 -

13 Pas. Plat bondek 254.15 m2 0.94 -

14 Water proofing 191.08 m2 0.28 -

Sub Total B.VI 8.14 -

TOTAL B 94.45 0.813

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 -

2 2,466.80 kg 1.11 -

3 852.07 kg 0.38 -

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 -

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Page 18: Time Schedule Project Ubl

5 72.00 Bh 0.07 -

6 271.61 kg 0.10 -

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 -

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 -

SUB TOTAL C 4.74 -

TOTAL ### 1.500

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 19: Time Schedule Project Ubl

LAPORAN MINGGUAN

MINGGU KE :

PRIODE :

NILAI

- 0.200 100%

- 0.225 100%

- 0.037 100%

- 0.052 100%

- - 0%

- 0.150 100%

- 0.022 100%

- 0.687

0.198 0.331 100%

0.076 0.126 100%

- 0.630 100%

0.004 0.004 10%

0.026 0.026 10%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

0.304 1.117

MINGGU INI

S/D MINGGU

INI

Page 20: Time Schedule Project Ubl

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

Page 21: Time Schedule Project Ubl

- - 0%

- - 0%

- - 0%

-

- -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- -

0.304 1.117

- - 0%

- - 0%

- - 0%

- - 0%

Page 22: Time Schedule Project Ubl

- - 0%

- - 0%

- - 0%

- - 0%

- -

0.304 1.804

Page 23: Time Schedule Project Ubl

LAPORAN MINGGUAN

Pekerjaan :

Lokasi :

No Uraian Pekerjaan VOLUME SATUAN BOBOT

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.200

2 Direksikeet dan Gudang 30.00 m2 0.22 0.225

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.037

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.052

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 -

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.150

7 Pemasangan Bouwplank 160.00 m' 0.02 0.022

TOTAL I 0.81 0.687

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.331

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.126

3 Galian tanah level Basement 800.00 m3 0.63 0.630

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.004

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.026

6 Lantai Kerja 8.05 m3 0.11 -

7 Pas. Beton Foot Plat 71.78 m3 3.64 -

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 -

9 Pas. Beton Tangga K 250 4.41 m3 0.35 -

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 -

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 -

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 -

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 -

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 -

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 -

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 -

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 -

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 -

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 -

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 -

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 -

22 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 -

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 -

Sub Total B.I 20.58 1.117

MINGGU LALU

Page 24: Time Schedule Project Ubl

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 -

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 -

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 -

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 -

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 -

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 -

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 -

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 -

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 -

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 -

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 -

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 -

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 -

15 Pas. Plat bondek 760.35 m2 2.40 -

Sub Total B.II 15.45 -

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 -

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 -

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 -

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 -

5 Pas Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 -

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 -

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 -

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 -

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 -

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 -

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 -

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 -

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 -

14 Pas Plat bondek 692.94 m2 2.35 -

Sub Total B.III 15.49 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 -

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 -

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 -

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 -

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 -

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 -

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 -

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 -

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 -

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 -

Page 25: Time Schedule Project Ubl

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 -

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 -

14 Pas. Plat bondek 912.41 m2 3.16 -

Sub Total B.IV 16.62 -

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 -

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 -

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 -

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 -

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 -

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 -

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 -

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 -

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 -

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 -

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 -

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 -

14 Pas. Plat bondek 1,131.88 m2 4.10 -

Sub Total B.V 18.17 -

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 -

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 -

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 -

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 0.05 m3 0.00 -

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 -

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 -

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 -

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 -

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 -

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 -

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 -

13 Pas. Plat bondek 254.15 m2 0.94 -

14 Water proofing 191.08 m2 0.28 -

Sub Total B.VI 8.14 -

TOTAL B 94.45 1.117

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 -

2 2,466.80 kg 1.11 -

3 852.07 kg 0.38 -

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 -

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Page 26: Time Schedule Project Ubl

5 72.00 Bh 0.07 -

6 271.61 kg 0.10 -

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 -

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 -

SUB TOTAL C 4.74 -

TOTAL ### 1.804

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 27: Time Schedule Project Ubl

LAPORAN MINGGUAN

MINGGU KE :

PRIODE :

NILAI

- 0.200 100%

- 0.225 100%

- 0.037 100%

- 0.052 100%

- - 0%

- 0.150 100%

- 0.022 100%

- 0.687

- 0.331 100%

- 0.126 100%

- 0.630 100%

0.003 0.007 18%

0.021 0.047 18%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

0.024 1.141

MINGGU INI

S/D MINGGU

INI

Page 28: Time Schedule Project Ubl

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

Page 29: Time Schedule Project Ubl

- - 0%

- - 0%

- - 0%

-

- -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- -

0.024 1.141

- - 0%

- - 0%

- - 0%

- - 0%

Page 30: Time Schedule Project Ubl

- - 0%

- - 0%

- - 0%

- - 0%

- -

0.024 1.828

Page 31: Time Schedule Project Ubl

LAPORAN MINGGUAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNG

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG

No Uraian Pekerjaan VOLUME SATUAN BOBOT

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 -

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02

TOTAL I 0.81 0.69

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13

3 Galian tanah level Basement 800.00 m3 0.63 0.63

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.01

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.05

6 Lantai Kerja 8.05 m3 0.11 -

7 Pas. Beton Foot Plat 71.78 m3 3.64 -

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 -

9 Pas. Beton Tangga K 250 4.41 m3 0.35 -

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 -

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 -

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 -

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 -

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 -

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 -

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 -

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 -

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 -

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 -

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 -

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 -

22 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 -

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 -

Sub Total B.I 20.58 1.14

MINGGU LALU

Page 32: Time Schedule Project Ubl

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 -

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 -

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 -

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 -

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 -

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 -

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 -

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 -

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 -

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 -

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 -

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 -

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 -

15 Pas. Plat bondek 760.35 m2 2.40 -

Sub Total B.II 15.45 -

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 -

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 -

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 -

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 -

5 Pas Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 -

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 -

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 -

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 -

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 -

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 -

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 -

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 -

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 -

14 Pas Plat bondek 692.94 m2 2.35 -

Sub Total B.III 15.49 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 -

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 -

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 -

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 -

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 -

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 -

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 -

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 -

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 -

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 -

Page 33: Time Schedule Project Ubl

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 -

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 -

14 Pas. Plat bondek 912.41 m2 3.16 -

Sub Total B.IV 16.62 -

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 -

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 -

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 -

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 -

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 -

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 -

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 -

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 -

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 -

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 -

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 -

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 -

14 Pas. Plat bondek 1,131.88 m2 4.10 -

Sub Total B.V 18.17 -

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 -

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 -

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 -

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 0.05 m3 0.00 -

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 -

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 -

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 -

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 -

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 -

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 -

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 -

13 Pas. Plat bondek 254.15 m2 0.94 -

14 Water proofing 191.08 m2 0.28 -

Sub Total B.VI 8.14 -

TOTAL B 94.45 1.14

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 -

2 2,466.80 kg 1.11 -

3 852.07 kg 0.38 -

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 -

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Page 34: Time Schedule Project Ubl

5 72.00 Bh 0.07 -

6 271.61 kg 0.10 -

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 -

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 -

SUB TOTAL C 4.74 -

TOTAL ### 1.83

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 35: Time Schedule Project Ubl

LAPORAN MINGGUAN

MINGGU KE :

PRIODE :

NILAI

- 0.20 100%

- 0.22 100%

- 0.04 100%

- 0.05 100%

- - 0%

- 0.15 100%

- 0.02 100%

- 0.69

- 0.33 100%

- 0.13 100%

- 0.63 100%

0.00 0.01 30%

(0.05) - 0%

0.03 0.03 30%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

(0.01) 1.13

MINGGU INI

S/D MINGGU

INI

Page 36: Time Schedule Project Ubl

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

Page 37: Time Schedule Project Ubl

- - 0%

- - 0%

- - 0%

-

- -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- -

(0.01) 1.13

- - 0%

- - 0%

- - 0%

- - 0%

Page 38: Time Schedule Project Ubl

- - 0%

- - 0%

- - 0%

- - 0%

- -

(0.01) 1.82

Page 39: Time Schedule Project Ubl

LAPORAN MINGGUAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNG

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG

No Uraian Pekerjaan VOLUME SATUAN BOBOT

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 -

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02

TOTAL I 0.81 0.69

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13

3 Galian tanah level Basement 800.00 m3 0.63 0.63

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.01

5 Urugan pasir bawah lantai 83.85 m3 0.26 -

6 Lantai Kerja 8.05 m3 0.11 0.03

7 Pas. Beton Foot Plat 71.78 m3 3.64 -

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 -

9 Pas. Beton Tangga K 250 4.41 m3 0.35 -

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 -

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 -

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 -

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 -

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 -

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 -

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 -

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 -

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 -

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 -

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 -

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 -

22 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 -

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 -

Sub Total B.I 20.58 1.13

MINGGU LALU

Page 40: Time Schedule Project Ubl

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 -

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 -

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 -

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 -

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 -

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 -

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 -

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 -

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 -

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 -

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 -

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 -

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 -

15 Pas. Plat bondek 760.35 m2 2.40 -

Sub Total B.II 15.45 -

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 -

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 -

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 -

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 -

5 Pas Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 -

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 -

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 -

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 -

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 -

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 -

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 -

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 -

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 -

14 Pas Plat bondek 692.94 m2 2.35 -

Sub Total B.III 15.49 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 -

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 -

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 -

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 -

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 -

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 -

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 -

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 -

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 -

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 -

Page 41: Time Schedule Project Ubl

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 -

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 -

14 Pas. Plat bondek 912.41 m2 3.16 -

Sub Total B.IV 16.62 -

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 -

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 -

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 -

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 -

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 -

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 -

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 -

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 -

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 -

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 -

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 -

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 -

14 Pas. Plat bondek 1,131.88 m2 4.10 -

Sub Total B.V 18.17 -

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 -

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 -

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 -

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 0.05 m3 0.00 -

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 -

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 -

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 -

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 -

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 -

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 -

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 -

13 Pas. Plat bondek 254.15 m2 0.94 -

14 Water proofing 191.08 m2 0.28 -

Sub Total B.VI 8.14 -

TOTAL B 94.45 1.13

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 -

2 2,466.80 kg 1.11 -

3 852.07 kg 0.38 -

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 -

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Page 42: Time Schedule Project Ubl

5 72.00 Bh 0.07 -

6 271.61 kg 0.10 -

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 -

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 -

SUB TOTAL C 4.74 -

TOTAL ### 1.82

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 43: Time Schedule Project Ubl

LAPORAN MINGGUAN

MINGGU KE :

PRIODE :

NILAI

- 0.20 100%

- 0.22 100%

- 0.04 100%

- 0.05 100%

- - 0%

- 0.15 100%

- 0.02 100%

- 0.69

- 0.33 100%

- 0.13 100%

- 0.63 100%

- 0.01 30%

- - 0%

- 0.03 30%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- 1.13

MINGGU INI

S/D MINGGU

INI

Page 44: Time Schedule Project Ubl

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

Page 45: Time Schedule Project Ubl

- - 0%

- - 0%

- - 0%

-

- -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- -

- 1.13

- - 0%

- - 0%

- - 0%

- - 0%

Page 46: Time Schedule Project Ubl

- - 0%

- - 0%

- - 0%

- - 0%

- -

- 1.82

Page 47: Time Schedule Project Ubl

LAPORAN MINGGUAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNG

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG

No Uraian Pekerjaan VOLUME SATUAN BOBOT

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 -

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02

TOTAL I 0.81 0.69

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13

3 Galian tanah level Basement 800.00 m3 0.63 0.63

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.01

5 Urugan pasir bawah lantai 83.85 m3 0.26 -

6 Lantai Kerja 8.05 m3 0.11 0.03

7 Pas. Beton Foot Plat 71.78 m3 3.64 -

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 -

9 Pas. Beton Tangga K 250 4.41 m3 0.35 -

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 -

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 -

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 -

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 -

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 -

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 -

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 -

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 -

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 -

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 -

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 -

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 -

22 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 -

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 -

Sub Total B.I 20.58 1.13

MINGGU LALU

Page 48: Time Schedule Project Ubl

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 -

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 -

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 -

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 -

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 -

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 -

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 -

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 -

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 -

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 -

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 -

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 -

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 -

15 Pas. Plat bondek 760.35 m2 2.40 -

Sub Total B.II 15.45 -

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 -

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 -

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 -

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 -

5 Pas Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 -

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 -

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 -

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 -

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 -

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 -

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 -

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 -

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 -

14 Pas Plat bondek 692.94 m2 2.35 -

Sub Total B.III 15.49 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 -

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 -

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 -

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 -

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 -

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 -

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 -

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 -

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 -

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 -

Page 49: Time Schedule Project Ubl

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 -

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 -

14 Pas. Plat bondek 912.41 m2 3.16 -

Sub Total B.IV 16.62 -

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 -

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 -

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 -

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 -

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 -

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 -

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 -

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 -

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 -

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 -

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 -

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 -

14 Pas. Plat bondek 1,131.88 m2 4.10 -

Sub Total B.V 18.17 -

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 -

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 -

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 -

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 0.05 m3 0.00 -

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 -

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 -

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 -

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 -

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 -

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 -

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 -

13 Pas. Plat bondek 254.15 m2 0.94 -

14 Water proofing 191.08 m2 0.28 -

Sub Total B.VI 8.14 -

TOTAL B 94.45 1.13

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 -

2 2,466.80 kg 1.11 -

3 852.07 kg 0.38 -

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 -

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Page 50: Time Schedule Project Ubl

5 72.00 Bh 0.07 -

6 271.61 kg 0.10 -

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 -

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 -

SUB TOTAL C 4.74 -

TOTAL ### 1.82

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 51: Time Schedule Project Ubl

LAPORAN MINGGUAN

MINGGU KE :

PRIODE :

NILAI

- 0.20 100%

- 0.22 100%

- 0.04 100%

- 0.05 100%

- - 0%

- 0.15 100%

- 0.02 100%

- 0.69

- 0.33 100%

- 0.13 100%

- 0.63 100%

- 0.01 30%

- - 0%

- 0.03 30%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- 1.13

MINGGU INI

S/D MINGGU

INI

Page 52: Time Schedule Project Ubl

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

Page 53: Time Schedule Project Ubl

- - 0%

- - 0%

- - 0%

-

- -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- -

- 1.13

- - 0%

- - 0%

- - 0%

- - 0%

Page 54: Time Schedule Project Ubl

- - 0%

- - 0%

- - 0%

- - 0%

- -

- 1.82

Page 55: Time Schedule Project Ubl

LAPORAN MINGGUAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNG

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG

No Uraian Pekerjaan VOLUME SATUAN BOBOT

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 -

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02

TOTAL I 0.81 0.69

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13

3 Galian tanah level Basement 800.00 m3 0.63 0.63

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.01

5 Urugan pasir bawah lantai 83.85 m3 0.26 -

6 Lantai Kerja 8.05 m3 0.11 0.03

7 Pas. Beton Foot Plat 71.78 m3 3.64 -

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 -

9 Pas. Beton Tangga K 250 4.41 m3 0.35 -

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 -

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 -

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 -

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 -

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 -

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 -

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 -

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 -

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 -

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 -

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 -

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 -

22 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 -

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 -

Sub Total B.I 20.58 1.13

MINGGU LALU

Page 56: Time Schedule Project Ubl

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 -

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 -

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 -

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 -

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 -

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 -

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 -

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 -

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 -

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 -

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 -

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 -

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 -

15 Pas. Plat bondek 760.35 m2 2.40 -

Sub Total B.II 15.45 -

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 -

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 -

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 -

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 -

5 Pas Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 -

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 -

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 -

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 -

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 -

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 -

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 -

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 -

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 -

14 Pas Plat bondek 692.94 m2 2.35 -

Sub Total B.III 15.49 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 -

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 -

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 -

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 -

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 -

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 -

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 -

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 -

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 -

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 -

Page 57: Time Schedule Project Ubl

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 -

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 -

14 Pas. Plat bondek 912.41 m2 3.16 -

Sub Total B.IV 16.62 -

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 -

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 -

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 -

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 -

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 -

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 -

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 -

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 -

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 -

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 -

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 -

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 -

14 Pas. Plat bondek 1,131.88 m2 4.10 -

Sub Total B.V 18.17 -

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 -

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 -

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 -

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 0.05 m3 0.00 -

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 -

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 -

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 -

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 -

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 -

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 -

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 -

13 Pas. Plat bondek 254.15 m2 0.94 -

14 Water proofing 191.08 m2 0.28 -

Sub Total B.VI 8.14 -

TOTAL B 94.45 1.13

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 -

2 2,466.80 kg 1.11 -

3 852.07 kg 0.38 -

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 -

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Page 58: Time Schedule Project Ubl

5 72.00 Bh 0.07 -

6 271.61 kg 0.10 -

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 -

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 -

SUB TOTAL C 4.74 -

TOTAL ### 1.82

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 59: Time Schedule Project Ubl

LAPORAN MINGGUAN

MINGGU KE :

PRIODE :

NILAI

- 0.20 100%

- 0.22 100%

- 0.04 100%

- 0.05 100%

- - 0%

- 0.15 100%

- 0.02 100%

- 0.69

- 0.33 100%

- 0.13 100%

- 0.63 100%

- 0.01 30%

- - 0%

- 0.03 30%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- 1.13

MINGGU INI

S/D MINGGU

INI

Page 60: Time Schedule Project Ubl

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

Page 61: Time Schedule Project Ubl

- - 0%

- - 0%

- - 0%

-

- -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- -

- 1.13

- - 0%

- - 0%

- - 0%

- - 0%

Page 62: Time Schedule Project Ubl

- - 0%

- - 0%

- - 0%

- - 0%

- -

- 1.82

Page 63: Time Schedule Project Ubl

LAPORAN MINGGUAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNG

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG

No Uraian Pekerjaan VOLUME SATUAN BOBOT

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 -

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02

TOTAL I 0.81 0.69

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13

3 Galian tanah level Basement 800.00 m3 0.63 0.63

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.01

5 Urugan pasir bawah lantai 83.85 m3 0.26 -

6 Lantai Kerja 8.05 m3 0.11 0.03

7 Pas. Beton Foot Plat 71.78 m3 3.64 -

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 -

9 Pas. Beton Tangga K 250 4.41 m3 0.35 -

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 -

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 -

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 -

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 -

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 -

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 -

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 -

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 -

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 -

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 -

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 -

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 -

22 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 -

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 -

Sub Total B.I 20.58 1.13

MINGGU LALU

Page 64: Time Schedule Project Ubl

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 -

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 -

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 -

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 -

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 -

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 -

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 -

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 -

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 -

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 -

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 -

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 -

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 -

15 Pas. Plat bondek 760.35 m2 2.40 -

Sub Total B.II 15.45 -

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 -

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 -

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 -

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 -

5 Pas Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 -

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 -

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 -

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 -

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 -

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 -

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 -

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 -

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 -

14 Pas Plat bondek 692.94 m2 2.35 -

Sub Total B.III 15.49 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 -

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 -

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 -

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 -

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 -

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 -

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 -

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 -

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 -

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 -

Page 65: Time Schedule Project Ubl

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 -

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 -

14 Pas. Plat bondek 912.41 m2 3.16 -

Sub Total B.IV 16.62 -

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 -

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 -

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 -

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 -

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 -

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 -

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 -

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 -

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 -

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 -

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 -

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 -

14 Pas. Plat bondek 1,131.88 m2 4.10 -

Sub Total B.V 18.17 -

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 -

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 -

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 -

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 0.05 m3 0.00 -

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 -

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 -

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 -

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 -

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 -

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 -

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 -

13 Pas. Plat bondek 254.15 m2 0.94 -

14 Water proofing 191.08 m2 0.28 -

Sub Total B.VI 8.14 -

TOTAL B 94.45 1.13

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 -

2 2,466.80 kg 1.11 -

3 852.07 kg 0.38 -

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 -

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Page 66: Time Schedule Project Ubl

5 72.00 Bh 0.07 -

6 271.61 kg 0.10 -

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 -

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 -

SUB TOTAL C 4.74 -

TOTAL ### 1.82

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 67: Time Schedule Project Ubl

LAPORAN MINGGUAN

MINGGU KE :

PRIODE :

NILAI

- 0.20 100%

- 0.22 100%

- 0.04 100%

- 0.05 100%

0.12 0.12 100%

- 0.15 100%

- 0.02 100%

0.12 0.81

- 0.33 100%

- 0.13 100%

- 0.63 100%

0.03 0.04 100%

0.26 0.26 100%

0.08 0.11 100%

3.64 3.64 100%

0.30 0.30 100%

- - 0%

0.14 0.14 100%

0.23 0.23 100%

2.38 2.38 100%

0.55 0.55 100%

0.22 0.22 100%

1.89 1.89 100%

4.43 4.43 100%

0.03 0.03 100%

0.16 0.16 100%

0.27 0.27 100%

2.86 2.86 100%

0.13 0.13 100%

- - 0%

- - 0%

17.60 18.73

MINGGU INI

S/D MINGGU

INI

Page 68: Time Schedule Project Ubl

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

0.18 0.18 100%

3.90 3.90 100%

0.42 0.42 100%

0.84 0.84 100%

0.28 0.28 100%

0.10 0.10 100%

0.02 0.02 100%

3.63 3.63 100%

2.40 2.40 100%

11.77 11.77 -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

Page 69: Time Schedule Project Ubl

- - 0%

- - 0%

- - 0%

-

- -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- -

29.37 30.50

- - 0%

- - 0%

- - 0%

- - 0%

Page 70: Time Schedule Project Ubl

- - 0%

- - 0%

- - 0%

- - 0%

- -

29.50 31.31

Page 71: Time Schedule Project Ubl

LAPORAN MINGGUAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNG

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG

No Uraian Pekerjaan VOLUME SATUAN BOBOT

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02

TOTAL I 0.81 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13

3 Galian tanah level Basement 800.00 m3 0.63 0.63

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26

6 Lantai Kerja 8.05 m3 0.11 0.11

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30

9 Pas. Beton Tangga K 250 4.41 m3 0.35 -

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13

MINGGU LALU

Page 72: Time Schedule Project Ubl

22 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 -

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 -

Sub Total B.I 20.58 18.73

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 -

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 -

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 -

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 -

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 -

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63

15 Pas. Plat bondek 760.35 m2 2.40 2.40

Sub Total B.II 15.45 11.77

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 -

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 -

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 -

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 -

5 Pas Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 -

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 -

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 -

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 -

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 -

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 -

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 -

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 -

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 -

14 Pas Plat bondek 692.94 m2 2.35 -

Sub Total B.III 15.49 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 -

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 -

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 -

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 -

Page 73: Time Schedule Project Ubl

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 -

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 -

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 -

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 -

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 -

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 -

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 -

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 -

14 Pas. Plat bondek 912.41 m2 3.16 -

Sub Total B.IV 16.62 -

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 -

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 -

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 -

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 -

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 -

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 -

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 -

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 -

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 -

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 -

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 -

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 -

14 Pas. Plat bondek 1,131.88 m2 4.10 -

Sub Total B.V 18.17 -

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 -

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 -

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 -

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 -

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 0.05 m3 0.00 -

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 -

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 -

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 -

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 -

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 -

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 -

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 -

13 Pas. Plat bondek 254.15 m2 0.94 -

14 Water proofing 191.08 m2 0.28 -

Page 74: Time Schedule Project Ubl

Sub Total B.VI 8.14 -

TOTAL B 94.45 30.50

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 -

2 2,466.80 kg 1.11 -

3 852.07 kg 0.38 -

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 -

5 72.00 Bh 0.07 -

6 271.61 kg 0.10 -

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 -

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 -

SUB TOTAL C 4.74 -

TOTAL ### 31.31

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 75: Time Schedule Project Ubl

LAPORAN MINGGUAN

MINGGU KE :

PRIODE :

NILAI

- 0.20 100%

- 0.22 100%

- 0.04 100%

- 0.05 100%

- 0.12 100%

- 0.15 100%

- 0.02 100%

- 0.81

- 0.33 100%

- 0.13 100%

- 0.63 100%

- 0.04 100%

- 0.26 100%

- 0.11 100%

- 3.64 100%

- 0.30 100%

- - 0%

- 0.14 100%

- 0.23 100%

- 2.38 100%

- 0.55 100%

- 0.22 100%

- 1.89 100%

- 4.43 100%

- 0.03 100%

- 0.16 100%

- 0.27 100%

- 2.86 100%

- 0.13 100%

MINGGU INI

S/D MINGGU

INI

Page 76: Time Schedule Project Ubl

- - 0%

- - 0%

- 18.73

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- 0.18 100%

- 3.90 100%

- 0.42 100%

- 0.84 100%

- 0.28 100%

- 0.10 100%

- 0.02 100%

- 3.63 100%

- 2.40 100%

- 11.77 -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

Page 77: Time Schedule Project Ubl

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

-

- -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- -

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

Page 78: Time Schedule Project Ubl

- -

- 30.50

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

- -

- 31.31

Page 79: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPU MINGGU KE: 11 ( Sebelas )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE :

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 - - - 0%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 25 1.02 m3 0.08 - - - 0%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 - - - 0%

Sub Total B.I 20.58 18.73 - 18.73

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 - 0.18 0.18 50%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 - 0.08 0.08 50%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 - 0.12 0.12 50%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 - 1.35 1.35 50%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - 0.06 0.06 50%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 - 0.04 0.04 50%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 80: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 11.77 1.84 13.61 -

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 - - - 0%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - - - 0%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 - - - 0%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - - 0%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 - - - 0%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 - - - 0%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 - - - 0%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 - - - 0%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 - - - 0%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 - - - 0%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 - - - 0%

14 Pas Plat bondek 692.94 m2 2.35 - - - 0%

Sub Total B.III 15.49 - - - -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 - - - 0%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 - - - 0%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 - - - 0%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 - - - 0%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 - - - 0%

14 Pas. Plat bondek 912.41 m2 3.16 - - - 0%

Sub Total B.IV 16.62 - - -

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 - - - 0%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 - - - 0%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 - - - 0%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 - - - 0%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

Page 81: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 - - - 0%

14 Pas. Plat bondek 1,131.88 m2 4.10 - - - 0%

Sub Total B.V 18.17 - - -

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 0.05 m3 0.00 - - - 0%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 - - - 0%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 - - - 0%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 - - - 0%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 - - - 0%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 - - - 0%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 - - - 0%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 - - - 0%

13 Pas. Plat bondek 254.15 m2 0.94 - - - 0%

14 Water proofing 191.08 m2 0.28 - - - 0%

Sub Total B.VI 8.14 - - -

TOTAL B 94.45 30.50 1.84 32.34

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 - - - 0%

2 2,466.80 kg 1.11 - - - 0%

3 852.07 kg 0.38 - - - 0%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 - - - 0%

5 72.00 Bh 0.07 - - - 0%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 - - - 0%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 - - -

TOTAL ### 31.31 1.84 33.15

Bandar Lampung, 24 Januari 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 82: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPU MINGGU KE : 12 ( Dua Belas )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 15 Jan - 22 Jan 2011

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 - 0.35 0.35 100%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 25 1.02 m3 0.08 - - - 0%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 - - - 0%

Sub Total B.I 20.58 18.73 0.35 19.08

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 0.18 - 0.18 50%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 0.08 0.08 0.15 100%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 0.12 0.12 0.24 100%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 1.35 1.35 2.71 100%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.06 0.06 0.13 100%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 0.04 0.04 0.08 100%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 83: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 13.61 1.66 15.26 -

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 - - - 0%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - - - 0%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 - - - 0%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - - 0%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 - - - 0%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 - - - 0%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 - - - 0%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 - - - 0%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 - - - 0%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 - - - 0%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 - - - 0%

14 Pas Plat bondek 692.94 m2 2.35 - - - 0%

Sub Total B.III 15.49 - - - -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 - - - 0%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 - - - 0%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 - - - 0%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 - - - 0%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 - - - 0%

14 Pas. Plat bondek 912.41 m2 3.16 - - - 0%

Sub Total B.IV 16.62 - - -

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 - - - 0%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 - - - 0%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 - - - 0%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 - - - 0%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

Page 84: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 - - - 0%

14 Pas. Plat bondek 1,131.88 m2 4.10 - - - 0%

Sub Total B.V 18.17 - - -

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 0.05 m3 0.00 - - - 0%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 - - - 0%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 - - - 0%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 - - - 0%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 - - - 0%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 - - - 0%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 - - - 0%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 - - - 0%

13 Pas. Plat bondek 254.15 m2 0.94 - - - 0%

14 Water proofing 191.08 m2 0.28 - - - 0%

Sub Total B.VI 8.14 - - -

TOTAL B 94.45 32.34 2.00 34.34

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 - - - 0%

2 2,466.80 kg 1.11 - - - 0%

3 852.07 kg 0.38 - - - 0%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 - - - 0%

5 72.00 Bh 0.07 - - - 0%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 - - - 0%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 - - -

TOTAL ### 33.15 2.00 35.16

Bandar Lampung, 24 Januari 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 85: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPU MINGGU KE : 13 ( Tiga Belas )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 23 Jan - 29 Jan 2011

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 0.35 - 0.35 100%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 25 1.02 m3 0.08 - - - 0%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 - - - 0%

Sub Total B.I 20.58 19.08 - 19.08

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 0.18 0.09 0.27 75%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 0.15 - 0.15 100%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 0.24 - 0.24 100%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 2.71 - 2.71 100%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 0.08 - 0.08 100%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 86: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 15.26 0.09 15.36 -

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 - - - 0%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - - - 0%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 - - - 0%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - - 0%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 - - - 0%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 - - - 0%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 - - - 0%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 - - - 0%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 - - - 0%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 - - - 0%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 - - - 0%

14 Pas Plat bondek 692.94 m2 2.35 - - - 0%

Sub Total B.III 15.49 - - - -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 - - - 0%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 - - - 0%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 - - - 0%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 - - - 0%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 - - - 0%

14 Pas. Plat bondek 912.41 m2 3.16 - - - 0%

Sub Total B.IV 16.62 - - -

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 - - - 0%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 - - - 0%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 - - - 0%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 - - - 0%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

Page 87: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 - - - 0%

14 Pas. Plat bondek 1,131.88 m2 4.10 - - - 0%

Sub Total B.V 18.17 - - -

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 0.05 m3 0.00 - - - 0%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 - - - 0%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 - - - 0%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 - - - 0%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 - - - 0%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 - - - 0%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 - - - 0%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 - - - 0%

13 Pas. Plat bondek 254.15 m2 0.94 - - - 0%

14 Water proofing 191.08 m2 0.28 - - - 0%

Sub Total B.VI 8.14 - - -

TOTAL B 94.45 34.34 0.09 34.44

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 - - - 0%

2 2,466.80 kg 1.11 - - - 0%

3 852.07 kg 0.38 - - - 0%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 - - - 0%

5 72.00 Bh 0.07 - - - 0%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 - - - 0%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 - - -

TOTAL ### 35.16 0.09 35.25

Bandar Lampung, 29 Januari 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 88: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPU MINGGU KE : 14 ( Empat Belas )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 30 Jan - 5 Feb 2011

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 0.35 - 0.35 100%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 25 1.02 m3 0.08 - - - 0%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 - - - 0%

Sub Total B.I 20.58 19.08 - 19.08

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 0.27 - 0.27 75%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 0.15 - 0.15 100%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 0.24 - 0.24 100%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 2.71 - 2.71 100%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 0.08 - 0.08 100%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 89: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 15.36 - 15.36 -

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 - - - 0%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - - - 0%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 - - - 0%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - - 0%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 - - - 0%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 - - - 0%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 - - - 0%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 - - - 0%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 - - - 0%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 - - - 0%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 - - - 0%

14 Pas Plat bondek 692.94 m2 2.35 - - - 0%

Sub Total B.III 15.49 - - - -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 - - - 0%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 - - - 0%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 - - - 0%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 - - - 0%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 - - - 0%

14 Pas. Plat bondek 912.41 m2 3.16 - - - 0%

Sub Total B.IV 16.62 - - -

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 - - - 0%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 - - - 0%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 - - - 0%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 - - - 0%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

Page 90: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 - - - 0%

14 Pas. Plat bondek 1,131.88 m2 4.10 - - - 0%

Sub Total B.V 18.17 - - -

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 0.05 m3 0.00 - - - 0%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 - - - 0%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 - - - 0%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 - - - 0%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 - - - 0%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 - - - 0%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 - - - 0%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 - - - 0%

13 Pas. Plat bondek 254.15 m2 0.94 - - - 0%

14 Water proofing 191.08 m2 0.28 - - - 0%

Sub Total B.VI 8.14 - - -

TOTAL B 94.45 34.44 - 34.44

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 - - - 0%

2 2,466.80 kg 1.11 - - - 0%

3 852.07 kg 0.38 - - - 0%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 - - - 0%

5 72.00 Bh 0.07 - - - 0%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 - - - 0%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 - - -

TOTAL ### 35.25 - 35.25

Bandar Lampung, 5 Februari 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 91: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPU MINGGU KE : 15 ( Lima Belas )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 6 Feb - 12 Feb 2011

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 0.35 - 0.35 100%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 25 1.02 m3 0.08 - - - 0%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 - - - 0%

Sub Total B.I 20.58 19.08 - 19.08

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 0.27 - 0.27 75%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 0.15 - 0.15 100%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 0.24 - 0.24 100%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 2.71 - 2.71 100%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 0.08 - 0.08 100%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 92: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 15.36 - 15.36 -

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 - - - 0%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - - - 0%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 - - - 0%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - - 0%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 - - - 0%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 - - - 0%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 - - - 0%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 - - - 0%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 - - - 0%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 - - - 0%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 - - - 0%

14 Pas Plat bondek 692.94 m2 2.35 - - - 0%

Sub Total B.III 15.49 - - - -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 - - - 0%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 - - - 0%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 - - - 0%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 - - - 0%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 - - - 0%

14 Pas. Plat bondek 912.41 m2 3.16 - - - 0%

Sub Total B.IV 16.62 - - -

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 - - - 0%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 - - - 0%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 - - - 0%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 - - - 0%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

Page 93: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 - - - 0%

14 Pas. Plat bondek 1,131.88 m2 4.10 - - - 0%

Sub Total B.V 18.17 - - -

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 0.05 m3 0.00 - - - 0%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 - - - 0%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 - - - 0%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 - - - 0%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 - - - 0%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 - - - 0%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 - - - 0%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 - - - 0%

13 Pas. Plat bondek 254.15 m2 0.94 - - - 0%

14 Water proofing 191.08 m2 0.28 - - - 0%

Sub Total B.VI 8.14 - - -

TOTAL B 94.45 34.44 - 34.44

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 - - - 0%

2 2,466.80 kg 1.11 - - - 0%

3 852.07 kg 0.38 - - - 0%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 - - - 0%

5 72.00 Bh 0.07 - - - 0%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 - - - 0%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 - - -

TOTAL ### 35.25 - 35.25

Bandar Lampung, 12 Februari 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 94: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPU MINGGU KE : 16 ( Enam Belas )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 13 Feb - 19 Feb 2011

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 0.35 - 0.35 100%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 25 1.02 m3 0.08 - - - 0%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 - - - 0%

Sub Total B.I 20.58 19.08 - 19.08

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 0.27 - 0.27 75%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 0.15 - 0.15 100%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 0.24 - 0.24 100%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 2.71 - 2.71 100%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 0.08 - 0.08 100%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 95: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 15.36 - 15.36 -

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 - - - 0%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - - - 0%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 - - - 0%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - - 0%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 - - - 0%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 - 0.06 0.06 30%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 - 1.20 1.20 30%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 - 0.13 0.13 30%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 - 0.26 0.26 30%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 - 0.09 0.09 30%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - 0.03 0.03 30%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - 0.01 0.01 30%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 - - - 0%

14 Pas Plat bondek 692.94 m2 2.35 - - - 0%

Sub Total B.III 15.49 - 1.76 1.76 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 - - - 0%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 - - - 0%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 - - - 0%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 - - - 0%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 - - - 0%

14 Pas. Plat bondek 912.41 m2 3.16 - - - 0%

Sub Total B.IV 16.62 - - -

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 - - - 0%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 - - - 0%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 - - - 0%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 - - - 0%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

Page 96: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 - - - 0%

14 Pas. Plat bondek 1,131.88 m2 4.10 - - - 0%

Sub Total B.V 18.17 - - -

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 0.05 m3 0.00 - - - 0%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 - - - 0%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 - - - 0%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 - - - 0%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 - - - 0%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 - - - 0%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 - - - 0%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 - - - 0%

13 Pas. Plat bondek 254.15 m2 0.94 - - - 0%

14 Water proofing 191.08 m2 0.28 - - - 0%

Sub Total B.VI 8.14 - - -

TOTAL B 94.45 34.44 1.76 36.20

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 - - - 0%

2 2,466.80 kg 1.11 - - - 0%

3 852.07 kg 0.38 - - - 0%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 - - - 0%

5 72.00 Bh 0.07 - - - 0%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 - - - 0%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 - - -

TOTAL ### 35.25 1.76 37.01

Bandar Lampung, 19 Februari 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 97: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPU MINGGU KE : 17 ( Tujuh Belas )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 20 Feb - 26 Feb 2011

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 0.35 - 0.35 100%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 25 1.02 m3 0.08 - - - 0%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 - - - 0%

Sub Total B.I 20.58 19.08 - 19.08

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 0.27 - 0.27 75%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 0.15 - 0.15 100%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 0.24 - 0.24 100%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 2.71 - 2.71 100%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 0.08 - 0.08 100%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 15.36 - 15.36 -

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 98: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 - - - 0%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - - - 0%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 - - - 0%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - - 0%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 - - - 0%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.06 0.04 0.09 50%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 1.20 0.80 2.00 50%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.13 0.09 0.21 50%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 0.26 0.17 0.43 50%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 0.09 0.06 0.14 50%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.03 0.02 0.05 50%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.01 0.00 0.01 50%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 - 1.88 1.88 50%

14 Pas Plat bondek 692.94 m2 2.35 - 2.35 2.35 100%

Sub Total B.III 15.49 1.76 5.40 7.16 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 - - - 0%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 - - - 0%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 - - - 0%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 - - - 0%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 - - - 0%

14 Pas. Plat bondek 912.41 m2 3.16 - - - 0%

Sub Total B.IV 16.62 - - -

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 - - - 0%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 - - - 0%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 - - - 0%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 - - - 0%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 - - - 0%

14 Pas. Plat bondek 1,131.88 m2 4.10 - - - 0%

Sub Total B.V 18.17 - - -

Page 99: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 0.05 m3 0.00 - - - 0%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 - - - 0%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 - - - 0%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 - - - 0%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 - - - 0%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 - - - 0%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 - - - 0%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 - - - 0%

13 Pas. Plat bondek 254.15 m2 0.94 - - - 0%

14 Water proofing 191.08 m2 0.28 - - - 0%

Sub Total B.VI 8.14 - - -

TOTAL B 94.45 36.20 5.40 41.60

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 - - - 0%

2 2,466.80 kg 1.11 - - - 0%

3 852.07 kg 0.38 - - - 0%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 - - - 0%

5 72.00 Bh 0.07 - - - 0%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 - - - 0%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 - - -

TOTAL ### 37.01 5.40 42.41

Bandar Lampung, 26 Februari 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 100: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPU MINGGU KE : 18 ( Delapan Belas )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 27 Feb - 5 Mar 2011

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 0.35 - 0.35 100%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 25 1.02 m3 0.08 - - - 0%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 - - - 0%

Sub Total B.I 20.58 19.08 - 19.08

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 0.27 - 0.27 75%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 0.15 - 0.15 100%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 0.24 - 0.24 100%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 2.71 - 2.71 100%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 0.08 - 0.08 100%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 15.36 - 15.36 -

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 101: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 - - - 0%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - - - 0%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 - - - 0%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - - 0%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 - - - 0%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.09 0.05 0.14 75%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 2.00 1.00 2.99 75%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.21 0.11 0.32 75%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 0.43 0.21 0.64 75%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 0.14 0.07 0.22 75%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.05 0.03 0.08 75%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.01 0.00 0.01 75%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 1.88 0.94 2.82 75%

14 Pas Plat bondek 692.94 m2 2.35 2.35 - 2.35 100%

Sub Total B.III 15.49 7.16 2.41 9.57 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 - - - 0%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 - - - 0%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 - - - 0%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 - - - 0%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 - - - 0%

14 Pas. Plat bondek 912.41 m2 3.16 - - - 0%

Sub Total B.IV 16.62 - - -

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 - - - 0%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 - - - 0%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 - - - 0%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 - - - 0%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 - - - 0%

14 Pas. Plat bondek 1,131.88 m2 4.10 - - - 0%

Sub Total B.V 18.17 - - -

Page 102: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 0.05 m3 0.00 - - - 0%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 - - - 0%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 - - - 0%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 - - - 0%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 - - - 0%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 - - - 0%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 - - - 0%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 - - - 0%

13 Pas. Plat bondek 254.15 m2 0.94 - - - 0%

14 Water proofing 191.08 m2 0.28 - - - 0%

Sub Total B.VI 8.14 - - -

TOTAL B 94.45 41.60 2.41 44.01

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 - - - 0%

2 2,466.80 kg 1.11 - - - 0%

3 852.07 kg 0.38 - - - 0%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 - - - 0%

5 72.00 Bh 0.07 - - - 0%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 - - - 0%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 - - -

TOTAL ### 42.41 2.41 44.82

Bandar Lampung, 5 Maret 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 103: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPU MINGGU KE : 19 ( Sembilan Belas )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 6 Mar - 12 Mar 2011

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 0.35 - 0.35 100%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 25 1.02 m3 0.08 - - - 0%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 - - - 0%

Sub Total B.I 20.58 19.08 - 19.08

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 0.27 - 0.27 75%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 0.15 - 0.15 100%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 0.24 - 0.24 100%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 2.71 - 2.71 100%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 0.08 - 0.08 100%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 15.36 - 15.36 -

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 104: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 - - - 0%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - - - 0%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 - - - 0%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - - 0%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 - - - 0%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.14 - 0.14 75%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 2.99 - 2.99 75%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.32 - 0.32 75%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 0.64 - 0.64 75%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 0.22 - 0.22 75%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.08 - 0.08 75%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.01 - 0.01 75%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 2.82 - 2.82 75%

14 Pas Plat bondek 692.94 m2 2.35 2.35 - 2.35 100%

Sub Total B.III 15.49 9.57 - 9.57 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 - - - 0%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 - - - 0%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 - - - 0%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 - - - 0%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 - - - 0%

14 Pas. Plat bondek 912.41 m2 3.16 - - - 0%

Sub Total B.IV 16.62 - - -

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 - - - 0%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 - - - 0%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 - - - 0%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 - - - 0%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 - - - 0%

14 Pas. Plat bondek 1,131.88 m2 4.10 - - - 0%

Sub Total B.V 18.17 - - -

Page 105: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 0.05 m3 0.00 - - - 0%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 - - - 0%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 - - - 0%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 - - - 0%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 - - - 0%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 - - - 0%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 - - - 0%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 - - - 0%

13 Pas. Plat bondek 254.15 m2 0.94 - - - 0%

14 Water proofing 191.08 m2 0.28 - - - 0%

Sub Total B.VI 8.14 - - -

TOTAL B 94.45 44.01 - 44.01

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 - - - 0%

2 2,466.80 kg 1.11 - - - 0%

3 852.07 kg 0.38 - - - 0%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 - - - 0%

5 72.00 Bh 0.07 - - - 0%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 - - - 0%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 - - -

TOTAL ### 44.82 - 44.82

Bandar Lampung, 12 Maret 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 106: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPU MINGGU KE : 20 ( Dua Puluh )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 13 Mar - 19 Mar 2011

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 0.35 - 0.35 100%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 25 1.02 m3 0.08 - - - 0%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 - - - 0%

Sub Total B.I 20.58 19.08 - 19.08

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 0.27 - 0.27 75%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 0.15 - 0.15 100%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 0.24 - 0.24 100%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 2.71 - 2.71 100%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 0.08 - 0.08 100%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 15.36 - 15.36 -

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 107: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 - - - 0%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - - - 0%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 - - - 0%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - - 0%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 - - - 0%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.14 - 0.14 75%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 2.99 - 2.99 75%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.32 - 0.32 75%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 0.64 - 0.64 75%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 0.22 - 0.22 75%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.08 - 0.08 75%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.01 - 0.01 75%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 2.82 - 2.82 75%

14 Pas Plat bondek 692.94 m2 2.35 2.35 - 2.35 100%

Sub Total B.III 15.49 9.57 - 9.57 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 - - - 0%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 - - - 0%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 - - - 0%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 - - - 0%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 - - - 0%

14 Pas. Plat bondek 912.41 m2 3.16 - - - 0%

Sub Total B.IV 16.62 - - -

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 - - - 0%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 - - - 0%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 - - - 0%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 - - - 0%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 - - - 0%

14 Pas. Plat bondek 1,131.88 m2 4.10 - - - 0%

Sub Total B.V 18.17 - - -

Page 108: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 0.05 m3 0.00 - - - 0%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 - - - 0%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 - - - 0%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 - - - 0%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 - - - 0%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 - - - 0%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 - - - 0%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 - - - 0%

13 Pas. Plat bondek 254.15 m2 0.94 - - - 0%

14 Water proofing 191.08 m2 0.28 - - - 0%

Sub Total B.VI 8.14 - - -

TOTAL B 94.45 44.01 - 44.01

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 - - - 0%

2 2,466.80 kg 1.11 - - - 0%

3 852.07 kg 0.38 - - - 0%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 - - - 0%

5 72.00 Bh 0.07 - - - 0%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 - - - 0%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 - - -

TOTAL ### 44.82 - 44.82

Bandar Lampung, 19 Maret 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 109: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUN MINGGU KE : 21 ( Dua Puluh Satu )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 20 Mar - 26 Mar 2011

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 0.35 - 0.35 100%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 25 1.02 m3 0.08 - - - 0%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 - - - 0%

Sub Total B.I 20.58 19.08 - 19.08

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 0.27 - 0.27 75%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 0.15 - 0.15 100%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 0.24 - 0.24 100%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 2.71 - 2.71 100%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 0.08 - 0.08 100%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 15.36 - 15.36 -

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 110: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 - 0.09 0.09 25%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - 0.08 0.08 50%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 - 1.39 1.39 50%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - 0.06 0.06 50%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 2 1.02 m3 0.08 - 0.01 0.01 15%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.14 0.05 0.19 100%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 2.99 1.00 3.99 100%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.32 0.11 0.43 100%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 0.64 0.21 0.86 100%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 0.22 0.07 0.29 100%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.08 0.03 0.11 100%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.01 0.00 0.02 100%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 2.82 0.94 3.75 100%

14 Pas Plat bondek 692.94 m2 2.35 2.35 - 2.35 100%

Sub Total B.III 15.49 9.57 4.04 13.61 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 - - - 0%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 - - - 0%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 - - - 0%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 - - - 0%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 - - - 0%

14 Pas. Plat bondek 912.41 m2 3.16 - - - 0%

Sub Total B.IV 16.62 - - -

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 - - - 0%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 - - - 0%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 - - - 0%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 - - - 0%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 - - - 0%

14 Pas. Plat bondek 1,131.88 m2 4.10 - - - 0%

Sub Total B.V 18.17 - - -

Page 111: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 0.05 m3 0.00 - - - 0%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 - - - 0%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 - - - 0%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 - - - 0%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 - - - 0%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 - - - 0%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 - - - 0%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 - - - 0%

13 Pas. Plat bondek 254.15 m2 0.94 - - - 0%

14 Water proofing 191.08 m2 0.28 - - - 0%

Sub Total B.VI 8.14 - - -

TOTAL B 94.45 44.01 4.04 48.05

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 - - - 0%

2 2,466.80 kg 1.11 - - - 0%

3 852.07 kg 0.38 - - - 0%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 - - - 0%

5 72.00 Bh 0.07 - - - 0%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 - - - 0%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 - - -

TOTAL ### 44.82 4.04 48.86

Bandar Lampung, 26 Maret 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 112: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUN MINGGU KE : 22 ( Dua Puluh Dua )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 27 Mar - 2 April 2011

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 0.35 - 0.35 100%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 25 1.02 m3 0.08 - - - 0%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 - - - 0%

Sub Total B.I 20.58 19.08 - 19.08

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 0.27 - 0.27 75%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 0.15 - 0.15 100%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 0.24 - 0.24 100%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 2.71 - 2.71 100%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 0.08 - 0.08 100%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 15.36 - 15.36 -

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 113: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 0.09 - 0.09 25%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.08 0.08 0.16 100%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 1.39 1.39 2.77 100%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.06 0.06 0.13 100%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 2 1.02 m3 0.08 0.01 0.07 0.08 100%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 3.99 - 3.99 100%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 0.86 - 0.86 100%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 0.29 - 0.29 100%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 3.75 - 3.75 100%

14 Pas Plat bondek 692.94 m2 2.35 2.35 - 2.35 100%

Sub Total B.III 15.49 13.61 1.60 15.21 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 - - - 0%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 - - - 0%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 - - - 0%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 - - - 0%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 - - - 0%

14 Pas. Plat bondek 912.41 m2 3.16 - - - 0%

Sub Total B.IV 16.62 - - -

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 - - - 0%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 - - - 0%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 - - - 0%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 - - - 0%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 - - - 0%

14 Pas. Plat bondek 1,131.88 m2 4.10 - - - 0%

Sub Total B.V 18.17 - - -

Page 114: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 0.05 m3 0.00 - - - 0%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 - - - 0%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 - - - 0%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 - - - 0%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 - - - 0%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 - - - 0%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 - - - 0%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 - - - 0%

13 Pas. Plat bondek 254.15 m2 0.94 - - - 0%

14 Water proofing 191.08 m2 0.28 - - - 0%

Sub Total B.VI 8.14 - - -

TOTAL B 94.45 48.05 1.60 49.65

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 - - - 0%

2 2,466.80 kg 1.11 - - - 0%

3 852.07 kg 0.38 - - - 0%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 - - - 0%

5 72.00 Bh 0.07 - - - 0%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 - - - 0%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 - - -

TOTAL ### 48.86 1.60 50.46

Bandar Lampung, 2 April 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 115: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNGMINGGU KE : 23 ( Dua Puluh Tiga )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 3 April - 9 April 2011

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 0.35 - 0.35 100%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 25 1.02 m3 0.08 - - - 0%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 - - - 0%

Sub Total B.I 20.58 19.08 - 19.08

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 0.27 - 0.27 75%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 0.15 - 0.15 100%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 0.24 - 0.24 100%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 2.71 - 2.71 100%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.08 0.08 - 0.08 100%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 15.36 - 15.36 -

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 116: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 0.09 - 0.09 25%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 2.77 - 2.77 100%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 2 1.02 m3 0.08 0.08 - 0.08 100%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 3.99 - 3.99 100%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 0.86 - 0.86 100%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 0.29 - 0.29 100%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 3.75 - 3.75 100%

14 Pas Plat bondek 692.94 m2 2.35 2.35 - 2.35 100%

Sub Total B.III 15.49 15.21 - 15.21 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 - 0.05 0.05 25%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 - 1.02 1.02 25%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 - 0.11 0.11 25%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 - 0.22 0.22 25%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 - 0.06 0.06 20%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - 0.02 0.02 20%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - 0.00 0.00 20%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 - - - 0%

14 Pas. Plat bondek 912.41 m2 3.16 - - - 0%

Sub Total B.IV 16.62 - 1.48 1.48

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 - - - 0%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 - - - 0%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 - - - 0%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 - - - 0%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 - - - 0%

14 Pas. Plat bondek 1,131.88 m2 4.10 - - - 0%

Sub Total B.V 18.17 - - -

Page 117: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 0.05 m3 0.00 - - - 0%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 - - - 0%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 - - - 0%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 - - - 0%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 - - - 0%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 - - - 0%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 - - - 0%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 - - - 0%

13 Pas. Plat bondek 254.15 m2 0.94 - - - 0%

14 Water proofing 191.08 m2 0.28 - - - 0%

Sub Total B.VI 8.14 - - -

TOTAL B 94.45 49.65 1.48 51.13

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 - - - 0%

2 2,466.80 kg 1.11 - - - 0%

3 852.07 kg 0.38 - - - 0%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 - - - 0%

5 72.00 Bh 0.07 - - - 0%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 - - - 0%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 - - -

TOTAL 100.00 50.46 1.48 51.94

Bandar Lampung, 9 April 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 118: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNG MINGGU KE : 24 ( Dua Puluh Empat )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 10 April - 16 April 2011

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 0.35 - 0.35 100%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 250 1.02 m3 0.08 - - - 0%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 - - - 0%

Sub Total B.I 20.58 19.08 - 19.08

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 0.27 - 0.27 75%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 0.15 - 0.15 100%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 0.24 - 0.24 100%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 2.71 - 2.71 100%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 15.36 - 15.36 -

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 119: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 0.09 - 0.09 25%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 2.77 - 2.77 100%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 3.99 - 3.99 100%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 0.86 - 0.86 100%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 0.29 - 0.29 100%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 3.75 - 3.75 100%

14 Pas Plat bondek 692.94 m2 2.35 2.35 - 2.35 100%

Sub Total B.III 15.49 15.21 - 15.21 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.05 0.04 0.09 45%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 1.02 0.82 1.84 45%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.11 0.09 0.20 45%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 0.22 0.18 0.40 45%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 0.06 0.06 0.12 40%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.02 0.02 0.04 40%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.00 0.00 0.01 35%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 - - - 0%

14 Pas. Plat bondek 912.41 m2 3.16 - - - 0%

Sub Total B.IV 16.62 1.48 1.20 2.68

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 - - - 0%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 - - - 0%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 - - - 0%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 - - - 0%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 - - - 0%

14 Pas. Plat bondek 1,131.88 m2 4.10 - - - 0%

Sub Total B.V 18.17 - - -

Page 120: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 0.05 m3 0.00 - - - 0%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 - - - 0%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 - - - 0%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 - - - 0%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 - - - 0%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 - - - 0%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 - - - 0%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 - - - 0%

13 Pas. Plat bondek 254.15 m2 0.94 - - - 0%

14 Water proofing 191.08 m2 0.28 - - - 0%

Sub Total B.VI 8.14 - - -

TOTAL B 94.45 51.13 1.20 52.33

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 - - - 0%

2 2,466.80 kg 1.11 - - - 0%

3 852.07 kg 0.38 - - - 0%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 - - - 0%

5 72.00 Bh 0.07 - - - 0%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 - - - 0%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 - - -

TOTAL 100.00 51.94 1.20 53.15

Bandar Lampung, 16 April 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 121: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNG MINGGU KE : 25 ( Dua Puluh Lima )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 17 April - 23 April 2011

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 0.35 - 0.35 100%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 250 1.02 m3 0.08 - - - 0%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 - - - 0%

Sub Total B.I 20.58 19.08 - 19.08

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 0.27 - 0.27 75%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 0.15 - 0.15 100%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 0.24 - 0.24 100%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 2.71 - 2.71 100%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 15.36 - 15.36 -

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 122: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 0.09 0.04 0.13 35%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 2.77 - 2.77 100%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 3.99 - 3.99 100%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 0.86 - 0.86 100%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 0.29 - 0.29 100%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 3.75 - 3.75 100%

14 Pas Plat bondek 692.94 m2 2.35 2.35 - 2.35 100%

Sub Total B.III 15.49 15.21 0.04 15.25 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.09 0.01 0.10 50%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 1.84 0.20 2.04 50%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.20 0.02 0.22 50%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 0.40 0.04 0.44 50%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 0.12 0.03 0.15 50%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.04 0.01 0.05 50%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.01 0.00 0.01 45%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 - - - 0%

14 Pas. Plat bondek 912.41 m2 3.16 - - - 0%

Sub Total B.IV 16.62 2.68 0.32 3.01

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 - - - 0%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 - - - 0%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 - - - 0%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 - - - 0%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 - - - 0%

14 Pas. Plat bondek 1,131.88 m2 4.10 - - - 0%

Sub Total B.V 18.17 - - -

Page 123: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 0.05 m3 0.00 - - - 0%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 - - - 0%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 - - - 0%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 - - - 0%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 - - - 0%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 - - - 0%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 - - - 0%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 - - - 0%

13 Pas. Plat bondek 254.15 m2 0.94 - - - 0%

14 Water proofing 191.08 m2 0.28 - - - 0%

Sub Total B.VI 8.14 - - -

TOTAL B 94.45 52.33 0.36 52.69

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 - - - 0%

2 2,466.80 kg 1.11 - - - 0%

3 852.07 kg 0.38 - - - 0%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 - - - 0%

5 72.00 Bh 0.07 - - - 0%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 - - - 0%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 - - -

TOTAL 100.00 53.15 0.36 53.51

Bandar Lampung, 23 April 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 124: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNG MINGGU KE : 26 ( Dua Puluh Enam )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 24 April - 30 April 2011

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 0.35 - 0.35 100%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 250 1.02 m3 0.08 - - - 0%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 - - - 0%

Sub Total B.I 20.58 19.08 - 19.08

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 0.27 - 0.27 75%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 0.15 - 0.15 100%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 0.24 - 0.24 100%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 2.71 - 2.71 100%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 15.36 - 15.36 -

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 125: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 0.13 - 0.13 35%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 2.77 - 2.77 100%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 3.99 - 3.99 100%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 0.86 - 0.86 100%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 0.29 - 0.29 100%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 3.75 - 3.75 100%

14 Pas Plat bondek 692.94 m2 2.35 2.35 - 2.35 100%

Sub Total B.III 15.49 15.25 - 15.25 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.10 0.10 0.19 100%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 2.04 2.04 4.09 100%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.22 0.22 0.43 100%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 0.44 0.44 0.88 100%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 0.15 0.15 0.30 100%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.05 0.05 0.11 100%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.01 0.01 0.02 100%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 - 3.84 3.84 100%

14 Pas. Plat bondek 912.41 m2 3.16 - 3.16 3.16 100%

Sub Total B.IV 16.62 3.01 10.01 13.02

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 - - - 0%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 - - - 0%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 - - - 0%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 - - - 0%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 - - - 0%

14 Pas. Plat bondek 1,131.88 m2 4.10 - - - 0%

Sub Total B.V 18.17 - - -

Page 126: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 0.05 m3 0.00 - - - 0%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 - - - 0%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 - - - 0%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 - - - 0%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 - - - 0%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 - - - 0%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 - - - 0%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 - - - 0%

13 Pas. Plat bondek 254.15 m2 0.94 - - - 0%

14 Water proofing 191.08 m2 0.28 - - - 0%

Sub Total B.VI 8.14 - - -

TOTAL B 94.45 52.69 10.01 62.70

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 - - - 0%

2 2,466.80 kg 1.11 - - - 0%

3 852.07 kg 0.38 - - - 0%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 - - - 0%

5 72.00 Bh 0.07 - - - 0%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 - - - 0%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 - - -

TOTAL 100.00 53.51 10.01 63.52

Bandar Lampung, 30 April 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 127: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNG MINGGU KE : 27 ( Dua Puluh Tujuh )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 1 Mei - 7 Mei 2011

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 0.35 - 0.35 100%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 250 1.02 m3 0.08 - - - 0%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 - - - 0%

Sub Total B.I 20.58 19.08 - 19.08

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 0.27 - 0.27 75%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 0.15 - 0.15 100%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 0.24 - 0.24 100%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 2.71 - 2.71 100%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 15.36 - 15.36 -

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 128: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 0.13 - 0.13 35%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 2.77 - 2.77 100%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 3.99 - 3.99 100%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 0.86 - 0.86 100%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 0.29 - 0.29 100%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 3.75 - 3.75 100%

14 Pas Plat bondek 692.94 m2 2.35 2.35 - 2.35 100%

Sub Total B.III 15.49 15.25 - 15.25 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 - 0.08 0.08 50%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 - 1.42 1.42 50%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 - 0.07 0.07 50%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 - 0.01 0.01 15%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 4.09 - 4.09 100%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 0.88 - 0.88 100%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 0.30 - 0.30 100%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 3.84 - 3.84 100%

14 Pas. Plat bondek 912.41 m2 3.16 3.16 - 3.16 100%

Sub Total B.IV 16.62 13.02 1.58 14.60

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 - - - 0%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 - - - 0%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 - - - 0%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 - - - 0%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - - - 0%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - - - 0%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 - - - 0%

14 Pas. Plat bondek 1,131.88 m2 4.10 - - - 0%

Sub Total B.V 18.17 - - -

Page 129: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 0.05 m3 0.00 - - - 0%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 - - - 0%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 - - - 0%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 - - - 0%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 - - - 0%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 - - - 0%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 - - - 0%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 - - - 0%

13 Pas. Plat bondek 254.15 m2 0.94 - - - 0%

14 Water proofing 191.08 m2 0.28 - - - 0%

Sub Total B.VI 8.14 - - -

TOTAL B 94.45 62.70 1.58 64.28

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 - - - 0%

2 2,466.80 kg 1.11 - - - 0%

3 852.07 kg 0.38 - - - 0%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 - - - 0%

5 72.00 Bh 0.07 - - - 0%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 - - - 0%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 - - -

TOTAL 100.00 63.52 1.58 65.09

Bandar Lampung, 7 Mei 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 130: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNG MINGGU KE : 28 ( Dua Puluh Delapan )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 8 Mei - 14 Mei 2011

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 0.35 - 0.35 100%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 250 1.02 m3 0.08 - - - 0%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 - - - 0%

Sub Total B.I 20.58 19.08 - 19.08

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 0.27 - 0.27 75%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 0.15 - 0.15 100%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 0.24 - 0.24 100%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 2.71 - 2.71 100%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 15.36 - 15.36 -

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 131: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 0.13 - 0.13 35%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 2.77 - 2.77 100%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 3.99 - 3.99 100%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 0.86 - 0.86 100%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 0.29 - 0.29 100%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 3.75 - 3.75 100%

14 Pas Plat bondek 692.94 m2 2.35 2.35 - 2.35 100%

Sub Total B.III 15.49 15.25 - 15.25 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.08 0.08 0.16 100%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 1.42 1.42 2.84 100%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.07 0.07 0.13 100%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 0.01 - 0.01 15%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 4.09 - 4.09 100%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 0.88 - 0.88 100%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 0.30 - 0.30 100%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 3.84 - 3.84 100%

14 Pas. Plat bondek 912.41 m2 3.16 3.16 - 3.16 100%

Sub Total B.IV 16.62 14.60 1.56 16.16

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 - 1.07 1.07 25%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 - 0.11 0.11 25%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 - 0.23 0.23 25%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 - 0.08 0.08 25%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 - 0.03 0.03 25%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 - 0.00 0.00 25%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 - - - 0%

14 Pas. Plat bondek 1,131.88 m2 4.10 - - - 0%

Sub Total B.V 18.17 - 1.52 1.52

Page 132: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 0.05 m3 0.00 - - - 0%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 - - - 0%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 - - - 0%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 - - - 0%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 - - - 0%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 - - - 0%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 - - - 0%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 - - - 0%

13 Pas. Plat bondek 254.15 m2 0.94 - - - 0%

14 Water proofing 191.08 m2 0.28 - - - 0%

Sub Total B.VI 8.14 - - -

TOTAL B 94.45 64.28 3.09 67.37

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 - - - 0%

2 2,466.80 kg 1.11 - - - 0%

3 852.07 kg 0.38 - - - 0%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 - - - 0%

5 72.00 Bh 0.07 - - - 0%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 - - - 0%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 - - -

TOTAL 100.00 65.09 3.09 68.18

Bandar Lampung, 14 Mei 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 133: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNG MINGGU KE : 28 ( Dua Puluh Sembilan )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 15 Mei - 21 Mei 2011

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 0.35 - 0.35 100%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 250 1.02 m3 0.08 - - - 0%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 - - - 0%

Sub Total B.I 20.58 19.08 - 19.08

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 0.27 0.09 0.36 100%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 0.15 - 0.15 100%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 0.24 - 0.24 100%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 2.71 - 2.71 100%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 15.36 0.09 15.45 -

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 134: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 0.13 0.24 0.37 100%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 2.77 - 2.77 100%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 3.99 - 3.99 100%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 0.86 - 0.86 100%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 0.29 - 0.29 100%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 3.75 - 3.75 100%

14 Pas Plat bondek 692.94 m2 2.35 2.35 - 2.35 100%

Sub Total B.III 15.49 15.25 0.24 15.49 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 - 0.10 0.10 25%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 2.84 - 2.84 100%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 0.01 - 0.01 15%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 4.09 - 4.09 100%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 0.88 - 0.88 100%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 0.30 - 0.30 100%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 3.84 - 3.84 100%

14 Pas. Plat bondek 912.41 m2 3.16 3.16 - 3.16 100%

Sub Total B.IV 16.62 16.16 0.10 16.26

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 1.07 1.07 2.14 50%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 0.11 0.11 0.23 50%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 0.23 0.23 0.46 50%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 0.08 0.08 0.15 50%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.03 0.03 0.06 50%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.00 0.00 0.01 50%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 - - - 0%

14 Pas. Plat bondek 1,131.88 m2 4.10 - - - 0%

Sub Total B.V 18.17 1.52 1.52 3.04

Page 135: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 0.05 m3 0.00 - - - 0%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 - - - 0%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 - - - 0%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 - - - 0%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 - - - 0%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 - - - 0%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 - - - 0%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 - - - 0%

13 Pas. Plat bondek 254.15 m2 0.94 - - - 0%

14 Water proofing 191.08 m2 0.28 - - - 0%

Sub Total B.VI 8.14 - - -

TOTAL B 94.45 67.37 1.95 69.32

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 - - - 0%

2 2,466.80 kg 1.11 - - - 0%

3 852.07 kg 0.38 - - - 0%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 - - - 0%

5 72.00 Bh 0.07 - - - 0%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 - - - 0%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 - - -

TOTAL 100.00 68.18 1.95 70.13

Bandar Lampung, 21 Mei 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 136: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNG MINGGU KE : 30 ( Tiga Puluh )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 22 Mei - 28 Mei 2011

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 0.35 - 0.35 100%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 250 1.02 m3 0.08 - - - 0%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 - - - 0%

Sub Total B.I 20.58 19.08 - 19.08

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 0.36 - 0.36 100%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 0.15 - 0.15 100%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 0.24 - 0.24 100%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 2.71 - 2.71 100%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 15.45 - 15.45 -

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 137: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 0.37 - 0.37 100%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 2.77 - 2.77 100%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 3.99 - 3.99 100%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 0.86 - 0.86 100%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 0.29 - 0.29 100%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 3.75 - 3.75 100%

14 Pas Plat bondek 692.94 m2 2.35 2.35 - 2.35 100%

Sub Total B.III 15.49 15.49 - 15.49 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 0.10 0.10 0.19 50%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 2.84 - 2.84 100%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 0.01 - 0.01 15%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 4.09 - 4.09 100%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 0.88 - 0.88 100%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 0.30 - 0.30 100%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 3.84 - 3.84 100%

14 Pas. Plat bondek 912.41 m2 3.16 3.16 - 3.16 100%

Sub Total B.IV 16.62 16.26 0.10 16.35

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 - - - 0%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 2.14 1.07 3.20 75%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 0.23 0.11 0.34 75%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 0.46 0.23 0.69 75%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 0.15 0.08 0.23 75%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.06 0.03 0.09 75%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.01 0.00 0.01 75%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 - - - 0%

14 Pas. Plat bondek 1,131.88 m2 4.10 - 2.05 2.05 50%

Sub Total B.V 18.17 3.04 3.57 6.62

Page 138: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 0.05 m3 0.00 - - - 0%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 - - - 0%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 - - - 0%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 - - - 0%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 - - - 0%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 - - - 0%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 - - - 0%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 - - - 0%

13 Pas. Plat bondek 254.15 m2 0.94 - - - 0%

14 Water proofing 191.08 m2 0.28 - - - 0%

Sub Total B.VI 8.14 - - -

TOTAL B 94.45 69.32 3.67 72.99

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 - - - 0%

2 2,466.80 kg 1.11 - - - 0%

3 852.07 kg 0.38 - - - 0%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 - - - 0%

5 72.00 Bh 0.07 - - - 0%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 - - - 0%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 - - -

TOTAL 100.00 70.13 3.67 73.80

Bandar Lampung, 28 Mei 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 139: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNG MINGGU KE : 31 ( Tiga Puluh Satu )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 29 Mei - 4 Juni 2011

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 0.35 - 0.35 100%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 250 1.02 m3 0.08 - - - 0%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 - - - 0%

Sub Total B.I 20.58 19.08 - 19.08

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 0.36 - 0.36 100%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 0.15 - 0.15 100%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 0.24 - 0.24 100%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 2.71 - 2.71 100%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 15.45 - 15.45 -

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 140: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 0.37 - 0.37 100%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 2.77 - 2.77 100%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 3.99 - 3.99 100%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 0.86 - 0.86 100%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 0.29 - 0.29 100%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 3.75 - 3.75 100%

14 Pas Plat bondek 692.94 m2 2.35 2.35 - 2.35 100%

Sub Total B.III 15.49 15.49 - 15.49 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 0.19 - 0.19 50%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 2.84 - 2.84 100%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 0.01 - 0.01 15%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 4.09 - 4.09 100%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 0.88 - 0.88 100%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 0.30 - 0.30 100%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 3.84 - 3.84 100%

14 Pas. Plat bondek 912.41 m2 3.16 3.16 - 3.16 100%

Sub Total B.IV 16.62 16.35 - 16.35

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 - 0.20 0.20 100%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 3.20 1.07 4.27 100%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 0.34 0.11 0.45 100%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 0.69 0.23 0.92 100%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 0.23 0.08 0.31 100%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.09 0.03 0.11 100%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.01 0.00 0.02 100%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 - 4.02 4.02 100%

14 Pas. Plat bondek 1,131.88 m2 4.10 2.05 2.05 4.10 100%

Sub Total B.V 18.17 6.62 7.79 14.40

Page 141: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 0.05 m3 0.00 - - - 0%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 - - - 0%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 - - - 0%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 - - - 0%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 - - - 0%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 - - - 0%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 - - - 0%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 - - - 0%

13 Pas. Plat bondek 254.15 m2 0.94 - - - 0%

14 Water proofing 191.08 m2 0.28 - - - 0%

Sub Total B.VI 8.14 - - -

TOTAL B 94.45 72.99 7.79 80.78

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 - - - 0%

2 2,466.80 kg 1.11 - - - 0%

3 852.07 kg 0.38 - - - 0%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 - - - 0%

5 72.00 Bh 0.07 - - - 0%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 - - - 0%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 - - -

TOTAL 100.00 73.80 7.79 81.59

Bandar Lampung, 4 Juni 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 142: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNG MINGGU KE : 32 ( Tiga Puluh Dua )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 5 Juni - 11 Juni 2011

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 0.35 - 0.35 100%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 250 1.02 m3 0.08 - - - 0%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 - - - 0%

Sub Total B.I 20.58 19.08 - 19.08

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 0.36 - 0.36 100%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 0.15 - 0.15 100%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 0.24 - 0.24 100%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 2.71 - 2.71 100%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 15.45 - 15.45 -

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 143: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 0.37 - 0.37 100%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 2.77 - 2.77 100%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 3.99 - 3.99 100%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 0.86 - 0.86 100%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 0.29 - 0.29 100%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 3.75 - 3.75 100%

14 Pas Plat bondek 692.94 m2 2.35 2.35 - 2.35 100%

Sub Total B.III 15.49 15.49 - 15.49 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 0.19 - 0.19 50%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 2.84 - 2.84 100%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 0.01 - 0.01 15%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 4.09 - 4.09 100%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 0.88 - 0.88 100%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 0.30 - 0.30 100%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 3.84 - 3.84 100%

14 Pas. Plat bondek 912.41 m2 3.16 3.16 - 3.16 100%

Sub Total B.IV 16.62 16.35 - 16.35

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 - 0.08 0.08 50%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 - 1.48 1.48 50%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 - 0.07 0.07 50%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 0.20 - 0.20 100%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 4.27 - 4.27 100%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 0.45 - 0.45 100%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 0.92 - 0.92 100%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 0.31 - 0.31 100%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 4.02 - 4.02 100%

14 Pas. Plat bondek 1,131.88 m2 4.10 4.10 - 4.10 100%

Sub Total B.V 18.17 14.40 1.64 16.04

Page 144: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 0.05 m3 0.00 - - - 0%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 - - - 0%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 - - - 0%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 - - - 0%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 - - - 0%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 - - - 0%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 - - - 0%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 - - - 0%

13 Pas. Plat bondek 254.15 m2 0.94 - - - 0%

14 Water proofing 191.08 m2 0.28 - - - 0%

Sub Total B.VI 8.14 - - -

TOTAL B 94.45 80.78 1.64 82.41

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 - - - 0%

2 2,466.80 kg 1.11 - - - 0%

3 852.07 kg 0.38 - - - 0%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 - - - 0%

5 72.00 Bh 0.07 - - - 0%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 - - - 0%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 - - -

TOTAL 100.00 81.59 1.64 83.23

Bandar Lampung, 11 Juni 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 145: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNG MINGGU KE : 33 ( Tiga Puluh Tiga )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 12 Juni - 18 Juni 2011

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 0.35 - 0.35 100%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 250 1.02 m3 0.08 - - - 0%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 - - - 0%

Sub Total B.I 20.58 19.08 - 19.08

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 0.36 - 0.36 100%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 0.15 - 0.15 100%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 0.24 - 0.24 100%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 2.71 - 2.71 100%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 15.45 - 15.45 -

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 146: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 0.37 - 0.37 100%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 2.77 - 2.77 100%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 3.99 - 3.99 100%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 0.86 - 0.86 100%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 0.29 - 0.29 100%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 3.75 - 3.75 100%

14 Pas Plat bondek 692.94 m2 2.35 2.35 - 2.35 100%

Sub Total B.III 15.49 15.49 - 15.49 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 0.19 - 0.19 50%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 2.84 - 2.84 100%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 0.01 - 0.01 15%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 4.09 - 4.09 100%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 0.88 - 0.88 100%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 0.30 - 0.30 100%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 3.84 - 3.84 100%

14 Pas. Plat bondek 912.41 m2 3.16 3.16 - 3.16 100%

Sub Total B.IV 16.62 16.35 - 16.35

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 0.08 0.08 0.17 100%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 1.48 1.48 2.96 100%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 0.07 0.07 0.14 100%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 0.20 - 0.20 100%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 4.27 - 4.27 100%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 0.45 - 0.45 100%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 0.92 - 0.92 100%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 0.31 - 0.31 100%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 4.02 - 4.02 100%

14 Pas. Plat bondek 1,131.88 m2 4.10 4.10 - 4.10 100%

Sub Total B.V 18.17 16.04 1.64 17.68

Page 147: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 0.05 m3 0.00 - - - 0%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 - - - 0%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 - - - 0%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 - - - 0%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 - - - 0%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 - - - 0%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 - - - 0%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 - - - 0%

13 Pas. Plat bondek 254.15 m2 0.94 - - - 0%

14 Water proofing 191.08 m2 0.28 - - - 0%

Sub Total B.VI 8.14 - - -

TOTAL B 94.45 82.41 1.64 84.05

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 - - - 0%

2 2,466.80 kg 1.11 - - - 0%

3 852.07 kg 0.38 - - - 0%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 - - - 0%

5 72.00 Bh 0.07 - - - 0%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 - - - 0%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 - - -

TOTAL 100.00 83.23 1.64 84.86

Bandar Lampung, 18 Juni 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 148: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNG MINGGU KE : 34 ( Tiga Puluh Empat )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 19 Juni - 25 Juni 2011

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 0.35 - 0.35 100%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 250 1.02 m3 0.08 - - - 0%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 - 0.71 0.71 50%

Sub Total B.I 20.58 19.08 0.71 19.79

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 0.36 - 0.36 100%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 0.15 - 0.15 100%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 0.24 - 0.24 100%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 2.71 - 2.71 100%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 15.45 - 15.45 -

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 149: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 0.37 - 0.37 100%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 2.77 - 2.77 100%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 3.99 - 3.99 100%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 0.86 - 0.86 100%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 0.29 - 0.29 100%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 3.75 - 3.75 100%

14 Pas Plat bondek 692.94 m2 2.35 2.35 - 2.35 100%

Sub Total B.III 15.49 15.49 - 15.49 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 0.19 - 0.19 50%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 2.84 - 2.84 100%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 0.01 - 0.01 15%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 4.09 - 4.09 100%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 0.88 - 0.88 100%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 0.30 - 0.30 100%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 3.84 - 3.84 100%

14 Pas. Plat bondek 912.41 m2 3.16 3.16 - 3.16 100%

Sub Total B.IV 16.62 16.35 - 16.35

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 0.17 - 0.17 100%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 2.96 - 2.96 100%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 0.14 - 0.14 100%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 0.20 - 0.20 100%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 4.27 - 4.27 100%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 0.45 - 0.45 100%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 0.92 - 0.92 100%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 0.31 - 0.31 100%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 4.02 - 4.02 100%

14 Pas. Plat bondek 1,131.88 m2 4.10 4.10 - 4.10 100%

Sub Total B.V 18.17 17.68 - 17.68

Page 150: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 0.05 m3 0.00 - - - 0%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 - 0.73 0.73 30%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 - 0.31 0.31 30%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 - 0.06 0.06 30%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 - 0.08 0.08 30%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 - 0.02 0.02 30%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 - 0.00 0.00 30%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 - - - 0%

13 Pas. Plat bondek 254.15 m2 0.94 - 0.47 0.47 50%

14 Water proofing 191.08 m2 0.28 - - - 0%

Sub Total B.VI 8.14 - 1.67 1.67

TOTAL B 94.45 84.05 2.38 86.43

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 - 0.02 0.02 20%

2 2,466.80 kg 1.11 - 0.22 0.22 20%

3 852.07 kg 0.38 - 0.08 0.08 20%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 - - - 0%

5 72.00 Bh 0.07 - - - 0%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 - 0.23 0.23 20%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 - 0.55 0.55

TOTAL 100.00 84.86 2.93 87.79

Bandar Lampung, 25 Juni 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 151: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNG MINGGU KE : 35 ( Tiga Puluh Lima )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 26 Juni - 2 Juli 2011

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 0.35 - 0.35 100%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 250 1.02 m3 0.08 - - - 0%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 0.71 0.71 1.42 100%

Sub Total B.I 20.58 19.79 0.71 20.50

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 0.36 - 0.36 100%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 0.15 - 0.15 100%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 0.24 - 0.24 100%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 2.71 - 2.71 100%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 15.45 - 15.45 -

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 152: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 0.37 - 0.37 100%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 2.77 - 2.77 100%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 3.99 - 3.99 100%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 0.86 - 0.86 100%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 0.29 - 0.29 100%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 3.75 - 3.75 100%

14 Pas Plat bondek 692.94 m2 2.35 2.35 - 2.35 100%

Sub Total B.III 15.49 15.49 - 15.49 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 0.19 - 0.19 50%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 2.84 - 2.84 100%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 0.01 - 0.01 15%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 4.09 - 4.09 100%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 0.88 - 0.88 100%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 0.30 - 0.30 100%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 3.84 - 3.84 100%

14 Pas. Plat bondek 912.41 m2 3.16 3.16 - 3.16 100%

Sub Total B.IV 16.62 16.35 - 16.35

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 0.17 - 0.17 100%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 2.96 - 2.96 100%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 0.14 - 0.14 100%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 0.20 - 0.20 100%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 4.27 - 4.27 100%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 0.45 - 0.45 100%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 0.92 - 0.92 100%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 0.31 - 0.31 100%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 4.02 - 4.02 100%

14 Pas. Plat bondek 1,131.88 m2 4.10 4.10 - 4.10 100%

Sub Total B.V 18.17 17.68 - 17.68

Page 153: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 - - - 0%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 - - - 0%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 - - - 0%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 0.05 m3 0.00 - - - 0%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 0.73 1.71 2.44 100%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 0.31 0.21 0.52 50%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 0.06 0.14 0.19 100%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 0.08 0.14 0.21 85%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 0.02 0.04 0.05 100%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 0.00 0.01 0.01 100%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 - 0.88 0.88 85%

13 Pas. Plat bondek 254.15 m2 0.94 0.47 0.33 0.80 85%

14 Water proofing 191.08 m2 0.28 - 0.24 0.24 85%

Sub Total B.VI 8.14 1.67 3.68 5.35

TOTAL B 94.45 86.43 4.39 90.82

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 0.02 0.01 0.02 30%

2 2,466.80 kg 1.11 0.22 0.11 0.33 30%

3 852.07 kg 0.38 0.08 0.04 0.12 30%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 - - - 0%

5 72.00 Bh 0.07 - - - 0%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 0.23 0.12 0.35 30%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 0.55 0.27 0.82

TOTAL 100.00 87.79 4.67 92.45

Bandar Lampung, 2 Juli 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 154: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNG MINGGU KE : 36 ( Tiga Puluh Enam )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 3 Juli - 9 Juli 2011

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 0.35 - 0.35 100%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 250 1.02 m3 0.08 - - - 0%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 1.42 - 1.42 100%

Sub Total B.I 20.58 20.50 - 20.50

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 0.36 - 0.36 100%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 0.15 - 0.15 100%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 0.24 - 0.24 100%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 2.71 - 2.71 100%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 15.45 - 15.45 -

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 155: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 0.37 - 0.37 100%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 2.77 - 2.77 100%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 3.99 - 3.99 100%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 0.86 - 0.86 100%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 0.29 - 0.29 100%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 3.75 - 3.75 100%

14 Pas Plat bondek 692.94 m2 2.35 2.35 - 2.35 100%

Sub Total B.III 15.49 15.49 - 15.49 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 0.19 - 0.19 50%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 2.84 - 2.84 100%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 0.01 - 0.01 15%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 4.09 - 4.09 100%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 0.88 - 0.88 100%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 0.30 - 0.30 100%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 3.84 - 3.84 100%

14 Pas. Plat bondek 912.41 m2 3.16 3.16 - 3.16 100%

Sub Total B.IV 16.62 16.35 - 16.35

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 0.17 - 0.17 100%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 2.96 - 2.96 100%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 0.14 - 0.14 100%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 0.20 - 0.20 100%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 4.27 - 4.27 100%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 0.45 - 0.45 100%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 0.92 - 0.92 100%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 0.31 - 0.31 100%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 4.02 - 4.02 100%

14 Pas. Plat bondek 1,131.88 m2 4.10 4.10 - 4.10 100%

Sub Total B.V 18.17 17.68 - 17.68

Page 156: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 - 0.03 0.03 15%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 - 0.17 0.17 15%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 - 0.02 0.02 15%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 0.05 m3 0.00 - - - 0%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 2.44 - 2.44 100%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 0.52 0.16 0.68 65%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 0.19 - 0.19 100%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 0.21 - 0.21 85%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 0.05 - 0.05 100%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 0.01 - 0.01 100%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 0.88 - 0.88 85%

13 Pas. Plat bondek 254.15 m2 0.94 0.80 - 0.80 85%

14 Water proofing 191.08 m2 0.28 0.24 - 0.24 85%

Sub Total B.VI 8.14 5.35 0.38 5.73

TOTAL B 94.45 90.82 0.38 91.20

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 0.02 - 0.02 30%

2 2,466.80 kg 1.11 0.33 - 0.33 30%

3 852.07 kg 0.38 0.12 - 0.12 30%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 - - - 0%

5 72.00 Bh 0.07 - - - 0%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 0.35 - 0.35 30%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 0.82 - 0.82

TOTAL 100.00 92.45 0.38 92.83

Bandar Lampung, 9 Juli 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 157: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNG MINGGU KE : 37 ( Tiga Puluh Tujuh )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 10 Juli - 16 Juli 2011

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 0.35 - 0.35 100%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 250 1.02 m3 0.08 - - - 0%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 1.42 - 1.42 100%

Sub Total B.I 20.58 20.50 - 20.50

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 0.36 - 0.36 100%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 0.15 - 0.15 100%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 0.24 - 0.24 100%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 2.71 - 2.71 100%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 15.45 - 15.45 -

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 158: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 0.37 - 0.37 100%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 2.77 - 2.77 100%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 3.99 - 3.99 100%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 0.86 - 0.86 100%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 0.29 - 0.29 100%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 3.75 - 3.75 100%

14 Pas Plat bondek 692.94 m2 2.35 2.35 - 2.35 100%

Sub Total B.III 15.49 15.49 - 15.49 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 0.19 0.06 0.25 65%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 2.84 - 2.84 100%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 0.01 - 0.01 15%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 4.09 - 4.09 100%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 0.88 - 0.88 100%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 0.30 - 0.30 100%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 3.84 - 3.84 100%

14 Pas. Plat bondek 912.41 m2 3.16 3.16 - 3.16 100%

Sub Total B.IV 16.62 16.35 0.06 16.41

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 0.17 - 0.17 100%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 2.96 - 2.96 100%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 0.14 - 0.14 100%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 0.20 - 0.20 100%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 4.27 - 4.27 100%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 0.45 - 0.45 100%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 0.92 - 0.92 100%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 0.31 - 0.31 100%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 4.02 - 4.02 100%

14 Pas. Plat bondek 1,131.88 m2 4.10 4.10 - 4.10 100%

Sub Total B.V 18.17 17.68 - 17.68

Page 159: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 0.03 0.05 0.08 45%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 0.17 0.35 0.52 45%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 0.02 0.04 0.07 45%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 0.05 m3 0.00 - - - 0%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 2.44 - 2.44 100%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 0.68 0.10 0.78 75%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 0.19 - 0.19 100%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 0.21 - 0.21 85%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 0.05 - 0.05 100%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 0.01 - 0.01 100%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 0.88 - 0.88 85%

13 Pas. Plat bondek 254.15 m2 0.94 0.80 - 0.80 85%

14 Water proofing 191.08 m2 0.28 0.24 - 0.24 85%

Sub Total B.VI 8.14 5.73 0.55 6.28

TOTAL B 94.45 91.20 0.61 91.81

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 0.02 0.01 0.04 45%

2 2,466.80 kg 1.11 0.33 0.17 0.50 45%

3 852.07 kg 0.38 0.12 0.06 0.17 45%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 - - - 0%

5 72.00 Bh 0.07 - - - 0%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 0.35 0.17 0.52 45%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 0.82 0.41 1.23

TOTAL 100.00 92.83 1.02 93.85

Bandar Lampung, 16 Juli 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 160: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNG MINGGU KE : 38 ( Tiga Puluh Delapan )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 17 Juli - 23 Juli 2011

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 0.35 - 0.35 100%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 250 1.02 m3 0.08 - - - 0%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 1.42 - 1.42 100%

Sub Total B.I 20.58 20.50 - 20.50

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 0.36 - 0.36 100%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 0.15 - 0.15 100%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 0.24 - 0.24 100%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 2.71 - 2.71 100%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 15.45 - 15.45 -

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 161: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 0.37 - 0.37 100%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 2.77 - 2.77 100%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 3.99 - 3.99 100%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 0.86 - 0.86 100%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 0.29 - 0.29 100%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 3.75 - 3.75 100%

14 Pas Plat bondek 692.94 m2 2.35 2.35 - 2.35 100%

Sub Total B.III 15.49 15.49 - 15.49 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 0.25 - 0.25 65%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 2.84 - 2.84 100%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 0.01 - 0.01 15%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 4.09 - 4.09 100%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 0.88 - 0.88 100%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 0.30 - 0.30 100%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 3.84 - 3.84 100%

14 Pas. Plat bondek 912.41 m2 3.16 3.16 - 3.16 100%

Sub Total B.IV 16.62 16.41 - 16.41

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 0.17 - 0.17 100%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 2.96 - 2.96 100%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 0.14 - 0.14 100%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 0.20 - 0.20 100%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 4.27 - 4.27 100%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 0.45 - 0.45 100%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 0.92 - 0.92 100%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 0.31 - 0.31 100%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 4.02 - 4.02 100%

14 Pas. Plat bondek 1,131.88 m2 4.10 4.10 - 4.10 100%

Sub Total B.V 18.17 17.68 - 17.68

Page 162: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 0.08 0.10 0.17 100%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 0.52 0.64 1.16 100%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 0.07 0.08 0.14 100%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 0.05 m3 0.00 - - - 0%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 2.44 - 2.44 100%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 0.78 0.26 1.04 100%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 0.19 - 0.19 100%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 0.21 0.04 0.25 100%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 0.05 - 0.05 100%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 0.01 - 0.01 100%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 0.88 0.15 1.03 100%

13 Pas. Plat bondek 254.15 m2 0.94 0.80 0.14 0.94 100%

14 Water proofing 191.08 m2 0.28 0.24 0.04 0.28 100%

Sub Total B.VI 8.14 6.28 1.45 7.73

TOTAL B 94.45 91.81 1.45 93.26

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 0.04 - 0.04 45%

2 2,466.80 kg 1.11 0.50 - 0.50 45%

3 852.07 kg 0.38 0.17 - 0.17 45%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 - - - 0%

5 72.00 Bh 0.07 - - - 0%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 0.52 - 0.52 45%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 1.23 - 1.23

TOTAL 100.00 93.85 1.45 95.30

Bandar Lampung, 23 Juli 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 163: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNG MINGGU KE : 39 ( Tiga Puluh Sembilan )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 24 Juli - 30 Juli 2011

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 0.35 - 0.35 100%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 250 1.02 m3 0.08 - - - 0%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 1.42 - 1.42 100%

Sub Total B.I 20.58 20.50 - 20.50

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 0.36 - 0.36 100%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 0.15 - 0.15 100%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 0.24 - 0.24 100%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 2.71 - 2.71 100%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 15.45 - 15.45 -

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 164: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 0.37 - 0.37 100%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 2.77 - 2.77 100%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 3.99 - 3.99 100%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 0.86 - 0.86 100%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 0.29 - 0.29 100%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 3.75 - 3.75 100%

14 Pas Plat bondek 692.94 m2 2.35 2.35 - 2.35 100%

Sub Total B.III 15.49 15.49 - 15.49 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 0.25 0.08 0.33 85%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 2.84 - 2.84 100%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 0.01 - 0.01 15%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 4.09 - 4.09 100%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 0.88 - 0.88 100%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 0.30 - 0.30 100%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 3.84 - 3.84 100%

14 Pas. Plat bondek 912.41 m2 3.16 3.16 - 3.16 100%

Sub Total B.IV 16.62 16.41 0.08 16.49

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 - 0.10 0.10 25%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 0.17 - 0.17 100%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 2.96 - 2.96 100%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 0.14 - 0.14 100%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 0.20 - 0.20 100%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 4.27 - 4.27 100%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 0.45 - 0.45 100%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 0.92 - 0.92 100%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 0.31 - 0.31 100%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 4.02 - 4.02 100%

14 Pas. Plat bondek 1,131.88 m2 4.10 4.10 - 4.10 100%

Sub Total B.V 18.17 17.68 0.10 17.78

Page 165: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 0.17 - 0.17 100%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 1.16 - 1.16 100%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 0.14 - 0.14 100%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 0.05 m3 0.00 - - - 0%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 2.44 - 2.44 100%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 1.04 - 1.04 100%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 0.19 - 0.19 100%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 0.25 - 0.25 100%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 0.05 - 0.05 100%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 0.01 - 0.01 100%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 1.03 - 1.03 100%

13 Pas. Plat bondek 254.15 m2 0.94 0.94 - 0.94 100%

14 Water proofing 191.08 m2 0.28 0.28 - 0.28 100%

Sub Total B.VI 8.14 7.73 - 7.73

TOTAL B 94.45 93.26 0.18 93.43

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 0.04 0.00 0.04 50%

2 2,466.80 kg 1.11 0.50 0.06 0.56 50%

3 852.07 kg 0.38 0.17 0.02 0.19 50%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 - 0.03 0.03 25%

5 72.00 Bh 0.07 - 0.01 0.01 20%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 0.52 - 0.52 45%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 1.23 0.12 1.35

TOTAL 100.00 95.30 0.30 95.60

Bandar Lampung, 23 Juli 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 166: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNG MINGGU KE : 40 ( Empat Puluh )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 31 Juli - 6 Agt 2011

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 0.35 - 0.35 100%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 250 1.02 m3 0.08 - - - 0%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 1.42 - 1.42 100%

Sub Total B.I 20.58 20.50 - 20.50

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 0.36 - 0.36 100%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 0.15 - 0.15 100%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 0.24 - 0.24 100%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 2.71 - 2.71 100%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 15.45 - 15.45 -

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 167: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 0.37 - 0.37 100%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 2.77 - 2.77 100%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 3.99 - 3.99 100%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 0.86 - 0.86 100%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 0.29 - 0.29 100%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 3.75 - 3.75 100%

14 Pas Plat bondek 692.94 m2 2.35 2.35 - 2.35 100%

Sub Total B.III 15.49 15.49 - 15.49 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 0.33 0.06 0.38 100%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 2.84 - 2.84 100%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 0.01 - 0.01 15%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 4.09 - 4.09 100%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 0.88 - 0.88 100%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 0.30 - 0.30 100%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 3.84 - 3.84 100%

14 Pas. Plat bondek 912.41 m2 3.16 3.16 - 3.16 100%

Sub Total B.IV 16.62 16.49 0.06 16.54

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 0.10 0.20 0.30 75%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 0.17 - 0.17 100%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 2.96 - 2.96 100%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 0.14 - 0.14 100%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 - - - 0%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 0.20 - 0.20 100%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 4.27 - 4.27 100%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 0.45 - 0.45 100%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 0.92 - 0.92 100%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 0.31 - 0.31 100%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 4.02 - 4.02 100%

14 Pas. Plat bondek 1,131.88 m2 4.10 4.10 - 4.10 100%

Sub Total B.V 18.17 17.78 0.20 17.98

Page 168: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - - - 0%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 0.17 - 0.17 100%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 1.16 - 1.16 100%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 0.14 - 0.14 100%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 0.05 m3 0.00 - - - 0%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 2.44 - 2.44 100%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 1.04 - 1.04 100%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 0.19 - 0.19 100%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 0.25 - 0.25 100%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 0.05 - 0.05 100%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 0.01 - 0.01 100%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 1.03 - 1.03 100%

13 Pas. Plat bondek 254.15 m2 0.94 0.94 - 0.94 100%

14 Water proofing 191.08 m2 0.28 0.28 - 0.28 100%

Sub Total B.VI 8.14 7.73 - 7.73

TOTAL B 94.45 93.43 0.26 93.69

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 0.04 - 0.04 50%

2 2,466.80 kg 1.11 0.56 - 0.56 50%

3 852.07 kg 0.38 0.19 - 0.19 50%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 0.03 - 0.03 25%

5 72.00 Bh 0.07 0.01 - 0.01 20%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 0.52 - 0.52 45%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 1.35 - 1.35

TOTAL 100.00 95.60 0.26 95.86

Bandar Lampung, 6 Agustus 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 169: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNG MINGGU KE : 41 ( Empat Puluh Satu )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 7 Agt - 13 Agt 2011

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 0.35 - 0.35 100%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 250 1.02 m3 0.08 - 0.08 0.08 100%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 1.42 - 1.42 100%

Sub Total B.I 20.58 20.50 0.08 20.58

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 0.36 - 0.36 100%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 0.15 - 0.15 100%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 0.24 - 0.24 100%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 2.71 - 2.71 100%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 15.45 - 15.45 -

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 170: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 0.37 - 0.37 100%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 2.77 - 2.77 100%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 3.99 - 3.99 100%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 0.86 - 0.86 100%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 0.29 - 0.29 100%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 3.75 - 3.75 100%

14 Pas Plat bondek 692.94 m2 2.35 2.35 - 2.35 100%

Sub Total B.III 15.49 15.49 - 15.49 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 0.38 - 0.38 100%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 2.84 - 2.84 100%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 0.01 0.07 0.09 100%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 4.09 - 4.09 100%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 0.88 - 0.88 100%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 0.30 - 0.30 100%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 3.84 - 3.84 100%

14 Pas. Plat bondek 912.41 m2 3.16 3.16 - 3.16 100%

Sub Total B.IV 16.62 16.54 0.07 16.62

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 0.30 0.10 0.40 100%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 0.17 - 0.17 100%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 2.96 - 2.96 100%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 0.14 - 0.14 100%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 - 0.09 0.09 100%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 0.20 - 0.20 100%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 4.27 - 4.27 100%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 0.45 - 0.45 100%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 0.92 - 0.92 100%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 0.31 - 0.31 100%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 4.02 - 4.02 100%

14 Pas. Plat bondek 1,131.88 m2 4.10 4.10 - 4.10 100%

Sub Total B.V 18.17 17.98 0.19 18.17

Page 171: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 - 0.16 0.16 40%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 0.17 - 0.17 100%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 1.16 - 1.16 100%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 0.14 - 0.14 100%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 0.05 m3 0.00 - 0.00 0.00 50%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 2.44 - 2.44 100%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 1.04 - 1.04 100%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 0.19 - 0.19 100%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 0.25 - 0.25 100%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 0.05 - 0.05 100%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 0.01 - 0.01 100%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 1.03 - 1.03 100%

13 Pas. Plat bondek 254.15 m2 0.94 0.94 - 0.94 100%

14 Water proofing 191.08 m2 0.28 0.28 - 0.28 100%

Sub Total B.VI 8.14 7.73 0.17 7.89

TOTAL B 94.45 93.69 0.51 94.20

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 0.04 0.03 0.07 90%

2 2,466.80 kg 1.11 0.56 0.44 1.00 90%

3 852.07 kg 0.38 0.19 0.13 0.33 85%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 0.03 0.06 0.09 75%

5 72.00 Bh 0.07 0.01 0.04 0.05 75%

6 271.61 kg 0.10 - - - 0%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 0.52 0.23 0.75 65%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - - - 0%

SUB TOTAL C 4.74 1.35 0.94 2.30

TOTAL 100.00 95.86 1.45 97.31

Bandar Lampung, 13 Agustus 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 172: Time Schedule Project Ubl

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH UNIVERSITAS BANDAR LAMPUNG MINGGU KE : 42 ( Empat Puluh Dua )

LOKASI : GEDUNG MENENG, BANDAR LAMPUNG PRIODE : 14 Agt - 20 Agt 2011

No Uraian Pekerjaan VOLUME BOBOT NILAI

A PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi 2,000.00 m2 0.20 0.20 - 0.20 100%

2 Direksikeet dan Gudang 30.00 m2 0.22 0.22 - 0.22 100%

3 Penyediaan obat-obatan ( P3K ) 1.00 Ls 0.04 0.04 - 0.04 100%

4 Penyediaan Air Kerja,listrik kerja dll 1.00 Ls 0.05 0.05 - 0.05 100%

5 Pemindahan Tiang Listrik 1.00 Ls 0.12 0.12 - 0.12 100%

6 Pemindahan Paving Blok Area Parkir 800.00 m2 0.15 0.15 - 0.15 100%

7 Pemasangan Bouwplank 160.00 m' 0.02 0.02 - 0.02 100%

TOTAL I 0.81 0.81 - 0.81

B PEKERJAAN STRUKTUR

I BASEMENT

1 Galian tanah utk pondasi 420.00 m3 0.33 0.33 - 0.33 100%

2 Urugan tanah ex. Galian 320.00 m3 0.13 0.13 - 0.13 100%

3 Galian tanah level Basement 800.00 m3 0.63 0.63 - 0.63 100%

4 Urugan pasir bawah pondasi 12.00 m3 0.04 0.04 - 0.04 100%

5 Urugan pasir bawah lantai 83.85 m3 0.26 0.26 - 0.26 100%

6 Lantai Kerja 8.05 m3 0.11 0.11 - 0.11 100%

7 Pas. Beton Foot Plat 71.78 m3 3.64 3.64 - 3.64 100%

8 Pas. Beton Pondasi Tangga K 250 3.83 m3 0.30 0.30 - 0.30 100%

9 Pas. Beton Tangga K 250 4.41 m3 0.35 0.35 - 0.35 100%

10 Pas. Pedestal uk.40/40 K 250 1.78 m3 0.14 0.14 - 0.14 100%

11 Pas. Pedestal uk.40/50 K 250 2.92 m3 0.23 0.23 - 0.23 100%

12 Pas. Pedestal uk.40/60 K 250 30.66 m3 2.38 2.38 - 2.38 100%

13 Pas. Pedestal uk.15/40 K 250 7.08 m3 0.55 0.55 - 0.55 100%

14 Pas. Beton Sloof uk. 15/20 K 250 2.40 m3 0.22 0.22 - 0.22 100%

15 Pas. Beton Sloof uk. 25/50 K 250 20.56 m3 1.89 1.89 - 1.89 100%

16 Pas. Beton Sloof uk. 20/40 K 250 48.24 m3 4.43 4.43 - 4.43 100%

17 Pas. Beton Sloof uk. 20/30 K 250 0.35 m3 0.03 0.03 - 0.03 100%

18 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 2.11 m3 0.16 0.16 - 0.16 100%

19 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.52 m3 0.27 0.27 - 0.27 100%

20 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 36.96 m3 2.86 2.86 - 2.86 100%

21 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.72 m3 0.13 0.13 - 0.13 100%

22 Pas. Beton Kol. praktis 11/11 ( KP ) K 250 1.02 m3 0.08 0.08 - 0.08 100%

23 Dinding Penahan Tanah Batu Putih 150.00 m3 1.42 1.42 - 1.42 100%

Sub Total B.I 20.58 20.58 - 20.58

II LANTAI I

1 Pas. Tangga Beton K 250 4.41 m3 0.36 0.36 - 0.36 100%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.15 0.15 - 0.15 100%

3 Pas. Beton Kolom uk. 40/50 ( K3 ) K 250 3.00 m3 0.24 0.24 - 0.24 100%

4 Pas. Beton Kolom uk. 40/60 ( K1 ) K 250 33.60 m3 2.71 2.71 - 2.71 100%

5 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

6 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

7 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.18 0.18 - 0.18 100%

8 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.90 3.90 - 3.90 100%

9 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.42 0.42 - 0.42 100%

10 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.84 0.84 - 0.84 100%

11 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.28 0.28 - 0.28 100%

12 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.10 0.10 - 0.10 100%

13 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

14 Pas. Beton Plat t.12 cm K 250 71.72 m3 3.63 3.63 - 3.63 100%

15 Pas. Plat bondek 760.35 m2 2.40 2.40 - 2.40 100%

Sub Total B.II 15.45 15.45 - 15.45 -

SATUAN

MINGGU LALU

MINGGU INI

S/D MINGGU

INI

Page 173: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

III LANTAI II

1 Pas Beton Tangga K 250 4.41 m3 0.37 0.37 - 0.37 100%

2 Pas Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.77 2.77 - 2.77 100%

4 Pas Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.08 0.08 - 0.08 100%

6 Pas Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 3.99 3.99 - 3.99 100%

8 Pas Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.86 0.86 - 0.86 100%

10 Pas Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.29 0.29 - 0.29 100%

11 Pas Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas Plat Beton t.12 cm K 250 72.36 m3 3.75 3.75 - 3.75 100%

14 Pas Plat bondek 692.94 m2 2.35 2.35 - 2.35 100%

Sub Total B.III 15.49 15.49 - 15.49 -

IV LANTAI III

1 Pas. Beton Tangga K 250 4.41 m3 0.38 0.38 - 0.38 100%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.16 0.16 - 0.16 100%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.84 2.84 - 2.84 100%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.13 0.13 - 0.13 100%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 0.09 - 0.09 100%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.19 0.19 - 0.19 100%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.09 4.09 - 4.09 100%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.43 0.43 - 0.43 100%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.88 0.88 - 0.88 100%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.30 0.30 - 0.30 100%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 3.84 3.84 - 3.84 100%

14 Pas. Plat bondek 912.41 m2 3.16 3.16 - 3.16 100%

Sub Total B.IV 16.62 16.62 - 16.62

V LANTAI IV

1 Pas. Beton Tangga K 250 4.41 m3 0.40 0.40 - 0.40 100%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.92 m3 0.17 0.17 - 0.17 100%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 33.60 m3 2.96 2.96 - 2.96 100%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.56 m3 0.14 0.14 - 0.14 100%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 1.02 m3 0.09 0.09 - 0.09 100%

6 Pas. Beton Balok uk. 30/60 ( B1 ) K 250 2.39 m3 0.20 0.20 - 0.20 100%

7 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 36.69 m3 4.27 4.27 - 4.27 100%

8 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 3.25 m3 0.45 0.45 - 0.45 100%

9 Pas. Beton Balok uk. 20/30 ( B4 ) K 250 6.97 m3 0.92 0.92 - 0.92 100%

10 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.91 m3 0.31 0.31 - 0.31 100%

11 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.80 m3 0.11 0.11 - 0.11 100%

12 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.11 m3 0.02 0.02 - 0.02 100%

13 Pas. Plat Beton t.10 cm K 250 72.36 m3 4.02 4.02 - 4.02 100%

14 Pas. Plat bondek 1,131.88 m2 4.10 4.10 - 4.10 100%

Sub Total B.V 18.17 18.17 - 18.17

Page 174: Time Schedule Project Ubl

No Uraian Pekerjaan VOLUME BOBOT NILAI SATUA

N MINGGU

LALU MINGGU

INI

S/D MINGGU

INI

VI LANTAI DAK

1 Pas. Beton Tangga K 250 4.41 m3 0.41 0.16 0.25 0.41 100%

2 Pas. Beton Kolom uk. 40/40 ( K4 ) K 250 1.94 m3 0.17 0.17 - 0.17 100%

3 Pas. Beton Kolom uk. 40/60 ( K2 ) K 250 12.90 m3 1.16 1.16 - 1.16 100%

4 Pas. Beton Kolom uk. 15/40 ( K5 ) K 250 1.60 m3 0.14 0.14 - 0.14 100%

5 Pas. Beton Kolom praktis 11/11 ( KP ) K 25 0.05 m3 0.00 0.00 0.00 0.00 100%

6 Pas. Beton Balok uk. 25/60 ( B2 ) K 250 20.53 m3 2.44 2.44 - 2.44 100%

7 Pas. Beton Balok uk. 20/40 ( B3 ) K 250 7.29 m3 1.04 1.04 - 1.04 100%

8 Pas. Beton Balok uk. 20/30 ( B4 )K 250 1.43 m3 0.19 0.19 - 0.19 100%

9 Pas. Beton Balok uk. 15/30 ( B5 ) K 250 1.52 m3 0.25 0.25 - 0.25 100%

10 Pas. Beton Balok uk. 15/20 ( B6 ) K 250 0.36 m3 0.05 0.05 - 0.05 100%

11 Pas. Beton Balok uk. 10/20 ( B7 ) K 250 0.08 m3 0.01 0.01 - 0.01 100%

12 Pas. Beton Plat t.10 cm K 250 18.19 m3 1.03 1.03 - 1.03 100%

13 Pas. Plat bondek 254.15 m2 0.94 0.94 - 0.94 100%

14 Water proofing 191.08 m2 0.28 0.28 - 0.28 100%

Sub Total B.VI 8.14 7.89 0.25 8.14

TOTAL B 94.45 94.20 0.25 94.45

C PEKERJAAN RANGKA DAN ATAP

1 178.85 kg 0.08 0.07 0.01 0.08 100%

2 2,466.80 kg 1.11 1.00 0.11 1.11 100%

3 852.07 kg 0.38 0.33 0.06 0.38 100%

4 Pas. Plat landas t.16 mm 335.70 kg 0.13 0.09 0.03 0.13 100%

5 72.00 Bh 0.07 0.05 0.02 0.07 100%

6 271.61 kg 0.10 - 0.10 0.10 100%

7 Pas. Gording C 150.50.20 3,076.50 kg 1.15 0.75 0.40 1.15 100%

8 Pas Seng Zing Alum 35 mm 762.12 m2 1.71 - 1.71 1.71 100%

SUB TOTAL C 4.74 2.30 2.45 4.74

TOTAL 100.00 97.31 2.69 ###

Bandar Lampung, 20 Agustus 2011

MENYETUJUI DI AJUKAN OLEH

DR. IR. HERY RIYANTO. MT IR. LILYANA

Pas. Pipa stump f 5"

Pas. Pipa stump f 3"

Pas. Pipa stump f 2"

Pas. Baut angkur f 22 mm

Trekstang besi f 12 mm

Page 175: Time Schedule Project Ubl

IR. LILYANAPROJECT MANAGER

IR. DARMAWAN

SITE MANAGER

SUKAMTO. SE

KEUANGAN

DAMAN

MANDOR

GUNADI, ST.

SURVEYOR

WAYU UMBORO, ST

PELAKSANAISMAWADI ISMAIL, BE.

QUALITY CONTROL

ISWANDI

LOGISTIK

TONI RACHMAN, AMT

ADMINISTRASI PROYEK