REKAPITULASIRENCANA ANGGARAN BIAYA

KEGIATAN : LANJUTAN PEMBANGUNAN SMKN KEDUNG, SMKN KALINYAMATAN DAN SMAN KEMBANG

PEKERJAAN : PEMBANGUNAN GEDUNG LABORATORIUM IPA SMK N KEDUNG

LOKASI : KECAMATAN KEDUNG KABUPATEN JEPARA

TAHUN : 2010

VOLUME : 8 x 15 m2

NO URAIAN PEKERJAAN HARGA

I PEKERJAAN PERSIAPAN 850,000.00

II PEKERJAAN TANAH 6,305,915.39

III PEKERJAAN PONDASI 17,826,759.72

IV PEKERJAAN DINDING 14,315,404.83

V PEKERJAAN PLESTERAN 15,196,776.57

VI PEKERJAAN KAYU 73,054,519.41

VIII PEKERJAAN BETON 43,801,069.36

VIII PEKERJAAN PENUTUP ATAP 9,729,102.50

IX PEKERJAAN SANITASI 3,151,250.00

X PEKERJAAN BESI DAN ALUMINIUM 804,750.00

XI PEKERJAAN KUNCI DAN KACA 3,795,342.81

XII PEKERJAAN PENUTUP LANTAI DAN DINDING 1,421,458.50

XIII PEKERJAAN INSTALASI LISTRIK 1,748,000.00

JUMLAH HARGA 192,000,349.09

DIBULATKAN 192,000,000.00

TERBILANG : SERATUS SEMBILAN PULUH DUA JUTA

Jepara, Maret 2010

Menyetujui ; Di Buat Oleh ;

PIMPINAN KEGIATAN CV. ARDIKON CIPTA ARTISTIKA

Drs. SUWARTO, MM TRI HARTATI, S. Sos. I

NIP. 19580610 198103 1 018 Direktris

Mengetahui ;

KEPALA DINAS PENDIDIKAN KEPALA DINAS PEKERJAAN UMUM

PEMUDA DAN OLAHRAGA DAN ENERGI SUMBER DAYA MINERAL

KABUPATEN JEPARA KABUPATEN JEPARA

Drs. B U N A J I Ir. SOEGIARTO, MT

NIP. 19540203 197408 1 001 NIP. 19540719 198603 1 005

Page 2: Lab SMA MD

RENCANA ANGGARAN BIAYA

KEGIATAN : LANJUTAN PEMBANGUNAN SMKN KEDUNG, SMKN KALINYAMATAN DAN SMAN KEMBANG

PEKERJAAN : PEMBANGUNAN GEDUNG LABORATORIUM IPA SMK N KEDUNG

LOKASI : KECAMATAN KEDUNG KABUPATEN JEPARA

TAHUN : 2010

VOLUME : 8 x 15 m2

NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA JUMLAH

(Rp) (Rp) (Rp)

1 2 3 4 5 6 7

I PEKERJAAN PERSIAPAN

1 Pengukuran dan pemasangan bouwplank 1.000 ls 300,000.00

2 Air Kerja 1.000 ls 300,000.00

3 Papan nama kegiatan 120 cm x 120 cm 1.000 bh ls 250,000.00 250,000.00

SUB TOTAL I : 850,000.00

II PEKERJAAN TANAH

1 Galian tanah biasa 84.700 T.1 25,437.00 2,154,513.90

2 Urugan tanah biasa dipadatkan 60.000 T.10 50,775.00 3,046,500.00

3 Urugan kembali 42.350 T.13 8,479.00 359,085.65

4 Urugan pasir hurug bawah pondasi 7.392 T.14 100,895.00 745,815.84

SUB TOTAL II : 6,305,915.39

III PEKERJAAN PONDASI

1 Aanstampeng batu belah 13.860 Pd.1 221,996.00 3,076,864.56

2 Pasang pondasi batu kali 1 Pc : 8 Ps 33.880 Pd.3 435,357.00 14,749,895.16

SUB TOTAL III : 17,826,759.72

IV PEKERJAAN DINDING

1 Pas. batu merah Kalipucang tbl. 1/2 bata, 1 Pc : 3 Ps 21.344 D.4 70,305.00 1,500,589.92

2 Pas. batu merah Kalipucang tbl. 1/2 bata, 1 Pc : 8 Ps 209.078 D.5 61,292.00 12,814,814.91

SUB TOTAL IV : 14,315,404.83

V PEKERJAAN PLESTERAN

1 Plesteran 1 Pc : 3 Ps tebal 15 mm di aci 42.688 PL.1 35,497.00 1,515,295.94

2 Plesteran 1 Pc : 8 Ps tebal 15 mm di aci 372.556 PL.2 31,523.00 11,744,089.09

3 Plesteran beton 1 Pc : 2 Ps tebal 15 mm di aci 66.290 PL.4 29,226.00 1,937,391.54

SUB TOTAL V : 15,196,776.57

VI PEKERJAAN KAYU

1 Pasang kusen pintu dan jendela kayu bengkirai 0.946 KY.2 12,966,300.00 12,270,891.40

2 Pasang kasau & reng kayu kruing 236.980 KY.7 85,876.00 20,350,894.48

3 Pasang kuda-kuda kayu kruing 2.892 KY.13 7,990,820.00 23,109,451.44

4 Pasang jalusi mati kayu bengkirai 12.430 KY.17.a 334,822.00 4,161,837.46

5 Bikin daun pintu rangka kayu bengkirai tb. 3,5 cm 9.240 KY.22 639,457.00 5,908,582.68

panil multiplek tb. 9 mm

6 Pasang jendela kaca kayu kanfer tb. 3 cm 8.245 KY.27 375,710.00 3,097,728.95

7 Pasang lisplank uk. 3/20 kayu kruing 43.000 KY.33.a 79,613.00 3,423,359.00

8 Papan papan sirip 17.200 KY.35 42,545.00 731,774.00

SUB TOTAL VI : 73,054,519.41

VII PEKERJAAN BETON

1 Cor beton K. 175 sloof 15/20 2.310 B.2 818,365.00 1,890,423.15

2 Pembesian beton sloof 15/20 253.626 kg B.6 16,612.00 4,213,229.80

3 Pasang bekisting beton sloof 15/20 30.253 B.11 60,263.00 1,823,136.54

4 Cor beton K. 175 kolom (K1) 15/20 1.368 B.2 818,365.00 1,119,523.32

5 Pembesian beton kolom 15/20 158.104 kg B. 6 16,612.00 2,626,428.96

6 Pasang bekisting beton kolom 15/20 18.240 B. 11 60,263.00 1,099,197.12

7 Cor beton K. 175 kolom (K2) 15/20+5 0.594 B.2 818,365.00 486,108.81

8 Pembesian beton kolom 15/20+5 74.577 kg B. 6 16,612.00 1,238,867.14

ANALISA

m3

m3

m3

m3

m3

m3

m2

m2

m2

m2

m2

m3

m2

m3

m2

m2

m2

m2

m1

m3

m2

m3

m2

m3

Page 3: Lab SMA MD

1 2 3 4 5 6 7

9 Pasang bekisting beton kolom 15/20+5 6.080 B. 11 60,263.00 366,399.04

10 Cor beton K. 175 kolom (K3) 15/15 0.919 B.2 818,365.00 752,179.73

11 Pembesian Beton kolom 15/15 133.537 kg B. 6 16,612.00 2,218,317.31

12 Pasang bekisting beton kolom 15/15 17.295 B. 11 60,263.00 1,042,248.59

13 Cor beton K. 175 balok lateiu 12/12 0.432 B.2 818,365.00 353,533.68

14 Pembesian beton balok lateiu k. 12/12 60.396 kg B. 6 16,612.00 1,003,298.35

15 Pasang bekisting beton balok lateiu k. 275 12/12 7.200 B. 11 60,263.00 433,893.60

16 Cor beton K. 175 ring balok 15/20 2.640 B.2 818,365.00 2,160,483.60

17 Pembesian Beton ring balok 15/20 289.858 kg B. 6 16,612.00 4,815,119.77

18 Pasang bekisting beton ring balok 15/20 26.400 B. 11 60,263.00 1,590,943.20

19 Cor beton K. 175 Konsol 15/20 0.810 B.2 818,365.00 662,875.65

20 Pembesian Beton Konsol 15/20 88.934 kg B. 6 16,612.00 1,477,366.29

21 Pasang bekisting beton Konsol 15/20 10.800 B. 11 60,263.00 650,840.40

22 Prancah/steger beton konsol 2.700 B. 10 68,477.00 184,887.90

23 Cor beton K. 175 sunduk 8/20 2.700 B.2 818,365.00 2,209,585.50

24 Pembesian Beton sunduk 33.878 kg B. 6 16,612.00 562,787.98

25 Pasang bekisting beton sunduk 7.680 B. 11 60,263.00 462,819.84

26 Prancah/steger beton balok sunduk 1.280 B. 10 68,477.00 87,650.56

27 Cor beton K. 175 plat meja laborat 1.050 B.2 818,365.00 859,283.25

28 Penulangan beton plat meja laborat 102.480 kg B. 6 16,612.00 1,702,397.76

29 Pasang bekisting beton plat meja laborat 9.000 B.9 167,712.00 1,509,408.00

30 Kolom beton bertulang meja laborat 4.200 B.7 72,812.00 305,810.40

31 Cor beton rabat K.100 t = 4 cm bawah lantai 5.533 B. 1 703,470.00 3,892,018.12

SUB TOTAL VII : 43,801,069.36

VIII PEKERJAAN PENUTUP ATAP

1 Pasang atap genteng lokal 236.980 PA.5 28,845.00 6,835,688.10

2 Pasang krepus lokal 51.200 PA.9 56,512.00 2,893,414.40

SUB TOTAL VIII : 9,729,102.50

IX PEKERJAAN SANITASI

1 Pasang bak cuci stainlees pd meja laborat 5.00 bh S.5 391,750.00 1,958,750.00

2 Pasang kran air stainlesteel 5.00 bh taksir 36,000.00 180,000.00

3 Pasang pipa PVC 3/4" AW utk air bersih 25.00 m' taksir 11,700.00 292,500.00

4 Pasang pipa PVC 3" AW utk. Air kotor 12.00 m' taksir 60,000.00 720,000.00

SUB TOTAL IX : 3,151,250.00

X PEKERJAAN BESI DAN ALUMINIUM

1 Pasang angkur dan baut 17.000 kg BS.10 30,801.00 523,617.00

2 Pasang scrool seng BJLS 28 6.000 taksir 46,855.50 281,133.00

SUB TOTAL X : 804,750.00

XI PEKERJAAN KUNCI DAN KACA

1 Pasang kunci pintu 2 x putar 4.000 bh KK. 1 133,537.00 534,148.00

2 Pasang engsel pintu 18.000 bh KK. 3 27,319.00 491,742.00

3 Pasang engsel jendela kupu-kupu 28.000 bh KK. 4 20,537.00 575,036.00

4 Pasang kait angin 28.000 bh KK. 6 14,019.00 392,532.00

5 Pasang kunci slot 32.000 bh KK. 8 19,092.00 610,944.00

6 Pasang hendle jendela 14.000 bh taksir 9,500.00 133,000.00

7 Pasang kaca tb. 5 mm 11.688 KK. 11 90,519.00 1,057,940.81

SUB TOTAL XI : 3,795,342.81

XII PEKERJAAN PENUTUP LANTAI DAN DINDING

1 Pasang keramik 20 x 20 meja laborat 10.500 L.11 135,377.00 1,421,458.50

SUB TOTAL XII : 1,421,458.50

m2

m3

m2

m3

m2

m3

m2

m3

m2

m2

m3

m2

m2

m3

m2

m2

m3

m2

m1

m2

m2

m2

Page 4: Lab SMA MD

1 2 3 4 5 6 7

XIII PEKERJAAN INSTALASI LISTRIK

1 Instalasi listrik 12.000 titik taksir 100,000.00 1,200,000.00

2 Pasang lampu TL 20 watt + fitting 8.000 bh taksir 50,000.00 400,000.00

3 Pasang lampu SL 11 watt + fitting 2.000 bh taksir 25,000.00 50,000.00

4 Pasang saklar ganda 2.000 bh taksir 22,000.00 44,000.00

5 Pasang saklar tunggal 1.000 bh taksir 18,000.00 18,000.00

6 Pasang stop kontak 2.000 bh taksir 18,000.00 36,000.00

SUB TOTAL XIII : 1,748,000.00

JUMLAH HARGA TOTAL 192,000,349.09

DIBULATKAN 192,000,000.00

Page 5: Lab SMA MD

RENCANA ANGGARAN BIAYA

KEGIATAN PEKERJAAN LOKASI TAHUN LUAS

NO URAIAN PEKERJAAN

1 2I PEKERJAAN PERSIAPAN1 Pengukuran dan pemasangan bouwplank4 Papan nama kegiatan 120 cm x 120 cm

I PEKERJAAN TANAH1 Galian tanah biasa 2 Urugan tanah biasa dipadatkan

3 Urugan kembali4 Urugan pasir bawah pondasi

Urugan pasir bawah lantaiII PEKERJAAN PONDASI

1 Aanstampeng batu belah2 Pasang pondasi batu belah 1:4 pasir pasang3 Pasang trashraam batu merah 1 : 3

III PEKERJAAN DINDING

1 Pas. batu merah Kalipucang tbl. 1/2 bata, 1Pc : 3Ps2 Pasangan roster 1Pc : 4Ps

IV PEKERJAAN PLESTERAN1 Plesteran 1Pc : 3 Ps tbl 15 mm2 Plesteran 1Pc : 8 Ps tebal 15 mm3 Plesteran skoneng 1 Pc : 2 Ps

V PEKERJAAN KAYU1 Pasang gantungan pyan

2 Pasang kusen pintu dan jendela kayu bengkirai

Page 6: Lab SMA MD

3 Pasang kasau dan reng kayu bengkirai

4 Pasang konstruksi atap kayubengkirai

5 Pasang pintu panyl kayu kanfer tb. 3,5 cm

6 Pasang jendela kaca kayu kanfer tb. 3 cm

7 Pasang lisplank uk. 3/20 kayu bengkiraiVI PEKERJAAN BETON

1 Membuat beton tumbuk mutu k.125

2 Membuat beton mutu k.

Page 7: Lab SMA MD

3 Pembesian dengan Besi polos atau ulir

4 Kolom praktis

5 Sloof beton bertulangring balk beton bertulangring balk gunungan

6 Begisting untuk plat beton

7 Steiger dari bambu

Page 8: Lab SMA MD

8 begistng dg kayu randu 2 cm

VII PEKERJAAN PENUTUP ATAP1 Pasang atap genteng kudus

2 Pasang krepus kudus

VIII PEKERJAAN LANGIT-LANGIT1 Pasang pyan eternit kerang super

IX PEKERJAAN SANITASI1 Pasang closet jongkok porselen2 Pasang floordrain3 Pasang pintu PVC 70/2004 Bikin bak mandi 80x70x705 Pasang pipa PVC 3/4"6 Pasang pipa PVC 4"7 Pasang kran air biasa8 Membuat sumur galian9 Membuat septictank 2 x 2 x 2 m + peresapan

X PEKERJAAN BESI DAN ALUMUNIUM1 Pasang talang miring seng BJLS 282 Pasang angkur dan baut3 Pasang scroll seng BJLS 28

XI PEKERJAAN KUNCI DAN KACA1 Pasang kunci tanam biasa

Page 9: Lab SMA MD

2 Pasang engsel pintu3 Pasang engsel jendela kupu-kupu4 Pasang kait angin5 Pasang kunci sloot6 Pasang kaca tb. 5 mm

XII PEKERJAAN PENUTUP LANTAI DAN DINDING1 Pasang lantai keramik KM / WC 20 x 202 Pasang lantai keramik 30 x 30 putih3 Pasang dinding keramik 20 x 254 Pasang bis beton diameter 0,80 m

XIII PEKERJAAN PENGECATAN1 Mengecat kayu 3 kali

2 Mengecat tembok dan plafond dengan DecolithXIV PEKERJAAN INSTALASI LISTRIK

1 Pemasangan sambungan baru listrik PLN 900 VA2 Instalasi listrik3 Pasang lampu TL 20 watt + fitting4 Pasang lampu SL 8 watt + fitting5 Pasang saklar ganda

6 Pasang stop kontak

JUMLAH HARGA TOTALDIBULATKAN

Page 10: Lab SMA MD

RENCANA ANGGARAN BIAYA

URAIAN PEKERJAAN L/l T P Bnyk Koef

2 3 4 5 6 7

Pas. batu merah Kalipucang tbl. 1/2 bata, 1Pc : 3Ps

Pasang kusen pintu dan jendela kayu bengkiraiP 1 0.12 x 0.06 x 9.30 x 2.00

P 2 0.12 x 0.06 x 7.48 x 2.00

J 1 0.12 x 0.06 x 14.69 x 3.00

J 2 0.12 x 0.06 x 13.69 x 3.00

J 3 0.12 x 0.06 x 6.37 x 2.00

12.00 OK

Page 11: Lab SMA MD

1 17.00 x 6.37

2 17.00 x 7.57

murplat & gording&nok 0.08 x 0.12 x 153.00

kuda-kuda 1 0.08 x 0.12 x 32.00 x 3.00

0.06 x 0.12 x 17.00 x 3.00

kuda-kuda trapesium 0.08 x 0.12 x 25.75 x 0.00

0.06 x 0.12 x 17.00 x 0.00

kuda-kuda 1/4 0.08 x 0.12 x 8.75 x 0.00

0.06 x 0.12 x 4.00 x 0.00

Balok angin 0.08 x 0.12 x 7.00 x 2.00

P 1 2.10 x 1.40 x 2.00

P 2 2.10 x 0.80 x 2.00

J 1 0.85 x 0.80 x 2.00 x 3.00

J 2 0.85 x 0.55 x 2.00 x 3.00

J 3 0.85 x 0.80 x 1.00 x 2.00

Rabat beton bawah lantai 208 x 0.05

Rabat beton teras keliling ### x 0.05

latiue 0.12 x 0.12 x 48.00

Beton kolom 15/15 ( K 3 ) 0.15 x 0.15 x 3.00 x 14.00

Beton kolom 15/15 ( K 3 ) 0.15 x 0.15 x 5.50 x 11.00

Beton kolom 15/20 ( K 1 ) 0.15 x 0.20 x 5.50 x 20.00

Beton kolom 20/20 ( K 2 ) 0.20 x 0.20 x 5.50 x 4.00

Beton Balok 15/20 0.15 x 0.30 x 21.50

Beton konsol 15/20 0.15 x 0.20 x 74.00

Page 12: Lab SMA MD

kantilever 0.40 x 0.08 x 3.50

plat balok sunduk 0.20 x 0.08 x 29.50

plat dag atap 2 2.00 x 0.10 x 0.00

plat dag atap doorluup 3.20 x 0.10 x 0.00

latiue 48.00 x 2.47

48.00 x 0.67

Beton kolom 15/15 ( K 3 ) 3.00 x 14.00 x 3.55

3.00 x 14.00 x 0.80

Beton kolom 15/15 ( K 3 ) 5.50 x 11.00 x 3.55

5.50 x 11.00 x 0.80

Beton kolom 15/20 ( K 1 ) 5.50 x 20.00 x 3.55

5.50 x 20.00 x 0.93

Beton kolom 20/20 ( K 2 ) 5.50 x 4.00 x 5.33

5.50 x 4.00 x 1.07

Beton Balok 15/20 21.50 x 3.55

21.50 x 1.40

Beton konsol 15/20 1.00 x 74.00 x 3.55

1.00 x 74.00 x 0.93

kantilever 3.50 x 1.98

3.50 x 2.33

plat balok sunduk 29.50 x 6.43

plat dag atap 2 0.00 x 12.34

plat dag atap doorluup 0.00 x 12.34

4.00 x 0.00

###

172.85

16.00

kantilever 0.40 x x 33.50

meja laborat 0.60 x x 4.60

plat dag atap 1 3.00 x x 3.00

plat dag atap 2 2.00 x x 3.00

plat dag atap doorluup 3.20 x x 4.50

Page 13: Lab SMA MD

Balok 15/30 & konsol 0.15 x x 51.00

latiue 0.24 x 48.00

Beton kolom 15/15 ( K 3 ) 0.60 x 3.00 x 14.00

Beton kolom 15/15 ( K 3 ) 0.30 x 5.50 x 11.00

Beton kolom 15/20 ( K 1 ) 0.40 x 5.50 x 20.00

Beton kolom 20/20 ( K 2 ) 0.40 x 5.50 x 4.00

Beton Balok 15/20 0.30 x 21.50

Beton konsol 15/20 0.55 x 74.00

plat balok sunduk 0.48 x 29.50

nok 20.30

jurai 63.00

Membuat septictank 2 x 2 x 2 m + peresapan

Page 14: Lab SMA MD

PEKERJAAN PENUTUP LANTAI DAN DINDING

P 1 0.36 x 9.30 x 3.00

P 2 0.36 x 7.64 x 3.00

0.36 x 5.64 x 0.00

P J1 0.36 x 11.65 x 1.00

P J2 0.36 x 15.29 x 5.00

P J3 0.36 x 11.74 x 2.00

0.36 x 10.27 x 0.00

J 1 0.36 x 14.05 x 2.00

J 2 0.36 x 14.85 x 8.00

0.36 x 9.41 x 0.00

BV1 0.36 x 3.70 x 2.00

BV2 0.36 x 9.00 x 17.00

43.00 OK

Mengecat tembok dan plafond dengan Decolith

Pemasangan sambungan baru listrik PLN 900 VA

Page 15: Lab SMA MD

Jmlh Jmlh Tot SAT

8 9 10

= 0.00 unit

= 0.00

= 0.00 m³

= 0.00 m³

= 0.00 m³

= 0.00 m³

= 0.00 m³

= 0.00 m³

= 0.00 m³

= 0.00 m³

= 0.00 m² lubang kosen2 unt pas trasrhaam= 0.00 m² P 1

P2

= 0.00 m² J 2

= 0.00 m² J 3

lubang kosen2= 0.13 P 1

= 0.11 P2

= 0.32 J 1

= 0.30 J 2

= 0.09 J 3

= 0.95 m³

Page 16: Lab SMA MD

= 108.29

= 128.69

= 236.98 m²

= 1.469

= 0.92

= 0.37

= 0.00

= 0.00

= 0.00

= 0.00

= 0.13

= 2.89 m²

= 5.88

= 3.36 = 9.24 0.00

LUAS KACA

= 4.08 J 1

= 2.81 J 2

= 1.36 J 3

= 8.25 0.00

= m³

= m³

= 0.69

= 0.95

= 1.36

= 3.30

= 0.88

= 0.97

= 2.22

Page 17: Lab SMA MD

= 0.11

= 0.47

= 0.00

= 0.00

= m³

= 118.46

= 31.97

= 149.18

= 33.57

= 214.90

= 48.35

= 390.72

= 102.56

= 117.22

= 23.44

= 76.37

= 30.07

= 262.85

= 69.00

= 6.91

= 8.16

= 189.68

= 0.00 #DIV/0! #DIV/0!

= 0.00

= 1,873.41 kg

= 0.00 m'

= 172.85 m'

= 172.85 m'

= 16.00 m'

m'

= 13.40

= 2.76

= 9.00

= 6.00

= 14.40

= 45.56 0.00

Page 18: Lab SMA MD

= 7.65

= 7.65 0.00

= 11.52

= 25.20

= 18.15

= 44.00

= 8.80

= 0.00

= 0.00

= 0.00

= 107.67 0.00

= 20.30

= 63.00

= 83.30 m'

Page 19: Lab SMA MD

= 10.04

= 8.25

= 0.00

= 4.19

= 27.52

= 8.45

= 0.00

= 10.12

= 42.77

= 0.00

= 2.66

= 55.08

= 169.09 0.00

Page 20: Lab SMA MD

lubang kosen2 unt pas trasrhaam0.61 x 2.00 = 1.22

0.32 x 2.00 = 0.64

3.43 x 0.00 = 0.00

1.58 x 0.00 = 0.00

0.49 x 0.00 = 0.00

0.28 3.00 0.00 =

2.89 x 2.00 = 5.78

1.75 x 2.00 = 3.50

4.13 x 3.00 = 12.39

3.43 x 3.00 = 10.30

1.58 x 2.00 = 3.17

=

Page 21: Lab SMA MD

0.76 x 2.00 = 1.52

1.40 x 4.00 = 5.58

1.40 x 4.00 = 5.58

0.54 x 2.00 = 1.07

13.75 ###

###

0.85 x 0.80 x 3.00 x 3.00 = 6.12

0.85 x 0.55 x 3.00 x 3.00 = 4.21

0.85 x 0.80 x 1.00 x 2.00 = 1.36

Page 22: Lab SMA MD

1.86 m²

Jalusi JALUSI

1.54 0.76 x 3.00

0.99

4.46 1.48 x 2.00

4.46 1.48 x 8.00

0.99

0.00 x 2.00

35.12 12.43 m² 15.00

Page 23: Lab SMA MD

2.31

8.91

11.22

4 Pasang konstruksi atap kayubengkiraimurplat 0.08 x 0.12 x

juraikuda-ku 0.08 x 0.12 x

0.06 x 0.12 x

kuda-kud 0.08 x 0.12 x

0.06 x 0.12 x

kuda-ku 0.08 x 0.12 x

0.06 x 0.12 x

Balok an 0.08 x 0.12 x

= 11.69 0.00

Page 24: Lab SMA MD

= 2.28

= 2.95

= 11.80

= 0.00

OK = 17.03 0.00

Page 25: Lab SMA MD

214.10 = 2.055

34.00 x 4.00 = 1.31

17.00 x 4.00 = 0.49

26.75 x 2.00 = 0.51

17.00 x 2.00 = 0.24

9.50 x 4.00 = 0.36

4.00 x 4.00 = 0.12

9.30 x 2.00 = 0.18

= 5.27

Page 26: Lab SMA MD

NGECAT

P 1 1.00 x 0.36 x 9.30 x 2.00

P 2 1.00 x 0.36 x 7.48 x 2.00

J 1 1.00 x 0.36 x 14.69 x 3.00

J 2 1.00 x 0.36 x 13.69 x 3.00

J 3 1.00 x 0.36 x 6.37 x 2.00

12.00

Page 27: Lab SMA MD

Page 28: Lab SMA MD

= 6.70

= 5.39

= 15.87

= 14.79

= 4.59

OK = 47.32 0.00

Page 29: Lab SMA MD

DAFTAR HARGA SATUAN BAHAN BANGUNANKABUPATEN JEPARA TAHUN 2010

NO BAHAN / MATERIAL SATUAN KODE KET

I. BAHAN / MATERIAL

1 Batu belah 15 - 20 cm / M 001 Rp 120,000

2 Batu pecah 1 - 2 cm / M 006 Rp 195,000

3 Batu merah Kali Pucang / bj M 018 Rp 400

4 Batu tempel 10 x 20 cm / M 020 Rp 97,900

5 Pasir hurug / timbun / M 023 Rp 75,600

6 Pasir beton / Muntilan / M 024 Rp 250,000

7 Pasir pasang (lokal) / M 025 Rp 137,500

8 Tanah hurug / M 026 Rp 18,900

9 S e m e n ( PC ) / kg M 031 Rp 1,320

10 Semen PC warna / kg M 033 Rp 8,100

11 K a p u r / M 034 Rp 495,000

12 Cat besi (emco/dextro) / kg M 035 Rp 54,600

13 Cat kayu / kg M 036 Rp 46,830

14 Cat Tembok Mowilex utk luar ruangan / kg M 037 Rp 78,200

15 Cat Tembok Mowilex utk dalam ruangan (standar) / kg M 038 Rp 53,000

16 Cat Tembok Decolith/sintex / kg M 041 Rp 19,400

17 Plamur / kg M 044 Rp 25,500

18 Amplas / lbr M 045 Rp 3,360

19 M e n i / kg M 046 Rp 23,940

20 Kawat Galvanis 3 mm / kg M 047 Rp 21,420

21 Baut Baja / kg M 049 Rp 20,160

22 Baja tulangan beton / besi beton / kg M 051 Rp 15,000

23 Paku usuk / reng / kg M 052 Rp 16,200

24 Kawat baja / bindrat / kg M 053 Rp 16,800

25 Multiplek 9 mm (90x220) / lbr M 054 Rp 151,500

26 Triplek 3 mm (90 x 220) / lbr M 055 Rp 58,300

27 Lem kayu / kg M 060 Rp 15,300

28 T i r / kg M 061 Rp 12,700

29 A f d u n e r s / ltr M 062 Rp 9,300

30 Tegel abu -abu 30 x 30 cm / bj M 065 Rp 1,500

31 Ubin keramik 30/30 cm putih (sekualitas Asia/Mulia) / bh M 074 Rp 3,940

32 Ubin keramik warna 20/20 (sekualitas Asia/Mulia) / bh M 076 Rp 1,900

33 Blok pafing tebal 6 cm K.125 / M 080 Rp 37,800

34 Blok pafing tebal 8 cm K.125 / M 081 Rp 39,500

35 Buis beton Ø 0,60 / m' M 090 Rp 128,000

36 Buis beton Ø 0,80 / m' M 091 Rp 216,800

37 Buis beton U 20 / m' M 094 Rp 45,360

38 Roster tanah merah / bh M 097 Rp 4,400

39 Kloset INA jongkok / bh M 098 Rp 134,000

40 Wastafel / bh M 103 Rp 330,000

41 Bak CuciPiring Stainles / bh M 104 Rp 235,000

42 Tempat sabun tanam / bh M 105 Rp 45,000

43 Floor drain / bh M 106 Rp 15,000

44 Seng BJLS 30 / M 107 Rp 55,900

45 Eternit kerang super / M 108 Rp 12,280

46 Asbes plat tb 2 mm / atrisco / M 109 Rp 15,540

47 Asbes plat tb 4 mm / M 110 Rp 21,000

48 Genting pres lokal / bh M 112 Rp 780

49 Genting pres Jatiwangi (kecil) tak berwarna / bh M 113 Rp 3,400

50 Genting bubung Jatiwangi tak berwarna / bh M 117 Rp 16,700

HARGA SATUAN BAHAN

m3

m3

m2

m3

m3

m3

m3

m3

m2

m2

m2

m2

m2

m2

Page 30: Lab SMA MD

51 Genting bubung lokal / bh M 118 Rp 6,900

52 Kayu hutan / M 124 Rp 4,273,500

53 Kayu randu / M 125 Rp 976,500

54 Kayu Kruing eks Banjar Merah / M 126 Rp 6,232,000

55 Kayu bengkirai / M 128 Rp 9,765,000

56 Kayu kanfer / M 129 Rp 10,080,000

57 Bambu / btg M 136 Rp 15,400

58 Kaca bening 5 mm / M 139 Rp 75,000

59 Engsel pintu kuningan lokal / bh M 143 Rp 19,300

60 Engsel jendela / set M 146 Rp 15,000

61 Kunci tanam royal / sekualitas / bh M 147 Rp 110,000

62 Sloot / grendel pintu / bh M 148 Rp 8,400

63 Hak angin biasa / bh M 150 Rp 6,000

64 Rel Pintu Dorong / bh M 153 Rp 275,000

65 Kran stainlesteel / bh M 154 Rp 36,000

66 Pipa PVC Ø 3/4' AW / m' M 157 Rp 9,000

67 Pipa PVC Ø 1" AW / m' M 158 Rp 12,300

68 Pipa PVC Ø 1 1/2" AW / m' M 159 Rp 20,000

69 Pipa PVC Ø 2" AW / m' M 160 Rp 26,500

70 Pipa PVC Ø 3" AW / m' M 161 Rp 48,500

71 Pipa PVC Ø 4" AW / m' M 162 Rp 70,400

72 Besi Strip 2 cm / M 183 Rp 17,400

73 Seng plat BJLS 28 / lbr M 195 Rp 40,000

74 Air / ltr M 204 Rp 17

NO JENIS TENAGA KERJA SATUAN KODE HARGA SATUAN

1 Mandor 1 hari L 061 Rp 42,500

2 Kepala tukang gali 1 hari L 062 Rp 45,000

3 Tukang gali / pekerja 1 hari L 063 Rp 32,500

4 Kepala tukang batu 1 hari L 064 Rp 45,000

5 Tukang batu 1 hari L 065 Rp 42,500

6 Laden tukang batu/pekerja 1 hari L 066 Rp 35,000

7 Kepala tukang kayu 1 hari L 067 Rp 47,500

8 Laden tukang kayu/pekerja 1 hari L 068 Rp 35,000

9 Tukang kayu 1 hari L 069 Rp 45,000

10 Kepala tukang besi 1 hari L 070 Rp 47,500

11 Tukang besi 1 hari L 071 Rp 45,000

12 Laden tukang besi/pekerja 1 hari L 072 Rp 35,000

13 Kepala tukang cat 1 hari L 073 Rp 47,500

14 Tukang cat 1 hari L 074 Rp 45,000

15 Laden tukang cat /pekerja 1 hari L 075 Rp 35,000

16 Laden tukang pipa/pekerja 1 hari L 084 Rp 23,900

NO URAIAN UNIT INSTALASI DAN KODE HARGA

ALAT BERAT

1 Motor Grader 100 HP E 010 Rp 236,500 / jam

2 Wheel loader 115 HP E 052 Rp 192,500 / jam

3 Wheel tractor 60 HP E 053 Rp 82,500 / jam

4 Roller vibrator Self P6 - 6 T E 082 Rp 170,500 / jam

5 Water tank truck 115 HP E 182 Rp 82,500 / jam

6 Dump truck 3,5 Ton/115 HP E 211 Rp 71,500 / jam

7 Service Car E 408 Rp 95,300 / jam

m3

m3

m3

m3

m3

m2

m1

Page 31: Lab SMA MD

DAFTAR ANALISA BIAYA SATUAN PEKERJAANPEKERJAAN KONSTRUKSI

KABUPATEN JEPARATAHUN 2010

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL UPAH

1 2 3 4 5 6 7 8 = 4 x 7 9

II DT 91-0006 PEKERJAAN TANAH2007

T.1 1.0000 m3 Galian Tanah Biasa Sedalam 1 m0.7500 OH pekerja 32,500.00 24,375.00 0.0250 OH mandor 42,500.00 1,062.50

25,437.50 T.10 1.2000 m3 Urugan tanah biasa dan dipadatkan

1.2000 m3 tanah biasa 18,900.00 22,680.00 0.0714 jam pekerja 32,500.00 2,320.50 0.0178 jam mandor 42,500.00 756.50 0.0178 jam whell loader 192,500.00 3,426.50 0.2289 jam dump truck 71,500.00 16,366.35 0.0061 jam motor grader 236,500.00 1,442.65 0.0100 jam vibro roller 170,500.00 1,705.00 0.0070 jam water tangker 82,500.00 577.50 1.0000 ls alat bantu 1,500.00 1,500.00

50,775.00 T.13 1.0000 m3 Urugan Kembali

0.2500 OH pekerja 32,500.00 8,125.00 0.0083 OH mandor 42,500.00 354.17

8,479.17 T.14 1.0000 m3 Urugan Pasir Hurug

1.2000 m3 pasir hurug 75,600.00 90,720.00 0.3000 OH pekerja 32,500.00 9,750.00 0.0100 OH mandor 42,500.00 425.00

100,895.00 T.23 1.0000 ttk

0.1250 OH Pekerja 35,000.00 4,375.00 0.0125 OH mandor 42,500.00 531.25

4,906.25 1.0000 btg Bambu 15,400.00 15,400.00 0.1000 jam alat pancang 9,000.00 900.00 0.0165 jam alat bantu 250.00 4.13

16,304.13 21,210.38

III DT 91-0007 PEKERJAAN PONDASI2007

Pd.1 1.0000 m3 Aanstampeng batu belah1.2000 m3 batu belah15/20 120,000.00 144,000.00 0.4320 m3 pasir hurug 75,600.00 32,659.20

176,659.20 0.7800 OH pekerja 32,500.00 25,350.00 0.3900 OH tukang batu 42,500.00 16,575.00 0.0390 OH kepala tukang 45,000.00 1,755.00 0.0390 OH mandor 42,500.00 1,657.50

45,337.50 221,996.70

Pd.5 1.0000 m3 Pas Pondasi batu belah camp 1 Pc : 4 Ps dengan pasir beton1.2000 m3 batu belah 120,000.00 144,000.00

163.0000 kg semen / PC 1,320.00 215,160.00 0.5220 m3 pasir muntilan 250,000.00 130,500.00

489,660.00 1.5000 OH pekerja 35,000.00 52,500.00 0.6000 OH tukang batu 42,500.00 25,500.00 0.0600 OH kepala tukang 45,000.00 2,700.00 0.0750 OH mandor 42,500.00 3,187.50

83,887.50 573,547.50

Pd.5.b 1.0000 m3 Pas Pondasi batu belah camp 1 Pc : 4 Ps dengan pasir pasang1.2000 m3 batu belah 120,000.00 144,000.00

163.0000 kg semen / PC 1,320.00 215,160.00 0.5220 m3 pasir pasang 137,500.00 71,775.00

430,935.00 1.5000 OH pekerja 35,000.00 52,500.00 0.6000 OH tukang batu 42,500.00 25,500.00 0.0600 OH kepala tukang 45,000.00 2,700.00 0.0750 OH mandor 42,500.00 3,187.50

83,887.50 514,822.50

Pemasangan trucuk bambu Æ 10 cm panjang 6 m

Page 32: Lab SMA MD

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL UPAH

1 2 3 4 5 6 7 8 = 4 x 7 9

Pd.7 1.0000 m3 Pasang Pondasi Rolag Trashraam Bata Merah 1 Pc : 3 Ps500.0000 m3 bata merah 400.00 200,000.00 156.0000 kg semen / PC 1,320.00 205,920.00

0.3300 m3 pasir pasang 137,500.00 45,375.00 451,295.00

4.5000 OH pekerja 35,000.00 157,500.00 1.5000 OH tukang batu 42,500.00 63,750.00 0.1500 OH kepala tukang 45,000.00 6,750.00 0.2250 OH mandor 42,500.00 9,562.50

237,562.50 688,857.50

IV DT 91-0009 PEKERJAAN DINDING2007

D.1 1.0000 m2 Pasangan Batu Merah Kali Pucang Tebal 1 bata, 1Pc : 4 Ps150.0000 bh biji bata merah Kali Pucang 400.00 60,000.00

26.5500 kg semen / PC 1,320.00 35,046.00 0.0930 m3 pasir pasang 137,500.00 12,787.50

107,833.50 0.6000 OH pekerja 35,000.00 21,000.00 0.2000 OH tukang batu 42,500.00 8,500.00 0.0200 OH kepala tukang 45,000.00 900.00 0.0300 OH mandor 42,500.00 1,275.00

31,675.00 139,508.50

D.4 1.0000 m2 Pasangan Batu Merah Kali Pucang Tebal 1/2 bata, 1Pc : 3 Ps75.0000 bh biji bata merah Kali Pucang 400.00 30,000.00 14.3700 kg semen / PC 1,320.00 18,968.40

0.0400 m3 pasir pasang 137,500.00 5,500.00 54,468.40

0.3000 OH pekerja 35,000.00 10,500.00 0.1000 OH tukang batu 42,500.00 4,250.00 0.0100 OH kepala tukang 45,000.00 450.00 0.0150 OH mandor 42,500.00 637.50

15,837.50 70,305.90

D.5 1.0000 m2 Pasangan Batu Merah Kali PucangTebal 1/2 bata, 1Pc : 8 Ps75.0000 bh biji bata merah Kali Pucang 400.00 30,000.00

6.5000 kg semen / PC 1,320.00 8,580.00 0.0500 m3 pasir pasang 137,500.00 6,875.00

45,455.00 0.3000 OH pekerja 35,000.00 10,500.00 0.1000 OH tukang batu 42,500.00 4,250.00 0.0100 OH kepala tukang 45,000.00 450.00 0.0150 OH mandor 42,500.00 637.50

15,837.50 61,292.50

V DT 91-0010 PEKERJAAN PLESTERAN2007

PL.1 1.0000 m2 Plesteran 1 Pc : 3 Ps 6.5000 kg semen/PC 1,320.00 8,580.00 0.0194 m3 pasir pasang 137,500.00 2,667.50

11,247.50 0.4000 OH pekerja 35,000.00 14,000.00 0.2000 OH tukang batu 42,500.00 8,500.00 0.0200 OH kepala tukang 45,000.00 900.00 0.0200 OH mandor 42,500.00 850.00

24,250.00 35,497.50

PL.2 1.0000 m2 Plesteran 1 Pc : 8 Ps di aci PC7.1860 kg semen/PC 1,320.00 9,485.52 0.0280 m3 pasir pasang 137,500.00 3,850.00

13,335.52 0.3000 OH pekerja 35,000.00 10,500.00 0.1500 OH tukang batu 42,500.00 6,375.00 0.0150 OH kepala tukang 45,000.00 675.00 0.0150 OH mandor 42,500.00 637.50

18,187.50 31,523.02

PL.3 1.0000 m2 Plester Siar Adukan 1 Pc : 2 Ps6.3400 kg semen 1,320.00 8,368.80 0.0120 m3 pasir pasang 137,500.00 1,650.00

10,018.80 0.2000 OH pekerja 35,000.00 7,000.00 0.1500 OH tukang batu 42,500.00 6,375.00 0.0150 OH kepala tukang 45,000.00 675.00 0.0100 OH mandor 42,500.00 425.00

14,475.00 24,493.80

Page 33: Lab SMA MD

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL UPAH

1 2 3 4 5 6 7 8 = 4 x 7 9

PL.4 1.0000 m2 Plesteran Beton 1 Pc : 2 Ps Tebal 15 mm9.3000 kg semen 1,320.00 12,276.00 0.0180 m3 pasir pasang 137,500.00 2,475.00

14,751.00 0.2000 OH pekerja 35,000.00 7,000.00 0.1500 OH tukang batu 42,500.00 6,375.00 0.0150 OH kepala tukang 45,000.00 675.00 0.0100 OH mandor 42,500.00 425.00

14,475.00 29,226.00

VI DT 91-0011 PEKERJAAN KAYU2007

KY.1 1.0000 m3 gantungan pyan15.0000 OH tukang kayu 45,000.00 675,000.00

1.5000 OH tukang kepala 47,500.00 71,250.00 5.0000 OH pekerja 35,000.00 175,000.00 0.2500 OH mandor 42,500.00 10,625.00

931,875.00 1.1000 m3 kayu kruing 6,232,000.00 6,855,200.00 0.1500 kg paku 16,200.00 2,430.00

6,857,630.00 7,789,505.00

KY.2 1.0000 m3 Pasang Kusen Pintu dan Jendela kayu Bengkirai1.2000 m3 kayu bengkirai 9,765,000.00 11,718,000.00 1.2500 kg paku 16,200.00 20,250.00 1.0000 kg lem kayu 15,300.00 15,300.00

11,753,550.00 6.0000 OH pekerja 35,000.00 210,000.00

20.0000 OH tukang kayu 45,000.00 900,000.00 2.0000 OH kepala tukang 45,000.00 90,000.00 0.3000 OH mandor 42,500.00 12,750.00

1,212,750.00 12,966,300.00

KY.7 1.0000 m2 Pasang Kasau & Reng Kayu Kruing0.0120 m3 kayu kruing 6,232,000.00 74,784.00 0.1500 kg paku 16,200.00 2,430.00

77,214.00 0.1000 OH pekerja 35,000.00 3,500.00 0.1000 OH tukang kayu 45,000.00 4,500.00 0.0100 OH kepala tukang 45,000.00 450.00 0.0050 OH mandor 42,500.00 212.50

8,662.50 85,876.50

KY.8 1.0000 m2 Pasang Kasau & Reng Kayu Bengkirai 0.0120 m3 kayu bengkirai 9,765,000.00 117,180.00 0.1500 kg paku 16,200.00 2,430.00

119,610.00 0.1000 OH pekerja 35,000.00 3,500.00 0.1000 OH tukang kayu 45,000.00 4,500.00 0.0100 OH kepala tukang 45,000.00 450.00 0.0050 OH mandor 42,500.00 212.50

8,662.50 128,272.50

KY.11 1.0000 m3 Pasang Konstruksi Kuda-Kuda Kayu Bengkirai1.1000 m3 kayu bengkirai 9,765,000.00 10,741,500.00

15.0000 kg baut / angkur 20,160.00 302,400.00 5.6000 kg paku 16,200.00 90,720.00

11,134,620.00 4.0000 OH pekerja 35,000.00 140,000.00

12.0000 OH tukang kayu 45,000.00 540,000.00 1.2000 OH kepala tukang 45,000.00 54,000.00 0.2000 OH mandor 42,500.00 8,500.00

742,500.00 11,877,120.00

KY.13 1.0000 m3 Pasang Konstruksi Kuda-Kuda Kayu Kruing1.1000 m3 kayu kruing 6,232,000.00 6,855,200.00

15.0000 kg baut / angkur 20,160.00 302,400.00 5.6000 kg paku 16,200.00 90,720.00

7,248,320.00 4.0000 OH pekerja 35,000.00 140,000.00

12.0000 OH tukang kayu 45,000.00 540,000.00 1.2000 OH kepala tukang 45,000.00 54,000.00 0.2000 OH mandor 42,500.00 8,500.00

742,500.00 7,990,820.00

Page 34: Lab SMA MD

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL UPAH

1 2 3 4 5 6 7 8 = 4 x 7 9

KY.14 1.0000 m3 Pasang konsol kayu kruing1.1000 m3 kayu kruing 6,232,000.00 6,855,200.00 8.0000 kg baut, beugel 20,160.00 161,280.00

7,016,480.00 6.0000 OH pekerja 35,000.00 210,000.00

18.0000 OH tukang kayu 45,000.00 810,000.00 1.8000 OH kepala tukang 45,000.00 81,000.00 0.3000 OH mandor 42,500.00 12,750.00

1,113,750.00 8,130,230.00

KY.17 1.0000 m2 Pasang Jalusi mati Kosen Kayu Bengkirai0.0600 m3 kayu bengkirai 9,765,000.00 585,900.00 0.1500 kg paku 16,200.00 2,430.00

588,330.00 0.5000 OH pekerja 35,000.00 17,500.00 2.0000 OH tukang kayu 45,000.00 90,000.00 0.2000 OH kepala tukang 45,000.00 9,000.00 0.0250 OH mandor 42,500.00 1,062.50

117,562.50 705,892.50

KY.17.a 1.0000 m2 Pasang Jalusi mati Kayu Bengkirai0.0220 m3 kayu bengkirai 9,765,000.00 214,830.00 0.1500 kg paku 16,200.00 2,430.00

217,260.00 0.5000 OH pekerja 35,000.00 17,500.00 2.0000 OH tukang kayu 45,000.00 90,000.00 0.2000 OH kepala tukang 45,000.00 9,000.00 0.0250 OH mandor 42,500.00 1,062.50

117,562.50 334,822.50

KY.22 1.0000 m2 Bikin daun pintu rangka kayu bengkirai tb 3,5 cm panil multiplek tb 9mm0.0140 m3 kayu bengkirai 9,765,000.00 136,710.00 0.2500 lbr mulitplek 151,500.00 37,875.00 0.0500 kg paku 16,200.00 810.00

175,395.00 2.5000 OH pekerja 35,000.00 87,500.00 7.5000 OH tukang kayu 45,000.00 337,500.00 0.7500 OH kepala tukang 45,000.00 33,750.00 0.1250 OH mandor 42,500.00 5,312.50

464,062.50 639,457.50

KY.25 1.0000 m2 Pasang Pintu Panyl Kayu Kanfer tb.3,5 cm0.0400 m3 kayu kanfer 10,080,000.00 403,200.00 0.5000 kg lem 15,300.00 7,650.00

410,850.00 1.0000 OH pekerja 35,000.00 35,000.00 2.5000 OH tukang kayu 45,000.00 112,500.00 0.2500 OH kepala tukang 45,000.00 11,250.00 0.0500 OH mandor 42,500.00 2,125.00

160,875.00 571,725.00

KY.27 1.0000 m2 Pasang Pintu & Jendela Kaca Kayu Kanfer tb.3 cm0.0240 m3 kayu kanfer 10,080,000.00 241,920.00 0.3000 kg lem 15,300.00 4,590.00

246,510.00 0.8000 OH pekerja 35,000.00 28,000.00 2.0000 OH tukang kayu 45,000.00 90,000.00 0.2000 OH kepala tukang 47,500.00 9,500.00 0.0400 OH mandor 42,500.00 1,700.00

129,200.00 375,710.00

KY.33 1.0000 m' Pasang Lisplank Uk. 3/20 Kayu Bengkirai0.0108 m3 kayu bengkirai 9,765,000.00 105,462.00 0.1000 kg paku 16,200.00 1,620.00

107,082.00 0.0100 OH pekerja 35,000.00 350.00 0.2000 OH tukang kayu 45,000.00 9,000.00 0.0250 OH kepala tukang 45,000.00 1,125.00 0.0050 OH mandor 42,500.00 212.50

10,687.50 117,769.50

KY.33.a 1.0000 m' Pasang Lisplank Uk. 3/20 Kayu kruing0.0108 m3 kayu kruing 6,232,000.00 67,305.60 0.1000 kg paku 16,200.00 1,620.00

68,925.60 0.0100 OH pekerja 35,000.00 350.00 0.2000 OH tukang kayu 45,000.00 9,000.00 0.0250 OH kepala tukang 45,000.00 1,125.00 0.0050 OH mandor 42,500.00 212.50

Page 35: Lab SMA MD

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL UPAH

1 2 3 4 5 6 7 8 = 4 x 7 9

10,687.50 79,613.10

Page 36: Lab SMA MD

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL UPAH

1 2 3 4 5 6 7 8 = 4 x 7 9

KY.35 1.0000 m' Pasang papan sirip0.0050 m3 kayu kruing 6,232,000.00 31,160.00 0.0500 kg paku 16,200.00 810.00

31,970.00 0.1000 OH pekerja 35,000.00 3,500.00 0.1000 OH tukang kayu 45,000.00 4,500.00 0.0100 OH kepala tukang 45,000.00 450.00 0.0500 OH mandor 42,500.00 2,125.00

10,575.00 42,545.00

VII DT 91-0008 PEKERJAAN BETON2007

B.1 1.0000 m3 Membuat beton tumbuk Mutu k.100 ( 1pc : 3.5ps : 4kr)247.0000 kg Pc 1,320.00 326,040.00

0.6210 m3 pasir beton 250,000.00 155,250.00 0.7400 m3 batu pecah 1-2 195,000.00 144,300.00

215.0000 ltr air 17.00 3,655.00 629,245.00

1.6500 OH pekerja 35,000.00 57,750.00 0.2750 OH tukang batu 42,500.00 11,687.50 0.0280 OH kepala tukang 45,000.00 1,260.00 0.0830 OH mandor 42,500.00 3,527.50

74,225.00

703,470.00

B.2 1.0000 m3 Membuat beton Mutu k.175 ( 1 Pc : 2,5 Ps : 3 Kr )326.0000 kg Pc 1,320.00 430,320.00

0.6514 m3 pasir beton 250,000.00 162,857.14 0.7622 m3 batu pecah 1-2 195,000.00 148,633.33

215.0000 ltr air 17.00 3,655.00 745,465.48

1.6500 OH pekerja 35,000.00 57,750.00 0.2500 OH tukang batu 42,500.00 10,625.00 0.0250 OH kepala tukang 45,000.00 1,125.00 0.0800 OH mandor 42,500.00 3,400.00

72,900.00

818,365.48

B.3 1.0000 m3 Membuat beton Mutu k.225 ( 1pc : 2ps : 3kr)371.0000 kg Pc 1,320.00 489,720.00

0.5983 m3 pasir beton 250,000.00 149,571.43 0.7756 m3 batu pecah 1-2 195,000.00 151,233.33

215.0000 ltr air 17.00 3,655.00 794,179.76

1.6500 OH pekerja 35,000.00 57,750.00 0.2500 OH tukang batu 42,500.00 10,625.00 0.0250 OH kepala tukang 45,000.00 1,125.00 0.0800 OH mandor 42,500.00 3,400.00

72,900.00

867,079.76

B.4 1.0000 m3 Membuat beton Mutu k.275 ( 1pc : 1.5ps : 2.5kr)406.0000 kg Pc 1,320.00 535,920.00

0.5863 m3 pasir beton 250,000.00 146,571.43 0.7600 m3 batu pecah 1-2 195,000.00 148,200.00

215.0000 ltr air 17.00 3,655.00 834,346.43

1.6500 OH pekerja 35,000.00 57,750.00 0.2500 OH tukang batu 42,500.00 10,625.00 0.0300 OH kepala tukang 45,000.00 1,350.00 0.0800 OH mandor 42,500.00 3,400.00

73,125.00 907,471.43

B.6 1.0000 kg Pembesian dg Besi Polos atau Ulir1.0500 kg besi beton 15,000.00 15,750.00 0.0150 kg kawat bindrat 16,800.00 252.00

16,002.00 0.0070 OH pekerja 35,000.00 245.00 0.0070 OH tukang besi 45,000.00 315.00 0.0007 OH kepala tukang 47,500.00 33.25 0.0004 OH mandor 42,500.00 17.00

610.25

16,612.25

B.7 1.0000 m' Kolom praktis (11 x 11 cm)0.0020 m3 papan kayu randu 976,500.00 1,953.00 0.0100 kg paku 16,200.00 162.00 3.0000 kg besi beton 15,000.00 45,000.00 0.4500 kg kawat bindrat 16,800.00 7,560.00 4.0000 kg Pc 1,320.00 5,280.00 0.0060 m3 pasir beton 250,000.00 1,500.00 0.0090 m3 batu pecah 1-2 195,000.00 1,755.00

Page 37: Lab SMA MD

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL UPAH

1 2 3 4 5 6 7 8 = 4 x 7 9

63,210.00

Page 38: Lab SMA MD

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL UPAH

1 2 3 4 5 6 7 8 = 4 x 7 9

0.1800 OH pekerja 35,000.00 6,300.00 0.0200 OH tukang batu 42,500.00 850.00 0.0200 OH tukang kayu 45,000.00 900.00 0.0200 OH tukang besi 45,000.00 900.00 0.0060 OH kepala tukang 45,000.00 270.00 0.0090 OH mandor 42,500.00 382.50

9,602.50

72,812.50

B.8 1.0000 m' Sloof / ring balk beton bertulang (10 x 15 cm)0.0030 m3 papan kayu randu 976,500.00 2,929.50 0.0200 kg paku 16,200.00 324.00 3.6000 kg besi beton 15,000.00 54,000.00 0.0500 kg kawat bindrat 16,800.00 840.00 5.5000 kg Pc 1,320.00 7,260.00 0.0090 m3 pasir beton 250,000.00 2,250.00 0.0150 m3 batu pecah 1-2 195,000.00 2,925.00

70,528.50

0.2970 OH pekerja 32,500.00 9,652.50 0.0330 OH tukang batu 42,500.00 1,402.50 0.0330 OH tukang kayu 45,000.00 1,485.00 0.0330 OH tukang besi 45,000.00 1,485.00 0.0100 OH kepala tukang 45,000.00 450.00 0.0150 OH mandor 42,500.00 637.50

15,112.50

85,641.00

B.9 1.0000 m2 Begisting untuk plat lantai0.0400 m3 papan kayu randu 976,500.00 39,060.00 0.4000 kg paku 16,200.00 6,480.00 0.0150 m3 balok kayu 976,500.00 14,647.50 0.3500 lbr triplek 58,300.00 20,405.00 3.0000 btg bambu Ø 8-10 cm pj. 8 m 15,400.00 46,200.00

126,792.50

0.6600 OH pekerja 35,000.00 23,100.00 0.3300 OH tukang kayu 45,000.00 14,850.00 0.0330 OH kepala tukang 47,500.00 1,567.50 0.0330 OH mandor 42,500.00 1,402.50

40,920.00

167,712.50

B.10 1.0000 m2 Steiger dari bambu0.4000 kg paku 16,200.00 6,480.00 0.0150 m3 balok kayu 976,500.00 14,647.50 2.0000 btg bambu Ø 8-10 cm pj. 8 m 15,400.00 30,800.00

51,927.50

0.2500 OH pekerja 35,000.00 8,750.00 0.1700 OH tukang kayu 45,000.00 7,650.00 0.0020 OH kepala tukang 47,500.00 95.00 0.0013 OH mandor 42,500.00 55.25

16,550.25 68,477.75

B.11 1.0000 m2 Cetakan beton (bekisting) dengan kayu randu tebal 2 cm0.0220 m3 kayu randu tebal 2 cm 976,500.00 21,483.00 0.4000 kg paku 16,200.00 6,480.00

27,963.00 0.5000 OH tukang kayu 45,000.00 22,500.00 0.0500 OH tukang kepala 47,500.00 2,375.00 0.2000 OH pekerja 35,000.00 7,000.00 0.0100 OH mandor 42,500.00 425.00

32,300.00 60,263.00

VIII 03-3436-2002 PEKERJAAN PENUTUP ATAP

PA.1 1.0000 m2 Pas atap genteng Jatiwangi tak berwarna kecil0.0750 OH tukang kayu 45,000.00 3,375.00 0.0080 OH tukang kepala 47,500.00 380.00 0.1500 OH pekerja 35,000.00 5,250.00 0.0080 OH mandor 42,500.00 340.00

9,345.00 25.0000 bj genteng pres Jatiwangi kecil 3,400.00 85,000.00

94,345.00 PA.5 1.0000 m2 Pas atap genteng lokal

Upah tenaga 9,345.00 25.0000 bj genteng lokal 780.00 19,500.00

28,845.00

Page 39: Lab SMA MD

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL UPAH

1 2 3 4 5 6 7 8 = 4 x 7 9

PA.7 1.0000 m' Pas krepus Jatiwangi tak berwarna0.2000 OH tukang batu 42,500.00 8,500.00 0.0200 OH tukang kepala 45,000.00 900.00 0.4000 OH pekerja 35,000.00 14,000.00 0.0020 OH mandor 42,500.00 85.00

23,485.00 8.0000 kg semen / PC 1,320.00 10,560.00 0.0320 m3 pasir 137,500.00 4,400.00 3.5000 bj krepus 16,700.00 58,450.00

73,410.00 96,895.00

PA.9 1.0000 m' Pas krepus lokalUpah tenaga 23,485.00

3.6000 kg semen 1,320.00 4,752.00 0.0300 m3 pasir 137,500.00 4,125.00 3.5000 bj krepus Kudus/lokal 6,900.00 24,150.00

33,027.00 56,512.00

IX DT 91-0013 PEKERJAAN LANGIT-LANGIT2007

LL.1 1.0000 m2 Langit-Langit Asbes (1,00x1,00)m, tb. 4 mm1.1000 lbr plat asbes tb 4 mm 21,000.00 23,100.00 0.0100 kg paku 16,200.00 162.00

23,262.00 0.0300 OH pekerja 35,000.00 1,050.00 0.0700 OH tukang kayu 45,000.00 3,150.00 0.0070 OH kepala tukang 47,500.00 332.50 0.0015 OH mandor 42,500.00 63.75

4,596.25 27,858.25

LL.2 1.0000 m2 pas pyan eternit kerang super0.4000 OH tukang kayu 45,000.00 18,000.00 0.0400 OH tukang kepala 47,500.00 1,900.00 0.1400 OH pekerja 35,000.00 4,900.00 0.0070 OH mandor 42,500.00 297.50

25,097.50 0.2000 kg paku 16,200.00 3,240.00 0.0070 m3 kayu kruing 4/6 + 5/7 6,232,000.00 43,624.00 1.0000 m2 eternit kerang super 12,280.00 12,280.00

59,144.00 84,241.50

LL.3 1.0000 m2 pas pyan eternit atrisco0.4000 OH tukang kayu 45,000.00 18,000.00 0.0400 OH tukang kepala 47,500.00 1,900.00 0.1400 OH pekerja 35,000.00 4,900.00 0.0070 OH mandor 42,500.00 297.50

25,097.50 0.2000 kg paku 16,200.00 3,240.00 0.0070 m3 kayu kruing 4/6 + 5/7 6,232,000.00 43,624.00 1.0000 m2 eternit atrisco 15,540.00 15,540.00

62,404.00 87,501.50

X 03- PEKERJAAN SANITASIS.2 1.0000 unit Memasang Closet Jongkok Porcelen

1.0000 bh kloset jongkok 134,000.00 134,000.00 6.0000 kg pc 1,320.00 7,920.00 0.0100 m3 pasir pasang 137,500.00 1,375.00

143,295.00 1.0000 OH pekerja 35,000.00 35,000.00 1.5000 OH tukang batu 42,500.00 63,750.00 1.5000 OH kepala tukang 45,000.00 67,500.00 0.1600 OH mandor 42,500.00 6,800.00

173,050.00 316,345.00

S.4 1.0000 unit Memasang Wastafel1.0000 bh wastafel 330,000.00 330,000.00 0.3000 perlengkapan 30% 330,000.00 99,000.00 6.0000 kg pc 1,320.00 7,920.00 0.0100 m3 pasir pasang 137,500.00 1,375.00

438,295.00 1.0000 OH pekerja 35,000.00 35,000.00 1.0000 OH tukang batu 42,500.00 42,500.00 0.1000 OH kepala tukang 45,000.00 4,500.00 0.1000 OH mandor 42,500.00 4,250.00

86,250.00 524,545.00

S.5 1.0000 unit Memasang Bak Cuci Piring Stainlees1.0000 bh bak cuci piring 235,000.00 235,000.00 0.3000 set water drain + asesories 235,000.00 70,500.00

Page 40: Lab SMA MD

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL UPAH

1 2 3 4 5 6 7 8 = 4 x 7 9

305,500.00

Page 41: Lab SMA MD

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL UPAH

1 2 3 4 5 6 7 8 = 4 x 7 9

1.0000 OH pekerja 35,000.00 35,000.00 1.0000 OH tukang batu 42,500.00 42,500.00 0.1000 OH kepala tukang 45,000.00 4,500.00 0.1000 OH mandor 42,500.00 4,250.00

86,250.00 391,750.00

S.6 1.0000 buah Memasang floor drain1.0000 bh floor drain 15,000.00 15,000.00

15,000.00 0.0100 OH pekerja 35,000.00 350.00 0.1000 OH tukang batu 42,500.00 4,250.00 0.0100 OH kepala tukang 45,000.00 450.00 0.0050 OH mandor 42,500.00 212.50

5,262.50 20,262.50

XI DT 91-0014 PEKERJAAN BESI DAN ALUMINIUM2007

BS.8 1.0000 m' Pasang Talang Datar / Jurai Seng BJLS 280.5000 lbr seng plat BJLS 28 40,000.00 20,000.00 0.0150 kg paku 16,200.00 243.00 0.0190 m3 kayu kruing 6,232,000.00 118,408.00

138,651.00 0.2000 OH pekerja 35,000.00 7,000.00 0.4000 OH tukang kayu 45,000.00 18,000.00 0.0250 OH kepala tukang 47,500.00 1,187.50

scrool 0.0100 OH mandor 42,500.00 425.00 46,855.50 26,612.50

165,263.50 BS.9 1.0000 m' Pasang Talang Miring Seng BJLS 28

0.5000 lbr seng plat BJLS 28 40,000.00 20,000.00 0.0150 kg paku 16,200.00 243.00 0.0190 m3 kayu kruing 6,232,000.00 118,408.00

138,651.00 0.2000 OH pekerja 35,000.00 7,000.00 0.4000 OH tukang kayu 45,000.00 18,000.00 0.0250 OH kepala tukang 47,500.00 1,187.50 0.0013 OH mandor 42,500.00 53.13

26,240.63 164,891.63

BS.10 1.0000 kg Baut-baut / angkur1.1000 kg baut baja 20,160.00 22,176.00 0.0900 OH tukang besi 45,000.00 4,050.00 0.0300 OH tukang kepala 47,500.00 1,425.00 0.0900 OH pekerja 35,000.00 3,150.00

30,801.00 BS.11 1.0000 m' Pasang Talang Talang Gantung 15 cm

0.2500 lbr seng plat BJLS 28 40,000.00 10,000.00 0.0100 kg paku 16,200.00 162.00

0.6500 besi strip 17,400.00 11,310.00

21,472.00 0.1500 OH pekerja 35,000.00 5,250.00 0.3000 OH tukang besi 45,000.00 13,500.00 0.0300 OH kepala tukang 47,500.00 1,425.00 0.0080 OH mandor 42,500.00 340.00

20,515.00 41,987.00

XII 03- PEKERJAAN KUNCI DAN KACA

KK.1 1.0000 bh Pasang Kunci Tanam Biasa1.0000 bh kunci tanam biasa 110,000.00 110,000.00

110,000.00 0.0100 OH pekerja 35,000.00 350.00 0.5000 OH tukang kayu 45,000.00 22,500.00 0.0100 OH kepala tukang 47,500.00 475.00 0.0050 OH mandor 42,500.00 212.50

23,537.50 133,537.50

KK.3 1.0000 bh Pasang Engsel Pintu1.0000 bh engsel pintu 19,300.00 19,300.00

19,300.00 0.0150 OH pekerja 35,000.00 525.00 0.1500 OH tukang kayu 45,000.00 6,750.00 0.0150 OH kepala tukang 47,500.00 712.50 0.0008 OH mandor 42,500.00 31.88

8,019.38 27,319.38

m1

Page 42: Lab SMA MD

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL UPAH

1 2 3 4 5 6 7 8 = 4 x 7 9

KK.4 1.0000 set Pasang Engsel Jendela Kupu-Kupu1.0000 set engsel jendela 15,000.00 15,000.00

15,000.00 0.0100 OH pekerja 35,000.00 350.00 0.1000 OH tukang kayu 45,000.00 4,500.00 0.0100 OH kepala tukang 47,500.00 475.00 0.0050 OH mandor 42,500.00 212.50

5,537.50 20,537.50

KK.6 1.0000 bh Pasang Kait Angin1.0000 bh kait angin 6,000.00 6,000.00

6,000.00 0.0150 OH pekerja 35,000.00 525.00 0.1500 OH tukang kayu 45,000.00 6,750.00 0.0150 OH kepala tukang 47,500.00 712.50 0.0008 OH mandor 42,500.00 31.88

8,019.38 14,019.38

KK.8 1.0000 bh Pasang Kunci Sloot1.0000 bh kunci sloot 8,400.00 8,400.00

8,400.00 0.0200 OH pekerja 35,000.00 700.00 0.2000 OH tukang kayu 45,000.00 9,000.00 0.0200 OH kepala tukang 47,500.00 950.00 0.0010 OH mandor 42,500.00 42.50

10,692.50 19,092.50

KK.9 1.0000 bh Pasang Rel Pintu Dorong1.0000 bh rel pintu dorong 275,000.00 275,000.00

275,000.00 0.0600 OH pekerja 35,000.00 2,100.00 0.6000 OH tukang kayu 45,000.00 27,000.00 0.0600 OH kepala tukang 47,500.00 2,850.00 0.0030 OH mandor 42,500.00 127.50

32,077.50 307,077.50

KK.11 1.0000 m2 Pasang Kaca tb. 5 mm1.1000 bh kaca 5 mm 75,000.00 82,500.00

82,500.00 0.0150 OH pekerja 35,000.00 525.00 0.1500 OH tukang kayu 45,000.00 6,750.00 0.0150 OH kepala tukang 47,500.00 712.50 0.0008 OH mandor 42,500.00 31.88

8,019.38 90,519.38

XIII DT 91-0012 PEKERJAAN PENUTUP LANTAI DAN DINDING2007

L.6 1.0000 m2 Pasang Lantai Keramik 20x20 26.5000 bh keramik 20/20 1,900.00 50,350.00 10.4000 kg pc 1,320.00 13,728.00

0.0450 m3 pasir pasang 137,500.00 6,187.50 1.6200 kg semen warna 8,100.00 13,122.00

83,387.50 0.2500 OH pekerja 35,000.00 8,750.00 0.1200 OH tukang batu 42,500.00 5,100.00 0.0120 OH kepala tukang 45,000.00 540.00 0.0125 OH mandor 42,500.00 531.25

14,921.25 98,308.75

L.8 1.0000 m2 Pasang Lantai Keramik 30x30 Putih11.8700 bh keramik putih 30/30 3,940.00 46,767.80 10.0000 kg pc 1,320.00 13,200.00

0.0450 m3 pasir pasang 137,500.00 6,187.50 1.5000 kg semen warna 8,100.00 12,150.00

78,305.30 0.2600 OH pekerja 35,000.00 9,100.00 0.1300 OH tukang batu 42,500.00 5,525.00 0.0130 OH kepala tukang 45,000.00 585.00 0.0130 OH mandor 42,500.00 552.50

15,762.50 94,067.80

L.11 1.0000 m2 Pasang Dinding Keramik 20x20 26.5000 bh keramik 20/20 1,900.00 50,350.00

9.3000 kg pc 1,320.00 12,276.00 0.0180 m3 pasir pasang 137,500.00 2,475.00

Page 43: Lab SMA MD

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL UPAH

1 2 3 4 5 6 7 8 = 4 x 7 9

1.9400 kg semen warna 8,100.00 15,714.00 80,815.00

Page 44: Lab SMA MD

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL UPAH

1 2 3 4 5 6 7 8 = 4 x 7 9

0.9000 OH pekerja 35,000.00 31,500.00 0.4500 OH tukang batu 42,500.00 19,125.00 0.0450 OH kepala tukang 45,000.00 2,025.00 0.0450 OH mandor 42,500.00 1,912.50

54,562.50 135,377.50

L.12 1.0000 m2 pasang batu tempel muntilan1.1000 bh batu tempel 97,900.00 107,690.00

11.7000 kg pc 1,320.00 15,444.00 0.0350 m3 pasir pasang 137,500.00 4,812.50

127,946.50 0.7000 OH pekerja 35,000.00 24,500.00 0.3500 OH tukang batu 42,500.00 14,875.00 0.0350 OH kepala tukang 45,000.00 1,575.00 0.0350 OH mandor 42,500.00 1,487.50

42,437.50 170,384.00

L.15 1.0000 m2 pasang lantai tegel 30 x 300.0130 m3 kapur x 1 1/2 495,000.00 9,652.50 0.0260 m3 pasir x 1 1/2 137,500.00 5,362.50

11.0000 bh tegel abu-abu 30x30 1,500.00 16,500.00 2.0000 kg semen 1,320.00 2,640.00

34,155.00 0.1500 OH tukang batu 42,500.00 6,375.00 0.0150 OH tukang kepala 45,000.00 675.00 0.5000 OH pekerja 35,000.00 17,500.00 0.0250 OH mandor 42,500.00 1,062.50

25,612.50 59,767.50

L.18 1.0000 m2 pasang blok pafing tebal 6 cm K.1250.0050 m3 pasir muntilan utk nat 250,000.00 1,250.00 1.0000 m2 pafing 37,800.00 37,800.00

39,050.00 Upah tenaga 25,612.50

64,662.50

L.19 1.0000 m2 pasang blok pafing tebal 8 cm K.1250.0050 m3 pasir muntilan utk nat 250,000.00 1,250.00 1.0000 m2 pafing 39,500.00 39,500.00

40,750.00 Upah tenaga 25,612.50

66,362.50 L.26 1.0000 m3 perekat portland 1 : 2

580.6000 kg semen / PC 1,320.00 766,392.00 0.9500 m3 pasir 137,500.00 130,625.00

897,017.00

XIV 03- -2002 PEKERJAAN PENGECATAN

C.1 1.0000 m2 mengecat kayu 3 x0.2600 kg cat 46,830.00 12,175.80 0.1740 ltr afduner 9,300.00 1,618.20 0.0600 kg plamur 25,500.00 1,530.00 0.0750 kg meni 23,940.00 1,795.50 0.2000 lbr amplas 3,360.00 672.00

17,791.50 0.0750 OH tukang cat 45,000.00 3,375.00 0.0075 OH tukang kepala 47,500.00 356.25 0.0500 OH pekerja 35,000.00 1,750.00 0.0025 OH mandor 42,500.00 106.25

5,587.50 23,379.00

C.4 1.0000 m2 mengecat tembok dg Mowilex utk dalam ruangan0.2000 kg cat tembok Mowilex 53,000.00 10,600.00 0.2250 kg plamur 25,500.00 5,737.50 0.2500 lbr amplas 3,360.00 840.00 0.0750 OH tukang cat 45,000.00 3,375.00 0.0075 OH tukang kepala 47,500.00 356.25 0.0500 OH pekerja 35,000.00 1,750.00 0.0025 OH mandor 42,500.00 104.13

22,762.88

Page 45: Lab SMA MD

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL UPAH

1 2 3 4 5 6 7 8 = 4 x 7 9

C.5 1.0000 m2 mengecat tembok dg Mowilex utk luar ruangan0.3500 kg cat tembok Mowilex 78,200.00 27,370.00 0.2250 kg plamur 25,500.00 5,737.50 0.2500 lbr amplas 3,360.00 840.00 0.0750 OH tukang cat 45,000.00 3,375.00 0.0075 OH tukang kepala 47,500.00 356.25 0.0500 OH pekerja 35,000.00 1,750.00 0.0025 OH mandor 42,500.00 106.25

39,535.00

C.6 1.0000 m2 mengecat tembok dg Decolith0.3000 kg cat tembok Decolith 19,400.00 5,820.00 0.2250 kg plamur 25,500.00 5,737.50 0.2500 lbr amplas 3,360.00 840.00 0.0750 OH tukang cat 45,000.00 3,375.00 0.0075 OH tukang kepala 47,500.00 356.25 0.0500 OH pekerja 35,000.00 1,750.00 0.0025 OH mandor 42,500.00 106.25

17,985.00

Page 46: Lab SMA MD

DAFTAR HARGA SATUAN PEKERJAAN KONSTRUKSIKABUPATEN JEPARA

TAHUN ANGGARAN 2010█ CIPTA KARYA █ BINA MARGA █ SUMBER DAYA AIR █

NO URAIAN PEKERJAAN SATUAN

I PEKERJAAN TANAH (03-2835-1992)1 Galian Tanah Biasa Sedalam 1 m T.1 Rp. Rp 25,437.50 25,437 2 Urugan tanah biasa dipadatkan T.10 Rp 50,775.00 50,775 3 Urugan Kembali T.13 Rp 8,479.17 8,479 4 Urugan Pasir Hurug T.14 Rp 100,895.00 100,895 5 1 ttk T.23 Rp 21,210.38 21,210

II PEKERJAAN PONDASI (03-2836-2002)1 Aanstampeng batu belah Pd.1 Rp. Rp 221,996.70 221,996 2 Pasang pondasi batu belah 1:4 pasir beton Pd.5 Rp. Rp 573,547.50 573,547 3 Pasang pondasi batu belah 1:4 pasir pasang Pd.5.bRp. Rp 514,822.50 514,822 4 Pasang pondasi rolag tashraam batu merah 1:3 Pd.7 Rp. Rp 688,857.50 688,857

III PEKERJAAN DINDING (03-2837-2002)1 Pasangan Batu Merah Kali Pucang Tebal 1 bata, 1Pc : 4 Ps D.1 Rp 139,508.50 139,508 2 Pasangan Batu Merah Kali Pucang Tebal 1/2 bata, 1Pc : 3 Ps D.4 Rp 70,305.90 70,305 3 Pasangan Batu Merah Kali PucangTebal 1/2 bata, 1Pc : 8 Ps D.5 Rp 61,292.50 61,292

IV PEKERJAAN PLESTERAN (03-2837-2002)1 Plesteran 1 Pc : 3 Ps diaci PL.1 Rp. Rp 35,497.50 35,497 2 Plesteran 1 Pc : 8 Ps diaci PL.2 Rp. Rp 31,523.02 31,523 3 Plester Siar Adukan 1 Pc : 2 Ps PL.3 Rp. Rp 24,493.80 24,493 4 Plesteran Beton 1 Pc : 2 Ps Tebal 15 mm PL.4 Rp 29,226.00 29,226

V PEKERJAAN KAYU ( 03-3434-2002 )1 Pasang gantungan pyan KY.1 Rp. Rp 7,789,505.00 7,789,505 2 Pasang Kusen Pintu dan Jendela kayu Bengkirai KY.2 Rp 12,966,300.00 12,966,300 3 Pasang Kasau & Reng Kayu Kruing KY.7 Rp 85,876.50 85,876 4 Pasang Kasau & Reng Kayu Bengkirai KY.8 Rp 128,272.50 128,272 5 Pasang Konstruksi Kuda-Kuda Kayu Bengkirai KY.11 Rp 11,877,120.00 11,877,120 6 Pasang Konstruksi Kuda-Kuda Kayu Kruing KY.13 Rp 7,990,820.00 7,990,820 7 Pasang konsol kayu kruing KY.14 Rp 8,130,230.00 8,130,230 8 Pasang Jalusi mati Kosen Kayu Bengkirai KY.17 Rp 705,892.50 705,892 9 Pasang Jalusi mati Kayu Bengkirai KY.17.a Rp 334,822.50 334,822

10 Bikin daun pintu rangka kayu bengkirai tb 3,5 cm panil multiplek tb 9 mm KY.22 Rp. Rp 639,457.50 639,457 11 Pasang Pintu Panyl Kayu Kanfer tb.3,5 cm KY.25 Rp 571,725.00 571,725 12 Pasang Pintu & Jendela Kaca Kayu Kanfer tb.3 cm KY.27 Rp 375,710.00 375,710 13 Pasang Lisplank Uk. 3/20 Kayu Bengkirai 1m' KY.33 Rp 117,769.50 117,769 14 Pasang Lisplank Uk. 3/20 Kayu kruing 1m' KY.33.a Rp 79,613.10 79,613 15 Pasang papan sirip 1m' KY.35 Rp 42,545.00 42,545

VI PEKERJAAN BETON ( 03-3435-2002 )1 Membuat beton tumbuk Mutu k.100 B.1 Rp 703,470.00 703,470 2 Membuat beton Mutu k.175 B.2 Rp 818,365.48 818,365 3 Membuat beton Mutu k.225 B.3 Rp 867,079.76 867,079 4 Membuat beton Mutu k.275 B.4 Rp 907,471.43 907,471 5 Pembesian dg Besi Polos atau Ulir 1 kg B.6 Rp 16,612.25 16,612 6 Kolom praktis 1 m' B.7 Rp 72,812.50 72,812 7 Sloof / ring balk beton bertulang 1 m' B.8 Rp 85,641.00 85,641 8 Begisting untuk plat lantai B.9 Rp 167,712.50 167,712 9 Steiger dari bambu B.10 Rp 68,477.75 68,477

10 Cetakan beton (bekisting) dengan kayu randu tebal 2 cm B.11 Rp 60,263.00 60,263

VII PEKERJAAN PENUTUP ATAP (03-3436-2002)1 Pas atap genteng Jatiwangi tak berwarna kecil PA.1 Rp 94,345.00 94,345 2 Pasang atap genteng lokal PA.5 Rp. Rp 28,845.00 28,845 3 Pas krepus Jatiwangi tak berwarna 1m' PA.7 Rp 96,895.00 96,895 4 Pasang krepus lokal 1 m' PA.9 Rp. Rp 56,512.00 56,512

VIII PEKERJAAN LANGIT-LANGIT ( 03-2838-2002 )1 Langit-Langit Asbes (1,00x1,00)m, tb. 4 mm LL.1 Rp 27,858.25 27,858 2 Pasang pyan eternit kerang super LL.2 Rp. Rp 84,241.50 84,241 3 Pasang pyan eternit atrisco LL.3 Rp. Rp 87,501.50 87,501

IX PEKERJAAN SANITASI1 Memasang Closet Jongkok Porcelen bh S.2 Rp 316,345.00 316,345 2 Memasang Wastafel bh S.4 Rp 524,545.00 524,545 3 Memasang Bak Cuci Piring Stainlees bh S.5 Rp 391,750.00 391,750 4 Memasang floor drain bh S.6 Rp 20,262.50 20,262

KODE ANALISA

HARGA SATUAN PEKERJAAN

HARGA SATUAN

PEKERJAAN DIBULATKAN

1 m3

1 m3

1 m3

1 m3

Pemasangan trucuk bambu Æ 10 cm panjang 6 m

1 m3

1 m3

1 m3

1 m3

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m3

1 m3

1 m2

1 m2

1 m3

1 m3

1 m3

1 m2

1 m2

1 m2

1 m2

1 m2

1 m3

1 m3

1 m3

1 m3

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

Page 47: Lab SMA MD

NO URAIAN PEKERJAAN SATUAN KODE ANALISA

HARGA SATUAN PEKERJAAN

HARGA SATUAN

PEKERJAAN DIBULATKAN

X PEKERJAAN BESI DAN ALUMINIUM1 Pasang Talang Datar / Jurai Seng BJLS 28 BS.8 Rp 165,263.50 165,263 2 Pasang Talang Miring Seng BJLS 28 BS.9 Rp 164,891.63 164,891 3 Baut angkur 1 kg BS.10 Rp. Rp 30,801.00 30,801 4 Pasang Talang Gantung 15 cm BS.11 Rp. Rp 41,987.00 41,987

XI PEKERJAAN KUNCI DAN KACA1 Pasang Kunci Tanam Biasa bh KK.1 Rp 133,537.50 133,537 2 Pasang Engsel Pintu bh KK.3 Rp 27,319.38 27,319 3 Pasang Engsel Jendela Kupu-Kupu set KK.4 Rp 20,537.50 20,537 4 Pasang Kait Angin bh KK.6 Rp 14,019.38 14,019 5 Pasang Kunci Sloot bh KK.8 Rp 19,092.50 19,092 6 Pasang Rel Pintu Dorong bh KK.9 Rp 307,077.50 307,077 7 Pasang Kaca tb. 5 mm KK.11 Rp 90,519.38 90,519

XII PEKERJAAN PENUTUP LANTAI DAN DINDING1 Pasang Lantai Keramik 20x20 L.6 Rp 98,308.75 98,308 2 Pasang Lantai Keramik 30x30 Putih L.8 Rp 94,067.80 94,067 3 Pasang Dinding Keramik 20x20 L.11 Rp 135,377.50 135,377 4 Pasang Batu Tempel Muntilan L.12 Rp. Rp 170,384.00 170,384 5 Pasang lantai tegel abu-abu ukuran 30 x 30 L.15 Rp. Rp 59,767.50 59,767 6 Pasang blok paving ukuran tebal 6 cm K.125 L.18 Rp. Rp 64,662.50 64,662 7 Pasang blok paving ukuran tebal 8 cm K.125 L.19 Rp. Rp 66,362.50 66,362 8 Perekat portland 1 : 2 L.26 Rp 897,017.00 897,017

XIII PEKERJAAN PENGECATAN1 Mengecat kayu 3 kali C.1 Rp. Rp 23,379.00 23,379 2 Mengecat tembok dg mowilex utk dalam ruangan C.4 Rp. Rp 22,762.88 22,762 3 Mengecat tembok dg mowilex utk luar ruangan C.5 Rp. Rp 39,535.00 39,535 4 Mengecat tembok dg Decolit C.6 Rp. Rp 17,985.00 17,985

1 m2

1 m2

1 m1

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m3

1 m2

1 m2

1 m2

1 m2