Sheet1HASIL PENGUJIAN RELAI ARUS LEBIHBAY : LINE 1 BATUBESAR -
NONGSAARUS KERJAPENGUJIAN ARUS KERJA
MATA UJIFASA YANG DI UJIMATA UJIFASA YANG DI UJIWaktu kerja FASA
RFASA RFASA S FASA TFASA NFASA RFASA S FASA TFASA
NISIPIR2xIS3xIS4xISArus setelan (Is) A1110.2Arus setelan (Is)
A0.50.50.50.211.2112.127.66.02Arus Kerja (Ipu) A1.21.21.20.23Arus
Kerja (Ipu) A0.510.510.510.21Arus Reset (Ir) A1110.2Arus Reset (Ir)
A0.480.480.480.18Ir/Ipu
%0.83333333330.83333333330.83333333330.8695652174Ir/Ipu
%0.94117647060.94117647060.94117647060.8571428571
WAKTU KERJAPENGUJIAN WAKTU KERJA
MATA UJIFASAARUS INJEKSIMATA UJIFASAARUS
INJEKSI2XIs3XIs4XIs2XIs3XIs4XIsWAKTU KERJAR12.127.66.02WAKTU
KERJAR8.675.414.27S12.127.66.02S8.675.414.27T12.127.66.02T8.675.414.27N12.127.626.04N6.444.023.17
ARUS FASA R LINEARUS FASA S LINEARUS FASA T LINEARUS FASA N
LINEWAKTU KERJA FASA R LINEWAKTU KERJA FASA S LINEWAKTU KERJA FASA
T LINEWAKTU KERJA FASA N LINEARUS FASA R TRAFOARUS FASA S TRAFOARUS
FASA T TRAFOARUS FASA N TRAFOWAKTU KERJA FASA R TRAFOWAKTU KERJA
FASA S TRAFOWAKTU KERJA FASA T TRAFOWAKTU KERJA FASA N TRAFOFASA
RFASA SFASA TFASA NARUS KERJA (A)WAKTU KERJA (s)ARUS KERJA (A)WAKTU
KERJA (s)ARUS KERJA (A)WAKTU KERJA (s)ARUS KERJA (A)WAKTU KERJA
(s)3008.673008.673008.673006.444505.414505.414505.414504.026004.276004.276004.276003.17
Sheet2HASIL PENGUJIAN RELAI ARUS LEBIHBAY : LINE 1 BATUBESAR -
NONGSA
PENGUJIAN ARUS KERJA LINE
MATA UJIFASA YANG DI UJIFASA RFASA SFASA TFASA NFasa N
TransmisiFasa N TrafoFASA RFASA S FASA TFASA NARUS KERJA (A)WAKTU
KERJA (S)ARUS KERJA (A)WAKTU KERJA (S)ARUS KERJA (A)WAKTU KERJA
(S)ARUS KERJA (A)WAKTU KERJA (S)Arus Kerja (A)Waktu Kerja (S)Arus
Kerja (A)Waktu Kerja (S)Arus setelan (Is)
A1110.2160012.12160012.12160012.12160012.12160016.153006.15Arus
Kerja (Ipu)
A1.21.21.20.2324007.624007.624007.624007.6224009.544503.63Arus
Reset (Ir)
A1110.232006.0232006.0232006.0232006.0432007.56002.85Ir/Ipu
%0.83333333330.83333333330.83333333330.86956521749002.2212001.9PENGUJIAN
WAKTU KERJA LINE15001.722501.45MATA UJIFASAARUS
INJEKSI30001.312XIs3XIs4XIs33001.26WAKTU
KERJAR12.127.66.02S12.127.66.02T12.127.66.02N12.127.626.04
HASIL PENGUJIAN RELAI ARUS LEBIHBAY : TRAFO 1 GI SAGULUNG
PENGUJIAN ARUS KERJA TRAFO
MATA UJIFASA YANG DI UJIFASA RFASA SFASA TFASA NFASA RFASA S
FASA TFASA NARUS KERJA (A)WAKTU KERJA (s)ARUS KERJA (A)WAKTU KERJA
(s)ARUS KERJA (A)WAKTU KERJA (s)ARUS KERJA (A)WAKTU KERJA (s)Arus
setelan (Is) A0.50.50.50.23008.673008.673008.673006.44Arus Kerja
(Ipu) A0.510.510.510.214505.414505.414505.414504.02Arus Reset (Ir)
A0.480.480.480.186004.276004.276004.276003.17NAMA GINAMA
PEMBANGKITKAPASITAS PEMBANGKITNAMA GIPANJANG TRANSMISIIr/Ipu
%0.94117647060.94117647060.94117647060.8571428571GI Panaran PLTG
PANARAN ( 4 x 27,5 MW)GI PANARAN - GI MUKA KUNING2xDRAKE 402
mm2PLTMG ANGGREKO 1 ( 20 x 1,2 MW )376 MVA / 1,447 APENGUJIAN WAKTU
KERJA TRAFOPLTMG TM 2500 (1 x 18 MW )L=7,06 kmr - 24 TowerMesin CC
(1 x 22,9 MW )GI MUKA KUNING - GI TANJUNG KASAM2xDRAKE 402 mm2MATA
UJIFASAARUS INJEKSIGI Sagulung PLTMG AGGREKO 2( 5 x 3,15 MW )376
MVA / 1,447 A2XIs3XIs4XIsGI Sei HarapanPLTD SEKUPANG 2 ( 4 x 4,5 MW
)L=15,76 kmr - 40 TowerWAKTU KERJAR8.675.414.27GI Tanjung
SengkuangPLTD BTA ATAS( 3 x 7,68 MW )GI TANJUNG KASAM - GI BATU
BESAR2xDOVE 282 mm2S8.675.414.27PLTD BTA BARU( 2 x 10,5 MW )308 MVA
/ 1,185 AT8.675.414.27PLTD SENGKUANG( 4 x 5,2 MW )L=8,2 kmr - 29
TowerN6.444.023.17GI Sei BaloiPLTD SEI BALOI( 2 x 12,34 MW )GI BATU
BESAR - GI SEI BALOI1xHAWK 241,7 mm2PLTD JEMBO 1( 3 x 9,36 MW )139
MVA / 535 APLTMG JEMBO 2(6 x 4 MW )L=9,671 kmr - 37 TowerGI Batu
BesarPLTMG KABIL 2 ( 6 x 2,5 MW)GI BALOI - GI TANJUNG
SENGKUANG2xZEBRA 428,8 mm2PLTMG KABIL 1 ( 3 x 6 MW)392 MVA / 1,509
AGI Tanjung KasamPLTU MESIN 1( 1 x 65 MW )L=8,32 kmr - 35 TowerPLTU
MESIN 2 ( 1 x 65 MW )GI BALOI - GI SEI HARAPAN1xHAWK 241,7 mm2Fasa
R TransmisiFasa R Trafo139 MVA / 535 AArus Kerja (A)Waktu Kerja
(S)Arus Kerja (A)Waktu Kerja (S)L=7,045 kmr - 22
Tower160016.153009.15GI SEI HARAPAN - GI SAGULUNG2xZEBRA 428,8
mm224009.544505.4392 MVA / 1,509 A32007.56004.25L=9,186 kmr - 33
Tower9003.3GI SAGULUNG - GI PANARAN2xZEBRA 428,8 mm212002.83392 MVA
/ 1,509 A15002.53L=21,87 kmr - 56 Tower22502.16TOTAL
TRANSMISI157,83 kms - 253 tower - 16 jalur30001.9513 trafo daya
150/20 kV - 450 MVA33001.88150 cel kubikel 20 KV
Sheet3OCR FASA R TRANSMISIOCR FASA R TRANSFORMATORMata UjiFasa
yang DiujiMata UjiFasa yang DiujiPengujian Arus Injeksi (A)waktu
kerja (s)Pengujian Arus Injeksi (A)waktu kerja (s)Fasa RFasa SFasa
TFasa NFasa RFasa SFasa TFasa N1216.15119.15Arus Setelan (Is)
A1110.2Arus Setelan (Is) A0.50.50.50.2239.5421.55.4Arus Kerja (Ipu)
A1.21.21.20.23Arus Kerja (Ipu) A0.510.510.510.21347.5324.25Arus
Reset (Ir) A1110.2Arus Reset (Ir)
A0.480.480.480.18465.83433.3Ir/Ipu %0.83%0.83%0.83%0.86%Ir/Ipu
%0.94%0.94%0.94%0.85%585542.836104.46652.5377.52.16Mata UjiFasaArus
InjeksiMata UjiFasaArus InjeksiGFR FASA N
TRANSMISI8101.952xIs3xIs4xIs2xIs3xIs4xIs9112.53waktu kerja
(s)R12.127.66.02waktu kerja (s)R8.675.414.27Pengujian Arus Injeksi
(A)waktu kerja (s)S12.127.66.02S8.675.414.2710.416.15GFR FASA N
TRANSFORMATORT12.127.66.02T8.675.414.2720.69.54N12.127.626.04N6.444.023.1730.87.5Pengujian
Arus Injeksi (A)waktu kerja
(s)41.25.8310.416.1551.6520.69.54624.4630.87.541.25.8351.65624.46731.45841.3194.41.26
Sheet4Fasa R TransmisiFasa R TrafoArus Kerja (A)Waktu Kerja
(S)Arus Kerja (A)Waktu Kerja
(S)160012.123008.6724007.64505.4132006.026004.27
Fasa N TransmisiFasa N TrafoArus Kerja (A)Waktu Kerja (S)Arus
Kerja (A)Waktu Kerja
(S)160012.123006.4424007.624504.0232006.046003.17
Sheet5Fasa R TransmisiFasa R TrafoFasa N TransmisiFasa N
TrafoArus Kerja (A)Waktu Kerja (S)Arus Kerja (A)Waktu Kerja (S)Arus
Kerja (A)Waktu Kerja (S)Arus Kerja (A)Waktu Kerja
(S)160016.153009.15160016.153006.1524009.544505.424009.544503.6332007.56004.2532007.56002.859003.39002.2212002.8312001.915002.5315001.722502.1622501.4530001.9530001.3133001.8833001.26