HUTAMA KARYA (Perse WILAYAH VII Proyek Banyu Urip EPC5 UPAH HARIAN PELAKSANA Periode 22 Juli s/d 02 Agustus 2013 No Nama Jabatan Jumlah (Rp) 1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 1 Sunadi Mandor Kayu 11 50,000 550,000 - 550,000 550,000 2 Marton Tukang Kayu 11 2 80,000 11,500 880,000 23,000 903,000 903,000 3 Jatmik Tukang Kayu 11 2 70,000 10,000 770,000 20,000 790,000 790,000 4 Ahmad. Tukang Kayu 8 70,000 560,000 - 560,000 560,000 5 Komar Mandor Besi 10 50,000 500,000 - 500,000 500,000 6 Saifud Tukang Besi 10 70,000 700,000 - 700,000 700,000 7 Akhmad Tukang Besi 10 70,000 700,000 - 700,000 700,000 8 Rudiyo Tukang Besi 10 70,000 700,000 - 700,000 700,000 9 Sahiru Tukang Besi 10 70,000 700,000 - 700,000 700,000 10 Juwart Tukang Besi 10 70,000 700,000 - 700,000 700,000 11 Angga. Tukang Besi 10 70,000 700,000 - 700,000 700,000 12 Chader Tukang Besi 10 70,000 700,000 - 700,000 700,000 13 Ahmad. Mandor pemada 1 60,000 60,000 - 60,000 60,000 14 Sarmid Tukang Pemada 1 60,000 60,000 - 60,000 60,000 15 Sadi Tukang Pemada 1 60,000 60,000 - 60,000 60,000 16 Suyant Tukang Pemada 1 60,000 60,000 - 60,000 60,000 TOTAL 8,443,000 rbilang : Delapan Juta Empat Ratus Empat Puluh Tiga Ribu Rupiah Bojonegoro, 02 Menyetujui : Mengetahui/Menyaksikan : Dibuat PT. Huta (Yoni Setyo, ST) (Mu Project Manager DPM GSI Super Jmlh Hr Kerja Jmlh Jam Lmbr Upah/Hr Kerja (Rp) Upah/Hr lmbr (Rp) Uang Makan/hr (Rp) Total upah kerja (Rp) Total Upah lmbr (Rp) Total Uang makan (Rp) Total Diterima (Rp) . I. Gede Dwi Sudi Manuar (Ir. Moch Alfin Zaini )
200

Tia Upah Mandor

Dec 25, 2015

Download

Documents

Lis Theeii Yaa

Tia Upah Mandor
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Tia Upah Mandor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 22 Juli s/d 02 Agustus 2013

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Sunadi Mandor Kayu 11 50,000 550,000 - 550,000 550,000 2 MartonTukang Kayu 11 2 80,000 11,500 880,000 23,000 903,000 903,000 3 JatmikoTukang Kayu 11 2 70,000 10,000 770,000 20,000 790,000 790,000 4 Ahmad. Tukang Kayu 8 70,000 560,000 - 560,000 560,000 5 Komar Mandor Besi 10 50,000 500,000 - 500,000 500,000 6 SaifudinTukang Besi 10 70,000 700,000 - 700,000 700,000 7 AkhmadTukang Besi 10 70,000 700,000 - 700,000 700,000 8 RudiyonTukang Besi 10 70,000 700,000 - 700,000 700,000 9 Sahirun.Tukang Besi 10 70,000 700,000 - 700,000 700,000

10 JuwartoTukang Besi 10 70,000 700,000 - 700,000 700,000 11 Angga. Tukang Besi 10 70,000 700,000 - 700,000 700,000 12 ChaderiTukang Besi 10 70,000 700,000 - 700,000 700,000 13 Ahmad.Mandor pemada 1 60,000 60,000 - 60,000 60,000 14 SarmidiTukang Pemadat 1 60,000 60,000 - 60,000 60,000 15 Sadi Tukang Pemadat 1 60,000 60,000 - 60,000 60,000 16 SuyantoTukang Pemadat 1 60,000 60,000 - 60,000 60,000

TOTAL 8,443,000

Terbilang : Delapan Juta Empat Ratus Empat Puluh Tiga Ribu RupiahBojonegoro, 02 agustus 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Page 2: Tia Upah Mandor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 21 Agustus s/d 05 September 2013

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Sunadi Mandor Kayu 6 50,000 300,000 - 300,000 300,000 2 MartonTukang Kayu 10 2 80,000 11,500 800,000 23,000 823,000 823,000 3 JatmikoTukang Kayu 2 2 70,000 10,000 140,000 20,000 160,000 160,000 4 Ahmad. Tukang Kayu 2 2 70,000 140,000 - 140,000 140,000 5 Muklisi Tukang Kayu 10 2 50,000 500,000 - 500,000 500,000 6 MaryonTukang Kayu 15 2 70,000 1,050,000 - 1,050,000 1,050,000 7 Harno Tukang Kayu 11 70,000 770,000 - 770,000 770,000 8 BudiyanTukang Kayu 15 2 70,000 1,050,000 - 1,050,000 1,050,000 9 JatmikoTukang Kayu 15 2 70,000 1,050,000 - 1,050,000 1,050,000

10 JatmikoTukang Kayu 13 70,000 910,000 - 910,000 910,000 11 Taufik ATukang Kayu 12 - - - - 12 - - - - 13 - - - - 14 - - - - 15 - - - - 16 - - - -

TOTAL 6,753,000

Terbilang : Enam Juta Tujuh Ratus Lima Puluh Tiga RupiahBojonegoro, 05 September 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Page 3: Tia Upah Mandor

Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 26 Agustus s/d 05 September 2013

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Komar Mandor Besi 6 50,000 300,000 - 300,000 300,000 2 JuwartoTukang Besi 11 80,000 11,500 880,000 - 880,000 880,000 3 Aris Ju Tukang Besi 11 70,000 10,000 770,000 - 770,000 770,000 4 KairmanTukang Besi 11 70,000 770,000 - 770,000 770,000 5 A. KhujaTukang Besi 11 50,000 550,000 - 550,000 550,000 6 SaifudinTukang Besi 11 70,000 770,000 - 770,000 770,000 7 SahirunTukang Besi 11 70,000 770,000 - 770,000 770,000 8 ChaderiTukang Besi 11 70,000 770,000 - 770,000 770,000 9 Abdu R Tukang Besi 11 70,000 770,000 - 770,000 770,000

10 Sapari Tukang Besi 11 70,000 770,000 - 770,000 770,000 11 Agus R Tukang Besi 6 70,000 420,000 - 420,000 420,000 12 MusodiTukang Besi 11 70,000 770,000 - 770,000 770,000 13 RudiyonTukang Besi 11 60,000 660,000 - 660,000 660,000

- - - - - - - - - - - -

TOTAL 8,970,000

Terbilang : Delapan Juta Sembilan Ratus Tujuh Puluh Ribu RupiahBojonegoro, 05 agustus 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 4: Tia Upah Mandor

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 01 September s/d 05 September 2013

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Ahmad.Mandor Perapia 3.5 60,000 210,000 - 210,000 210,000 2 SarmidiTukang galian 3.5 60,000 210,000 - 210,000 210,000 3 Sadi Tukang galian 3.5 60,000 210,000 - 210,000 210,000 4 SuyantoTukang galian 2.5 60,000 150,000 - 150,000 150,000

TOTAL 780,000

Terbilang : Tujuh Ratus Delapan Puluh Ribu RupiahBojonegoro, 05 September 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 5: Tia Upah Mandor

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 06 September s/d 19 September 2013

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Sunadi Mandor Kayu 6 50,000 300,000 - 300,000 300,000 2 MartonTukang Kayu 15 80,000 1,200,000 - 1,200,000 1,200,000 3 JatmikoTukang Kayu - 70,000 - - - 4 Ahmad. Tukang Kayu 7 70,000 490,000 - 490,000 490,000 5 Muklisi Tukang Kayu 12 70,000 840,000 - 840,000 840,000 6 MaryonTukang Kayu 6 70,000 420,000 - 420,000 420,000 7 Harno Tukang Kayu 9 70,000 630,000 - 630,000 630,000 8 BudiyanTukang Kayu 5 70,000 350,000 - 350,000 350,000 9 JatmikoTukang Kayu 13 70,000 910,000 - 910,000 910,000

10 JatmikoTukang Kayu 11.5 70,000 805,000 - 805,000 805,000 11 Taufik ATukang Kayu - 70,000 - - -

- - - - - - - - - - - - - - - - - - - -

TOTAL 5,945,000

Terbilang : Lima Juta Sembilan Ratus Empat Puluh Lima Ribu RupiahBojonegoro, 19 September 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 6: Tia Upah Mandor

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 06 September s/d 19 September 2013

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Komar Mandor Besi 6 50,000 300,000 - 300,000 300,000 2 JuwartoTukang Besi 16 70,000 1,120,000 - 1,120,000 1,120,000 3 Aris Ju Tukang Besi 16 70,000 1,120,000 - 1,120,000 1,120,000 4 KairmanTukang Besi 16 70,000 1,120,000 - 1,120,000 1,120,000 5 A. KhujaTukang Besi 10 70,000 700,000 - 700,000 700,000 6 SaifudinTukang Besi 13 70,000 910,000 - 910,000 910,000 7 SahirunTukang Besi 16 70,000 1,120,000 - 1,120,000 1,120,000 8 ChaderiTukang Besi 16 70,000 1,120,000 - 1,120,000 1,120,000 9 Abdu R Tukang Besi 16 70,000 1,120,000 - 1,120,000 1,120,000

10 Sapari Tukang Besi 16 70,000 1,120,000 - 1,120,000 1,120,000 11 Agus R Tukang Besi - 70,000 - - - 12 MusodiTukang Besi 16 70,000 1,120,000 - 1,120,000 1,120,000 13 RudiyonTukang Besi 16 70,000 1,120,000 - 1,120,000 1,120,000

TOTAL 11,990,000

Terbilang : Sebelas Juta Sembilan Ratus Sembilan Puluh Ribu RupiahBojonegoro, 19 September 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 7: Tia Upah Mandor

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 06 September s/d 19 September 2013

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Ahmad.Mandor Perapia 2.5 60,000 150,000 - 150,000 150,000 2 SuparlaBantu besi 2.5 60,000 150,000 - 150,000 150,000 3 SupriyaBantu besi 2.5 60,000 150,000 - 150,000 150,000 4 MujiantBantu besi 2 60,000 120,000 - 120,000 120,000

TOTAL 570,000

Terbilang : Lima Ratus Tujuh Puluh Ribu RupiahBojonegoro, 19 September 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 8: Tia Upah Mandor

PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 20 September s/d 03 Oktober 2013

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Sunadi Mandor Kayu 10 50,000 500,000 - 500,000 500,000 2 MartonTukang Kayu 22 9 80,000 11,500 1,760,000 103,500 1,863,500 1,863,500 3 Sapari Tukang Kayu 30 70,000 2,100,000 - 2,100,000 2,100,000 4 Ahmad. Tukang Kayu 10.5 4 70,000 10,000 735,000 40,000 775,000 775,000 5 Muklisi Tukang Kayu 19 10 70,000 10,000 1,330,000 100,000 1,430,000 1,430,000 6 MaryonTukang Kayu 21 10 70,000 10,000 1,470,000 100,000 1,570,000 1,570,000 7 Harno Tukang Kayu 12.5 4 70,000 10,000 875,000 40,000 915,000 915,000 8 Radini Tukang Kayu 30 50,000 1,500,000 - 1,500,000 1,500,000 9 JatmikoTukang Kayu 18.5 3 70,000 10,000 1,295,000 30,000 1,325,000 1,325,000

10 JatmikoTukang Kayu 23 3 70,000 10,000 1,610,000 30,000 1,640,000 1,640,000 11 Taufik ATukang Kayu - 70,000 - - - 12 Warno Tukang Kayu 19.5 4 70,000 10,000 1,365,000 40,000 1,405,000 1,405,000 13 Priyant Tukang Kayu 14 3 70,000 10,000 980,000 30,000 1,010,000 1,010,000 14 Totok Tukang Kayu 16.5 7 70,000 10,000 1,155,000 70,000 1,225,000 1,225,000 15 RiyantoTukang Kayu 18.5 7 70,000 10,000 1,295,000 70,000 1,365,000 1,365,000 16 Tari Tukang Kayu 17 3 70,000 10,000 1,190,000 30,000 1,220,000 1,220,000 17 Lampir Tukang Kayu 9 3 70,000 10,000 630,000 30,000 660,000 660,000 18 Yaji Tukang Kayu 3 70,000 10,000 210,000 210,000 210,000

TOTAL 20,713,500

Terbilang : Dua Puluh Juta Tujuh Ratus Tiga Belas Ribu Lima Ratus RupiahBojonegoro, 03 Oktober 2013

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 9: Tia Upah Mandor

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 06 September s/d 19 September 2013

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Komar Mandor Besi 6 50,000 300,000 - 300,000 300,000 2 JuwartoTukang Besi 16 70,000 1,120,000 - 1,120,000 1,120,000 3 Aris Ju Tukang Besi 16 70,000 1,120,000 - 1,120,000 1,120,000 4 KairmanTukang Besi 16 70,000 1,120,000 - 1,120,000 1,120,000 5 A. KhujaTukang Besi 10 70,000 700,000 - 700,000 700,000 6 SaifudinTukang Besi 13 70,000 910,000 - 910,000 910,000 7 SahirunTukang Besi 16 70,000 1,120,000 - 1,120,000 1,120,000 8 ChaderiTukang Besi 16 70,000 1,120,000 - 1,120,000 1,120,000 9 Abdu R Tukang Besi 16 70,000 1,120,000 - 1,120,000 1,120,000

10 Sapari Tukang Besi 16 70,000 1,120,000 - 1,120,000 1,120,000 11 Agus R Tukang Besi - 70,000 - - - 12 MusodiTukang Besi 16 70,000 1,120,000 - 1,120,000 1,120,000 13 RudiyonTukang Besi 16 70,000 1,120,000 - 1,120,000 1,120,000

TOTAL 11,990,000

Terbilang : Sebelas Juta Sembilan Ratus Sembilan Puluh Ribu Rupiah

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 10: Tia Upah Mandor

Bojonegoro, 19 September 2013Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :

PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 06 September s/d 19 September 2013

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Ahmad.Mandor Perapia 2.5 60,000 150,000 - 150,000 150,000 2 SuparlaBantu besi 2.5 60,000 150,000 - 150,000 150,000 3 SupriyaBantu besi 2.5 60,000 150,000 - 150,000 150,000 4 MujiantBantu besi 2 60,000 120,000 - 120,000 120,000

TOTAL 570,000

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 11: Tia Upah Mandor

Terbilang : Lima Ratus Tujuh Puluh Ribu RupiahBojonegoro, 19 September 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANA BARUPeriode 20 September s/d 03 Oktober 2013

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 - - - - 2 MartonTukang Kayu 22 9 80,000 11,500 1,760,000 103,500 1,863,500 1,863,500 3 70,000 - - - - 4 Ahmad. Tukang Kayu 8.5 4 70,000 10,000 595,000 40,000 635,000 635,000 5 Muklisi Tukang Kayu 19 10 70,000 10,000 1,330,000 100,000 1,430,000 1,430,000 6 MaryonTukang Kayu 21 10 70,000 10,000 1,470,000 100,000 1,570,000 1,570,000 7 Harno Tukang Kayu 12.5 4 70,000 10,000 875,000 40,000 915,000 915,000 8 - - - - 9 JatmikoTukang Kayu 18.5 3 70,000 10,000 1,295,000 30,000 1,325,000 1,325,000

10 JatmikoTukang Kayu 23 3 70,000 10,000 1,610,000 30,000 1,640,000 1,640,000 11 Taufik ATukang Kayu - 70,000 - - - 12 Warno Tukang Kayu 19.5 4 70,000 10,000 1,365,000 40,000 1,405,000 1,405,000 13 Priyant Tukang Kayu 14 3 70,000 10,000 980,000 30,000 1,010,000 1,010,000 14 Totok Tukang Kayu 16.5 7 70,000 10,000 1,155,000 70,000 1,225,000 1,225,000 15 RiyantoTukang Kayu 18.5 7 70,000 10,000 1,295,000 70,000 1,365,000 1,365,000 16 Tari Tukang Kayu 17 3 70,000 10,000 1,190,000 30,000 1,220,000 1,220,000 17 70,000 10,000 - - - - 18 Yaji Tukang Kayu 3 70,000 10,000 210,000 210,000 210,000

TOTAL 15,813,500

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 12: Tia Upah Mandor

Terbilang : Bojonegoro, 03 Oktober 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 20 September s/d 03 Oktober 2013

Pekerjaan : MCU, Training HSE , Pembersihan puing2 bekas bobokan pancang sebelum Instal besi footing

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Rinawa Mandor Besi 3 70,000 210,000 - 210,000 210,000 2 Eko Tk besi 3 70,000 210,000 - 210,000 210,000 3 Tamuji Tk besi 3 70,000 210,000 - 210,000 210,000 4 Asep S Tk besi 4 70,000 280,000 - 280,000 280,000

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 13: Tia Upah Mandor

TOTAL 910,000

Terbilang : Sembilan Ratus Sepuluh Ribu RupiahBojonegoro, 03 Oktober 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANA Periode 20 September s/d 03 Oktober 2013

Pekerjaan : Harian pencabutan paku, pembersihan kayu2 bekas bongkaran, pembersihan kawat bendrat, siram air sebelum di cor

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Muklisi Tukang Kayu 4 70,000 280,000 - 280,000 280,000 2 MaryonTukang Kayu 4 70,000 280,000 - 280,000 280,000 3 JatmikoTukang Kayu 2 70,000 140,000 - 140,000 140,000 4 MaryonTukang Kayu 2 70,000 140,000 - 140,000 140,000 5 Warno Tukang Kayu 2 70,000 140,000 - 140,000 140,000 6 Sapari Tukang Kayu 30 70,000 2,100,000 2,100,000 2,100,000 7 Radini Tukang Kayu 30 50,000 1,500,000 1,500,000 1,500,000

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 14: Tia Upah Mandor

TOTAL 4,580,000

Terbilang : Empat Juta Lima Ratus Delapan Puluh Ribu RupiahBojonegoro, 03 Oktober 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANA Periode 04 Oktober s/d 17 Oktober 2013

Pekerjaan : Harian pencabutan paku, pembersihan kayu2 bekas bongkaran, pembersihan kawat bendrat, siram air sebelum di cor

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Muklisi Tukang Kayu 5 70,000 350,000 - 350,000 350,000 2 MaryonTukang Kayu 5 70,000 350,000 - 350,000 350,000 3 JatmikoTukang Kayu 5 70,000 350,000 - 350,000 350,000 4 MaryonTukang Kayu 4 70,000 280,000 - 280,000 280,000 5 Warno Tukang Kayu 4 70,000 280,000 - 280,000 280,000 6 Lampir Tukang Kayu 4 70,000 280,000 280,000 280,000

- - -

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 15: Tia Upah Mandor

TOTAL 1,890,000

Terbilang : Satu Juta Delapan Ratus Sembilan Puluh Ribu RupiahBojonegoro, 17 Oktober 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 04 Oktober s/d 17 Oktober 2013

Pekerjaan : MCU, Training HSE

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Parno Tk besi 3 70,000 210,000 - 210,000 210,000 - - - - - - - - - - - -

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 16: Tia Upah Mandor

TOTAL 210,000

Terbilang : Dua Ratus Sepuluh Ribu RupiahBojonegoro, 17 Oktober 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 04 Oktober s/d 17 Oktober 2013

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Mandor Besi 50,000 - - - - 2 JuwartoTukang Besi 7 100,000 700,000 - 700,000 700,000

Tukang Besi 20 90,000 1,800,000 - 1,800,000 1,800,000 Tukang Besi 19 75,000 1,425,000 - 1,425,000 1,425,000 Tukang Besi 16 90,000 1,440,000 - 1,440,000 1,440,000 Tukang Besi 70,000 - - - - Tukang Besi 19 75,000 1,425,000 - 1,425,000 1,425,000 Tukang Besi 75,000 - - - - Tukang Besi 19 80,000 1,520,000 - 1,520,000 1,520,000 Tukang Besi 18 80,000 1,440,000 - 1,440,000 1,440,000 Tukang Besi - 70,000 - - - Tukang Besi 19 75,000 1,425,000 - 1,425,000 1,425,000 Tukang Besi 19 75,000 1,425,000 - 1,425,000 1,425,000 Tukang Besi 18 75,000 1,350,000 1,350,000 1,350,000

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 17: Tia Upah Mandor

TOTAL 13,950,000

Terbilang : Sebelas Juta Sembilan Ratus Sembilan Puluh Ribu RupiahBojonegoro, 17 Oktober 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANA BARUPeriode 04 Oktober s/d 17 Oktober 2013

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Sunadi Mandor - - - - 2 MartonTukang Kayu 23.5 80,000 11,500 1,880,000 - 1,880,000 1,880,000 3 70,000 - - - - 4 Ahmad. Tukang Kayu 4 2 70,000 10,000 280,000 20,000 300,000 300,000 5 Muklisi Tukang Kayu 23.5 70,000 10,000 1,645,000 - 1,645,000 1,645,000 6 MaryonTukang Kayu 17.5 2 70,000 10,000 1,225,000 20,000 1,245,000 1,245,000 7 Harno Tukang Kayu 10 70,000 10,000 700,000 - 700,000 700,000 8 - - - - 9 JatmikoTukang Kayu 16 2 70,000 10,000 1,120,000 20,000 1,140,000 1,140,000

10 JatmikoTukang Kayu 14 2 70,000 10,000 980,000 20,000 1,000,000 1,000,000 11 Taufik ATukang Kayu - 70,000 - - - 12 Warno Tukang Kayu 14 2 70,000 10,000 980,000 20,000 1,000,000 1,000,000 13 Priyant Tukang Kayu 15 70,000 10,000 1,050,000 - 1,050,000 1,050,000 14 Totok Tukang Kayu 10 70,000 10,000 700,000 - 700,000 700,000 15 RiyantoTukang Kayu 16 2 70,000 10,000 1,120,000 20,000 1,140,000 1,140,000

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 18: Tia Upah Mandor

16 Tari Tukang Kayu 17 70,000 10,000 1,190,000 - 1,190,000 1,190,000 17 Lampir Tukang Kayu 23 70,000 10,000 1,610,000 - 1,610,000 1,610,000 18 Yaji Tukang Kayu 10 70,000 10,000 700,000 700,000 700,000

TOTAL 15,300,000

Terbilang : Bojonegoro, 17 Oktober 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 18 Oktober s/d 31 Oktober 2013

Pekerjaan : Pembersihan kerak beton di besi P9, P10, P11, P12

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Heru. S Tk besi 3 70,000 210,000 - 210,000 210,000 2 Muji. R Tk besi 3 70,000 210,000 - 210,000 210,000

- - - - - - - -

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 19: Tia Upah Mandor

TOTAL 420,000

Terbilang : Empat Ratus Dua Puluh Ribu RupiahBojonegoro, 31 Oktober 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANA BARUPeriode 18 Oktober s/d 31 Oktober 2013

Pekerjaan : Pembersihan kerak beton di besi, Chiping beton Kolom P2, P17, P18

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Lampir Tukang Kayu 6 70,000 420,000 - 420,000 420,000 2 Muklisi Tukang Kayu 5 70,000 350,000 - 350,000 350,000

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - -

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 20: Tia Upah Mandor

- - - - - - - - - - - - - - - - - - - - - - -

TOTAL 770,000

Terbilang : Tujuh Ratus Tujuh Puluh Ribu RupiahBojonegoro, 31 Oktober 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 18 Oktober s/d 31 Oktober 2013

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Komar Mandor Besi 50,000 - - - - 2 JuwartoTukang Besi 100,000 - - - - 3 Aris Ju Tukang Besi 4 90,000 360,000 - 360,000 360,000 4 KairmanTukang Besi 4 75,000 300,000 - 300,000 300,000 5 A. KhujaTukang Besi 4 90,000 360,000 - 360,000 360,000 6 SaifudinTukang Besi 70,000 - - - - 7 SahirunTukang Besi 4 75,000 300,000 - 300,000 300,000 8 ChaderiTukang Besi 75,000 - - - - 9 Abdu R Tukang Besi 4 80,000 320,000 - 320,000 320,000

10 Sapari Tukang Besi 4 80,000 320,000 - 320,000 320,000 11 Agus R Tukang Besi - 70,000 - - -

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 21: Tia Upah Mandor

12 MusodiTukang Besi 4 75,000 300,000 - 300,000 300,000 13 RudiyonTukang Besi 4 75,000 300,000 - 300,000 300,000 14 Angga STukang Besi 4 75,000 300,000 300,000 300,000

TOTAL 2,860,000

Terbilang : Dua Juta Delapan Ratus Enam Puluh Ribu RupiahBojonegoro, 31 Oktober 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANA BARUPeriode 18 Oktober s/d 31 Oktober 2013

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Sunadi Mandor 50,000 - - - - 2 MartonTukang Kayu 21 2 80,000 11,500 1,680,000 23,000 1,703,000 1,703,000 3 Yatin Tukang Kayu 14 70,000 980,000 - 980,000 980,000 4 SuwarnTukang Kayu 16 70,000 10,000 1,120,000 - 1,120,000 1,120,000 5 Muklisi Tukang Kayu 18 70,000 10,000 1,260,000 - 1,260,000 1,260,000 6 MaryonTukang Kayu 12 2 70,000 10,000 840,000 20,000 860,000 860,000 7 Harno Tukang Kayu 70,000 10,000 - - - - 8 Kasmo Tukang Kayu 4 70,000 280,000 - 280,000 280,000 9 JatmikoTukang Kayu 9 70,000 10,000 630,000 - 630,000 630,000

10 Sugeng Tukang Kayu 16 70,000 10,000 1,120,000 - 1,120,000 1,120,000

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 22: Tia Upah Mandor

11 JaswadiTukang Kayu 16 70,000 1,120,000 - 1,120,000 1,120,000 12 Warno Tukang Kayu 7 2 70,000 10,000 490,000 20,000 510,000 510,000 13 Priyant Tukang Kayu 70,000 10,000 - - - - 14 Totok Tukang Kayu 70,000 10,000 - - - - 15 RiyantoTukang Kayu 20 2 70,000 10,000 1,400,000 20,000 1,420,000 1,420,000 16 Tari Tukang Kayu 9 70,000 10,000 630,000 - 630,000 630,000 17 Lampir Tukang Kayu 20 2 60,000 10,000 1,200,000 20,000 1,220,000 1,220,000 18 SupardiTukang Kayu 17 70,000 10,000 1,190,000 1,190,000 1,190,000 19 Damin Tukang Kayu 5 70,000 350,000 350,000 350,000

TOTAL 14,393,000

Terbilang : Bojonegoro, 31 Oktober 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANA BARUPeriode 1 Oktober s/d 31 Oktober 2013

Pekerjaan : Pembersihan kayu-kayu, puing2 beton sebelum backfiling footing

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Sapari Tukang Kayu 31 70,000 2,170,000 - 2,170,000 2,170,000 2 Radini Tukang Kayu 31 50,000 1,550,000 - 1,550,000 1,550,000

- - - - - - - - - - - - - - - - - - - - - - - - - - - -

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 23: Tia Upah Mandor

- - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - -

TOTAL 3,720,000

Terbilang : Tiga Juta Tujuh Ratus Dua Puluh Ribu RupiahBojonegoro, 31 Oktober 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 1 November s/d 14 November 2013

Pekerjaan : MCU, Training Safety tenaga baru Besi

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 M RifanTukang Besi 3 70,000 210,000 - 210,000 210,000 2 Zainuri Tukang Besi 3 70,000 210,000 - 210,000 210,000 3 SumadiTukang Besi 3 70,000 210,000 - 210,000 210,000 4 Huri Tukang Besi 3 70,000 210,000 - 210,000 210,000 5 Kadir Tukang Besi 3 70,000 210,000 - 210,000 210,000 6 Ramidi Tukang Besi 3 70,000 210,000 - 210,000 210,000

- - - - - - - -

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 24: Tia Upah Mandor

- - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

TOTAL 1,260,000

Terbilang : Satu Juta Dua Ratus Enam Puluh Ribu RupiahBojonegoro, 14 November 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANA Periode 1 November s/d 14 November 2013

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Sunadi Mandor 10 50,000 500,000 - 500,000 500,000 2 MartonTukang Kayu 16 10 80,000 11,500 1,280,000 115,000 1,395,000 1,395,000 3 Yatin Tukang Kayu 6 8 70,000 420,000 - 420,000 420,000 4 SuwarnTukang Kayu 13 10 70,000 10,000 910,000 100,000 1,010,000 1,010,000 5 Muklisi Tukang Kayu 11 6 70,000 10,000 770,000 60,000 830,000 830,000 6 MaryonTukang Kayu 14 6 70,000 10,000 980,000 60,000 1,040,000 1,040,000 7 Harno Tukang Kayu 70,000 10,000 - - - -

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 25: Tia Upah Mandor

8 Kasmo Tukang Kayu 14 10 70,000 980,000 - 980,000 980,000 9 JatmikoTukang Kayu 13 10 70,000 10,000 910,000 100,000 1,010,000 1,010,000

10 Sugeng Tukang Kayu 13 10 70,000 10,000 910,000 100,000 1,010,000 1,010,000 11 JaswadiTukang Kayu 13 10 70,000 910,000 - 910,000 910,000 12 Warno Tukang Kayu 70,000 10,000 - - - - 13 Priyant Tukang Kayu 70,000 10,000 - - - - 14 Totok Tukang Kayu 70,000 10,000 - - - - 15 RiyantoTukang Kayu 12 10 70,000 10,000 840,000 100,000 940,000 940,000 16 Tari Tukang Kayu 70,000 10,000 - - - - 17 Lampir Tukang Kayu 16 10 60,000 10,000 960,000 100,000 1,060,000 1,060,000 18 SupardiTukang Kayu 13 10 70,000 10,000 910,000 910,000 910,000 19 Damin Tukang Kayu 70,000 - - -

TOTAL 12,015,000

Terbilang : Bojonegoro, 14 November 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 1 November s/d 14 November 2013

Pekerjaan : Pembersihan kayu2 work true, Chiping beton Kolom P19

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Lampir Tukang Kayu 5 70,000 350,000 - 350,000 350,000 2 Muklisi Tukang Kayu 5 70,000 350,000 - 350,000 350,000 3 RiyantoTukang Kayu 2 70,000 140,000 - 140,000 140,000 4 JaswadiTukang Kayu 2 70,000 140,000 - 140,000 140,000 5 Kasmo Tukang Kayu 2 70,000 140,000 - 140,000 140,000 6 Sugeng Tukang Kayu 2 70,000 140,000 - 140,000 140,000

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 26: Tia Upah Mandor

- - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

TOTAL 1,260,000

Terbilang : Satu Juta Dua Ratus Enam Puluh Ribu RupiahBojonegoro, 14 November 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 1 November s/d 30 November 2013

Pekerjaan : Pembersihan kayu-kayu, puing2 beton sebelum backfiling footing

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Sapari Tukang Kayu 30 70,000 2,100,000 - 2,100,000 2,100,000 2 Radini Tukang Kayu 30 50,000 1,500,000 - 1,500,000 1,500,000

- - - - - - - - - - - -

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 27: Tia Upah Mandor

- - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

TOTAL 3,600,000

Terbilang : Tiga Juta Enam Ratus Ribu RupiahBojonegoro, 30 November 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 15 November s/d 30 November 2013

Pekerjaan : MCU, Training Safety tenaga baru Besi

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 SuratnoTukang Besi 3 70,000 210,000 - 210,000 210,000 2 KhoirusTukang Besi 3 70,000 210,000 - 210,000 210,000 3 M Ali A Tukang Besi 3 70,000 210,000 - 210,000 210,000 4 M SholiTukang Besi 3 70,000 210,000 - 210,000 210,000

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 28: Tia Upah Mandor

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

TOTAL 840,000

Terbilang : Delapan Ratus Empat Puluh Ribu RupiahBojonegoro, 30 November 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 15 November s/d 30 November 2013

Pekerjaan : Pembersihan kayu2 work true, Pasang schafolding P3 & P17, Pembersihan compresor sebelum cor footing

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Lampir Tukang Kayu 4 70,000 280,000 - 280,000 280,000 2 Muklisi Tukang Kayu 4 70,000 280,000 - 280,000 280,000 3 MaryonTukang Kayu 4 70,000 280,000 - 280,000 280,000

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 29: Tia Upah Mandor

4 JatmikoTukang Kayu 4 70,000 280,000 - 280,000 280,000 - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

TOTAL 1,120,000

Terbilang : Satu Juta Seratus Dua Puluh Ribu RupiahBojonegoro, 30 November 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANA Periode 15 November s/d 28 November 2013

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Sunadi Mandor 10 50,000 500,000 - 500,000 500,000 2 MartonTukang Kayu 20 8 80,000 11,500 1,600,000 92,000 1,692,000 1,692,000

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 30: Tia Upah Mandor

3 Yatin Tukang Kayu 16 6 70,000 1,120,000 - 1,120,000 1,120,000 4 SuwarnTukang Kayu 6 2 70,000 10,000 420,000 20,000 440,000 440,000 5 Muklisi Tukang Kayu 15 8 70,000 10,000 1,050,000 80,000 1,130,000 1,130,000 6 MaryonTukang Kayu 13 4 70,000 10,000 910,000 40,000 950,000 950,000 7 Harno Tukang Kayu 70,000 10,000 - - - - 8 Kasmo Tukang Kayu 9 4 70,000 630,000 - 630,000 630,000 9 JatmikoTukang Kayu 17 6 70,000 10,000 1,190,000 60,000 1,250,000 1,250,000

10 Sugeng Tukang Kayu 70,000 10,000 - - - - 11 JaswadiTukang Kayu 19 6 70,000 1,330,000 - 1,330,000 1,330,000 12 Warno Tukang Kayu 70,000 10,000 - - - - 13 Priyant Tukang Kayu 16 6 70,000 10,000 1,120,000 60,000 1,180,000 1,180,000 14 Totok Tukang Kayu 70,000 10,000 - - - - 15 RiyantoTukang Kayu 70,000 10,000 - - - - 16 Tari Tukang Kayu 70,000 10,000 - - - - 17 Lampir Tukang Kayu 20 6 60,000 10,000 1,200,000 60,000 1,260,000 1,260,000 18 SupardiTukang Kayu 17 4 70,000 10,000 1,190,000 1,190,000 1,190,000 19 Damin Tukang Kayu 15 2 70,000 1,050,000 1,050,000 1,050,000

TOTAL 13,722,000

Terbilang : Bojonegoro, 28 November 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 29 Desember s/d 12 Desember 2013

Pekerjaan : Pembersihan kayu2 work true, Pembersihan compresor sebelum cor footing

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Lampir Tukang Kayu 5 70,000 350,000 - 350,000 350,000

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 31: Tia Upah Mandor

2 Muklisi Tukang Kayu 5 70,000 350,000 - 350,000 350,000 3 MaryonTukang Kayu 5 70,000 350,000 - 350,000 350,000 4 JatmikoTukang Kayu 5 70,000 350,000 - 350,000 350,000 5 RiyantoTukang Kayu 5 70,000 350,000 - 350,000 350,000

- - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

TOTAL 1,750,000

Terbilang : Satu Juta Tujuh Ratus Lima Puluh Ribu RupiahBojonegoro, 12 Desember 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 29 Desember s/d 12 Desember 2013

Pekerjaan : Pembuatan beton decking, pembersihan besi2 persiapan work true

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 32: Tia Upah Mandor

1 SuparnoTukang Besi 5 70,000 350,000 - 350,000 350,000 2 SumadiTukang Besi 5 70,000 350,000 - 350,000 350,000 3 As' ad Tukang Besi 5 70,000 350,000 - 350,000 350,000 4 M RifanTukang Besi 5 70,000 350,000 - 350,000 350,000

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

TOTAL 1,400,000

Terbilang : Satu Juta Empat Ratus Ribu RupiahBojonegoro, 12 Desember 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANA Periode 29 November s/d 12 Desember 2013

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 33: Tia Upah Mandor

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Sunadi Mandor 18 80,000 1,440,000 - 1,440,000 1,440,000 2 MartonTukang Kayu 20 4 80,000 11,500 1,600,000 46,000 1,646,000 1,646,000 3 Yatin Tukang Kayu 10 70,000 700,000 - 700,000 700,000 4 SuwarnTukang Kayu 70,000 10,000 - - - - 5 Muklisi Tukang Kayu 19 4 70,000 10,000 1,330,000 40,000 1,370,000 1,370,000 6 MaryonTukang Kayu 10 4 70,000 10,000 700,000 40,000 740,000 740,000 7 Harno Tukang Kayu 70,000 10,000 - - - - 8 Kasmo Tukang Kayu 20 4 70,000 1,400,000 - 1,400,000 1,400,000 9 JatmikoTukang Kayu 10 2 70,000 10,000 700,000 20,000 720,000 720,000

10 Sugeng Tukang Kayu 70,000 10,000 - - - - 11 JaswadiTukang Kayu 13 2 70,000 910,000 - 910,000 910,000 12 Warno Tukang Kayu 70,000 10,000 - - - - 13 Priyant Tukang Kayu 16 4 70,000 10,000 1,120,000 40,000 1,160,000 1,160,000 14 Totok Tukang Kayu 70,000 10,000 - - - - 15 RiyantoTukang Kayu 70,000 10,000 - - - - 16 Tari Tukang Kayu 70,000 10,000 - - - - 17 Lampir Tukang Kayu 19 4 60,000 10,000 1,140,000 40,000 1,180,000 1,180,000 18 SupardiTukang Kayu 20 4 70,000 10,000 1,400,000 1,400,000 1,400,000 19 Damin Tukang Kayu 12 2 70,000 10,000 840,000 840,000 840,000

TOTAL 13,506,000

Terbilang : Bojonegoro, 12 Desember 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANA Periode 29 November s/d 12 Desember 2013

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 34: Tia Upah Mandor

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Sunadi Mandor - - - - 2 MartonTukang Kayu 18 4 80,000 11,500 1,440,000 46,000 1,486,000 1,486,000 3 Yatin Tukang Kayu 70,000 - - - - 4 SuwarnTukang Kayu 70,000 10,000 - - - - 5 Muklisi Tukang Kayu 17 4 70,000 10,000 1,190,000 40,000 1,230,000 1,230,000 6 MaryonTukang Kayu 8 4 70,000 10,000 560,000 40,000 600,000 600,000 7 Harno Tukang Kayu 70,000 10,000 - - - - 8 Kasmo Tukang Kayu 18 4 70,000 1,260,000 - 1,260,000 1,260,000 9 JatmikoTukang Kayu 8 2 70,000 10,000 560,000 20,000 580,000 580,000

10 Sugeng Tukang Kayu 70,000 10,000 - - - - 11 JaswadiTukang Kayu 11 2 70,000 770,000 - 770,000 770,000 12 Warno Tukang Kayu 70,000 10,000 - - - - 13 Priyant Tukang Kayu 14 4 70,000 10,000 980,000 40,000 1,020,000 1,020,000 14 Totok Tukang Kayu 70,000 10,000 - - - - 15 RiyantoTukang Kayu 70,000 10,000 - - - - 16 Tari Tukang Kayu 70,000 10,000 - - - - 17 Lampir Tukang Kayu 17 4 60,000 10,000 1,020,000 40,000 1,060,000 1,060,000 18 SupardiTukang Kayu 18 4 70,000 10,000 1,260,000 1,260,000 1,260,000 19 Damin Tukang Kayu 70,000 - - -

TOTAL 9,266,000

Terbilang : Bojonegoro, 12 Desember 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 13 Desember s/d 26 Desember 2013

Pekerjaan : Pembuatan besi tie rod P19, P1, potong besi tie rod yg nempel di dinding P19

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 35: Tia Upah Mandor

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 SuparnoTukang Besi 5 70,000 350,000 - 350,000 350,000 2 SumadiTukang Besi 5 70,000 350,000 - 350,000 350,000 3 As' ad Tukang Besi 5 70,000 350,000 - 350,000 350,000 4 M RifanTukang Besi 5 70,000 350,000 - 350,000 350,000

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

TOTAL 1,400,000

Terbilang : Satu Juta Empat Ratus Ribu RupiahBojonegoro, 26 Desember 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 13 Desember s/d 26 Desember 2013

Pekerjaan : Finishing tutup bekas tie rod P19, langsir bekisting dr P19 ke P1, chiping sambungan kolom P16, P4, P5, p6

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Page 36: Tia Upah Mandor

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Muklisi Tukang Kayu 6 70,000 420,000 - 420,000 420,000 2 MaryonTukang Kayu 6 70,000 420,000 - 420,000 420,000 3 JatmikoTukang Kayu 6 70,000 420,000 - 420,000 420,000 4 Kasmo Tukang Kayu 6 70,000 420,000 - 420,000 420,000

- - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

TOTAL 1,680,000

Terbilang : Satu Juta Enam Ratus Delapan Puluh Ribu RupiahBojonegoro, 26 Desember 2013

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 27 Desember s/d 09 Januari 2014

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Page 37: Tia Upah Mandor

Pekerjaan : langsir bekisting dr P37 zone 3 ke P34 zone 2, chiping sambungan kolom P15, P7, P8,

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Muklisi Tukang Kayu 4 70,000 280,000 - 280,000 280,000 2 MaryonTukang Kayu 4 70,000 280,000 - 280,000 280,000 3 JatmikoTukang Kayu 4 70,000 280,000 - 280,000 280,000 4 Kasmo Tukang Kayu 4 70,000 280,000 - 280,000 280,000

- - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

TOTAL 1,120,000

Terbilang : Satu Juta Seratus Dua Puluh Ribu RupiahBojonegoro, 09 Januari 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANA

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Page 38: Tia Upah Mandor

Periode 27 Desember s/d 09 Januari 2014Pekerjaan : Pembuatan besi tie rod P2, potong besi tie rod yg nempel di dinding P1, pabrikasi & Instal besi sliper dudukan shoring, pembuatan beton decking

No Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 SuparnoTukang Besi 7 70,000 490,000 - 490,000 490,000 2 SumadiTukang Besi 7 70,000 490,000 - 490,000 490,000 3 As' ad Tukang Besi 7 70,000 490,000 - 490,000 490,000 4 M RifanTukang Besi 7 70,000 490,000 - 490,000 490,000

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

TOTAL 1,960,000

Terbilang : Satu Juta Sembilan Ratus Enam Puluh Ribu Enam Ratus Ribu RupiahBojonegoro, 09 Januari 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Page 39: Tia Upah Mandor

UPAH HARIAN PELAKSANAPeriode 27 Desember s/d 09 Januari 2014

Pekerjaan : MCU, Training HSE tenaga baru

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Supingi Wakil Mandor 3 70,000 210,000 - 210,000 210,000 2 MahfudTukang kayu 3 70,000 210,000 - 210,000 210,000 3 MisbahTukang Kayu 3 70,000 210,000 - 210,000 210,000 4 SudaryaTukang kayu 3 70,000 210,000 - 210,000 210,000 5 Darto Tukang kayu 3 70,000 210,000 - 210,000 210,000 6 Fauzi Tukang kayu 3 70,000 210,000 - 210,000 210,000 7 IndartoTukang kayu 3 70,000 210,000 - 210,000 210,000 8 Rangga Tukang kayu 3 70,000 210,000 - 210,000 210,000 9 Iwan Tukang kayu 3 70,000 210,000 - 210,000 210,000

10 MatolibTukang kayu 3 70,000 210,000 - 210,000 210,000 11 WarsitoTukang besi 3 70,000 210,000 - 210,000 210,000 12 Arif Tukang besi 3 70,000 210,000 - 210,000 210,000 13 Sugeng Tukang besi 3 70,000 210,000 - 210,000 210,000 14 SulaemTukang besi 3 70,000 210,000 - 210,000 210,000 15 Suyoto Tukang kayu 3 70,000 210,000 - 210,000 210,000 16 - - - -

- - - - - - -

TOTAL 3,150,000

Terbilang : Tiga Juta Seratus Lima Puluh Ribu RupiahBojonegoro, 09 Januari 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Page 40: Tia Upah Mandor

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANA Periode 27 Desember s/d 09 Januari 2014

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Sunadi Mandor 10 50,000 500,000 - 500,000 500,000 2 MartonTukang Kayu 11 15 80,000 11,500 880,000 172,500 1,052,500 1,052,500 3 Kasmo Tukang Kayu 11 15 70,000 10,000 770,000 150,000 920,000 920,000 4 Priyant Tukang Kayu 11 15 70,000 10,000 770,000 150,000 920,000 920,000 5 SupardiTukang Kayu 11 15 70,000 10,000 770,000 150,000 920,000 920,000 6 JaswadiTukang Kayu 11 15 70,000 10,000 770,000 150,000 920,000 920,000 7 JatmikoTukang Kayu 12 15 70,000 10,000 840,000 150,000 990,000 990,000 8 Komari Tukang Kayu 5 70,000 350,000 - 350,000 350,000 9 Bowo Tukang Kayu 5 70,000 10,000 350,000 - 350,000 350,000

10 Eko H Tukang Kayu 5 70,000 10,000 350,000 - 350,000 350,000 11 Daryon Tukang Kayu 5 70,000 350,000 - 350,000 350,000 12 Subeki Tukang Kayu 5 70,000 10,000 350,000 - 350,000 350,000 13 HaryadiTukang Kayu 5 70,000 10,000 350,000 - 350,000 350,000 14 RokimaTukang Kayu 5 70,000 10,000 350,000 - 350,000 350,000 15 Agung YTukang Kayu 5 70,000 10,000 350,000 - 350,000 350,000 16 Zainul Tukang Kayu 5 70,000 10,000 350,000 - 350,000 350,000 17 Sugeng Tukang Kayu 5 70,000 10,000 350,000 - 350,000 350,000

70,000 10,000 - - - 70,000 - - -

TOTAL 9,722,500

Terbilang : Bojonegoro, 9 Januari 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Page 41: Tia Upah Mandor

WILAYAH VIIProyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 10 Januari s/d 23 Januari 2014

Pekerjaan : Penambahan tenaga besi MCU, training HSE

No Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 KuwatnTukang Besi 3 70,000 210,000 - 210,000 210,000 2 Sutrisn Tukang Besi 3 70,000 210,000 - 210,000 210,000 3 Diana Tukang Besi 3 70,000 210,000 - 210,000 210,000 4 SuwardiTukang Besi 3 70,000 210,000 - 210,000 210,000 5 SuwandTukang Besi 3 70,000 210,000 - 210,000 210,000 6 Sutaji Tukang Besi 3 70,000 210,000 - 210,000 210,000

- - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

TOTAL 1,260,000

Terbilang : Satu Juta Dua Ratus Enam Puluh Ribu RupiahBojonegoro, 23 Januari 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Page 42: Tia Upah Mandor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 10 Januari s/d 23 Januari 2014

Pekerjaan : Penambahan tenaga bekisting , cor . MCU, training HSE

No Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Yono Tukang kayu 3 70,000 210,000 - 210,000 210,000 2 Eko Tukang kayu 3 70,000 210,000 - 210,000 210,000 3 Giadi Tukang kayu 3 70,000 210,000 - 210,000 210,000 4 Yetno Tukang kayu 3 70,000 210,000 - 210,000 210,000 5 Zainul Tukang kayu 3 70,000 210,000 - 210,000 210,000 6 Sugeng Tukang kayu 3 70,000 210,000 - 210,000 210,000 7 Agung YTukang kayu 3 70,000 210,000 - 210,000 210,000 8 RokimaTukang kayu 3 70,000 210,000 - 210,000 210,000 9 HaryadiTukang kayu 3 70,000 210,000 - 210,000 210,000

10 Subeki Tukang kayu 3 70,000 210,000 - 210,000 210,000 - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - -

TOTAL 2,100,000

Terbilang : Dua Juta Seratus Ribu RupiahBojonegoro, 23 Januari 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Page 43: Tia Upah Mandor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANA Periode 10 Januari s/d 23 Januari 2014

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Sunadi Mandor 50,000 - - - - 2 MartonTukang Kayu 24 8 80,000 11,500 1,920,000 92,000 2,012,000 2,012,000 3 Kasmo Tukang Kayu 70,000 10,000 - - - - 4 Priyant Tukang Kayu 23 8 70,000 10,000 1,610,000 80,000 1,690,000 1,690,000 5 SupardiTukang Kayu 24 8 70,000 10,000 1,680,000 80,000 1,760,000 1,760,000 6 JaswadiTukang Kayu 21 8 70,000 10,000 1,470,000 80,000 1,550,000 1,550,000 7 JatmikoTukang Kayu 70,000 10,000 - - - - 8 Komari Tukang Kayu 70,000 - - - - 9 Bowo Tukang Kayu 22 10 70,000 10,000 1,540,000 100,000 1,640,000 1,640,000

10 Eko H Tukang Kayu 21 10 70,000 10,000 1,470,000 100,000 1,570,000 1,570,000 11 ParyonoTukang Kayu 20 8 70,000 1,400,000 - 1,400,000 1,400,000 12 Subeki Tukang Kayu 19 8 70,000 10,000 1,330,000 80,000 1,410,000 1,410,000 13 HaryadiTukang Kayu 20 10 70,000 10,000 1,400,000 100,000 1,500,000 1,500,000 14 RokimaTukang Kayu 70,000 10,000 - - - - 15 Agung YTukang Kayu 20 10 70,000 10,000 1,400,000 100,000 1,500,000 1,500,000 16 Zainul Tukang Kayu 18 8 70,000 10,000 1,260,000 80,000 1,340,000 1,340,000 17 Sugeng Tukang Kayu 20 10 70,000 10,000 1,400,000 100,000 1,500,000 1,500,000 18 Rohim Tukang Kayu 21 10 70,000 10,000 1,470,000 100,000 1,570,000 1,570,000

- - -

TOTAL 20,442,000

Terbilang : Bojonegoro, 23 Januari 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Page 44: Tia Upah Mandor

Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 1 Januari s/d 31 Januari 2014

Pekerjaan : Pembersihan kayu-kayu, puing2 beton sebelum backfiling footing

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Sapari Tukang Kayu 30 70,000 2,100,000 - 2,100,000 2,100,000 2 Radini Tukang Kayu 30 50,000 1,500,000 - 1,500,000 1,500,000

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

TOTAL 3,600,000

Terbilang : Tiga Juta Enam Ratus Ribu RupiahBojonegoro, 31 Januari 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 45: Tia Upah Mandor

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANA Periode 24 Januari s/d 06 Februari 2014

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Sunadi Mandor 20 50,000 1,000,000 - 1,000,000 1,000,000 2 MartonTukang Kayu 26 80,000 11,500 2,080,000 - 2,080,000 2,080,000 3 Kasmo Tukang Kayu 70,000 10,000 - - - - 4 Priyant Tukang Kayu 21 4 70,000 10,000 1,470,000 40,000 1,510,000 1,510,000 5 SupardiTukang Kayu 22 70,000 10,000 1,540,000 - 1,540,000 1,540,000 6 JaswadiTukang Kayu 21 2 70,000 10,000 1,470,000 20,000 1,490,000 1,490,000 7 JatmikoTukang Kayu 70,000 10,000 - - - - 8 Komari Tukang Kayu 70,000 - - - - 9 Bowo Tukang Kayu 24 2 70,000 10,000 1,680,000 20,000 1,700,000 1,700,000

10 Eko H Tukang Kayu 19.5 2 70,000 10,000 1,365,000 20,000 1,385,000 1,385,000 11 ParyonoTukang Kayu 20.5 70,000 1,435,000 - 1,435,000 1,435,000 12 Subeki Tukang Kayu 24 2 70,000 10,000 1,680,000 20,000 1,700,000 1,700,000 13 HaryadiTukang Kayu 21 2 70,000 10,000 1,470,000 20,000 1,490,000 1,490,000 14 RokimaTukang Kayu 70,000 10,000 - - - - 15 Agung YTukang Kayu 20 4 70,000 10,000 1,400,000 40,000 1,440,000 1,440,000 16 Zainul Tukang Kayu 70,000 10,000 - - - - 17 Sugeng Tukang Kayu 22 2 70,000 10,000 1,540,000 20,000 1,560,000 1,560,000 18 Rohim Tukang Kayu 21 2 70,000 10,000 1,470,000 20,000 1,490,000 1,490,000

- - -

TOTAL 19,820,000

Terbilang : Bojonegoro, 06 Februari 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 46: Tia Upah Mandor

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANA Periode 24 Januari s/d 06 Februari 2014

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Sunadi Mandor 20 50,000 1,000,000 - 1,000,000 1,000,000 2 MartonTukang Kayu 28 80,000 11,500 2,240,000 - 2,240,000 2,240,000 3 Kasmo Tukang Kayu 70,000 10,000 - - - - 4 Priyant Tukang Kayu 27 4 70,000 10,000 1,890,000 40,000 1,930,000 1,930,000 5 SupardiTukang Kayu 26 70,000 10,000 1,820,000 - 1,820,000 1,820,000 6 JaswadiTukang Kayu 26 2 70,000 10,000 1,820,000 20,000 1,840,000 1,840,000 7 JatmikoTukang Kayu 70,000 10,000 - - - - 8 Komari Tukang Kayu 70,000 - - - - 9 Bowo Tukang Kayu 26 2 70,000 10,000 1,820,000 20,000 1,840,000 1,840,000

10 Eko H Tukang Kayu 25 2 70,000 10,000 1,750,000 20,000 1,770,000 1,770,000 11 ParyonoTukang Kayu 26 70,000 1,820,000 - 1,820,000 1,820,000 12 Subeki Tukang Kayu 26 2 70,000 10,000 1,820,000 20,000 1,840,000 1,840,000 13 HaryadiTukang Kayu 26 2 70,000 10,000 1,820,000 20,000 1,840,000 1,840,000 14 RokimaTukang Kayu 70,000 10,000 - - - - 15 Agung YTukang Kayu 26 4 70,000 10,000 1,820,000 40,000 1,860,000 1,860,000 16 Zainul Tukang Kayu 70,000 10,000 - - - - 17 Sugeng Tukang Kayu 26 2 70,000 10,000 1,820,000 20,000 1,840,000 1,840,000 18 Rohim Tukang Kayu 27 2 70,000 10,000 1,890,000 20,000 1,910,000 1,910,000

- - -

TOTAL 23,550,000

Terbilang : Bojonegoro, 06 Februari 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 47: Tia Upah Mandor

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 14 Februari 2014

Pekerjaan : Stand by akibat hujan debu gunung kelud

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 M RifanTukang Besi 1 70,000 70,000 - 70,000 70,000 2 Zainuri Tukang Besi 1 70,000 70,000 - 70,000 70,000 3 SumadiTukang Besi 1 70,000 70,000 - 70,000 70,000 4 Huri Tukang Besi 1 70,000 70,000 - 70,000 70,000 5 Kadir Tukang Besi 1 70,000 70,000 - 70,000 70,000 6 Ramidi Tukang Besi 1 70,000 70,000 - 70,000 70,000 7 Rinawa Tukang Besi 1 70,000 70,000 - 70,000 70,000 8 Eko Tukang Besi 1 70,000 70,000 - 70,000 70,000

- - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

TOTAL 560,000

Terbilang : Lima Ratus Enam Puluh Ribu RupiahBojonegoro, 14 Fbruari 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 48: Tia Upah Mandor

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 7 Februari sd 20 Februari 2014

Pekerjaan : Penambahan tenaga bekisting , cor . MCU, training HSE

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 SuprayiTukang kayu 3 70,000 210,000 - 210,000 210,000 2 Purwot Tukang kayu 3 70,000 210,000 - 210,000 210,000 3 LasimanTukang kayu 3 70,000 210,000 - 210,000 210,000 4 Budi S Tukang kayu 3 70,000 210,000 - 210,000 210,000

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

TOTAL 840,000

Terbilang : Delapan Ratus Empat Puluh Ribu RupiahBojonegoro, 20 Februari 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 49: Tia Upah Mandor

PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 7 Februari sd 20 Februari 2014

Pekerjaan : Penambahan tenaga besi, bekisting , cor . MCU, training HSE ( stand by 5 hari)

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 SuyonoTukang kayu 5 70,000 350,000 - 350,000 350,000 2 Samsul Tukang kayu 5 70,000 350,000 - 350,000 350,000 3 RadimaTukang kayu 5 70,000 350,000 - 350,000 350,000 4 Karimu Tukang kayu 5 70,000 350,000 - 350,000 350,000 5 SuparmTukang besi 5 70,000 350,000 - 350,000 350,000 6 Suradi Tukang besi 5 70,000 350,000 - 350,000 350,000 7 Priyant Tukang besi 5 70,000 350,000 - 350,000 350,000 8 SuteknoTukang besi 5 70,000 350,000 - 350,000 350,000 9 PoniranTukang besi 5 70,000 350,000 - 350,000 350,000

10 Rizal Tukang besi 5 70,000 350,000 - 350,000 350,000 - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - -

TOTAL 3,500,000

Terbilang : Tiga Juta Lima Ratus Ribu RupiahBojonegoro, 20 Februari 2014

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 50: Tia Upah Mandor

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 7 Februari sd 20 Februari 2014

Pekerjaan : Penambahan tenaga besi, bekisting , cor . MCU, training HSE ( stand by 3.5 hari)

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Zainul I Tukang kayu 3.5 70,000 245,000 - 245,000 245,000 2 Parno Tukang kayu 3.5 70,000 245,000 - 245,000 245,000 3 Hadi Tukang kayu 3.5 70,000 245,000 - 245,000 245,000 4 Pandi Tukang kayu 3.5 70,000 245,000 - 245,000 245,000 5 MuslimiTukang kayu 3.5 70,000 245,000 - 245,000 245,000 6 Trimon Tukang kayu 3.5 70,000 245,000 - 245,000 245,000 7 Saiput Tukang kayu 3.5 70,000 245,000 - 245,000 245,000 8 Agung Tukang kayu 3.5 70,000 245,000 - 245,000 245,000 9 Slamet Tukang kayu 3.5 70,000 245,000 - 245,000 245,000

10 Yogo Tukang kayu 3.5 70,000 245,000 - 245,000 245,000 11 Anam Tukang kayu 3.5 70,000 245,000 - 245,000 245,000 12 Hoki tukang besi 3.5 70,000 245,000 - 245,000 245,000 13 Siswanttukang besi 3.5 70,000 245,000 - 245,000 245,000 14 Anis tukang besi 3.5 70,000 245,000 - 245,000 245,000 15 Srofi tukang besi 3.5 70,000 245,000 - 245,000 245,000 16 kartonotukang besi 3.5 70,000 245,000 - 245,000 245,000 17 Samsul tukang besi 3.5 70,000 245,000 - 245,000 245,000 18 Trono tukang besi 3.5 70,000 245,000 245,000 245,000 19 Riski tukang besi 3.5 70,000 245,000 245,000 245,000 20 Imam tukang besi 3.5 70000 245,000 245,000 245,000

TOTAL 4,900,000

Terbilang : Empat Juta Sembilan Ratus Ribu Rupiah

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 51: Tia Upah Mandor

Bojonegoro, 20 Februari 2014Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :

PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANA Periode 07 Januari s/d 20 Februari 2014

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Sunadi Mandor 20 50,000 1,000,000 - 1,000,000 1,000,000 2 MartonTukang Kayu 20 8 80,000 11,500 1,600,000 92,000 1,692,000 1,692,000 3 MaryonTukang Kayu 9 4 70,000 10,000 630,000 40,000 670,000 670,000 4 Priyant Tukang Kayu 20 8 70,000 10,000 1,400,000 80,000 1,480,000 1,480,000 5 SupardiTukang Kayu 19 10 70,000 10,000 1,330,000 100,000 1,430,000 1,430,000 6 JaswadiTukang Kayu 16 12 70,000 10,000 1,120,000 120,000 1,240,000 1,240,000 7 Ahmad Tukang Kayu 2 70,000 10,000 140,000 - 140,000 140,000 8 LasimanTukang Kayu 10 8 70,000 700,000 - 700,000 700,000 9 Parwot Tukang Kayu 10 8 70,000 10,000 700,000 80,000 780,000 780,000

10 Eko H Tukang Kayu 15 12 70,000 10,000 1,050,000 120,000 1,170,000 1,170,000 11 ParyonoTukang Kayu 16 10 70,000 1,120,000 - 1,120,000 1,120,000 12 Subeki Tukang Kayu 18 10 70,000 10,000 1,260,000 100,000 1,360,000 1,360,000 13 HaryadiTukang Kayu 18 10 70,000 10,000 1,260,000 100,000 1,360,000 1,360,000 14 SuprayiTukang Kayu 11 6 70,000 10,000 770,000 60,000 830,000 830,000 15 Budi S Tukang Kayu 11 6 70,000 10,000 770,000 60,000 830,000 830,000 16 Zainul Tukang Kayu 70,000 10,000 - - - - 17 Sugeng Tukang Kayu 14 10 70,000 10,000 980,000 100,000 1,080,000 1,080,000 18 Rohim Tukang Kayu 20 8 70,000 10,000 1,400,000 80,000 1,480,000 1,480,000

- - -

TOTAL 18,362,000

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 52: Tia Upah Mandor

Terbilang : Bojonegoro, 20 Februari 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANA Periode 07 Januari s/d 20 Februari 2014

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Sunadi Mandor 20 50,000 1,000,000 - 1,000,000 1,000,000 2 MartonTukang Kayu 21 8 80,000 11,500 1,680,000 92,000 1,772,000 1,772,000 3 MaryonTukang Kayu 21 8 70,000 10,000 1,470,000 80,000 1,550,000 1,550,000 4 Priyant Tukang Kayu 21 8 70,000 10,000 1,470,000 80,000 1,550,000 1,550,000 5 SupardiTukang Kayu 20 10 70,000 10,000 1,400,000 100,000 1,500,000 1,500,000 6 JaswadiTukang Kayu 17 12 70,000 10,000 1,190,000 120,000 1,310,000 1,310,000 7 Ahmad Tukang Kayu 10 4 70,000 10,000 700,000 40,000 740,000 740,000 8 LasimanTukang Kayu 19 6 70,000 1,330,000 - 1,330,000 1,330,000 9 Parwot Tukang Kayu 21 8 70,000 10,000 1,470,000 80,000 1,550,000 1,550,000

10 Eko H Tukang Kayu 18 8 70,000 10,000 1,260,000 80,000 1,340,000 1,340,000 11 ParyonoTukang Kayu 21 8 70,000 1,470,000 - 1,470,000 1,470,000 12 Subeki Tukang Kayu 21 8 70,000 10,000 1,470,000 80,000 1,550,000 1,550,000 13 HaryadiTukang Kayu 21 8 70,000 10,000 1,470,000 80,000 1,550,000 1,550,000 14 SuprayiTukang Kayu 18 8 70,000 10,000 1,260,000 80,000 1,340,000 1,340,000 15 Budi S Tukang Kayu 11 6 70,000 10,000 770,000 60,000 830,000 830,000 16 Zainul Tukang Kayu 70,000 10,000 - - - - 17 Sugeng Tukang Kayu 14 10 70,000 10,000 980,000 100,000 1,080,000 1,080,000 18 Rohim Tukang Kayu 20 8 70,000 10,000 1,400,000 80,000 1,480,000 1,480,000

- - -

TOTAL 22,942,000

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 53: Tia Upah Mandor

Terbilang : Bojonegoro, 20 Februari 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 1 Februari s/d 28 Februari 2014

Pekerjaan : Pembersihan kayu-kayu, puing2 beton sebelum backfiling footing

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Sapari Tukang Kayu 28 70,000 1,960,000 - 1,960,000 1,960,000 2 Radini Tukang Kayu 28 50,000 1,400,000 - 1,400,000 1,400,000

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 54: Tia Upah Mandor

TOTAL 3,360,000

Terbilang : Tiga Juta Tiga Ratus Enam Puluh Ribu RupiahBojonegoro, 28 Februari 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 21 Februari sd 4 Maret 2014

Pekerjaan : Penambahan tenaga besi , cor . MCU, training HSE

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 SugiantTukang besi 4 70,000 280,000 - 280,000 280,000 2 NgadimTukang besi 4 70,000 280,000 - 280,000 280,000 3 Sugino Tukang besi 4 70,000 280,000 - 280,000 280,000

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 55: Tia Upah Mandor

TOTAL 840,000

Terbilang : Delapan Ratus Empat Puluh Ribu RupiahBojonegoro, 4 Maret 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 7 Februari sd 20 Februari 2014

Pekerjaan : Penambahan tenaga besi, bekisting , cor . MCU, training HSE ( stand by 5 hari)

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 SuyonoTukang kayu 5 70,000 350,000 - 350,000 350,000 2 Samsul Tukang kayu 5 70,000 350,000 - 350,000 350,000 3 RadimaTukang kayu 5 70,000 350,000 - 350,000 350,000 4 Karimu Tukang kayu 5 70,000 350,000 - 350,000 350,000 5 SuparmTukang besi 5 70,000 350,000 - 350,000 350,000 6 Suradi Tukang besi 5 70,000 350,000 - 350,000 350,000 7 Priyant Tukang besi 5 70,000 350,000 - 350,000 350,000 8 SuteknoTukang besi 5 70,000 350,000 - 350,000 350,000 9 PoniranTukang besi 5 70,000 350,000 - 350,000 350,000

10 Rizal Tukang besi 5 70,000 350,000 - 350,000 350,000 - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - -

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 56: Tia Upah Mandor

TOTAL 3,500,000

Terbilang : Tiga Juta Lima Ratus Ribu RupiahBojonegoro, 20 Februari 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 21 Februari sd 4 Maret 2014

Pekerjaan : Penambahan tenaga bekisting , cor . MCU, training HSE ( stand by 5 hari)

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 M Rind Tukang kayu 5 70,000 350,000 - 350,000 350,000 2 KarmijaTukang kayu 5 70,000 350,000 - 350,000 350,000 3 Muhari Tukang kayu 5 70,000 350,000 - 350,000 350,000 4 NunungTukang kayu 5 70,000 350,000 - 350,000 350,000 5 Yudi Tukang kayu 5 70,000 350,000 - 350,000 350,000 6 MuslimTukang kayu 5 70,000 350,000 - 350,000 350,000 7 Timan Tukang kayu 5 70,000 350,000 - 350,000 350,000 8 Ahmad Tukang kayu 5 70,000 350,000 - 350,000 350,000 9 Sofyan Tukang kayu 5 70,000 350,000 - 350,000 350,000

10 TrimulyTukang kayu 5 70,000 350,000 - 350,000 350,000 11 Suligi Tukang kayu 5 70,000 350,000 - 350,000 350,000 12 Wanto Tukang kayu 5 70,000 350,000 - 350,000 350,000 13 M UlinuTukang kayu 5 70,000 350,000 - 350,000 350,000

- - - - - - - - - - - - - - - -

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 57: Tia Upah Mandor

- - -

TOTAL 4,550,000

Terbilang : Empat Juta Lima Ratus Lima Puluh Ribu RupiahBojonegoro, 4 Maret 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 21 Februari sd 4 Maret 2014

Pekerjaan : Penambahan tenaga besi , cor . MCU, training HSE

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Solikin Tukang besi 6 70,000 420,000 - 420,000 420,000 2 Matraji Tukang besi 6 70,000 420,000 - 420,000 420,000

- - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - -

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 58: Tia Upah Mandor

- - - - - - -

TOTAL 840,000

Terbilang : Delapan Ratus Empat Puluh Ribu RupiahBojonegoro, 4 Maret 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANA Periode 21 Februari s/d 04 Maret 2014

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Sunadi Mandor 10 50,000 500,000 - 500,000 500,000 2 MartonTukang Kayu 22 8 90,000 12,000 1,980,000 96,000 2,076,000 2,076,000 3 MaryonTukang Kayu 21 8 70,000 10,000 1,470,000 80,000 1,550,000 1,550,000 4 Priyant Tukang Kayu 14 8 70,000 10,000 980,000 80,000 1,060,000 1,060,000 5 SupardiTukang Kayu 22 8 70,000 10,000 1,540,000 80,000 1,620,000 1,620,000 6 JaswadiTukang Kayu 16 8 70,000 10,000 1,120,000 80,000 1,200,000 1,200,000 7 Ahmad Tukang Kayu 70,000 10,000 - - - - 8 LasimanTukang Kayu 21 8 70,000 1,470,000 - 1,470,000 1,470,000 9 Parwot Tukang Kayu 19 8 70,000 10,000 1,330,000 80,000 1,410,000 1,410,000

10 Eko H Tukang Kayu 18 8 70,000 10,000 1,260,000 80,000 1,340,000 1,340,000 11 ParyonoTukang Kayu 70,000 - - - - 12 Subeki Tukang Kayu 21 6 70,000 10,000 1,470,000 60,000 1,530,000 1,530,000 13 HaryadiTukang Kayu 21 8 70,000 10,000 1,470,000 80,000 1,550,000 1,550,000 14 SuprayiTukang Kayu 18 8 70,000 10,000 1,260,000 80,000 1,340,000 1,340,000 15 Budi S Tukang Kayu 19 8 70,000 10,000 1,330,000 80,000 1,410,000 1,410,000

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 59: Tia Upah Mandor

16 Zainul Tukang Kayu 22 4 70,000 10,000 1,540,000 40,000 1,580,000 1,580,000 17 Sugeng Tukang Kayu 20 8 70,000 10,000 1,400,000 80,000 1,480,000 1,480,000 18 Rohim Tukang Kayu 14 8 70,000 10,000 980,000 80,000 1,060,000 1,060,000

- - -

TOTAL 22,176,000

Terbilang : Bojonegoro, 4 Maret 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 21 Februari sd 4 Maret 2014

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 M Rind Tukang kayu 4 70,000 280,000 - 280,000 280,000 2 KarmijaTukang kayu 4 70,000 280,000 - 280,000 280,000 3 Muhari Tukang kayu 4 70,000 280,000 - 280,000 280,000 4 NunungTukang kayu 4 70,000 280,000 - 280,000 280,000 5 Arif R Tukang kayu 4 70,000 280,000 - 280,000 280,000 6 MuslimTukang kayu 4 70,000 280,000 - 280,000 280,000 7 Sugeng Tukang kayu 4 70,000 280,000 - 280,000 280,000 8 Ahmad Tukang kayu 4 70,000 280,000 - 280,000 280,000 9 SuntoroTukang kayu 4 70,000 280,000 - 280,000 280,000

10 TrimulyTukang kayu 4 70,000 280,000 - 280,000 280,000 11 Suligi Tukang kayu 4 70,000 280,000 - 280,000 280,000 12 Wanto Tukang kayu 4 70,000 280,000 - 280,000 280,000 13 M UlinuTukang kayu 4 70,000 280,000 - 280,000 280,000

- - - -

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 60: Tia Upah Mandor

- - - - - - - - - - - - - - -

TOTAL 3,640,000

Terbilang : Empat Juta Lima Ratus Lima Puluh Ribu RupiahBojonegoro, 4 Maret 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANA Periode 05 Maret s/d 18 Maret 2014

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Sunadi Mandor 10 50,000 500,000 - 500,000 500,000 2 MartonTukang Kayu 17 18 90,000 12,000 1,530,000 216,000 1,746,000 1,746,000 3 MaryonTukang Kayu 3 6 70,000 10,000 210,000 60,000 270,000 270,000 4 Priyant Tukang Kayu 16 18 70,000 10,000 1,120,000 180,000 1,300,000 1,300,000 5 SupardiTukang Kayu 17 18 70,000 10,000 1,190,000 180,000 1,370,000 1,370,000 6 JaswadiTukang Kayu 17 18 70,000 10,000 1,190,000 180,000 1,370,000 1,370,000 7 Ahmad Tukang Kayu 70,000 10,000 - - - - 8 LasimanTukang Kayu 13 20 70,000 910,000 - 910,000 910,000 9 Parwot Tukang Kayu 12 18 70,000 10,000 840,000 180,000 1,020,000 1,020,000

10 Eko H Tukang Kayu 14 20 70,000 10,000 980,000 200,000 1,180,000 1,180,000 11 ParyonoTukang Kayu 70,000 - - - - 12 Subeki Tukang Kayu 11 16 70,000 10,000 770,000 160,000 930,000 930,000 13 HaryadiTukang Kayu 14 20 70,000 10,000 980,000 200,000 1,180,000 1,180,000

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 61: Tia Upah Mandor

14 SuprayiTukang Kayu 12 16 70,000 10,000 840,000 160,000 1,000,000 1,000,000 15 Budi S Tukang Kayu 15 18 70,000 10,000 1,050,000 180,000 1,230,000 1,230,000 16 Zainul Tukang Kayu 8 12 70,000 10,000 560,000 120,000 680,000 680,000 17 Sugeng Tukang Kayu 6 12 70,000 10,000 420,000 120,000 540,000 540,000 18 Rohim Tukang Kayu 16 20 70,000 10,000 1,120,000 200,000 1,320,000 1,320,000

- - -

TOTAL 16,546,000

Terbilang : Bojonegoro, 22 Maret 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 05 Maret sd 18 Maret 2014

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 M Rind Tukang kayu 11 18 70,000 770,000 - 770,000 770,000 2 KarmijaTukang kayu 4 6 70,000 280,000 - 280,000 280,000 3 Muhari Tukang kayu 15 12 70,000 1,050,000 - 1,050,000 1,050,000 4 NunungTukang kayu 70,000 - - - - 5 Arif R Tukang kayu 6 12 70,000 420,000 - 420,000 420,000 6 MuslimTukang kayu 11 16 70,000 770,000 - 770,000 770,000 7 Sugeng Tukang kayu 15 22 70,000 1,050,000 - 1,050,000 1,050,000 8 Ahmad Tukang kayu 70,000 - - - - 9 SuntoroTukang kayu 8 12 70,000 560,000 - 560,000 560,000

10 TrimulyTukang kayu 8 8 70,000 560,000 - 560,000 560,000 11 Suligi Tukang kayu 8 8 70,000 560,000 - 560,000 560,000 12 Wanto Tukang kayu 15 22 70,000 1,050,000 - 1,050,000 1,050,000

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 62: Tia Upah Mandor

13 M UlinuTukang kayu 17 18 70,000 1,190,000 - 1,190,000 1,190,000 14 KholaloTukang kayu 13 18 - - - -

- - - - - - - - - - - - - - -

TOTAL 8,260,000

Terbilang : Bojonegoro, 22 Maret 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANA Periode 19 Maret s/d 1 April 2014

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Sunadi Mandor 20 50,000 1,000,000 - 1,000,000 1,000,000 2 MartonTukang Kayu 23 4 90,000 12,000 2,070,000 48,000 2,118,000 2,118,000 3 MaryonTukang Kayu 70,000 10,000 - - - - 4 Priyant Tukang Kayu 20 4 70,000 10,000 1,400,000 40,000 1,440,000 1,440,000 5 SupardiTukang Kayu 22 6 70,000 10,000 1,540,000 60,000 1,600,000 1,600,000 6 JaswadiTukang Kayu 16 4 70,000 10,000 1,120,000 40,000 1,160,000 1,160,000 7 Ahmad Tukang Kayu 70,000 10,000 - - - - 8 LasimanTukang Kayu 19 4 70,000 1,330,000 - 1,330,000 1,330,000 9 Parwot Tukang Kayu 18 4 70,000 10,000 1,260,000 40,000 1,300,000 1,300,000

10 Eko H Tukang Kayu 19 4 70,000 10,000 1,330,000 40,000 1,370,000 1,370,000 11 ParyonoTukang Kayu 70,000 - - - -

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 63: Tia Upah Mandor

12 Subeki Tukang Kayu 70,000 10,000 - - - - 13 HaryadiTukang Kayu 70,000 10,000 - - - - 14 SuprayiTukang Kayu 70,000 10,000 - - - - 15 Budi S Tukang Kayu 17 8 70,000 10,000 1,190,000 80,000 1,270,000 1,270,000 16 Zainul Tukang Kayu 70,000 10,000 - - - - 17 Sugeng Tukang Kayu 3 70,000 10,000 210,000 - 210,000 210,000 18 Rohim Tukang Kayu 22 4 70,000 10,000 1,540,000 40,000 1,580,000 1,580,000

- - -

TOTAL 14,378,000

Terbilang : Bojonegoro, 1 april 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 19 Maret sd 1 April 2014

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 M Rind Tukang kayu 21 4 70,000 1,470,000 - 1,470,000 1,470,000 2 KarmijaTukang kayu 20 6 70,000 1,400,000 - 1,400,000 1,400,000 3 Muhari Tukang kayu 22 6 70,000 1,540,000 - 1,540,000 1,540,000 4 NunungTukang kayu 70,000 - - - - 5 Arif R Tukang kayu 18 2 70,000 1,260,000 - 1,260,000 1,260,000 6 MuslimTukang kayu 23 4 70,000 1,610,000 - 1,610,000 1,610,000 7 Sugeng Tukang kayu 70,000 - - - - 8 Ahmad Tukang kayu 70,000 - - - - 9 SuntoroTukang kayu 70,000 - - - -

10 TrimulyTukang kayu 70,000 - - - -

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 64: Tia Upah Mandor

11 Suligi Tukang kayu 3 70,000 210,000 - 210,000 210,000 12 Wanto Tukang kayu 20 4 70,000 1,400,000 - 1,400,000 1,400,000 13 M MalinTukang kayu 3 70,000 210,000 - 210,000 210,000 14 Kholil Tukang kayu 19 4 70,000 1,330,000 - 1,330,000 1,330,000 15 Bowo Tukang kayu 6 4 70,000 420,000 - 420,000 420,000 16 Riyadi Tukang kayu 7 70,000 490,000 - 490,000 490,000 17 Triono Tukang kayu 3 70,000 210,000 - 210,000 210,000

- - -

TOTAL 11,550,000

Terbilang : Bojonegoro, 1 april 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANA Periode 19 Maret s/d 1 April 2014

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Sunadi Mandor 20 50,000 1,000,000 - 1,000,000 1,000,000 2 MartonTukang Kayu 23 4 90,000 12,000 2,070,000 48,000 2,118,000 2,118,000 3 MaryonTukang Kayu 70,000 10,000 - - - - 4 Priyant Tukang Kayu 20 4 70,000 10,000 1,400,000 40,000 1,440,000 1,440,000 5 SupardiTukang Kayu 22 6 70,000 10,000 1,540,000 60,000 1,600,000 1,600,000 6 JaswadiTukang Kayu 16 4 70,000 10,000 1,120,000 40,000 1,160,000 1,160,000 7 Ahmad Tukang Kayu 70,000 10,000 - - - - 8 LasimanTukang Kayu 19 4 70,000 1,330,000 - 1,330,000 1,330,000 9 Parwot Tukang Kayu 18 4 70,000 10,000 1,260,000 40,000 1,300,000 1,300,000

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 65: Tia Upah Mandor

10 Eko H Tukang Kayu 19 4 70,000 10,000 1,330,000 40,000 1,370,000 1,370,000 11 ParyonoTukang Kayu 70,000 - - - - 12 Subeki Tukang Kayu 70,000 10,000 - - - - 13 HaryadiTukang Kayu 70,000 10,000 - - - - 14 SuprayiTukang Kayu 70,000 10,000 - - - - 15 Budi S Tukang Kayu 17 8 70,000 10,000 1,190,000 80,000 1,270,000 1,270,000 16 Zainul Tukang Kayu 70,000 10,000 - - - - 17 Sugeng Tukang Kayu 3 70,000 10,000 210,000 - 210,000 210,000 18 Rohim Tukang Kayu 22 4 70,000 10,000 1,540,000 40,000 1,580,000 1,580,000

- - -

TOTAL 14,378,000

Terbilang : Bojonegoro, 1 april 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 19 Maret sd 1 April 2014

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 M Rind Tukang kayu 21 4 70,000 1,470,000 - 1,470,000 1,470,000 2 KarmijaTukang kayu 20 6 70,000 1,400,000 - 1,400,000 1,400,000 3 Muhari Tukang kayu 22 6 70,000 1,540,000 - 1,540,000 1,540,000 4 NunungTukang kayu 70,000 - - - - 5 Arif R Tukang kayu 18 2 70,000 1,260,000 - 1,260,000 1,260,000 6 MuslimTukang kayu 23 4 70,000 1,610,000 - 1,610,000 1,610,000 7 Sugeng Tukang kayu 70,000 - - - - 8 Ahmad Tukang kayu 70,000 - - - -

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 66: Tia Upah Mandor

9 SuntoroTukang kayu 70,000 - - - - 10 TrimulyTukang kayu 70,000 - - - - 11 Suligi Tukang kayu 22 70,000 1,540,000 - 1,540,000 1,540,000 12 Wanto Tukang kayu 20 4 70,000 1,400,000 - 1,400,000 1,400,000 13 M MalinTukang kayu 22 70,000 1,540,000 - 1,540,000 1,540,000 14 Kholil Tukang kayu 19 4 70,000 1,330,000 - 1,330,000 1,330,000 15 Bowo Tukang kayu 22 2 70,000 1,540,000 - 1,540,000 1,540,000 16 Riyadi Tukang kayu 17 70,000 1,190,000 - 1,190,000 1,190,000 17 Triono Tukang kayu 19 70,000 1,330,000 - 1,330,000 1,330,000

- - -

TOTAL 17,150,000

Terbilang : Bojonegoro, 1 april 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero) PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 16 April sd 29 April 2014

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 M In amTukang kayu 7 70,000 490,000 - 490,000 490,000 2 M IkhsaTukang kayu 7 70,000 490,000 - 490,000 490,000 3 M NasuTukang kayu 7 70,000 490,000 - 490,000 490,000 4 Milono Tukang kayu 7 70,000 490,000 - 490,000 490,000 5 A RohmTukang kayu 7 70,000 490,000 - 490,000 490,000 6 Dul Wa Tukang kayu 7 70,000 490,000 - 490,000 490,000 7 SriyonoTukang kayu 7 70,000 490,000 - 490,000 490,000

(Ir. I. Gede Dwi Sudi Manuarta) (Ir. Moch Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 67: Tia Upah Mandor

8 DamparTukang kayu 7 70,000 490,000 - 490,000 490,000 9 SuparnoTukang kayu 7 70,000 490,000 - 490,000 490,000

10 Ahmad Tukang kayu 7 70,000 490,000 - 490,000 490,000 11 M Ali Y Tukang kayu 7 70,000 490,000 - 490,000 490,000 12 Wardi Tukang kayu 7 70,000 490,000 - 490,000 490,000 13 SuripanTukang kayu 7 70,000 490,000 - 490,000 490,000 14 SudarsoTukang kayu 7 70,000 490,000 - 490,000 490,000 15 MunsariTukang kayu 7 70,000 490,000 - 490,000 490,000

- - - - - - - - - - -

TOTAL 7,350,000

Terbilang : Tujuh Juta Tiga Ratus Lima Puluh Ribu RupiahBojonegoro, 29 april 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Budiono Satriyo. ST) (Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 16 April sd 29 April 2014

Pekerjaan : Penambahan tenaga besi , cor . MCU, training HSE

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Yatno Tukang besi 4 70,000 280,000 - 280,000 280,000 2 Taufik Tukang besi 4 70,000 280,000 - 280,000 280,000 3 SantosoTukang besi 4 70,000 280,000 - 280,000 280,000 4 SamudiTukang besi 4 70,000 280,000 - 280,000 280,000

- - - - - -

(Ir. M. Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 68: Tia Upah Mandor

- - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - -

TOTAL 1,120,000

Terbilang : Satu Juta Seratus Dua Puluh Ribu Rupiah Bojonegoro, 29 april 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Budiono Satriyo. ST) (Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 16 April sd 29 April 2014

Pekerjaan : Penambahan tenaga besi , cor . MCU, training HSE

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 SantosoTukang besi 8 70,000 560,000 - 560,000 560,000 2 Dwi P Tukang besi 8 70,000 560,000 - 560,000 560,000 3 Jumadi Tukang besi 8 70,000 560,000 - 560,000 560,000 4 RusdiyaTukang besi 8 70,000 560,000 - 560,000 560,000 5 SuparmTukang besi 8 70,000 560,000 - 560,000 560,000

(Ir. M. Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 69: Tia Upah Mandor

6 JudiwanTukang besi 8 70,000 560,000 - 560,000 560,000 7 ParwanTukang besi 8 70,000 560,000 - 560,000 560,000 8 Sukeni Tukang besi 8 70,000 560,000 - 560,000 560,000 9 WagimaTukang besi 8 70,000 560,000 - 560,000 560,000

- - - - - - - - - - - - - - - - - -

- - - - - - - - - - -

TOTAL 5,040,000

Terbilang : Lima Juta Empat Puluh Ribu Rupiah Bojonegoro, 29 april 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Budiono Satriyo. ST) (Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 16 April sd 29 April 2014

Pekerjaan : Bobok, pasang besi, grouting bearing pad utk dudukan girder zone 3

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 RiswantTukang kayu 20 70,000 1,400,000 - 1,400,000 1,400,000 2 Mardi Tukang kayu 18 70,000 1,260,000 - 1,260,000 1,260,000 3 MujiminTukang kayu 16 70,000 1,120,000 - 1,120,000 1,120,000 4 RadimaTukang kayu 16 70,000 1,120,000 - 1,120,000 1,120,000

(Ir. M. Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 70: Tia Upah Mandor

- - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - -

- - - - - - - - - - -

TOTAL 4,900,000

Terbilang : Empat Juta Sembilan Ratus Ribu Rupiah Bojonegoro, 29 april 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Budiono Satriyo. ST) (Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 16 April sd 29 April 2014

Pekerjaan : Penambahan Mandor Tukang kayu,besi , cor . MCU, training HSE, nunggu APD

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 SuyantoMandor 5 70,000 350,000 - 350,000 350,000 2 Juwadi Tukang kayu 5 70,000 350,000 - 350,000 350,000 3 Dul SyuTukang kayu 5 70,000 350,000 - 350,000 350,000

(Ir. M. Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 71: Tia Upah Mandor

4 Yuhdi Tukang kayu 5 70,000 350,000 - 350,000 350,000 5 MualimTukang kayu 5 70,000 350,000 - 350,000 350,000 6 Juwant Tukang kayu 5 70,000 350,000 - 350,000 350,000 7 Suno Tukang kayu 5 70,000 350,000 - 350,000 350,000 8 Suhud Tukang kayu 5 70,000 350,000 - 350,000 350,000 9 Eko Yul Tukang kayu 5 70,000 350,000 - 350,000 350,000

10 Damin Tukang kayu 5 70,000 350,000 - 350,000 350,000 11 RohmatTukang kayu 5 70,000 350,000 - 350,000 350,000 12 Suwadi Tukang kayu 5 70,000 350,000 - 350,000 350,000 13 SantosoTukang kayu 5 70,000 350,000 - 350,000 350,000 14 MorsidiTukang kayu 5 70,000 350,000 - 350,000 350,000 15 Sukaria Tukang kayu 5 70,000 350,000 - 350,000 350,000

- - - - - - - - - - -

TOTAL 5,250,000

Terbilang : Lima Juta Dua Ratus Lima Puluh Ribu RupiahBojonegoro, 29 april 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Budiono Satriyo. ST) (Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 20 April sd 5 mei 2014

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 sunadi Mandor 50,000 - - - - 2 martonTukang kayu 24 8 90,000 12,000 2,160,000 96,000 2,256,000 2,256,000

(Ir. M. Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 72: Tia Upah Mandor

3 bowo Tukang kayu 18 14 70,000 10,000 1,260,000 140,000 1,400,000 1,400,000 4 arif Tukang kayu 5 6 70,000 10,000 350,000 60,000 410,000 410,000 5 sugeng Tukang kayu 18 14 70,000 10,000 1,260,000 140,000 1,400,000 1,400,000 6 kolil Tukang kayu 17 12 70,000 10,000 1,190,000 120,000 1,310,000 1,310,000 7 budi s Tukang kayu 17 12 70,000 10,000 1,190,000 120,000 1,310,000 1,310,000 8 muhari Tukang kayu 21 10 70,000 10,000 1,470,000 100,000 1,570,000 1,570,000 9 sugeng Tukang kayu 20 12 70,000 10,000 1,400,000 120,000 1,520,000 1,520,000

10 karmijaTukang kayu 16 8 70,000 10,000 1,120,000 80,000 1,200,000 1,200,000 11 rindo Tukang kayu 20 10 70,000 10,000 1,400,000 100,000 1,500,000 1,500,000 12 prianto Tukang kayu 19 8 70,000 10,000 1,330,000 80,000 1,410,000 1,410,000 13 supardiTukang kayu 23 8 70,000 10,000 1,610,000 80,000 1,690,000 1,690,000 14 jaswadiTukang kayu 19 12 70,000 10,000 1,330,000 120,000 1,450,000 1,450,000 15 subeki Tukang kayu 21 12 70,000 10,000 1,470,000 120,000 1,590,000 1,590,000 16 m alinuTukang kayu 19 12 70,000 10,000 1,330,000 120,000 1,450,000 1,450,000 17 riyadi Tukang kayu 18 12 70,000 10,000 1,260,000 120,000 1,380,000 1,380,000 18 muslih Tukang kayu 22 12 70,000 10,000 1,540,000 120,000 1,660,000 1,660,000 19 zainul Tukang kayu 19 12 70,000 10,000 1,330,000 120,000 1,450,000 1,450,000 20 rohim Tukang kayu 16 6 70,000 10,000 1,120,000 60,000 1,180,000 1,180,000

TOTAL 27,136,000

Terbilang : Bojonegoro, 5 mei 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Budiono Satriyo. ST) (Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 20 April sd 5 mei 2014

No Nama Jabatan Jmlh Hr Kerja Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 suligi Tukang kayu 20 12 70,000 1,400,000 - 1,400,000 1,400,000

(Ir. M. Alfin Zaini)

Jmlh Jam

LmbrUpah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 73: Tia Upah Mandor

2 juwantoTukang kayu 19 12 70,000 12,000 1,330,000 144,000 1,474,000 1,474,000 3 m inamTukang kayu 17 4 70,000 10,000 1,190,000 40,000 1,230,000 1,230,000 4 wardi Tukang kayu 15 8 70,000 10,000 1,050,000 80,000 1,130,000 1,130,000 5 m ali y Tukang kayu 15 8 70,000 10,000 1,050,000 80,000 1,130,000 1,130,000 6 ahmad Tukang kayu 15 8 70,000 10,000 1,050,000 80,000 1,130,000 1,130,000 7 suparnoTukang kayu 15 8 70,000 10,000 1,050,000 80,000 1,130,000 1,130,000 8 sriyonoTukang kayu 16 6 70,000 10,000 1,120,000 60,000 1,180,000 1,180,000 9 damparTukang kayu 16 10 70,000 10,000 1,120,000 100,000 1,220,000 1,220,000

10 dulwahTukang kayu 15 8 70,000 10,000 1,050,000 80,000 1,130,000 1,130,000 11 a rohm Tukang kayu 15 8 70,000 10,000 1,050,000 80,000 1,130,000 1,130,000 12 milono Tukang kayu 16 6 70,000 10,000 1,120,000 60,000 1,180,000 1,180,000 13 m nasukTukang kayu 16 6 70,000 10,000 1,120,000 60,000 1,180,000 1,180,000 14 m ikhsaTukang kayu 15 8 70,000 10,000 1,050,000 80,000 1,130,000 1,130,000 15 sudarsoTukang kayu 16 6 70,000 10,000 1,120,000 60,000 1,180,000 1,180,000 16 munsariTukang kayu 15 8 70,000 10,000 1,050,000 80,000 1,130,000 1,130,000 17 suripanTukang kayu 15 8 70,000 10,000 1,050,000 80,000 1,130,000 1,130,000

- - - - - - - - - - - -

TOTAL 20,214,000

Terbilang : Bojonegoro, 5 mei 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Budiono Satriyo. ST) (Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 5 Mei sd 19 mei 2014

No Nama Jabatan Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

(Ir. M. Alfin Zaini)

Jmlh Hr Kerja

Jmlh Jam Lmbr

Upah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 74: Tia Upah Mandor

1 sunadi Mandor 20 50,000 1,000,000 - 1,000,000 1,000,000 2 martono Tukang kayu 32.5 6 90,000 12,000 2,925,000 72,000 2,997,000 2,997,000 3 bowo Tukang kayu 23 14 70,000 10,000 1,610,000 140,000 1,750,000 1,750,000 4 arif Tukang kayu 25.5 4 70,000 10,000 1,785,000 40,000 1,825,000 1,825,000 5 sugeng r Tukang kayu 70,000 10,000 - - - - 6 kolil Tukang kayu 22 8 70,000 10,000 1,540,000 80,000 1,620,000 1,620,000 7 budi s Tukang kayu 21 8 70,000 10,000 1,470,000 80,000 1,550,000 1,550,000 8 muhari Tukang kayu 24.5 12 70,000 10,000 1,715,000 120,000 1,835,000 1,835,000 9 sugeng Tukang kayu 70,000 10,000 - - - -

10 karmijan Tukang kayu 25 12 70,000 10,000 1,750,000 120,000 1,870,000 1,870,000 11 rindo Tukang kayu 27 8 70,000 10,000 1,890,000 80,000 1,970,000 1,970,000 12 prianto Tukang kayu 22.5 10 70,000 10,000 1,575,000 100,000 1,675,000 1,675,000 13 supardi Tukang kayu 22 14 70,000 10,000 1,540,000 140,000 1,680,000 1,680,000 14 jaswadi Tukang kayu 19 14 70,000 10,000 1,330,000 140,000 1,470,000 1,470,000 15 subeki Tukang kayu 20 12 70,000 10,000 1,400,000 120,000 1,520,000 1,520,000 16 m alinuha Tukang kayu 24 10 70,000 10,000 1,680,000 100,000 1,780,000 1,780,000 17 riyadi Tukang kayu 22 10 70,000 10,000 1,540,000 100,000 1,640,000 1,640,000 18 muslih Tukang kayu 24 4 70,000 10,000 1,680,000 40,000 1,720,000 1,720,000 19 zainul Tukang kayu 22 8 70,000 10,000 1,540,000 80,000 1,620,000 1,620,000 20 rohim Tukang kayu 20 10 70,000 10,000 1,400,000 100,000 1,500,000 1,500,000

TOTAL 31,022,000

Terbilang : Bojonegoro,19 mei 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Budiono Satriyo. ST) (Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 5 Mei sd 19 mei 2014

No Nama Jabatan Jumlah (Rp) Paraf Ket

(Ir. M. Alfin Zaini)

Jmlh Hr Kerja

Jmlh Jam Lmbr

Upah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 75: Tia Upah Mandor

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 suligi Tukang kayu 8 70,000 560,000 - 560,000 560,000 2 juwanto Tukang kayu 23 14 70,000 12,000 1,610,000 168,000 1,778,000 1,778,000 3 m inam Tukang kayu 22.5 6 70,000 10,000 1,575,000 60,000 1,635,000 1,635,000 4 wardi Tukang kayu 22.5 10 70,000 10,000 1,575,000 100,000 1,675,000 1,675,000 5 m ali y Tukang kayu 20 14 70,000 10,000 1,400,000 140,000 1,540,000 1,540,000 6 ahmad z Tukang kayu 20 10 70,000 10,000 1,400,000 100,000 1,500,000 1,500,000 7 suparno Tukang kayu 19 8 70,000 10,000 1,330,000 80,000 1,410,000 1,410,000 8 sriyono Tukang kayu 22 6 70,000 10,000 1,540,000 60,000 1,600,000 1,600,000 9 dampar Tukang kayu 18 14 70,000 10,000 1,260,000 140,000 1,400,000 1,400,000

10 dulwahab Tukang kayu 25 10 70,000 10,000 1,750,000 100,000 1,850,000 1,850,000 11 a rohman Tukang kayu 26.5 6 70,000 10,000 1,855,000 60,000 1,915,000 1,915,000 12 milono Tukang kayu 24 8 70,000 10,000 1,680,000 80,000 1,760,000 1,760,000 13 m nasuka Tukang kayu 24 6 70,000 10,000 1,680,000 60,000 1,740,000 1,740,000 14 m ikhsan Tukang kayu 20 10 70,000 10,000 1,400,000 100,000 1,500,000 1,500,000 15 sudarso Tukang kayu 23 8 70,000 10,000 1,610,000 80,000 1,690,000 1,690,000 16 munsarip Tukang kayu 20 14 70,000 10,000 1,400,000 140,000 1,540,000 1,540,000 17 suripan Tukang kayu 20 8 70,000 10,000 1,400,000 80,000 1,480,000 1,480,000

- - - - - - - - - - - -

TOTAL 26,573,000

Terbilang : Bojonegoro, 19 mei 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Budiono Satriyo. ST) (Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 5 Mei sd 19 mei 2014

No Nama Jabatan Jumlah (Rp) Paraf Ket

(Ir. M. Alfin Zaini)

Jmlh Hr Kerja

Jmlh Jam Lmbr

Upah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 76: Tia Upah Mandor

No Nama Jabatan Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 sunadi Mandor 30 100,000 3,000,000 - 3,000,000 3,000,000 2 martono Tukang kayu 32.5 6 90,000 12,000 2,925,000 72,000 2,997,000 2,997,000 3 bowo Tukang kayu 23 14 70,000 10,000 1,610,000 140,000 1,750,000 1,750,000 4 arif Tukang kayu 25.5 4 70,000 10,000 1,785,000 40,000 1,825,000 1,825,000 5 sugeng r Tukang kayu 20 70,000 10,000 1,400,000 - 1,400,000 1,400,000 6 kolil Tukang kayu 22 8 70,000 10,000 1,540,000 80,000 1,620,000 1,620,000 7 budi s Tukang kayu 21 8 70,000 10,000 1,470,000 80,000 1,550,000 1,550,000 8 muhari Tukang kayu 24.5 12 70,000 10,000 1,715,000 120,000 1,835,000 1,835,000 9 sugeng Tukang kayu 20 70,000 10,000 1,400,000 - 1,400,000 1,400,000

10 karmijan Tukang kayu 25 12 70,000 10,000 1,750,000 120,000 1,870,000 1,870,000 11 rindo Tukang kayu 27 8 70,000 10,000 1,890,000 80,000 1,970,000 1,970,000 12 prianto Tukang kayu 22.5 10 70,000 10,000 1,575,000 100,000 1,675,000 1,675,000 13 supardi Tukang kayu 22 14 70,000 10,000 1,540,000 140,000 1,680,000 1,680,000 14 jaswadi Tukang kayu 19 14 70,000 10,000 1,330,000 140,000 1,470,000 1,470,000 15 subeki Tukang kayu 20 12 70,000 10,000 1,400,000 120,000 1,520,000 1,520,000 16 m alinuha Tukang kayu 24 10 70,000 10,000 1,680,000 100,000 1,780,000 1,780,000 17 riyadi Tukang kayu 22 10 70,000 10,000 1,540,000 100,000 1,640,000 1,640,000 18 muslih Tukang kayu 24 4 70,000 10,000 1,680,000 40,000 1,720,000 1,720,000 19 zainul Tukang kayu 22 8 70,000 10,000 1,540,000 80,000 1,620,000 1,620,000 20 rohim Tukang kayu 20 10 70,000 10,000 1,400,000 100,000 1,500,000 1,500,000

TOTAL 35,822,000

Terbilang : Bojonegoro,19 mei 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Budiono Satriyo. ST) (Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 5 Mei sd 19 mei 2014

No Nama Jabatan Jumlah (Rp) Paraf Ket

Jmlh Hr Kerja

Jmlh Jam Lmbr

Upah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

(Ir. M. Alfin Zaini)

Jmlh Hr Kerja

Jmlh Jam Lmbr

Upah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 77: Tia Upah Mandor

No Nama Jabatan Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 suligi Tukang kayu 25 70,000 1,750,000 - 1,750,000 1,750,000 2 juwanto Tukang kayu 23 14 70,000 12,000 1,610,000 168,000 1,778,000 1,778,000 3 m inam Tukang kayu 22.5 6 70,000 10,000 1,575,000 60,000 1,635,000 1,635,000 4 wardi Tukang kayu 22.5 10 70,000 10,000 1,575,000 100,000 1,675,000 1,675,000 5 m ali y Tukang kayu 20 14 70,000 10,000 1,400,000 140,000 1,540,000 1,540,000 6 ahmad z Tukang kayu 20 10 70,000 10,000 1,400,000 100,000 1,500,000 1,500,000 7 suparno Tukang kayu 19 8 70,000 10,000 1,330,000 80,000 1,410,000 1,410,000 8 sriyono Tukang kayu 22 6 70,000 10,000 1,540,000 60,000 1,600,000 1,600,000 9 dampar Tukang kayu 18 14 70,000 10,000 1,260,000 140,000 1,400,000 1,400,000

10 dulwahab Tukang kayu 25 10 70,000 10,000 1,750,000 100,000 1,850,000 1,850,000 11 a rohman Tukang kayu 26.5 6 70,000 10,000 1,855,000 60,000 1,915,000 1,915,000 12 milono Tukang kayu 24 8 70,000 10,000 1,680,000 80,000 1,760,000 1,760,000 13 m nasuka Tukang kayu 24 6 70,000 10,000 1,680,000 60,000 1,740,000 1,740,000 14 m ikhsan Tukang kayu 20 10 70,000 10,000 1,400,000 100,000 1,500,000 1,500,000 15 sudarso Tukang kayu 23 8 70,000 10,000 1,610,000 80,000 1,690,000 1,690,000 16 munsarip Tukang kayu 20 14 70,000 10,000 1,400,000 140,000 1,540,000 1,540,000 17 suripan Tukang kayu 20 8 70,000 10,000 1,400,000 80,000 1,480,000 1,480,000

- - - - - - - - - - - -

TOTAL 27,763,000

Terbilang : Bojonegoro, 19 mei 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Budiono Satriyo. ST) (Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 1 Mei sd 30 mei 2014

Pekerjaan : Pembersi kayu2, besi dll house keeping fly over

Jmlh Hr Kerja

Jmlh Jam Lmbr

Upah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

(Ir. M. Alfin Zaini)

Page 78: Tia Upah Mandor

No Nama Jabatan Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Sapari Tukang kayu 30 70,000 2,100,000 - 2,100,000 2,100,000 2 Radini Tukang kayu 30 50,000 1,500,000 - 1,500,000 1,500,000

- - - - - - - - - - - -

TOTAL 3,600,000

Terbilang : Tiga Juta Enam Ratus Ribu RupiahBojonegoro, 30 mei 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Budiono Satriyo. ST) (Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 20 Mei sd 2 Juni 2014

Jmlh Hr Kerja

Jmlh Jam Lmbr

Upah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

(Ir. M. Alfin Zaini)

Page 79: Tia Upah Mandor

No Nama Jabatan Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 sunadi Mandor 30 100,000 3,000,000 - 3,000,000 3,000,000 2 martono Tukang kayu 22 12 90,000 12,000 1,980,000 144,000 2,124,000 2,124,000 3 bowo Tukang kayu 70,000 10,000 - - - - 4 arif Tukang kayu 21.5 14 70,000 10,000 1,505,000 140,000 1,645,000 1,645,000 5 sugeng r Tukang kayu 70,000 10,000 - - - - 6 kolil Tukang kayu 22.5 12 70,000 10,000 1,575,000 120,000 1,695,000 1,695,000 7 budi s Tukang kayu 18 16 70,000 10,000 1,260,000 160,000 1,420,000 1,420,000 8 muhari Tukang kayu 21 12 70,000 10,000 1,470,000 120,000 1,590,000 1,590,000 9 sugeng Tukang kayu 70,000 10,000 - - - -

10 karmijan Tukang kayu 17 18 70,000 10,000 1,190,000 180,000 1,370,000 1,370,000 11 rindo Tukang kayu 20.5 10 70,000 10,000 1,435,000 100,000 1,535,000 1,535,000 12 prianto Tukang kayu 19 14 70,000 10,000 1,330,000 140,000 1,470,000 1,470,000 13 supardi Tukang kayu 18 12 70,000 10,000 1,260,000 120,000 1,380,000 1,380,000 14 jaswadi Tukang kayu 15 22 70,000 10,000 1,050,000 220,000 1,270,000 1,270,000 15 subeki Tukang kayu 20 16 70,000 10,000 1,400,000 160,000 1,560,000 1,560,000 16 m alinuha Tukang kayu 16 20 70,000 10,000 1,120,000 200,000 1,320,000 1,320,000 17 riyadi Tukang kayu 16 20 70,000 10,000 1,120,000 200,000 1,320,000 1,320,000 18 muslih Tukang kayu 20.5 14 70,000 10,000 1,435,000 140,000 1,575,000 1,575,000 19 zainul Tukang kayu 21 14 70,000 10,000 1,470,000 140,000 1,610,000 1,610,000 20 - - - -

TOTAL 25,884,000

Terbilang : Bojonegoro,2 Juni 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Budiono Satriyo. ST) (Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANA

Jmlh Hr Kerja

Jmlh Jam Lmbr

Upah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

(Ir. M. Alfin Zaini)

Page 80: Tia Upah Mandor

Periode 20 Mei sd 2 Juni 2014

No Nama Jabatan Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 suligi Tukang kayu 70,000 - - - - 2 juwanto Tukang kayu 18 16 70,000 12,000 1,260,000 192,000 1,452,000 1,452,000 3 m inam Tukang kayu 19 12 70,000 10,000 1,330,000 120,000 1,450,000 1,450,000 4 wardi Tukang kayu 18 16 70,000 10,000 1,260,000 160,000 1,420,000 1,420,000 5 m ali y Tukang kayu 15 18 70,000 10,000 1,050,000 180,000 1,230,000 1,230,000 6 ahmad z Tukang kayu 15 14 70,000 10,000 1,050,000 140,000 1,190,000 1,190,000 7 suparno Tukang kayu 15 14 70,000 10,000 1,050,000 140,000 1,190,000 1,190,000 8 sriyono Tukang kayu 18 12 70,000 10,000 1,260,000 120,000 1,380,000 1,380,000 9 dampar Tukang kayu 18 12 70,000 10,000 1,260,000 120,000 1,380,000 1,380,000

10 dulwahab Tukang kayu 70,000 10,000 - - - - 11 a rohman Tukang kayu 70,000 10,000 - - - - 12 milono Tukang kayu 17 18 70,000 10,000 1,190,000 180,000 1,370,000 1,370,000 13 m nasuka Tukang kayu 70,000 10,000 - - - - 14 m ikhsan Tukang kayu 16 8 70,000 10,000 1,120,000 80,000 1,200,000 1,200,000 15 sudarso Tukang kayu 20.5 12 70,000 10,000 1,435,000 120,000 1,555,000 1,555,000 16 munsarip Tukang kayu 16 16 70,000 10,000 1,120,000 160,000 1,280,000 1,280,000 17 suripan Tukang kayu 17 14 70,000 10,000 1,190,000 140,000 1,330,000 1,330,000 18 Agung R Tukang kayu 10 12 70,000 10,000 700,000 120,000 820,000 820,000

- - - - - - - -

TOTAL 18,247,000

Terbilang : Bojonegoro, 2 Juni 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Budiono Satriyo. ST) (Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

Jmlh Hr Kerja

Jmlh Jam Lmbr

Upah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

(Ir. M. Alfin Zaini)

Page 81: Tia Upah Mandor

UPAH HARIAN PELAKSANAPeriode 3 Juni sd 12 Juni 2014

No Nama Jabatan Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 sunadi Mandor 20 100,000 2,000,000 - 2,000,000 2,000,000 2 martono Tukang kayu 23 90,000 12,000 2,070,000 - 2,070,000 2,070,000 3 bowo Tukang kayu 70,000 10,000 - - - - 4 arif Tukang kayu 18 4 70,000 10,000 1,260,000 40,000 1,300,000 1,300,000 5 sugeng r Tukang kayu 70,000 10,000 - - - - 6 kolil Tukang kayu 20 2 70,000 10,000 1,400,000 20,000 1,420,000 1,420,000 7 budi s Tukang kayu 17 6 70,000 10,000 1,190,000 60,000 1,250,000 1,250,000 8 muhari Tukang kayu 70,000 10,000 - - - - 9 sugeng Tukang kayu 70,000 10,000 - - - -

10 karmijan Tukang kayu 7 2 70,000 10,000 490,000 20,000 510,000 510,000 11 rindo Tukang kayu 20 4 70,000 10,000 1,400,000 40,000 1,440,000 1,440,000 12 prianto Tukang kayu 18 70,000 10,000 1,260,000 - 1,260,000 1,260,000 13 supardi Tukang kayu 22 70,000 10,000 1,540,000 - 1,540,000 1,540,000 14 jaswadi Tukang kayu 20 70,000 10,000 1,400,000 - 1,400,000 1,400,000 15 subeki Tukang kayu 12 12 70,000 10,000 840,000 120,000 960,000 960,000 16 m alinuha Tukang kayu 20 2 70,000 10,000 1,400,000 20,000 1,420,000 1,420,000 17 riyadi Tukang kayu 20 2 70,000 10,000 1,400,000 20,000 1,420,000 1,420,000 18 muslih Tukang kayu 18.5 70,000 10,000 1,295,000 - 1,295,000 1,295,000 19 zainul Tukang kayu 19 4 70,000 10,000 1,330,000 40,000 1,370,000 1,370,000 20 - - - -

TOTAL 20,655,000

Terbilang : Bojonegoro,12 Juni 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Budiono Satriyo. ST) (Yoni Setyo, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Jmlh Hr Kerja

Jmlh Jam Lmbr

Upah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

(Ir. M. Alfin Zaini)

Page 82: Tia Upah Mandor

Proyek Banyu Urip EPC5

UPAH HARIAN TUKANG BESIPeriode 20 Juli sd 24 Juli 2014

No Nama Jabatan Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Supri Mandor 11 100,000 1,100,000 - 1,100,000 1,100,000 2 Dwi Purnama wakil mandor 11 90,000 990,000 - 990,000 990,000 3 Aris triyono Tukang Besi 11 90,000 990,000 - 990,000 990,000 4 Parmin Tukang Besi 11 90,000 990,000 - 990,000 990,000 5 Eko Dwi H Tukang Besi 11 90,000 990,000 - 990,000 990,000 6 Rubadi Tukang Besi 11 90,000 990,000 - 990,000 990,000 7 Yatno Tukang Besi 11 90,000 990,000 - 990,000 990,000 8 Wariman Tukang Besi 7 90,000 630,000 - 630,000 630,000 9 Wibowo Tukang Besi 11 90,000 990,000 - 990,000 990,000

10 Rasfani Tukang Besi 11 90,000 990,000 - 990,000 990,000 11 Frendi S Tukang Besi 11 90,000 990,000 - 990,000 990,000 12 Purwanto Helper besi 11 80,000 880,000 - 880,000 880,000 13 Bayu S Helper besi 11 80,000 880,000 - 880,000 880,000 14 Hanja Helper besi 11 80,000 880,000 - 880,000 880,000

TOTAL 13,280,000

Terbilang : Tiga Belas Juta Dua Ratus Delapan Puluh Ribu RupiahBojonegoro, 24 Juli 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Budiono Satriyo. ST) (I Nyoman Kardita,ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Jmlh Hr Kerja

Jmlh Jam Lmbr

Upah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

(Ir. M. Alfin Zaini)

Page 83: Tia Upah Mandor

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 23 Juni sd 08 Juli 2014

No Nama Jabatan Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Yasin Tukang kayu 14 14 70,000 10,000 980,000 140,000 1,120,000 1,120,000 2 martono Tukang kayu 32.5 8 90,000 12,000 2,925,000 96,000 3,021,000 3,021,000 3 Mardi Tukang kayu 13 12 70,000 10,000 910,000 120,000 1,030,000 1,030,000 4 arif Tukang kayu 22 20 70,000 10,000 1,540,000 200,000 1,740,000 1,740,000 5 Suyanto Tukang kayu 13 18 70,000 10,000 910,000 180,000 1,090,000 1,090,000 6 kolil Tukang kayu 22 10 70,000 10,000 1,540,000 100,000 1,640,000 1,640,000 7 budi s Tukang kayu 19 20 70,000 10,000 1,330,000 200,000 1,530,000 1,530,000 8 Winarto Tukang kayu 12 16 70,000 10,000 840,000 160,000 1,000,000 1,000,000 9 Zaim Tukang kayu 20 14 70,000 10,000 1,400,000 140,000 1,540,000 1,540,000

10 karmijan Tukang kayu 21.5 4 70,000 10,000 1,505,000 40,000 1,545,000 1,545,000 11 rindo Tukang kayu 24 12 70,000 10,000 1,680,000 120,000 1,800,000 1,800,000 12 prianto Tukang kayu 9.5 6 70,000 10,000 665,000 60,000 725,000 725,000 13 supardi Tukang kayu 24 14 70,000 10,000 1,680,000 140,000 1,820,000 1,820,000 14 jaswadi Tukang kayu 19 18 70,000 10,000 1,330,000 180,000 1,510,000 1,510,000 15 Harno Tukang kayu 17.5 22 70,000 10,000 1,225,000 220,000 1,445,000 1,445,000 16 m alinuha Tukang kayu 17.5 24 70,000 10,000 1,225,000 240,000 1,465,000 1,465,000 17 riyadi Tukang kayu 15 26 70,000 10,000 1,050,000 260,000 1,310,000 1,310,000 18 muslih Tukang kayu 21.5 15 70,000 10,000 1,505,000 150,000 1,655,000 1,655,000 19 Sugianto Tukang kayu 14 24 70,000 10,000 980,000 240,000 1,220,000 1,220,000 20 Qambali Tukang kayu 20 12 70,000 10,000 1,400,000 120,000 1,520,000 1,520,000 21 zainul Tukang kayu 17 22 70,000 10,000 1,190,000 220,000 1,410,000 1,410,000 22 Dangin Tukang kayu 16.5 20 70,000 10,000 1,155,000 200,000 1,355,000 1,355,000

TOTAL 32,491,000

Terbilang : Tiga Puluh Dua Juta Empat Ratus Sembilan Puluh Satu Ribu RupiahBojonegoro, 08 Juli 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Budiono Satriyo. ST) (Nyoman Kardita, ST) (Muslih)Project Manager DPM GSI Supervisor

Jmlh Hr Kerja

Jmlh Jam Lmbr

Upah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

(Ir. M. Alfin Zaini)

Page 84: Tia Upah Mandor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 23 Juni sd 08 Juli 2014

No Nama Jabatan Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Rohim Tukang kayu 23 12 70,000 10,000 1,610,000 120,000 1,730,000 1,730,000 2 juwanto Tukang kayu 20 16 70,000 10,000 1,400,000 160,000 1,560,000 1,560,000 3 Riyanto Tukang kayu 19 14 70,000 10,000 1,330,000 140,000 1,470,000 1,470,000 4 wardi Tukang kayu 12 8 70,000 10,000 840,000 80,000 920,000 920,000 5 Indri Tukang kayu 13 16 70,000 10,000 910,000 160,000 1,070,000 1,070,000 6 M. yusron Tukang kayu 9 10 70,000 10,000 630,000 100,000 730,000 730,000 7 suparno Tukang kayu 15 22 70,000 10,000 1,050,000 220,000 1,270,000 1,270,000 8 Eko Tukang kayu 18 24 70,000 10,000 1,260,000 240,000 1,500,000 1,500,000 9 dampar Tukang kayu 15 22 70,000 10,000 1,050,000 220,000 1,270,000 1,270,000

10 Rizki Tukang kayu 14 24 70,000 10,000 980,000 240,000 1,220,000 1,220,000 11 Purnomo Tukang kayu 18.5 24 70,000 10,000 1,295,000 240,000 1,535,000 1,535,000 12 milono Tukang kayu 24 14 70,000 10,000 1,680,000 140,000 1,820,000 1,820,000 13 Nurkholik Tukang kayu 20.5 22 70,000 10,000 1,435,000 220,000 1,655,000 1,655,000 14 Sugiantoro Tukang kayu 22 20 70,000 10,000 1,540,000 200,000 1,740,000 1,740,000 15 sudarso Tukang kayu 19 10 70,000 10,000 1,330,000 100,000 1,430,000 1,430,000 16 munsarip Tukang kayu 11 22 70,000 10,000 770,000 220,000 990,000 990,000 17 suripan Tukang kayu 14 24 70,000 10,000 980,000 240,000 1,220,000 1,220,000 18 Agung R Tukang kayu 18 22 70,000 10,000 1,260,000 220,000 1,480,000 1,480,000 19 Jatmiko Tukang kayu 16 22 70,000 10,000 1,120,000 220,000 1,340,000 1,340,000 20 Maryono Tukang kayu 25 8 70,000 10,000 1,750,000 80,000 1,830,000 1,830,000 21 Sumanto Tukang kayu 17 26 70,000 10,000 1,190,000 260,000 1,450,000 1,450,000

TOTAL 29,230,000

Terbilang : Dua Puluh Sembilan Juta Dua Ratus Tiga Puluh Ribu RupiahBojonegoro, 08 Juli 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Budiono Satriyo. ST) ( I Nyoman Kardita,ST) (Muslih)Project Manager DPM GSI Supervisor

Jmlh Hr Kerja

Jmlh Jam Lmbr

Upah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

(Ir. M. Alfin Zaini)

Page 85: Tia Upah Mandor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 14 Juli sd 24 Juli 2014

No Nama Jabatan Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Mustagfirin Mandor 16 12 150,000 20,000 2,400,000 240,000 2,640,000 2,640,000 2 Yasmuri Carpenter 16 12 80,000 10,000 1,280,000 120,000 1,400,000 1,400,000 3 Boiren Carpenter 16 12 80,000 10,000 1,280,000 120,000 1,400,000 1,400,000 4 Sholeh Carpenter 16 12 80,000 10,000 1,280,000 120,000 1,400,000 1,400,000 5 Sugiono Carpenter 16 12 80,000 10,000 1,280,000 120,000 1,400,000 1,400,000 6 Sugeng Carpenter 16 12 80,000 10,000 1,280,000 120,000 1,400,000 1,400,000 7 Marsudi Carpenter 16 12 80,000 10,000 1,280,000 120,000 1,400,000 1,400,000 8 Agus s Carpenter 16 12 75,000 9,000 1,200,000 108,000 1,308,000 1,308,000 9 Yahudi Rebarman 16 12 80,000 10,000 1,280,000 120,000 1,400,000 1,400,000

10 Boari Rebarman 16 12 80,000 10,000 1,280,000 120,000 1,400,000 1,400,000 11 Matius Edi Rebarman 16 12 75,000 9,000 1,200,000 108,000 1,308,000 1,308,000 12 Gigih Carpenter 16 12 80,000 10,000 1,280,000 120,000 1,400,000 1,400,000

TOTAL 17,856,000

Terbilang : Tujuh Belas Juta Delapan Ratus Lima Puluh Enam Ribu RuipahBojonegoro,24 Juli 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Budiono Satriyo. ST) (Nyoman Kardita, ST) (Muslih)

Jmlh Hr Kerja

Jmlh Jam Lmbr

Upah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

(Ir. M. Alfin Zaini)

Page 86: Tia Upah Mandor

Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 13 JUni sd 22 Juni 2014

No Nama Jabatan Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

21 Zanuar G Helper 9.5 8 75,000 9,000 712,500 72,000 784,500 784,500 22 Agus S Helper 10.5 6 75,000 9,000 787,500 54,000 841,500 841,500 23 Matius E Helper 9.5 4 75,000 9,000 712,500 36,000 748,500 748,500 24 Yaudi Carpenter 10.5 6 80,000 10,000 840,000 60,000 900,000 900,000 25 Badri Carpenter 10.5 6 80,000 10,000 840,000 60,000 900,000 900,000

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

TOTAL 4,174,500 Terbilang : Empat Juta Seratus Tujuh Puluh Empat Ribu Lima Ratus Rupiah

Bojonegoro, 30 Juni 2014Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :

PT. Hutama Karya

Jmlh Hr Kerja

Jmlh Jam Lmbr

Upah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 87: Tia Upah Mandor

(Budiono Satriyo. ST) (Nyoman Kardita, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 01 Juli - 06 Juli 2014

No Nama Jabatan Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

1 Sukiman Carpenter 7.5 90,000 675,000 - 675,000 675,000 2 Pujianto Carpenter 7.5 90,000 675,000 - 675,000 675,000 3 Yanto Carpenter 7.5 90,000 675,000 - 675,000 675,000 4 Ali Yakub Carpenter 9 90,000 810,000 - 810,000 810,000 5 Mashuri Carpenter 9 90,000 810,000 - 810,000 810,000 6 Joko Triyono Carpenter 9 80,000 720,000 - 720,000 720,000 7 Angga S A Carpenter 9 80,000 720,000 - 720,000 720,000 8 Didik Prihadi Carpenter 9 80,000 720,000 - 720,000 720,000 9 M. Heri S Carpenter 9 80,000 720,000 - 720,000 720,000

10 Alfitroh Carpenter 9 80,000 720,000 - 720,000 720,000 11 Zaenuri Wakil Mandor 9 90,000 810,000 - 810,000 810,000 12 M. Rozi M Carpenter 9 80,000 720,000 - 720,000 720,000

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

TOTAL 8,775,000

Terbilang : Delapan Juta Tujuh Ratus Tujuh Puluh Lima Ribu RupiahBojonegoro,06 Juli 2014

Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :PT. Hutama Karya

(Ir. M. Alfin Zaini)

Jmlh Hr Kerja

Jmlh Jam Lmbr

Upah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 88: Tia Upah Mandor

(Budiono Satriyo. ST) (Nyoman Kardita, ST) (Muslih)Project Manager DPM GSI Supervisor

PT. HUTAMA KARYA (Persero)WILAYAH VII

Proyek Banyu Urip EPC5

UPAH HARIAN PELAKSANAPeriode 25 Juni sd 28 Juni 2014

No Nama Jabatan Jumlah (Rp) Paraf Ket

1 2 3 4 5 6 7 8 9=4x6 10=5x7 11=4x8 12=9+10+11 13 14 15

21 Zanuar G Helper 9.5 8 75,000 9,000 712,500 72,000 784,500 784,500 22 Agus S Helper 10.5 6 75,000 9,000 787,500 54,000 841,500 841,500 23 Matius E Helper 9.5 4 75,000 9,000 712,500 36,000 748,500 748,500 24 Yaudi Carpenter 10.5 6 80,000 10,000 840,000 60,000 900,000 900,000 25 Badri Carpenter 10.5 6 80,000 10,000 840,000 60,000 900,000 900,000

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

TOTAL 4,174,500 Terbilang : Empat Juta Seratus Tujuh Puluh Empat Ribu Lima Ratus Rupiah

Bojonegoro, 30 Juni 2014Menyetujui : Mengetahui/Menyaksikan : Dibuat Oleh :

PT. Hutama Karya

(Ir. M. Alfin Zaini)

Jmlh Hr Kerja

Jmlh Jam Lmbr

Upah/Hr Kerja (Rp)

Upah/Hr lmbr (Rp)

Uang Makan/hr

(Rp)Total upah kerja (Rp)

Total Upah lmbr (Rp)

Total Uang makan (Rp)

Total Diterima (Rp)

Page 89: Tia Upah Mandor

(Budiono Satriyo. ST) (Nyoman Kardita, ST) (Muslih)Project Manager DPM GSI Supervisor(Ir. M. Alfin Zaini)

Page 90: Tia Upah Mandor

47,350,000 (650,000)

Page 91: Tia Upah Mandor

44,131,000

Page 92: Tia Upah Mandor

22,030,500

Page 93: Tia Upah Mandor

SCHEDULE BULANANFLY OVER

NO URAIAN SATUAN RENCANA BULAN NOVEMBER / DESEMBER 2013 KETERANGAN VOLUME 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

I P14 (FOOTING)1 Pembesian Footing kg 15,355.00 2 Bekisting Footing m2 45.36 3 Cor Footing m3 98.00 4 Bongkar Bekisting Footing m2 45.36 5 Backfilling m3 185.00

II P37 (FOOTING)1 Besi, Bekisting, Cor PHT titik 14.00 2 Pembesian Footing kg 10,456.00 3 Bekisting Footing m2 38.88 4 Cor Footing m3 43.35 5 Bongkar Bekisting Footing m2 38.88 6 Backfilling m3

III P36 (FOOTING)1 Besi, Bekisting, Cor PHT titik 14.00 2 Pembesian Footing kg 11,256.00 3 Bekisting Footing m2 43.00 4 Cor Footing m3 48.00 5 Bongkar Bekisting Footing m2 45.00 6 Backfilling m3

IV P15 (FOOTING)1 COP titik2 Leveling & Compacted m23 LC m34 Besi, Bekisting, Cor PHT titik5 Pembesian Footing kg 14,755.00 6 Bekisting Footing m2 50.40 7 Cor Footing m3 91.00 8 Bongkar Bekisting Footing m2 50.40 9 Backfilling m3

V P4 ( KOLOM )1 Schafolding m22 Pembesian kolom kg3 Bekisting kolom m24 Cor Kolom m35 Bongkar Bekisting Kolom m2

Page 94: Tia Upah Mandor

VI P5 ( KOLOM )1 Schafolding m22 Pembesian kolom kg3 Bekisting kolom m24 Cor Kolom m35 Bongkar Bekisting Kolom m2

VII P6 ( KOLOM )1 Schafolding m22 Pembesian kolom kg3 Bekisting kolom m24 Cor Kolom m35 Bongkar Bekisting Kolom m2

VIII P7 ( KOLOM )1 Schafolding m22 Pembesian kolom kg3 Bekisting kolom m24 Cor Kolom m35 Bongkar Bekisting Kolom m2

XI P8 ( KOLOM )1 Schafolding m22 Pembesian kolom kg3 Bekisting kolom m24 Cor Kolom m35 Bongkar Bekisting Kolom m2

XII P18 ( KOLOM )1 Schafolding m22 Pembesian kolom kg3 Bekisting kolom m24 Cor Kolom m35 Bongkar Bekisting Kolom m2

XIII P17 ( KOLOM )1 Schafolding m22 Pembesian kolom kg3 Bekisting kolom m24 Cor Kolom m35 Bongkar Bekisting Kolom m2

Page 95: Tia Upah Mandor

XIV P16 ( KOLOM )1 Schafolding m22 Pembesian kolom kg3 Bekisting kolom m24 Cor Kolom m35 Bongkar Bekisting Kolom m2

XV BOX CULVERT KALI NGRAHO1 Galian2 COP titik3 Leveling & Compacted m24 LC m25 Besi, Bekisting, Cor PHT titik6 Pembesian Footing kg7 Bekisting Footing m28 Cor Footing m39 Bongkar Bekisting Footing m2

10 Schafolding m211 Pembesian dinding thp I kg12 Bekisting dinding thp I m213 Cor dinding thp I m314 Bongkar Bekisting dinding thp I m215 Schafolding thp II m216 Pembesian dinding thp II kg17 Bekisting dinding thp II m218 Pasang Perancah bekisting plate m219 Schafolding m220 Bekisting Plate m221 Pembesian Plate kg22 Cor Plate m3

XVI P19 (DINDING ABUTMENT)1 Schafolding m22 Bekisting Dinding Thp I m23 Pembesian dinding I kg4 Pasang Dowel Diafragma titik5 Cor dinding thp I m36 Pembesian Dinding Thp II kg7 Bekisting Dinding Thp II m28 Cor dinding thp II m3

Page 96: Tia Upah Mandor

NO URAIAN RENCANA REALISASI KETERANGAN VOLUME

NO URAIAN RENCANA REALISASI KETERANGAN VOLUME

Page 97: Tia Upah Mandor
Page 98: Tia Upah Mandor

12.635.28

5.415.12

50.4

Page 99: Tia Upah Mandor

1 2

196 685 196 1077 10.65 93.00 185 93 371 3.45181 714.2 181 1076.2 6.85 89.70 190.7 89.7 370.1 1.85166 743.7 166 1075.7 3.8 86.40 196.4 86.4 369.2 1.6151 773.2 151 1075.2 0.292308 83.10 202.1 83.1 368.3 0.057143136 802.7 136 1074.7 79.80 207.8 79.8 367.4 3.321429121 832.2 121 1074.2 15.07692 76.50 213.5 76.5 366.5106 861.7 106 1073.7 73.20 219.2 73.2 365.6

91 891.2 91 1073.2 69.90 224.9 69.9 364.776 920.7 76 1072.7 66.60 230.6 66.6 363.861 950.2 61 1072.2 63.30 236.3 63.3 362.946 979.7 46 1071.7 60.00 242 60 36231 1009.2 31 1071.2 56.70 247.7 56.7 361.116 1038.7 16 1070.7 53.40 253.4 53.4 360.2

1065 1065 50.10 259.1 50.1 359.3 46.80 264.8 46.8 358.4 43.50 270.5 43.5 357.5 40.20 276.2 40.2 356.6 36.90 281.9 36.9 355.7 33.60 287.6 33.6 354.8 30.30 293.3 30.3 353.9 27.00 299 27 353 23.70 304.7 23.7 352.1 20.40 310.4 20.4 351.2 17.10 316.1 17.1 350.3 13.80 321.8 13.8 349.4 10.50 327.5 10.5 348.5 7.20 333.2 7.2 347.6 3.90 338.9 3.9 346.7

345 345

Page 100: Tia Upah Mandor

22484.71 50

martono bowo arif sugeng r kolil budi s muhari sugeng karmijan2 2 2.00 1 22 3 3.00 3 13 2 2.00 2 12 2 2.00 2 12 2 2.00 2 22 1 3.00 13 2 2.00 22 3 3.00 33 1 1.00 12

Page 101: Tia Upah Mandor

23 0 18 0 20.00 17 0 0 7

Page 102: Tia Upah Mandor

16,546,000.00 8,260,000.00 24,806,000.00

14,378,000.00 11,550,000.00 25,928,000.00

17,150,000.00 14,378,000.00 31,528,000.00

4,291,950.00 4,645,550.00 2,080,000.00 3,008,850.00

Page 103: Tia Upah Mandor

2,677,350.00 1,800,000.00 5,100,000.00 3,921,600.00 5,095,600.00 7,200,000.00 7,350,000.00 1,500,000.00 48,670,900.00

1,124,235.50

2,488,472.00 2,086,184.00 3,395,852.00 5,942,741.00 1,894,837.00 3,789,674.00 625,680.00 1,500,000.00 1,225,000.00 1,125,000.00 600,000.00 1,120,000.00 1,124,235.50 26,917,675.50

rindo prianto supardi jaswadi subeki m alinuha riyadi muslih zainul rohim2 2 2.00 2 1 1 1 2 1 12 3 2.00 3 1 3 3 3 3 33 2 3.00 2 2 2 2 2 2 22 2 2.00 2 2 2 2 1 2 22 2 2.00 2 1 2 2 2 2 22 3 2.00 3 1 3 3 1 3 31 2 3.00 2 1 2 2 2 2 22 2 2.00 3 2 3 3 3.5 3 33 2.00 1 1 2 2 2 1 21 2.00

Page 104: Tia Upah Mandor

20 18 22.00 20 12 20 20 18.5 19 20

Page 105: Tia Upah Mandor

suligi juwanto m inam wardi m ali y ahmad z suparno sriyono dampar dulwahab a rohman1 1 1 2 2 2 1 12 1 3 3 1 1 1 33 2 2 2 1 1 2 22 2 2 2 2 2 2 21 2 1 3 2 2 2 12 1 3 2 1 1 2 21 1 2 3 1 2 2 32 1 2 3 1 1 23 2 2 11 2

11

Page 106: Tia Upah Mandor

0 18 11 14 19 15 14 18 16 0 0

Page 107: Tia Upah Mandor

milono m nasuka m ikhsan sudarso munsarip suripan Agung R Harno Jatmiko Maryono1 1 1 2 1 2 2 23 3 2 3 3 3 3 32 2 2 2 1 1 1 22 2 2 2 1 3 31 3 3 1 2 1 2

2 2 2 13 3 3 22 2 2 2

2

Page 108: Tia Upah Mandor

9 0 0 18 17 17 15 6 10 10