Home >Documents >SITA RAM UPTODATED BIODATA (corrected)

SITA RAM UPTODATED BIODATA (corrected)

Date post:22-Jan-2017
Category:
View:446 times
Download:8 times
Share this document with a friend
Transcript:

BIO DATA1. Name

: G.SITA RAM, B.E., (Civil) 2. Fathers Name

: Thiru. A.C.A. Ganapathy Mudaliar, B.A., 3. Native Place

: Sankarankovil, Tirunelveli District

4. Designation (Present) : DIVISIONAL ENGINEER (RETD),( COLLECTOR RANK) HIGHWAYS DEPARTMENT OF

GOVERNMENT OF TAMILNADU

5. Address for communication

a. Postal address : 17/96, SRI GANAPATHY ILLAM, THAMIRAPATHY COLONY, THIYAGARAJA NAGAR, TIRUNELVELI 627 011. TAMILNADU STATE, INDIA.

b. Telephone number Residence : 0462-2532134 Cell : (+91) 98658-23311.

c. Email

: [email protected] 6. Date of Birth

: 1.7.1953.

7. Nationality

: Indian

8. Religion

: Hindu

9. Caste: Kaikolar, Senguntha Mudaliar

10. Whether belongs : Backward Community

to SC/ST / BC

11.a. Date of entry in service : 29.12.1977

b. Date of retirement : 30.06.2011

12. Group & Gross Pay : A group & Total Pay at theTime of Retirement(2011): Rs.60,000

13. Educational Qualifications:

Examination passedYears of PassingName of the College / InstituteUniversity / BoardMain SubjectsTotal AggregateRemarks

SSLC1970Sri Gomathi Ambal High School. SankarankoilState BoardChemistry65%

PUC1971Paramakalyani college, AlwarkurichiMadras UniversityMaths, Physics, Chemistry58%

B.E., (Civil)1976PSG college of Technology,

ComibatoreMadras UniversityCivil59%

14.Languages:

LanguageReadingWriting Speaking

EnglishExcellentExcellentExcellent

Tamil

Hindi

TeluguExcellent

Good

-Excellent

Good

-Excellent

Good

Good

15. Membership of Professional Socities: MEMBER in the TECHNICAL EXPERT COMMITTEE to carry out the tasks prescribed by the Metropolitan Infrastructure Development Fund Project Sanctioning Committee for the work of Improvements of BT & CC roads for Chennai Corporation.

STATE QUALITY MONITOR (ROADS) in Rural Development and Panchayat Raj, Chennai of Government of Tamil Nadu

STATE QUALITY MONITOR (ROADS AND DRAINS) in Tamil Nadu Urban Finance and Infrastructure Development Corporation Limited (TUFIDCO), Chennai. Of Government of Tamil Nadu Undertaking Life Member in the Association of Tamil Nadu Highways Engineers, Chennai, Life Member No: 897.

State Executive Committee Member in the Association of Tamil Nadu Highways Engineers, Chennai. Year 2002 2003.

Life Member in the Association of Retired Tamil Nadu Highways Engineers, Life Member No.M480.

Life Member in Socio Economic Service Society in Chennai, Life Member No: 1209.

Life Member in South Indian Sengunthar Association in Chennai, Life Member No.14417.

Rotarian in Tirunelveli Central Rotary Club R.I. Dist. 3212 Club No.27440.

Master Mason in Lodge Tamiravarni, Tirunelveli No: 289, Member No.97 Member in Nellai Masonic Readers Forum.

District Coordinator-International Service of Rotary International Dist. 3212 Year 2010-2011.

16. Achievements:

TOTAL GOVERNMENT SERVICE : 35 YEARS AND TOTAL PRIVATE SERVICE : 3+ YEARS.

STATE QUALITY MONITOR FOR ROADS Sanctioned by the central and State GovernmentMONITORING WORKS OF PMGSY AND OTHER SCHEMES IN PANCHAYAT UNIONS OF RURAL DEVELOPMENT, NATIONAL HIGHWAYS, CORPORATIONS, MUNICIPALITIES AND TOWN PANCHAYATS. HE HAS ACHIEVED CONSTRUCTION OF HIGH LEVEL BRIDGE WORTH ABOVE 16.4 CRORES RUPEES IN VANNARPETTAI, TIRUNELVELI

HE HAS PREPARED ESTIMATE FOR 28 CRORES RUPEES IN KULAVANIGARPURAM RAILWAY OVER BRIDGE @ TIRUNELVELI AND SUBMITTED TO THE GOVERNMENT OF TAMIL NADU AND SANCTIONED THE ABOVE ESTIMATES AND IS READY FOR CONSTRUCTION

HE WAS HAVING ENOURMOUS POWER TO SPEND GOVT. MONEY OF ANY AMOUNT OF CRORES FOR PROJECT.

HE HAS SERVED AS TEAM LEADER, BRIDGE ENGINEER, QUALITY AND MATERIAL ENGINEER IN VARIOUS SUPERVISORY CONSULTANCIES.ER G.SITA RAM, B.E,FIE has worked as ASSISTANT ENGINEER in Highways Department in various places @Thiruchuli, Mudukulathur, Devakottai, Virudhunagar, Sathur, Ramanathapuram, Coimbatore , Tuticorin, Ottapidaram and Madurai.

He has worked as ASSISTANT DIVISIONAL ENGINEER in Highways Department in various places @ Madurai, Tirunelveli, Nagercoil.

He has worked as DIVISIONAL ENGINEER (COLLECTOR RANK) in Highways Department @Tiruchirapalli, Nagercoil and Tirunelveli.

During his tenure, ER.G.SITA RAM B.E. has constructed School buildings, Maternity Centres, Adi- Dravida Groups houses, Irrigation tanks, Formed Bye-pass and approaches to the Railway Over bridges, NABARD Works, Ring Roads around Madurai, Construction of High Level Bridges, Construction of Railway Over Bridges Estimated of Rs.20 Crores and above etc.,

During his tenure, ER.G.SITA RAM B.E. has been Selected and undergone training in

National Institute of Training of Highways Engineers under Ministry of Road Transport and Highways, Government of India @ NOIDA, UTTAR PRADESH.

Tirunelveli Public Health Department, Government of India /UNICEF/ UNDP Rural Sanitation Project.

Coir Board, Cochin Government of India, Central Road Research Institute, New Delhi and Highways & Rural Works Department, Government of Tamil Nadu in Workshop on Coir Geo Grids/ Geo Fabrics in Civil Engineering and Coir netting for Soil Erosion Control

State Planning Commission, Tamil Nadu State, District Planning Commission.

Highways Research Station, Chennai.

Refresher course on Quality Control of PMGSY Roads for State Quality Monitors Sponsored by National Rural Roads Developments Agency, New Delhi and State Rural Roads Development Agency, Tamil Nadu at National Institute of Technology , Trichirapalli.

17.Other trainings undergone: Training Programme for Office Automation under Highways Department of Tamil Nadu - 2008

Training Programme on Procurement Procedures for Junior Level Officers sponsored by Finance Department, Govt. of Tamil Nadu - 2006

Training Programme on Procurement Procedures for Middle Level Officers sponsored by Finance Department, Govt. of Tamil Nadu 2005

Training Programme on Construction Supervision of Road and Bridges 2004

Quality Control Training by Highways Research Station 2002

Training Programme on various planning training under Rural Developments conducted by state planning commission and District planning commission 2000

Training under Sanitation Project on Low Cost Water Seal Latrine 1981

Special Training of Apprenticeship training under Apprenticeship Scheme 1977

Anna Institute of Management, Chennai.

Training under Quality Control of PMGSY Roads by National Rural Roads Development Agency, New Delhi.

18.Employment Record:

TOTAL GOVERNMENT SERVICE: 35 YEARS, TOTAL PRIVATE SERVICE: 3+ YEARS Period[[Employing organization and title / position held.

CountrySummary of activities performed

June

2014-To Till Date

Tamil Nadu Urban Finance and Infrastructure Development Corporation Limited (TUFIDCO), Chennai

Government of Tamil Nadu Under taking

Position: State Quality Monitor (Roads & Drains)&

Position: Member in Technical Expert Committee HONOURARIUM JOB

India

Pls. refer the below mentioned description

June 2014-To May 2015

Nov 2012- To May 2014National Rural Roads Development Agency under Ministry of Rural Development, New Delhi & Directorate of Rural Development and Panchayat Raj Department, Chennai, Government of Tamil Nadu

Position: State Quality Monitor (Roads) HONOURARIUM JOB&National Highways Department, Chennai under Ministry of Highways and Port, New Delhi

Position: State Quality Monitor (Roads) HONOURARIUM JOB&

Tamil Nadu Urban Finance and Infrastructure Development Corporation Limited (TUFIDCO), Chennai

Government of Tamil Nadu Under taking

Position: State Quality Monitor (Roads & Drains) HONOURARIUM JOBCos Consultancy Services. Madurai

Team Leader cum Structural Engineer / Bridge EngineerIndia

IndiaPls. refer the below mentioned description

Pls. refer the below mentioned description

Feb 2012 - Oct 2012LEA International Ltd. / LEA Associates South Asia Pvt. Ltd. (JV), New Delhi

Quality and Material Engineer cum Bridge EngineerIndiaPls. refer the below mentioned description

July 2011-Jan 2012Jan 2011 - Jun 2011Cos Consultancy Services. Madurai

Resident Engineer cum Bridge Expert-

Highways Department (Project),

Govt. of Tamil Nadu

Divisional Engineer (Collector Rank)IndiaIndia

Pls. refer the below mentioned description

Pls. refer the below mentioned description

Dec 2008 - Dec 2010Highways Department (Investigation),

Govt. of Tamil Nadu

Divisional Engineer (Collector Rank)IndiaPls. refer the below mentioned description

Jun 2003 - Nov 2008Highways Department (Project),

Govt. of Tamil Nadu

Assistant Divisional EngineerIndiaPls. refer the below mentioned description

Oct 2002 - May 2003Rural Development Department

Assistant Divisional EngineerIndiaPls. refer the below mentioned description

Mar 2002 - Sep 2002Highways Department (Project),

Govt. of Tamil Nadu

Assistant Divisional EngineerIndiaPls. refer the below mentioned description

Sep 2000 - Feb 2002Highways Department (Project),

Govt. of Tamil Nadu

Assistant EngineerIndiaPls. refer the below mentioned description

Oct 1997 - Aug 2000Rural Development Department, Govt of Tamil NaduPanchayat Union EngineerIndiaPls. refer the below mentioned description

Aug 1995 - Sep 1997Highways Department (Rural Roads),

Govt. of Tamil Nadu

Assistant EngineerIndiaPls. refer the below mentioned description

Oct 1991 - Jul 1995National Highways (Execution),Govt. of Tamil Nadu

Assistant EngineerIndiaPls. refer the below mentioned description

Jun 1990 - Sep 1991Rural Development Department

Panchayat Union EngineerIndiaPls. refer the below mentioned description

Jun 1989 - Dec 1989Highways Department (Execution),Govt. of Tamil Nadu

Assistant EngineerIndiaPls. refer the below mentioned description

Feb 1988 - Feb 1989National Highways (Planning),

Govt. of Tamil Nadu

Assistant EngineerIndiaPls. refer the below mentioned description

Dec 1987 - Jan 1988National Highways (Execution),Govt. of Tamil Nadu

Assistant EngineerIndiaPls. refer the below mentioned description

Jan 1986 - Oct 1987National Highways (Execution),

Govt of Tamil Nadu

Assistant EngineerIndiaPls. refer the below mentioned description

May 1985 - Jan 1986Rural Development Department

Panchayat Union EngineerIndiaPls. refer the below mentioned description

May 1984 - May 1985Highways Department (Execution)Govt. of Tamil Nadu

Assistant EngineerIndiaPls. refer the below mentioned description

Nov 1983 - Apr 1984Highways Department (Investigation)Govt. of Tamil NaduAssistant EngineerIndiaPls. refer the below mentioned description

Apr 1983 - Oct 1983Rural Development Department

Assistant EngineerIndiaPls. refer the below mentioned description

Oct 1980 - Mar 1983Rural Development Department

Additional Panchayat Union EngineerIndiaPls. refer the below mentioned description

Jun 1980 - Oct 1980Agricultural Engineering Department

Assistant EngineerIndiaPls. refer the below mentioned description

May 1979 - Jun 1980Agricultural Engineering Department

Assistant EngineerIndiaPls. refer the below mentioned description

Dec 1977 - May 1979Agricultural Engineering Department

Assistant EngineerIndiaPls. refer the below mentioned description

Sep 1977 - Dec 1977Pioneer Engineering Corporation, Madras

Site SupervisorIndiaPls. refer the below mentioned description

Aug 1976 - Aug 1977Highways Department (Execution)Govt. of Tamil Nadu

EngineerIndiaPls. refer the below mentioned description

From June 2014 to Till Date: Tamil Nadu Urban Finance and Infrastructure

Development Corporation Limited (TUFIDCO) Chennai Government of Tamil Nadu Under taking

Position: State Quality Monitor (Roads & Drains) & Member in Technical Expert Committee HONOURARIUM JOBMain Project Features:

Monitoring and Inspection of quality of Road works sanctioned by Central and State Governments in the execution of Corporations, City Roads, Municipalities, Town Panchayats of Tamil Nadu State under Tamil Nadu Urban Finance and Infrastructure Development Corporation Limited (TUFIDCO) and Reporting to the Chairman & Managing Director of TUFIDCO, Chennai. Project Name: Road works sanctioned by State Government and Central Government under IUDM, MIDF Schemes of TUFIDCO. (Clients: Corporations, Municipalities, Town Panchayats)Task Assigned and achieved:

Monitoring and Inspection of works sanctioned by Central and State Government in Tami Nadu State in the execution of Corporations, City Roads, Municipalities, Town Panchayats of Tamil Nadu State under Tamil Nadu Urban Finance and Infrastructure Development Corporation Limited (TUFIDCO) , Following IS standards, Bid Specifications, drawings and guide lines and Reporting to the Chairman & Managing Director of TUFIDCO, Chennai about the quality, quantity, deviations, deficiencies in works- Material Testing in Laboratory.From June 2014 To May 2015: National Rural Roads Development Agency under Ministry of Rural Development, New Delhi & Directorate of Rural Development & Panchayat Raj Department, Chennai, Government of TamiNadu. Position: State Quality Monitor (Roads) HONOURARIUM JOBMain Project Features:

Monitoring and Inspection of quality of Road works sanctioned by Central and State Governments in the execution of Panchayat Unions & Panchayats of Tamil Nadu State under National Rural Roads Development Agency under Ministry of Rural Development, New Delhi & Directorate of Rural Development & Panchayat Raj Department, Chennai, Government of TamiNadu and Reporting to the Director of Rural Development and Panchayat Raj.Project Name: PMGSY, NABARD, 13 th FINANCE 2013-14, RIS,POOLED ASSIGNED REVENUE, MRR works sanctioned by State Government and Central Government under Rural Development and Panchayat Raj (Clients: Panchayats, Panchayat Unions).Task Assigned and achieved:

Monitoring and Inspection of works sanctioned by Central and State Government in Tamil Nadu State- Following IS standards, Bid Specifications, drawings and guide lines- Reporting to the Director of Rural Development and Panchayat Raj Department, Chennai about the quality, quantity, deviations, deficiencies in works- Material Testing in Laboratory.From June 2014 To May 2015: National Highways Department, Chennai under Ministry of Highways and Port, New Delhi

Position: State Quality Monitor (Roads) HONOURARIUM JOBMain Project Features: Monitoring and Inspection of quality of Road works sanctioned by Central and State Governments in the execution of National Highways Department under Ministry of Highways and Ports and Reporting to the Chief Engineer, National Highways Department, Chennai.

Project Name: PMGSY, NABARD, Road works sanctioned by State Government and Central Government under Ministry of Highways and Ports, New Delhi(Client: National Highways).

Task Assigned and achieved:

Monitoring and Inspection of works sanctioned by Central and State Government in Tamil Nadu State under the Schemes of PMGSY, NABARD, Following IS standards, Bid Specifications, drawings and guide lines- Reporting to the Chief Engineer, National Highways Department, Chennai. about the quality, quantity, deviations, deficiencies in works- Material Testing in Laboratory. ( Given as exampled for the following works out of total works performed by me): Monitoring and Inspection of National Highways Roads under PMGSY,NABARD Schemes in the State of Tamil Nadu. Length: 122.60 KM OF N.H., S.H. 1.00KM AND MDR 4.00KM,Client: National Highways Department under Ministry of Highways and Ports.

.1) N.H. No.47, 2 lane Strengthening the road of Nagerkoil- Sucheendram Km.631/0 to Km

641/4 = 10.40Km

2) N.H. No.49 2 lane Maintaining the road of Ramanathapuram- Thanushkodi Km 130/0 to Km

145/2 = 15.20Km

3) N.H. No.230 2 lane Widening the road of Thiruppuvanam- Thondy Km.70/0 to 84/0 = 14.00Km

4) N.H. No.234 2 lane Maintaining the road of Vellore- Villupuram Km.90/0 to 120/4 = 30.40Km

5) N.H. No.532 2 lane Widening the road of Cudalore- Virudhachalam Km.10/0 to 15/0 = 5.00Km

6) N.H. No.226 2 lane Maintaining the road of Perambalur- Tanjore Km.1/0 to 15/6 = 14.60Km

7) N.H. No.49 4 lane Widening the road of Madurai- Paramakudi = 10 Km

8) N.H. No.49 a 2 lane Maintaining the road of Paramakudy- Ramanathapuram = 8.00 Km

9) N.H.No.67 2 lane Maintaining the road of Nagapattinam-Tanjore = 15.00Km

10) S.H. No. 141 Virudhachalam Thozhudur road to Arangur 0/0 to 1/0= 1.00 Km

11) MDR of Mettur- Erode Km 3/0 to 5/0 = 2.00 Km

12) MDR of Gopi Dharapuram =2.0Km From Nov 2012 to May 2014:

Cos Consultancy Services, Madurai

Team Leader cum Structural Engineer /

Bridge EngineerMain Project Features:

TEAM LEADER of administration in general professional control, technical reviews and program management of various projects, finalized various project reports including internally assisted, processed and pursued projects for sanctions including liaison and coordination with the funding agencies, advised the state Government in policy matters like infrastructure development and planning, technical reviews and fiscal performance of the department. Involved in project administration, project management, quality control, schedule control, monitoring in surveying and ROW, traffic, geo-technical investigations, road geometrics and design, pavement evaluation and designs, road amenities, final design, Project Preparation tender drawings, specifications and cost estimate. Construction Supervision and Quality control checks by the means of detailed site visits and regular monitoring of field tests. Project Name:- Consultancy Services for the Preparation of Detail Project Report of Flyover at Kalavasal Junction and Goripalayam Junction in Madurai District as per DFR 4-lane standards; Client: The Superintending Engineer [H], Highways C &M Circle, Alagarkoil Road, Madurai.Bridge Detail:- Kalavasal Fly Over: Tier - 1 - 1300 m - span = 24 x 40 m & Tier - 2 - 1100 m - span = 20 x 40 m

Goripalayam Fly Over: Goripalayam - Simmakkal Arm 1100 m (span - 8 x 40m + 19 x 30 m), Anna Nagar Arm 360 m (span - 5 x 40 m) & Sellur Arm 650 m (span - 11 x 40m)

Location: Madurai

Consultancy Services for the Preparation of Detail Project Report of Fly over to be constructed in Madurai City to reduce traffic congestion (Elevated corridor from Periyar Bus stand to Yanaikal Junction) in Madurai City as per D.F.R; Client: The Superintending Engineer [H], Highways C &M Circle, Alagarkoil Road, Madurai. Location: Madurai Bridge Detail:- Major Fly over Length - 2350 m 4- lane standards (span - 63 x 40 m)

Consultancy assignment for preparation of DPR on Construction of High level bridges at Apollo Hospital junction and Jawahar Hospital junction in Madurai Corporation; Client: The Commissioner, Madurai Municipal Corporation Madurai, Madurai.

Location: Madurai

Task Assigned and achieved: Responsible for check accuracy of the bridge inventory, checking of design of falls work for superstructure; Check layout of bridges; Inspect the construction of structure; Monitor Bridge rehabilitation and repair works to be undertaken by Concessionaire; Inspect and quality during construction of bridges and other structures; Coordination with Material Engineer and contractors expert for quality of works; Structural analysis using STADD, monitoring of Bridge works using modern software like MS-Project (equal to Primavera); Guide and check reinforcement / cable laying operations rectify any apparent mistakes; Checking and controlling proper mix design; Checking of geo technical and soil investigation reports; Interpretation of sub soil investigation reports for use in designs; Recommendation of foundation levels and spans arrangement; BBS approval, Staging methodology approval; Construction supervision of works to ensure its compliance with the specifications, design and drawings; Checking Measurements, Review and approve As-built documents for bridges and other structures; Review and approve maintenance manual for bridge and other structures; correspondence with client and Contractor; preparation and submission of various reports and documents. Project Name:- Consultancy Services for the preparation of Detailed Project Report Drawing, L.P.S, GAD, Detailed Estimate for the work of Construction of ROB in Hanumantha Nagar at Dindigul town in lieu of existing LC. No. 309 in Railway Km 431/900-432/0 in Dindigul Yard; Client: The Divisional Engineer, Nabard & Rural Roads, Madurai

Location: Dindugul.

Bridge Detail: - Major ROB Length - 700m - Two lane standards - span 2 x 35 m +22 x 16.60 m Task assigned and achieved:Position: Bridge Engineer Responsible for Needed design work for bridges and other structures; Make site visit to check accuracy of the bridge inventory prepared by designs; Review design standards used for the bridge design/ other structures and suggest any needed change; Review geotechnical report and ascertain of the bridge foundation types are used correctly; Review the design/ drawings/ specifications for bridge/ other structures and suggest any defects or needed modifications; Prepare new bridge design, in case the original design is defective or there are omissions, both for superstructure and/ or sub structure; Prepare review report for bridges/ other structures and submit to employer; Issue modified construction drawings to the concessionaire for bridges/ other structures and associated variation orders agreed by the employer; Participate with the value engineering team and perform design optimization for bridges and other structures.Name:- Supervision Consultancy Services for Special Repairs to the Stretch from Km. 0/0 to Km. 86/0 & Km. 100/0 to Km 135/400 in Trichy to Chidambaram Section of NH - 227 in the State of Tamilnadu (Package No. TN / SC / NH-227 / SR / 2011 - 12 / 01) for NHAI. Length - 121.400 Km 4-lane standards; Client: The Project Director, NHAI, PIU, Villupuram

Location: Villupuram

Bridge Detail: -

Repairs and rehabilitation of bridge at Ch: 101/2 of NH 227 (40m)

Repairs and rehabilitation of bridge at Ch: 121/8 of NH 227 (60m)

Repairs and rehabilitation of bridge at Ch: 121/8 of NH 227 (60m)

Task assigned and achieved:

(Bridge & Structural Engineer)

Administered general professional control, technical reviews and program management in various projects, finalized various project reports including internally assisted, processed and pursued projects for sanctions including liaison and coordination with the funding agencies, advised the state Government in policy matters like infrastructure development and planning, technical reviews and fiscal performance of the department. Involved in project administration, project management, quality control, schedule control, monitoring in surveying and ROW, traffic, geo-technical investigations, road geometrics and design, pavement evaluation and designs, road amenities, final design, Project Preparation tender drawings, specifications and cost estimate. Construction Supervision and Quality control checks by the means of detailed site visits and regular monitoring of field tests.

From Aug 1976 to Oct 2012:

Highways Department, Govt. of Tamil Nadu

Divisional Engineer / Assistant Divisional Engineer

/ Assistant Engineer / Panchayat Union Engineer

Details Year, Position Held

Main project features:

Control of major project, In charge of execution & construction of roads, major bridges, railway over bridges

Project Name:

1. Supervisory Consultancy Services for the construction of Kumbakonam byepass extension in TN. Package TNRSP - 05A - 06 Project.

Total Length 4.08 Km

Cost of the project Rs. 28.78 Cr

Task assigned and achieved:

Construction of road work of 4.08Km from embankment to PC, retaining wall, major junction improvement 3 Nos, intersection 9 Nos, slab culvert 7 Nos, box culvert 2 Nos, minor bridges (1x12m, 2x24m & 2x27m) with piles, pre stressed girders 16 Nos, 16 Nos with pile foundation, 1 No under path (1 span 7m length 6m height), 1 No railway over bridge, 3 Nos of pipe culvert 1000mm dia and ROB at Km 1/170 of retaining wall 620m length and ROB portion 50m length with ground improvements using high strength woven Geo Textiles. Project Name:

Consultancy services for the preparation of detailed project report on Construction of High level bridges at Simmakkal road to Goripalayam and ESI hospital to Arapalayam under Urban Transport and Traffic Improvements for Madurai Corporation across river vaigai . Client: The City Engineer, Madurai Municipal Corporation, MaduraiBridge Detail:-

Simmakkal to Goripalayam: 250 m

ESI hospital to Arappalayam: 320 m Task assigned and achieved:

Consultancy services for taking data collection and reconnaissance survey, traffic survey, analysis and forecasting engineering survey and investigation, geo technical investigation, furnishing design alignment, topo graphical survey, drawing, land plan schedule and detailed project report for Bypass Aranthangi SH26 Length - 20.50 Km - Four lane standards. Client: The Divisional Engineer (H),

Year: Feb 2012 to Oct 2012

Location: Kumbakonam

Client: Project Director, PIU, Tamil Nadu Road Sector Project - 05A (TNRSP), Chennai.

Contractor: DODLA Engineering Company,

Associated with

1. Z-Tech (India) Pvt. Ltd.,

2. Good for Construction

3. Usha Martin Limited

Consultant: LEA International Ltd./ LEA Associates South Asia Pvt. Ltd. (JV), New Delhi

Position Held : Quality and Material Engineer cum

Bridge EngineerYear: July 2011 to Jan 2012

Location: Madurai

Client: City Engineer, Madurai Corporation, Madurai

Consultant: Cos Consultancy Services, Madurai

Position Held: Resident Engineer cum Bridge Expert

Main Project Features :

Preparation of Estimates, Tendering, Technical Sanction of Estimates Upto RS.50 Lakhs, Preparation of Land Plan Schedule, Land Acquisition, Liaison with Special Commissioner of Land Revenue and Collector of Tirunelveli, Nagercoil, Tuticorin, and Railway Officials. Verified quality and quanty of road worksProject Name:

1. Construction of Railway over Bridge (ROB) at Km 0/8 of Tenkasi - Madurai road (SH) in lieu of existing LC No. 502 at railway Km 660/8-9 between Tenkasi - Sengottai railway stations in Tirunelveli district.

Estimate amount: Rs.2450 Lakhs

Length of bridge: 360.65m

Length of approaches on both sides 379.35m

No. of spans 20

Railway span: abutment 2, piers 17, capping beam 17, deck slab 19, retaining wall 22

Task Assigned:Head of District Level Officer.

Preparation of estimate, detailed project report (DPR), tendering, technical sanction of estimate, preparation of Land Plan Schedule,

Land acquisition, Liaison with special commissioner of Land Revenue and District Collectors of Tirunelveli, Nagercoil, Tuticorin and Railway officials.

15 (2) A & B notification and 15 (1) notification were issued for land acquisition and compensation paid of Rs.2,53,82,997 for land acquire for private land 3,858 sq.mt and alienation for government land 1263 sq.mt completed. Shifting of TNEB poles 23 Nos, transformer 2 Nos shifted. Project in all respect completed.

2. Construction of Railway over Bridge (ROB) at Km 1/4 of Nagercoil - Palamore road in Kanyakumari district in lieu of existing LC No. 32B railway Km 228/6-7 between Nagercoil junction and Nagercoil town (Eraniel)

Estimate amount: Rs.1876 Lakhs

Length of bridge: 634m

Carriageway width: 12m

No. of spans: 19

Railway Span 1, Length of retaining wall 208m, Service road 600m, Side drain 500m, Abutment 2, Pile cap 19, Piers 17, Capping beam 17, deck slab 19, retaining wall 4.

Task Assigned:

Land acquisition for private land 1526 sq.mt, EB poles 27 Nos and transformer 2 Nos, shifted completed. Work completed except railway portion 84 Nos of piles for pile foundation completed.

3. Construction of ROB at Km. 153/10 of Madurai - Kanyakumari (NH 7) in lieu of existing LC No. 4 at railway Km 4 / 8 - 9 at Tirunelveli and Seithunganallur railway stations.

Administrative sanctioned estimate amount: Rs.2552 Lakhs

Task Assigned:

Land acquisition for private land 10049 sq.mt and alienation for government land 34019sq.mt. Land Plan Schedule prepared and sent for 15 (2) notification. Estimate for Rs.25 Crores prepared and submitted.

4. Construction of ROB in lieu of LC No. 486 & 487 at railway Km 652 / 11-12 and Km 663/6-7 between Milavittan and Tuticorin railway station (SH).

Task Assigned:

i. Site plan and longitudinal section for Limited Use Subways.

ii. Prepared GAD for Rs.27.50 Crores

5. Construction of ROB at Km 94/2 of Madurai - Kanyakumari road (NH 7) in lieu of existing LC No. 440 at railway Km 588/9-10 between Kovilpatty and Kumarapuram railway stations.

Estimate amount of Rs.744 Lakhs Task Assigned:.

Prepared estimate for Limited Use Subway.

6. Construction of ROB at Km 132/6 of Madurai - Tuticorin road (SH) in lieu of existing LC No. 485 at railway Km 651/12-13 at Tuticorin between Milavittan and Tuticorin railway stations.

Task Assigned:

Prepared estimate for service road on Tuticorin side and prepared land plan schedule for land acquisition for Estimate amount of Rs.133 Lakhs.Year: Jan 2011 - June 2011

Location: Tirunelveli, Tenkasi, Kovlpatty, Nagercoil, Kanyakumari, TuticorinClient: Highways Department (Project)Main project features: Control, execution & Construction

Positions held: Divisional Engineer (Project) - Collector Rank- Zonal Divisional Engineer for Quality and Assurance

Main project features:Preparation of estimates for construction of high level bridges, alignment approval being a Member in Alignment Committee, technical approval of estimates being a Member in Technical Audit Committee, preparation of Detailed Project Report (DPR)

Projects:

Estimates technically approved by me as a Member in Technical Audit Committee:

1.Trichy Highways C&M Division(Trichy, Lalkudi, Manaparai, Thuraiyur, Musiri Sub Divisions)

No. of works:54, Total KM: 115.986, Est. Amount : 2969.75 Lakhs

2.Pudukottai Highways C&M Division (Pudukottai,Thirumayam, Keeranoor, Aranthanki, Avudaiyar kovil, Alangudi Subdivisions)

No. of works:91, Total KM: 185.110, Est. Amount : 3412.100 Lakhs

3.Thiruvarur Higaways C&M Division (Thiruvarur, Mannarkudi, Nannilam, Thiruthuraipoondi, Kodavasal, Valangaiman Subdivisions)

No. of works:35, Total KM: 60.600, Est. Amount : 2497.500 Lakhs

4.Thanjavur Highways C&M Division( Thanjavur, Thiruvidaimaruthur, THIRUVAIYARU, Pattukottai, Peraurani, Orathanadu, Papanasam, Kumbakonam Subdivisions)

No. of works:55, Total KM: 129.705, Est. Amount : 3913.25 Lakhs

5.Nagapattinam C&M Division (Nagapattinam, Sirkali,

Mayiladudurai, Vetharanyam Subdivisions)

No. of works:34, Total KM: 65.18, Est. Amount : 2762.00 Lakhs

6.Tiruchi Nabard & RR Division

No. of works:13, Total KM: 30.85, Est. Amount : 211.80 Lakhs

7.Pudukottai Nabard & RR Division

No. of works:25, Total KM: 73.80, Est. Amount : 574.750 Lakhs

8.Thanjavur Nabard & RR Division

No. of works:34, Total KM: 92.245, Est. Amount : 802.40 Lakhs

9.Nagapattinam Nabard & RR Division

No. of works:30, Total KM: 70.54, Est. Amount : 783.46 Lakhs

10.Thiruvarur Nabard & RR Division

No. of works:2, , Est. Amount : 43.00 Lakhs

11.Construction of Bridges: 6 works

Estimates prepared by me and got sanctioned by conversation thro power point in the sitting of Experts and Directorate of technical authorities:

Forming Thuraiur Byepass Road Km 0/0-3/6 (Main and subestimates including CD works) (Highways C&M Division)

Estimate Amount: Rs. 570 Lakhs

Alignment approved by me as a Member of Alignment Committee:

1.Construction of Railway Over Bridge (ROB) at Km. of old

GST Road in lieu of existing L.C.No.281 at Railway Km. 377/100-200 in between Manaparai and Chettiapatti Railway Station (Trichi Highway project)

2.Re construction of High Level Bridge at Km. 117/8-10 of Trichi-Pudukottai-aranthanki-Memisal Road (SH-26) (avudaiyar kovil Subdivision, Pudukottai division)3.Construction of Bridges: 15 works

Alignment Proposals Prepared and submitted by me:

1.Re construction of Bridge at Km. 2/6 of Papakoil- Karunganni Road under T Sunami Rehabilitation Programme) Nagapattinam Highways C&M Division Est. Amount: Rs.237 Lakhs

2.Forming Thuraiur Bypass Road Km. 0/0- 3/6 Trichi Highways C&M Division, Est. Amount Rs. 570 Lakhs3.Forming buypass road for Myladuthurai Town starting @

Km. 28/6 of Kumbakonam- Sirkali Road and joining @ Km. 4/4 of Myladuthurai- Thiruthuraipoondi Road, Nagapattinam Nabard RR Division

4.Forming Thuraiur Buypass

Field particulars prepared and submitted by me:

1.Construction of High Level Bridge (HLB)= 2 works

2.Construction of Bridges= 2 works

Task assigned and achieved:

Preparation of estimates for construction of high level bridges, alignment approval being a Member in Alignment Committee, technical approval of estimates being a Member in Technical Audit Committee, preparation of Detailed Project Report (DPR)

Year: Dec 2008-Jan 2011Location: Tirucbirappalli

Client: Highways Department (Investigation) Positions held: Divisional Engineer (Investigation)-Collector Rank.

Main project features:Construction & SupervisionProject Name 1.Construction of Flyover at Km 3/8 of Tirunelveli Buypass @ Vannarpettai near Speaker Chellapandian statue. Estimate amount: Rs.15.68 Crores.

2. Construction of high level bridge at Km 41/8 of Cheranmahadevi - Panangudi road under HUDCO Project.

No. of span: 2 x 6.8m.3. Construction of bridge at Km 6/8 of Mangadu road in Kanyakumari district. Under TNADP Scheme, Submersible bridge pile 900 mm dia,RCC Deck Slab & Spans of 10 meters, approach length : 162 meteres

Estimate amount: Rs.209 Lakhs.

4. Construction of bridge at Km 24/4 of Aralvoymozhi - Nedumangadu road in Kanyakumari district. Under HUDCO Project, 3 spans of 6 metres Estimate amount: Rs.40 Lakhs.

5. Construction of bridge at Km 0/4 of Sengottai

Sambavarvadakarai road.

No. of Spans: 4, Clear span 5.60m

Approach road length: 130m

6. Construction of bridge at Km 10 / 2 - 4 of Palayamkottai - Ambassamudram road.

Estimate amount: Rs.29.09 Crores.

7. Construction of bridge at Km 32/6 of Palayamkottai - Ambassamudram road.

Estimate amount: Rs.29.67 Crores.

8. Construction of bridge at Km 62/4 of Rajapalayam - Sankarankoil - Tirunelveli road under HUDCO Project.

Estimate amount: Rs.72.00 Lakhs.

9. Construction of bridge at Km 59/10 of Paruvakudi - Kovilpatty - Ettayapuram - Vilathikulam - Vembar road.

Estimate amount: Rs.42.24 Lakhs.under HUDCO Project

10. Construction of high level bridge at Km 19 / 8 - 10 of Valliyoor - Ittamozhi road under HUDCO Project.

Estimate amount: Rs.1.31 Crores.

No. of Spans: 6 of clear span 20.10 metres

No. of piers 5 with pile foundation

Approach road length: 495m

11. Construction of high level bridge at Km 2/6 of Sundarapandiyampuram - Sambavarvadakarai road at Tenkasi.

Under HUDCO Project

Estimate amount: Rs.142 Lakhs.

No. of Spans: 2, clear span 13.495m,piles 1.2 metres dia,

cast- in-situ RCC Tee Beam Slab12. Construction of high level bridge at Km 10/4 of Ambassamudram - Alangulam road under HUDCO Project.

13. Construction of high level bridge at Km 1 / 2 - 4 of Thiruvenkadam - Avudaiyapuram road under HUDCO Project, Est. Amount 93 Lakhs.

14. Construction of ROB at Km 132/6 of Madurai - Tuticorin road (SH) in lieu of existing LC No. 485 at railway Km 651/12-13 at Tuticorin between Milavittan and Tuticorin railway stations.

Estimate amount of Rs.1114 Lakhs.

15. Tsunami works in Kizhamamakudi and Melamanakudi in Nagercoil of Kanyakumari district.Task Assigned:

Work completed except service road on Tuticorin side.Year: June 2003 - Dec 2008

Location: Tirunelveli, Nagercoil, Kovilpatty, Tuticorin, SankarankovilClient: Highways Department (Project)Positions held: Assistant Divisional Engineer

Main project features:

Inspection of rural roads, PMGSY Roads, Village Panchayat Roads, Panchayat Union Roads, NABARD Roads, buildings, minor bridgesTask assigned and achieved:

Execution of rural roads, buildings, minor bridgesYear: Oct 2002 - May 2003

Location: ThoothukudiClient: Rural Development DepartmentMain project features: Inspection of rural roads, PMGSY Roads, Village Panchayat Roads, Panchayat Union Roads, NABARD Roads, buildings, minor bridgesPositions held: Assistant Divisional Engineer

1. Construction of Railway over bridge Project at Km 438/6 of Banaras to Cape-camerin Road (BCC Road) in NH - 7; Project Cost: INR 18 Crores.2. Improvements of Madurai - Alagar Koil Road from Km 3.600 to Km 10.000 in the state of Tamil Nadu; Project Cost: INR 18.2 Crores.Year: Mar 2002 - Oct 2002

Location: MaduraiClient: Highways Department (Project)Main project features: Construction SupervisionPositions held: Assistant Divisional EngineerActivities performed: Forming bypass, ring roads, major bridge works in National Highways.

1. Construction Supervision of Ring Road around Madurai city from Km 0.000 to Km 27.200 connecting Trichy - Madurai Road and Madurai - Kanyakumari Road of NH - 7 including construction of High Level Bridge across Vaigai River at Km. 5.200 of Ring Road; Funded by: World Bank; Project Cost: INR 26 Crores and above.

2. Construction of two Railway Over Bridges on Railway Lines at Km. 6.600 & Km 27.200 of Madurai Ring Road; Project Cost: INR 47.35 Crores.Year: Sept 2000 - Feb 2002

Location: MaduraiClient: Highways Department (Project)Main project features: Construction Supervision of National Highways

Positions held: Assistant EngineerActivities performed: Completed the above railway over bridges.

Rural DevelopmentYear: Oct 1997 - Aug 2000

Location: TirunelveliClient: Rural Development DepartmentMain project features: Execution of Rural Roads, State Finance Roads, buildings, minor bridgesPositions held: Panchayat Union EngineerActivities performed: Execution of rural roads, buildings, minor bridges.

Execution of roads and bridges in rural areas of NABARD Scheme.Year: Aug 1995 - Sept 1997

Location: Ottapidaram (Tuticorin Dt.)Client: Highways Department (Rural Roads)Main project features: Execution of NABARD Roads and bridges in rural areas

Positions held: Assistant EngineerActivities performed: Execution of roads and bridges in rural areas of NABARD Schemes.

1. Maintenance and supervision of NH 7A Km 0/0 to 56/0

2. Construction of approaches to Major Bridge at Km 38.600 of NH - 7A, Project Cost: INR 69.25 Lakhs3. Construction Supervision for Junction Improvement at Km. 37.400, 39.400 and 39.600 of NH - 7A; Project Cost: 7.12 Lakhs4. Construction of approaches to Major Bridge at Km 38.600 of NH- 7A; Project Cost: INR 71.532 Lakhs.5. Construction of Major Bridge at Km. 38.600 and reconstruction of Minor Bridge at Km. 47.400 of NH-7A; Project Cost: INR 17.743 Crores

Year: Oct 1991 - Jul 1995

Location: TuticorinClient: National Highways (Execution)Main project features: Construction Supervision of National Highways Roads and Bridges

Positions held: Assistant EngineerActivities performed: Completed the above major bridge works and Toll plaza in National Highways.

1. Construction of Adi Dravida Group Houses of 24 nos. under Jawahar Yojna Scheme

2. Construction of Adi Dravida Group Houses of 24 nos. under J.V.V.T

3. Construction of Adi Dravida Group Houses of 20 nos. under Additional works allotted of J.V.V.T

4. Construction of Panchayat office buildings 2 nosYear: June 1990 - Sept 1991

Location: Papakudi (Tirunelveli Dt.)Client: Rural Development DepartmentMain project features: Construction Supervision of Rural Roads, Infrastructure RoadsPositions held: Panchayat Union EngineerActivities performed: Completed the above works

Construction, Supervision and Maintenance of State Highways Roads Year : June 1989 - Dec 1989

Location : Vadipatty

Client : Highways Department (Execution)Main Project Features : Construction, Supervision and Maintenance of State Highways Roads

Position Held : Assistant EngineerActivities performed: Completed the above works

1. Reconstruction of Minor Bridge at Km. 161. 100 and at Km 22.600 on Salem - Cochin Road of NH- 47;

2. Construction of bye pass to Coimbatore town Km. 2.110 to 27.000 on Salem- Cochin Road of NH- 47Year: Feb 1988 - Feb 1989

Location: CoimbatoreClient: National Highways (Planning)Main project features: Land Survey, Campus Survey, Leveling, Preparation of Estimates and Detailed Project Report (DPR) in National HighwaysPositions held: Assistant EngineerActivities performed: Completed the above works

Construction, Supervision and Maintenance of Roads in National Highways from Ramanathapuram to Rameswaram NH Road - 27 KmYear: Dec 1987- Jan 1988

Location: Ramanathapuram, RameshwaramClient: National Highways (Execution)

Main project features: Construction, Supervision and Maintenance of Roads in National Highways from Ramanathapuram to Rameswaram NH Road.

Position Held : Assistant EngineerActivities performed: Completed the above works

Construction of Byepass and approaches to the Railway Over Bridge within Virudhunagar Municipal limit of Virudhunagar townYear: Jan 1986 - Oct 1987

Location: VirudhunagarClient: National Highways (Execution)

Main project features: Construction, SupervisionPositions held: Assistant EngineerActivities performed: Completed the above works

Construction, Supervision of Panchayat Union Rural Roads.Year : May 1985 - Jan 1986

Location : Sathur

Client : Rural Development Department

Main Project features : Construction, Supervision of Panchayat Union Rural Roads

Position Held : Panchayat Union EngineerActivities performed : Completed the above works

Construction, Supervision and Maintenance of State Highways Roads, Bridges and Culverts.Year : May 1984 - May 1985

Location : Virdhunagar

Client : Highways Department (Execution)

Main Project features: Construction, Supervision and Maintenance of SH Roads, Bridges and Culverts.

Position Held : Assistant EngineerActivities performed : Completed the above works

Investigation Works Like Surveying Leveling , Preparation of Estimates and Detailed Projects Reports (DPR) Year : Nov 1983 - April 1984

Location : Sathur

Client : Highways Department (Investigation)Main Project features : Investigation Works Like Surveying Leveling, Preparation of Estimates & (DPR)

Position Held : Assistant EngineerActivities performed : Completed the above works

1. Renovation and strengthening of irrigation tanks - 42 nos.

2. Renovation and Strengthening of 30 nos. irrigation tanks.Year: Apr 1983 - Oct 1983Location: Devakottai, KannanagudiClient: Rural Development DepartmentMain project features: Construction Supervision of Irrigation TanksPositions held: Assistant EngineerActivities performed: Completed the above works in rural areas

1. Construction of school buildings - 3 nos.

2. Construction of Panchayat Board building

3. Construction of Maternity Center

4. Construction of bed level causeway

5. Panchayat Union RoadsYear: Oct 1980 - Mar 1983

Location: Kariapatty, Mudukulathar, Devakottai

Client: Rural Development DepartmentMain project features: Construction Supervision of Panchayat Union Rural Roads and Buildings

Positions held: Additional Panchayat Union EngineerActivities performed: Completed the above works in rural areas

Integrated Dry Land Agricultural Development Project.Year: June 1980 - Oct 1980

Location: Kovilpatty - (Tuticorin Dt.)Client: Agricultural Engineering DepartmentMain project features: Supervision and Execution

Positions held: Assistant EngineerActivities performed: Responsible for supervision and execution of earth works With bulldozer, land leveling, borrow pit reclamation works using tractors, construction of percolation ponds etc.,

Soil Conservation Scheme Project.Year: May 1979 - June 1980

Location: TirunelveliClient: Agricultural Engineering DepartmentMain project features: Supervision and Execution

Positions held: Assistant EngineerActivities performed: Responsible supervision and execution of earth works with bulldozer, borrow pit reclamation works using tractors, land leveling, pipe laying works under Soil Conservation Scheme, constriction of surplus weirs, check dams, percolation ponds under Whole Village Developing Program and Integrated Rural Development Program, surveying, preparing designs, Estimates, bills, taking measurements etc.,

Soil and Water Management Scheme

Year: Dec 1977 - May 1979

Location: Tiruvannamalai (North Arcot Dt.)Client: Agricultural Engineering DepartmentMain project features: Supervision and Execution

Positions held: Assistant EngineerActivities performed: Responsible for supervision and execution of irrigation, field Channel, drainage, land leveling, pipe laying works, Surveying in command area, Preparing designs, Estimates, bills etc.,

Design, Planning, Estimating, Construction of RCC and Structural works.

Year : Sep 1977 - Dec 1977

Location: Kovur Sugar Project, Kovur, Andhra Pradesh.

Client: Pioneer Engineering Corporation, Madras.

Main Project features : Design, Planning, Estimating, Construction of RCC and Structural works

Position Held : Site Supervisor

Activities Performed : Design, Planning, Estimating, Construction of RCC and Structural works

Construction and Supervision of Highways Roads, Bridgesand Culverts. Experienced in Workshop of Tools and Machineries Section with machineries like Bulldozers. Tractors, Mini Mix Plant, Etc.

Year : 16.08.1976 15.08.1977 Location: Tuticorin, Tirunelveli. Sankarankovil

Client : Highways Department (Execution)

Main Project Features : Construction and Supervision

of Highways Roads, Bridges and Culverts. Experienced In Workshop of Tools and Machineries Section with machineries like Bulldozers, Tractors, Mini Mix Plant Plant, Etc. Position Held : Assistant Engineer ( Apprenticeship) Activities Performed : Successfully completed one year Apprenticeship Training

19.PASSPORT DETAILS :

Type

:P

Country code

:IND

Passport No

:F4733587

Surname

:Ganapathy

Given Name

:SITA RAM

Nationality

:Indian

Date of birth

:01.07.1953

Place Of Birth

:Sankaran Kovil

Place Of Issue

:Tiruchirapalli

Date of Expiry

:14.09.2015

Emigration check:NOT REQUIRED

20.Certification

I, the undersigned, certify that to the best of my knowledge and belief that this CV correctly describes myself, my qualifications, and my experience. I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if engaged. With Kind Regards,

(ER.G.SITA RAM, B.E) CV of G.SITA RAM25 of 25

Click here to load reader

Reader Image
Embed Size (px)
Recommended