REKAPITULASI ANGGARAN B KEGIATAN : PEMBANGUNAN RUMAH TINGGAL PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL LOKASI : TENGGARONG SEBERANG TAHUN ANGGARAN : 2013 NO. URAIAN PEKERJAAN 1 2 A PEKERJAAN PERSIAPAN B PEKERJAAN TANAH C PEKERJAAN PASANGAN D PEKERJAAN BETON E PEKERJAAN LANTAI F PEKERJAAN PINTU DAN JENDELA G PEKERJAAN ATAP H PEKERJAAN KUNCI DAN PENGGANTUNG I PEKERJAAN CAT-CATAN J PEKERJAAN INSTALASI LISTRIK K PEKERJAAN SANITAIR L PEKERJAAN SEPTICKTANK A JUMLAH HARGA SELURUH PEKERJAAN C DIBULATKAN Terbilang : Tiga Ratus Tiga Puluh Dua Juta Delapan Ra SA CV.
32

Rumah Tinggal Tenggarong

Dec 06, 2014

Download

Documents

Asrr Ssai

RAB
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Rumah Tinggal Tenggarong

REKAPITULASI ANGGARAN BIAYA

KEGIATAN : PEMBANGUNAN RUMAH TINGGAL PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL LOKASI : TENGGARONG SEBERANG TAHUN ANGGARAN : 2013

NO. URAIAN PEKERJAANJUMLAH HARGA

(Rp.)

1 2 3

A PEKERJAAN PERSIAPAN 9,888,677.00B PEKERJAAN TANAH 6,031,583.36C PEKERJAAN PASANGAN 84,975,371.50D PEKERJAAN BETON 83,588,208.53E PEKERJAAN LANTAI 32,365,840.45F PEKERJAAN PINTU DAN JENDELA 37,104,932.27G PEKERJAAN ATAP 35,563,996.60H PEKERJAAN KUNCI DAN PENGGANTUNG 5,166,984.00I PEKERJAAN CAT-CATAN 19,137,394.80J PEKERJAAN INSTALASI LISTRIK 11,009,500.00K PEKERJAAN SANITAIR 5,473,352.00L PEKERJAAN SEPTICKTANK 2,500,000.00

A JUMLAH HARGA SELURUH PEKERJAAN 332,805,840.50C DIBULATKAN 332,805,000.00

Terbilang :

Tiga Ratus Tiga Puluh Dua Juta Delapan Ratus Lima Ribu Rupiah

SANGATTA , 13 JULI 2010DIBUAT OLEH :

CV. ANDIKA ALBANJARI

H. BARSANIDIREKTUR

Page 2: Rumah Tinggal Tenggarong

RENCANA ANGGARAN BIAYA

KEGIATAN : PEMBANGUNAN RUMAH TINGGAL PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL LOKASI : TENGGARONG SEBERANG TAHUN ANGGARAN : 2013

NO. URAIAN PEKERJAAN SATUAN VOLUMEHARGA JUMLAHSATUAN HARGA

( Rp. ) ( Rp. )1 2 3 4 5 6

A PEKERJAAN PERSIAPAN

1 Pembersihan Lokasi 153.00 47,000.00 7,191,000.002 Pasang Bowplank 41.00 65,797.00 2,697,677.00

JUMLAH 9,888,677.00B PEKERJAAN TANAH

1 Urugan Tanah Dipadatkan 18.88 73,750.00 1,392,339.53

2 Urugan Pasir dibawah Lantai 25.17 184,300.00 4,639,243.83JUMLAH 6,031,583.36

C PEKERJAAN PASANGAN

1 Pasangan Batu Bata tebal 1/2 bata; Camp 1 pc : 2 ps 12.00 137,100.00 1,645,200.002 Pasangan Batu Bata tebal 1/2 bata; Camp 1 pc : 4 ps 252.93 127,150.00 32,160,049.503 Plesteran 529.86 52,159.00 27,636,967.74

4 Acian 529.86 25,541.00 13,533,154.265 Pekerjaan Profilan / Mainan Ls 1.00 10,000,000.00 10,000,000.00

JUMLAH 84,975,371.50D PEKERJAAN BETON

1 Beton 10.90 5,536,831.50 60,351,463.35

2 Cor Beton Bawah Lantai 1:3:5 18.88 1,230,825.00 23,236,745.17JUMLAH 83,588,208.53

E PEKERJAAN LANTAI

1 Pasang Lantai Keramik 40 x 40 93.93 194,679.00 18,286,198.47

2 Pasang Lantai Keramik 20 x 20 4.98 158,033.00 787,004.34

3 Pasang Dinding Keramik Kamar Mandi 20 x 25 16.74 168,033.00 2,812,872.424 Plint Keramik M¹ 105.58 99,259.00 10,479,765.22

JUMLAH 32,365,840.45F PEKERJAAN PINTU DAN JENDELA

1 Mengerjakan Kusen Pintu dan Jendela 0.57 5,879,000.00 3,363,375.902 Daun Jendela Kaca Tebal 5 mm Unit 5.00 316,930.50 1,584,652.503 Daun Pintu Panel Unit 7.00 272,512.00 1,907,584.004 Papan Listplank 2,5 cm M¹ 10.78 49,519.00 533,814.825 Penutup plafond 98.91 47,920.00 4,739,767.20

6 Rangka Plafond 98.91 81,575.00 8,068,583.257 Pintu Fiber Kamar Mandi Unit 2.00 320,000.00 640,000.008 Bak Mandi Fiber Kamar Mandi Unit 2.00 240,000.00 480,000.009 List Plafond Gypsum 105.58 35,870.00 3,787,154.60

10 Railing Door Ls 1.00 12,000,000.00 12,000,000.00JUMLAH 37,104,932.27

M²M¹

M3

M3

M2

M²M2

M2

M3

M3

M2

M2

M2

M3

M2

M2

M1

Page 3: Rumah Tinggal Tenggarong

NO. URAIAN PEKERJAAN SATUAN VOLUMEHARGA JUMLAHSATUAN HARGA

( Rp. ) ( Rp. )1 2 3 4 5 6

G PEKERJAAN ATAP

1 Memasang Rangka Atap 88.87 248,000.00 22,039,760.002 Atap Genteng Metal 88.87 152,180.00 13,524,236.60

JUMLAH 35,563,996.60H PEKERJAAN KUNCI DAN PENGGANTUNG

1 Kunci tanam Pintu Bh. 6.00 74,800.00 448,800.002 Slot Pintu atas bawah Bh. 14.00 36,430.00 510,020.003 Slot Jendela Bh. 10.00 36,430.00 364,300.004 Kait Angin Jendela Bh. 20.00 30,200.00 604,000.005 Engsel steinlist 11-15 cm untuk Pintu Bh. 16.00 36,329.00 581,264.006 Engsel steinlist 5-10 cm untuk Jendela Bh. 20.00 116,215.00 2,324,300.007 Tarikan Jendela (Handle Jendela) Bh. 10.00 33,430.00 334,300.00

JUMLAH 5,166,984.00I PEKERJAAN CAT-CATAN

1 Mengecat Tembok, 1 x plamir, 2 x Mengecat 529.86 29,077.50 15,407,004.15

2 Mengecat plafond 98.91 37,715.00 3,730,390.65JUMLAH 19,137,394.80

J PEKERJAAN INSTALASI LISTRIK

1 Stop Kontak Bh. 10.00 268,000.00 2,680,000.002 Lampu Phillips Bh. 15.00 304,375.00 4,565,625.003 Saklar Bh. 12.00 269,375.00 3,232,500.004 Box Panel + MCB 3 group Bh. 1.00 531,375.00 531,375.00

JUMLAH 11,009,500.00K PEKERJAAN SANITAIR

1 Memasang Pipa PVC 3" 13.00 102,175.00 1,328,275.00

2 Memasang Pipa PVC 4" 8.00 157,860.50 1,262,884.00

3 Memasang Pipa PVC 3/4" 17.00 34,029.00 578,493.004 Memasang kran pancar bh 3.00 54,900.00 164,700.005 Memasang closed jongkok bh 2.00 1,069,500.00 2,139,000.00

JUMLAH 5,473,352.00L PEKERJAAN SEPTICKTANK

1 Septick tank + Resapan Ls 1.00 2,500,000.00 2,500,000.00JUMLAH 2,500,000.00

M²M2

M2

M2

M1

M1

M1

Page 4: Rumah Tinggal Tenggarong

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

KEGIATAN : PEMBANGUNAN RUMAH TINGGAL PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL LOKASI : TENGGARONG SEBERANG TAHUN ANGGARAN : 2013

Nomor Jenis Pekerjaan Harga Satuan Biaya Upah Biaya Bahan Jumlah Harga

( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) 1 2 3 4 5 6

1 1 M' Mengukur & Pasang Bouwplank BAHAN : 0.0120 M3 Kayu Meranti 5/7 2,500,000.00 30,000.00 0.0200 Kg Paku 20,000.00 400.00 0.0070 M3 Papan Meranti 3/20 2,071,000.00 14,497.00

TENAGA : 0.0050 OH Mandor 130,000.00 650.00 0.0100 OH Kepala Tukang 125,000.00 1,250.00 0.1000 OH Tukang 100,000.00 10,000.00 0.1000 OH Pekerja 90,000.00 9,000.00

Total 20,900.00 44,897.00 65,797.00

2 1 M3 Galian Tanah Biasa TENAGA : 0.0250 OH Mandor 130,000.00 3,250.00 0.7500 OH Pekerja 90,000.00 67,500.00

Total 70,750.00 - 70,750.00

3 1 M3 Urugan Tanah BAHAN : 1.2000 M3 Tanah Urug 40,000.00 48,000.00

TENAGA : 0.0250 OH Mandor 130,000.00 3,250.00 0.2500 OH Pekerja 90,000.00 22,500.00

Total 25,750.00 48,000.00 73,750.00

4 1 M3 Urugan Pasir BAHAN : 1.2000 M3 Pasir Urug 130,000.00 156,000.00

TENAGA : 0.0100 OH Mandor 130,000.00 1,300.00 0.3000 OH Pekerja 90,000.00 27,000.00

Total 28,300.00 156,000.00 184,300.00

5 1 M2 Pasangan Batu Bata; Camp. 1 : 2 BAHAN : 70.0000 Bh. Batu Bata 800.00 56,000.00 18.5000 Kg. Semen 1,600.00 29,600.00 0.0380 M3 Pasir Pasang 250,000.00 9,500.00

TENAGA : 0.0150 OH Mandor 130,000.00 1,950.00 0.0100 OH Kepala Tukang 125,000.00 1,250.00 0.1000 OH Tukang 100,000.00 10,000.00 0.3200 OH Pekerja 90,000.00 28,800.00

Total 42,000.00 95,100.00 137,100.00

6 1 M2 Pasangan Batu Bata; Camp. 1 : 4 BAHAN : 70.0000 Bh. Batu Bata 800.00 56,000.00 11.5000 Kg. Semen 1,600.00 18,400.00 0.0430 M3 Pasir Pasang 250,000.00 10,750.00

TENAGA : 0.0150 OH Mandor 130,000.00 1,950.00 0.0100 OH Kepala Tukang 125,000.00 1,250.00 0.1000 OH Tukang 100,000.00 10,000.00 0.3200 OH Pekerja 90,000.00 28,800.00

Total 42,000.00 85,150.00 127,150.00

Page 5: Rumah Tinggal Tenggarong

Nomor Jenis Pekerjaan Harga Satuan Biaya Upah Biaya Bahan Jumlah Harga

( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) 1 2 3 4 5 6

7 1 M' Parit Pasangan Batu Bata 1 : 4 BAHAN : 30.0000 Bh. Batu Bata 800.00 24,000.00 6.0000 Kg. Semen 1,600.00 9,600.00 0.1200 M3 Pasir Pasang 250,000.00 30,000.00

TENAGA : 0.0150 OH Mandor 130,000.00 1,950.00 0.0100 OH Kepala Tukang 125,000.00 1,250.00 0.1000 OH Tukang 100,000.00 10,000.00 0.3200 OH Pekerja 90,000.00 28,800.00

Total 42,000.00 63,600.00 105,600.00

8 1 M2 Plesteran; Camp. 1 : 4 BAHAN : 6.2400 Kg. Semen 1,600.00 9,984.00 0.0240 M3 Pasir Pasang 250,000.00 6,000.00

TENAGA : 0.0100 OH Mandor 130,000.00 1,300.00 0.0150 OH Kepala Tukang 125,000.00 1,875.00 0.1500 OH Tukang 100,000.00 15,000.00 0.2000 OH Pekerja 90,000.00 18,000.00

Total 36,175.00 15,984.00 52,159.00

9 1 M2 Acian Semen BAHAN : 8.6800 Kg Semen 1,600.00 13,888.00

TENAGA : 0.0031 OH Mandor 130,000.00 403.00 0.0050 OH Kepala Tukang 125,000.00 625.00 0.0500 OH Tukang 100,000.00 5,000.00 0.0625 OH Pekerja 90,000.00 5,625.00

Total 11,653.00 13,888.00 25,541.00

10 1 M2 Pasangan Lantai Keramik 40 x 40 BAHAN : 1.0000 M2 Keramik 40 x 40 cm 69,000.00 69,000.00 8.1900 Kg. Semen 1,600.00 13,104.00 0.0450 M3 Pasir Pasang 250,000.00 11,250.00 1.5000 Kg. Semen Warna 1,500.00 2,250.00

TENAGA : 0.0300 OH Mandor 130,000.00 3,900.00 0.0350 OH Kepala Tukang 125,000.00 4,375.00 0.3500 OH Tukang 100,000.00 35,000.00 0.6200 OH Pekerja 90,000.00 55,800.00

Total 99,075.00 95,604.00 194,679.00

11 1 M2 Pasangan Lantai Keramik 20 x 20 BAHAN : 1.0000 M2 Keramik 20 x 20 cm 28,000.00 28,000.00 11.3800 Kg. Semen 1,600.00 18,208.00 0.0420 M3 Pasir Pasang 250,000.00 10,500.00 1.5000 Kg. Semen Warna 1,500.00 2,250.00

TENAGA : 0.0300 OH Mandor 130,000.00 3,900.00 0.0350 OH Kepala Tukang 125,000.00 4,375.00 0.3500 OH Tukang 100,000.00 35,000.00 0.6200 OH Pekerja 90,000.00 55,800.00

Total 99,075.00 58,958.00 158,033.00

Page 6: Rumah Tinggal Tenggarong

Nomor Jenis Pekerjaan Harga Satuan Biaya Upah Biaya Bahan Jumlah Harga

( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) 1 2 3 4 5 6

12 1 M2 Pasangan Lantai Keramik 30 x 30 BAHAN : 1.0000 M2 Keramik 30 x 30 cm 51,000.00 51,000.00 11.3800 Kg. Semen 1,600.00 18,208.00 0.0420 M3 Pasir Pasang 250,000.00 10,500.00 1.5000 Kg. Semen Warna 1,500.00 2,250.00

TENAGA : 0.0300 OH Mandor 130,000.00 3,900.00 0.0350 OH Kepala Tukang 125,000.00 4,375.00 0.3500 OH Tukang 100,000.00 35,000.00 0.6200 OH Pekerja 90,000.00 55,800.00

Total 99,075.00 81,958.00 181,033.00 12 1 M2 Pasangan Lantai Keramik 20 x 25

BAHAN : 1.0000 M2 Keramik 20 x 25 cm 38,000.00 38,000.00 11.3800 Kg. Semen 1,600.00 18,208.00 0.0420 M3 Pasir Pasang 250,000.00 10,500.00 1.5000 Kg. Semen Warna 1,500.00 2,250.00

TENAGA : 0.0300 OH Mandor 130,000.00 3,900.00 0.0350 OH Kepala Tukang 125,000.00 4,375.00 0.3500 OH Tukang 100,000.00 35,000.00 0.6200 OH Pekerja 90,000.00 55,800.00

Total 99,075.00 68,958.00 168,033.00

13 1 M' Pasangan Plint Keramik 10 x 30 cm BAHAN : 3.5300 M2 Keramik Plint artistik 10x30 cm 22,000.00 77,660.00 1.1400 Kg. Semen 1,600.00 1,824.00 0.0030 M3 Pasir Pasang 250,000.00 750.00 0.1000 Kg. Semen Warna 1,500.00 150.00

TENAGA : 0.0050 OH Mandor 130,000.00 650.00 0.0090 OH Kepala Tukang 125,000.00 1,125.00 0.0900 OH Tukang 100,000.00 9,000.00 0.0900 OH Pekerja 90,000.00 8,100.00

Total 18,875.00 80,384.00 99,259.00

14 1 M3 Beton Cor; Camp. 1 : 3 : 5 BAHAN : 0.8700 M3 Koral Beton 500,000.00 435,000.00 218.0000 Kg Semen 1,600.00 348,800.00 0.5200 M3 Pasir beton 500,000.00 260,000.00

TENAGA : 0.0800 OH Mandor 130,000.00 10,400.00 0.0250 OH Kepala Tukang 125,000.00 3,125.00 0.2500 OH Tukang 100,000.00 25,000.00 1.6500 OH Pekerja 90,000.00 148,500.00

Total 187,025.00 1,043,800.00 1,230,825.00

15.a. 1 M3 Beton Cor; Camp. 1 : 2 : 3 BAHAN : 0.8100 M3 Koral Beton 500,000.00 405,000.00 336.0000 Kg Semen 1,600.00 537,600.00 0.5400 M3 Pasir beton 500,000.00 270,000.00

TENAGA : 1.0000 OH Mandor 130,000.00 130,000.00 0.0350 OH Kepala Tukang 125,000.00 4,375.00 0.3500 OH Tukang 100,000.00 35,000.00 2.0000 OH Pekerja 90,000.00 180,000.00

Total 349,375.00 1,212,600.00 1,561,975.00

15.b. Tulangan Besi Beton polos 100 kg Mengerjakan Besi Beton (110 kg besi terhitung 10% Besi-besi hilang) BAHAN : 105.0000 Kg Besi Beton 20,000.00 2,100,000.00 0.1500 Kg Kawat Bendrat 16,000.00 2,400.00

TENAGA : 0.0003 OH Mandor 130,000.00 39.00 0.0007 OH Kepala Tukang 125,000.00 87.50 0.0070 OH Tukang 100,000.00 700.00 0.0070 OH Pekerja 90,000.00 630.00

Total 1,456.50 2,102,400.00 2,103,856.50

Page 7: Rumah Tinggal Tenggarong

Nomor Jenis Pekerjaan Harga Satuan Biaya Upah Biaya Bahan Jumlah Harga

( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) 1 2 3 4 5 6

15.c. 1 M2 Cetakan (begesting) Beton diperlukan BAHAN : 0.0450 M3 Kayu Meranti 2,071,000.00 93,195.00 0.3000 Kg Paku 20,000.00 6,000.00

TENAGA : 0.0060 OH Mandor 130,000.00 780.00 0.0330 OH Kepala Tukang 125,000.00 4,125.00 0.3300 OH Tukang 100,000.00 33,000.00 0.3000 OH Pekerja 90,000.00 27,000.00

Total 64,905.00 99,195.00 164,100.00

15.d. 100 Kg Memasang dan Menempatkan Besi Beton TENAGA : 0.5000 OH Tukang 100,000.00 50,000.00 2.0000 OH Pekerja 90,000.00 180,000.00

Total 230,000.00 - 230,000.00

15.e. 1 M3 Beton cor 1 : 2 : 3 dengan pembesian 100 kg tanpa penyokong begesting 1.0000 15.a. Beton Cor 1,561,975.00 1,561,975.00 1.0000 15.b. Besi Tulangan 2,103,856.50 2,103,856.50 10.0000 15.c. Begesting 164,100.00 1,641,000.00 1.0000 15.d. Memasang Besi 230,000.00 230,000.00

Total 5,536,831.50 - 5,536,831.50

16 1 M' Pasang List plafond BAHAN : 1.0500 M' Gyp 30,000.00 31,500.00

TENAGA : 0.0010 OH Mandor 130,000.00 130.00 0.0020 OH Kepala Tukang 125,000.00 250.00 0.0210 OH Tukang 100,000.00 2,100.00 0.0210 OH Pekerja 90,000.00 1,890.00

Total 4,370.00 31,500.00 35,870.00 22 1 M2 Memasang atap multiroof

BAHAN : 1.0200 M2 Multiroof 120,000.00 122,400.00 0.0200 Kg Paku 20,000.00 400.00

TENAGA : 0.0010 OH Mandor 130,000.00 130.00 0.0100 OH Kepala Tukang 125,000.00 1,250.00 0.1000 OH Tukang 100,000.00 10,000.00 0.2000 OH Pekerja 90,000.00 18,000.00

Total 29,380.00 122,800.00 152,180.00

23 1 M' Memasang Bubungan metal BAHAN : 1.1000 Bh. Bubungan metal 24,000.00 26,400.00 0.0500 Kg Paku 20,000.00 1,000.00

TENAGA : 0.0130 OH Mandor 130,000.00 1,690.00 0.0150 OH Kepala Tukang 125,000.00 1,875.00 0.1500 OH Tukang 100,000.00 15,000.00 0.2500 OH Pekerja 90,000.00 22,500.00

Total 41,065.00 27,400.00 68,465.00

24 1 M2 Penutup Plafond BAHAN : 0.3750 Lbr Calsiboard 78,000.00 29,250.00 0.0300 Kg. Paku 20,000.00 600.00

TENAGA : 0.0040 OH Mandor 130,000.00 520.00 0.0100 OH Kepala Tukang 125,000.00 1,250.00 0.1000 OH Tukang 100,000.00 10,000.00 0.0700 OH Pekerja 90,000.00 6,300.00

Total 18,070.00 29,850.00 47,920.00

Page 8: Rumah Tinggal Tenggarong

Nomor Jenis Pekerjaan Harga Satuan Biaya Upah Biaya Bahan Jumlah Harga

( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) 1 2 3 4 5 6

25 1 M3 Mengerjakan Kusen Pintu & Jendela BAHAN : 1.1000 M3 Kayu Bengkirai 2,750,000.00 3,025,000.00 1.2500 Kg Paku 20,000.00 25,000.00

TENAGA : 0.3000 OH Mandor 130,000.00 39,000.00 2.0000 OH Kepala Tukang Kayu 125,000.00 250,000.00 20.0000 OH Tukang Kayu 100,000.00 2,000,000.00 6.0000 OH Pekerja 90,000.00 540,000.00

Total 2,829,000.00 3,050,000.00 5,879,000.00 26 Pancang Ulin 10/10-2m dilancipkan & ditumbuk

BAHAN : 0.0210 M3 Balok ulin 10/10 4,350,000.00 91,350.00

TENAGA : 0.0260 OH Mandor 130,000.00 3,380.00 0.0290 OH Kepala Tukang Kayu 125,000.00 3,625.00 0.2900 OH Tukang Kayu 100,000.00 29,000.00 0.5000 OH Pekerja 90,000.00 45,000.00

Total 81,005.00 91,350.00 172,355.00 27 1 M' Papan Listplank 2,5 cm

BAHAN : 0.0070 M3 Kayu papan Listplank 2,017,000.00 14,119.00 0.0500 Kg Paku 20,000.00 1,000.00

TENAGA : 0.0050 OH Mandor 130,000.00 650.00 0.0220 OH Kepala Tukang Kayu 125,000.00 2,750.00 0.2200 OH Tukang Kayu 100,000.00 22,000.00 0.1000 OH Pekerja 90,000.00 9,000.00

Total 34,400.00 15,119.00 49,519.00 28 1 M2 Rangka Plafond

BAHAN : 0.0120 M3 Kayu Kapur 2,350,000.00 28,200.00 0.1000 Kg. Paku 20,000.00 2,000.00

TENAGA : 0.0750 OH Mandor 130,000.00 9,750.00 0.0250 OH Kepala Tukang 125,000.00 3,125.00 0.2500 OH Tukang 100,000.00 25,000.00 0.1500 OH Pekerja 90,000.00 13,500.00

Total 51,375.00 30,200.00 81,575.00

29 1 M2 Pengecatan Dinding Baru 1x plamir, 1x cat dasar, 2x cat penutup BAHAN : 0.3600 Kg. Cat Tembok Paragon 35,000.00 12,600.00 0.1000 Kg. Plamir 24,000.00 2,400.00 1.0000 Lbr. Kertas gosok 4,800.00 4,800.00

TENAGA : 0.0030 OH Mandor 130,000.00 390.00 0.0063 OH Kepala Tukang 125,000.00 787.50 0.0630 OH Tukang 100,000.00 6,300.00 0.0200 OH Pekerja 90,000.00 1,800.00

Total 9,277.50 19,800.00 29,077.50

30 1 M2 Mengecat Plafond Plywood BAHAN : 0.3700 Kg. Cat Paragon 35,000.00 12,950.00 1.0000 Lbr. Kertas gosok 4,800.00 4,800.00

TENAGA : 0.0080 OH Mandor 130,000.00 1,040.00 0.0250 OH Kepala Tukang 125,000.00 3,125.00 0.0230 OH Tukang 100,000.00 2,300.00 0.1500 OH Pekerja 90,000.00 13,500.00

Total 19,965.00 17,750.00 37,715.00

Page 9: Rumah Tinggal Tenggarong

Nomor Jenis Pekerjaan Harga Satuan Biaya Upah Biaya Bahan Jumlah Harga

( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) 1 2 3 4 5 6

31 1 M2 Pengecatan 1x cat dasar, 2x cat penutup BAHAN : 0.2600 Kg. Cat Minyak 32,000.00 8,320.00 0.1700 Kg. Cat dasar kayu 26,000.00 4,420.00 0.1500 Kg. Plamir 24,000.00 3,600.00 0.2000 Kg. Cat Meni 28,000.00 5,600.00 1.0000 Lbr. Kertas gosok 4,800.00 4,800.00

TENAGA : 0.0030 OH Mandor 130,000.00 390.00 0.0060 OH Kepala Tukang 125,000.00 750.00 0.0090 OH Tukang 100,000.00 900.00 0.0700 OH Pekerja 90,000.00 6,300.00

Total 8,340.00 26,740.00 35,080.00

32 1 M' Pasang PVC Dia. 2" BAHAN : 1.2000 M' Pipa PVC Dia. 2" 56,000.00 67,200.00 0.3500 Hrg Perlengkapan 56,000.00 19,600.00

TENAGA : 0.0030 OH Mandor 130,000.00 390.00 0.0090 OH Kepala Tukang 125,000.00 1,125.00 0.0900 OH Tukang 100,000.00 9,000.00 0.0540 OH Pekerja 90,000.00 4,860.00

Total 15,375.00 86,800.00 102,175.00

33 1 M' Pasang PVC Dia. 4" BAHAN : 1.2000 M' Pipa PVC Dia. 4" 87,000.00 104,400.00 0.3500 Hrg Perlengkapan 87,000.00 30,450.00

TENAGA : 0.0041 OH Mandor 130,000.00 533.00 0.0135 OH Kepala Tukang 125,000.00 1,687.50 0.1350 OH Tukang 100,000.00 13,500.00 0.0810 OH Pekerja 90,000.00 7,290.00

Total 23,010.50 134,850.00 157,860.50

34 1 M' Pasang PVC Dia. 3/4" BAHAN : 1.2000 M' Pipa PVC Dia. 3/4" 18,000.00 21,600.00 0.3500 Hrg Perlengkapan 6,300.00 2,205.00

TENAGA : 0.0018 OH Mandor 130,000.00 234.00 0.0060 OH Kepala Tukang 125,000.00 750.00 0.0600 OH Tukang 100,000.00 6,000.00 0.0360 OH Pekerja 90,000.00 3,240.00

Total 10,224.00 23,805.00 34,029.00

35 1 M' Pasang PVC Dia. 1/2" BAHAN : 1.2000 M' Pipa PVC Dia. 1/2" 18,000.00 21,600.00 0.3500 Hrg Perlengkapan 6,300.00 2,205.00

TENAGA : 0.0018 OH Mandor 130,000.00 234.00 0.0060 OH Kepala Tukang 125,000.00 750.00 0.0600 OH Tukang 100,000.00 6,000.00 0.0360 OH Pekerja 90,000.00 3,240.00

Total 10,224.00 23,805.00 34,029.00

36 1 Buah Pasang Kran Air BAHAN : 1.0000 Bh. Kran Air Standar 42,000.00 42,000.00 0.0250 Bh. Seal tape 4,000.00 100.00

TENAGA : 0.0050 OH Mandor 130,000.00 650.00 0.0100 OH Kepala Tukang 125,000.00 1,250.00 0.1000 OH Tukang 100,000.00 10,000.00 0.0100 OH Pekerja 90,000.00 900.00

Total 12,800.00 42,100.00 54,900.00

Page 10: Rumah Tinggal Tenggarong

Nomor Jenis Pekerjaan Harga Satuan Biaya Upah Biaya Bahan Jumlah Harga

( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) 1 2 3 4 5 6

1 Buah Pasang Closed Duduk BAHAN :

37 1.0000 Bh. Closed duduk 760,000.00 760,000.00 6.0000 Kg. Semen 1,600.00 9,600.00 7.0000 Bh. Batu bata 800.00 5,600.00 0.0100 M3 Pasir pasang 250,000.00 2,500.00

TENAGA : 0.1100 OH Mandor 130,000.00 14,300.00 0.3000 OH Kepala Tukang 125,000.00 37,500.00 1.5000 OH Tukang 100,000.00 150,000.00

38 1.0000 OH Pekerja 90,000.00 90,000.00 Total 291,800.00 777,700.00 1,069,500.00

1 Buah Pasang Stop kontak 1 Phasa BAHAN : 1.0000 Bh Stop kontak 48,000.00 48,000.00 12.0000 M' Instalasi Kabel NYY 3 x 2,5 mm 10,000.00 120,000.00

TENAGA : 1.0000 OH Tukang 100,000.00 100,000.00 1 Bh Pasang Kait angin BAHAN : 1.0000 Bh. Kait Angin 11,000.00 11,000.00

TENAGA : 0.0075 OH Mandor 130,000.00 975.00 0.0150 OH Kepala Tukang 125,000.00 1,875.00 0.1500 OH Tukang 100,000.00 15,000.00 0.0150 OH Pekerja 90,000.00 1,350.00

Total 19,200.00 11,000.00 30,200.00 39

1 Bh Pasang Kunci slot BAHAN : 1.0000 Bh. Kunci slot 12,000.00 12,000.00

TENAGA : 0.0010 OH Mandor 130,000.00 130.00 0.0200 OH Kepala Tukang 125,000.00 2,500.00 0.2000 OH Tukang 100,000.00 20,000.00 0.0200 OH Pekerja 90,000.00 1,800.00

Total 24,430.00 12,000.00 36,430.00

40 1 Bh Pasang Kunci Tanam Biasa BAHAN : 1.0000 Bh. Kunci tanam biasa 22,000.00 22,000.00

TENAGA : 0.0050 OH Mandor 130,000.00 650.00 0.0100 OH Kepala Tukang Kayu 125,000.00 1,250.00 0.5000 OH Kepala Tukang Kayu 100,000.00 50,000.00 0.0100 OH Kepala Tukang Kayu 90,000.00 900.00

Total 52,800.00 22,000.00 74,800.00

Page 11: Rumah Tinggal Tenggarong

Nomor Jenis Pekerjaan Harga Satuan Biaya Upah Biaya Bahan Jumlah Harga

( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) 1 2 3 4 5 6

41 1 Bh Pasang Engsel Pintu BAHAN : 1.0000 Bh. Engsel Pintu 18,000.00 18,000.00

TENAGA : 0.0008 OH Mandor 130,000.00 104.00 0.0150 OH Kepala Tukang Kayu 125,000.00 1,875.00 0.1500 OH Tukang Kayu 100,000.00 15,000.00 0.0150 OH Pekerja 90,000.00 1,350.00

Total 18,329.00 18,000.00 36,329.00

42 1 Bh Pasang Engsel Jendela BAHAN : 1.0000 Bh. Engsel Jendela 14,000.00 14,000.00

TENAGA : 0.0005 OH Mandor 130,000.00 65.00 0.0100 OH Kepala Tukang Kayu 125,000.00 1,250.00 1.0000 OH Tukang Kayu 100,000.00 100,000.00 0.0100 OH Pekerja 90,000.00 900.00

Total 102,215.00 14,000.00 116,215.00

43 1 Bh Pasang Handle Jendela BAHAN : 1.0000 Bh. Handle Jendela 9,000.00 9,000.00

TENAGA : 0.0010 OH Mandor 130,000.00 130.00 0.0200 OH Kepala Tukang Kayu 125,000.00 2,500.00 0.2000 OH Tukang Kayu 100,000.00 20,000.00 0.0200 OH Pekerja 90,000.00 1,800.00

Total 24,430.00 9,000.00 33,430.00

Page 12: Rumah Tinggal Tenggarong

DAFTAR HARGA SATUAN UPAH TENAGA

KEGIATAN : PEMBANGUNAN RUMAH TINGGAL PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL LOKASI : TENGGARONG SEBERANG TAHUN ANGGARAN : 2013

Nomor Jenis Tenaga SatuanHarga Satuan

( Rp. )

1 2 3 4

1 Mandor OH 130,000.00 2 Kepala Tukang Kayu OH 125,000.00 3 Tukang Kayu OH 100,000.00 4 Kepala Tukang Batu OH 125,000.00 5 Tukang Batu OH 100,000.00 6 Kepala Tukang Besi OH 125,000.00 7 Tukang Besi OH 100,000.00 8 Tukang Listrik OH 125,000.00 9 Pekerja OH 90,000.00

Page 13: Rumah Tinggal Tenggarong

DAFTAR HARGA SATUAN BAHAN

KEGIATAN : PEMBANGUNAN RUMAH TINGGAL PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL LOKASI : TENGGARONG SEBERANG TAHUN ANGGARAN : 2013

Nomor Jenis Bahan SatuanHarga Satuan

( Rp. )

1 2 3 4

1 Tanah Urug M3 40,000.00 2 Batu Gunung M3 250,000.00 3 Koral beton M3 500,000.00 4 Pasir Urug M3 130,000.00 5 Pasir Beton M3 500,000.00 6 Pasir Pasang M3 250,000.00 7 Batu Bata Bh. 800.00 8 Semen @ 50 kg Zak. 80,000.00 9 Semen Kg. 1,600.00

10 Semen Warna Kg. 1,500.00 11 Besi tulangan Kg. 20,000.00 12 Kawat Bendrat Kg. 16,000.00 13 Minyak Begesting Ltr. 18,500.00 14 Paku Kg. 20,000.00 15 Papan Kayu Meranti M3 2,071,000.00 16 Balok Kayu Meranti M3 2,500,000.00 17 Balok Kayu Borneo M3 2,400,000.00 18 Papan Kayu Bengkirai M3 2,017,000.00 19 Balok Kayu Bengkirai M3 2,750,000.00 20 Papan Kayu Ulin M3 3,500,000.00 21 Balok Kayu Ulin M3 4,350,000.00 22 Papan Kayu Kapur M3 2,100,000.00 23 Balok Kayu Kapur M3 2,350,000.00 24 Calsiboard Lbr 78,000.00 25 Plywood 9 mm Lbr 128,000.00 26 Atap Metal M2 58,000.00 27 Bubungan Metal M1 24,000.00 28 Stop Kontak 1 Phasa Bh. 48,000.00 29 Lampu Softigt Philip 18 watt Bh. 38,000.00 30 Saklar ganda Bh. 48,000.00 31 Saklar tunggal Bh. 48,000.00 32 Box Panel + MCB 3 group Bh. 350,000.00 33 Instalasi + Kabel NYY 3 x 2,5 mm Bh. 10,000.00 34 Isolasi Bh. 2,500.00 35 Cat Tembok Kg. 35,000.00 36 Cat Minyak Kg. 32,000.00 37 Plamir Tembok Kg. 24,000.00 38 Plamir Kayu Kg. 24,000.00 39 Cat dasar minyak/air Kg. 26,000.00 40 Cat Meni Kg. 28,000.00 41 Kertas gosok Lbr 4,800.00

Page 14: Rumah Tinggal Tenggarong

Nomor Jenis Bahan SatuanHarga Satuan

( Rp. )

1 2 3 4

42 Pipa PVC 2" M' 56,000.00 43 Pipa PVC 4" M' 87,000.00 44 Pipa PVC 3/4" M' 18,000.00 45 Pipa PVC 1/2" M' 18,000.00 46 Kran air standard Bh. 42,000.00 47 Seal tape Bh. 4,000.00 48 Klosed duduk Bh. 760,000.00 49 Keramik 40 x 40 M2 69,000.00 50 Keramik 10 x 30 M2 22,000.00 51 Keramik 20 x 20 M2 28,000.00 52 Keramik 30 x 30 M2 51,000.00 53 Keramik 20 x 25 M2 38,000.00 54 Profil Gyp M' 30,000.00 55 Kaca M2 86,000.00 56 Kunci Tanam Bh. 22,000.00 57 engsel Pintu Bh. 18,000.00 58 Engsel jendela Bh. 14,000.00 59 kait angin Bh. 11,000.00 60 Kunci slot Bh. 12,000.00 60 Seng Bh. 120,000.00

Page 15: Rumah Tinggal Tenggarong

JADWAL PELAKSANAAN PEKERJAAN

KEGIATAN : PEMBANGUNAN RUMAH TINGGAL PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL LOKASI : TENGGARONG SEBERANG TAHUN ANGGARAN : 2013 NO.

U R A I A N JUMLAH BOBOT TAHUN 2010

BAB. HARGA ( % ) BULAN 1 BULAN 2 BULAN 3 ( Rp. ) MG 1 MG 2 MG 3 MG 4 MG 5 MG 6 MG 7 MG 8 MG 9 MG 10 MG 11 MG 12

A PEKERJAAN PERSIAPAN 9,888,677.00 #REF! 0.50 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

B PEKERJAAN TANAH 6,031,583.36 #REF! #REF!

C PEKERJAAN PASANGAN 84,975,371.50 #REF! #REF! #REF! #REF!

D PEKERJAAN BETON 83,588,208.53 #REF! #REF! #REF!

E PEKERJAAN LANTAI 32,365,840.45 #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

F PEKERJAAN PINTU DAN JENDELA 37,104,932.27 #REF! #REF! #REF! #REF! #REF!

G PEKERJAAN ATAP 35,563,996.60 #REF! #REF! #REF! #REF!

I PEKERJAAN CAT-CATAN 19,137,394.80 #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

J PEKERJAAN INSTALASI LISTRIK 11,009,500.00 #REF! #REF!

K PEKERJAAN SANITAIR 5,473,352.00 #REF! #REF!

L PEKERJAAN SEPTICKTANK 2,500,000.00 #REF! #REF! #REF!

A. JUMLAH #REF! #REF! B. KEMAJUAN RENCANA MINGGUAN 0.50 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! C. KOMULATIF KEMAJUAN RENCANA 0.50 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! D. KEMAJUAN MINGGUAN ACTUAL E. KOMULATIF KEMAJUAN ACTUAL F. DEVIASI

SANGATTA , 13 JULI 2010 DIBUAT OLEH :

CV. ANDIKA ALBANJARI

Page 16: Rumah Tinggal Tenggarong

H. BARSANI DIREKTUR

Page 17: Rumah Tinggal Tenggarong

METHODE PELAKSANAAN

A PEKERJAAN PERSIAPAN Meliputi pekerjaan : Pembersihan Lokasi

#REF!

B PEKERJAAN TANAH Meliputi pekerjaan : Urugan Tanah Dipadatkan

Urugan Pasir dibawah Lantai

C PEKERJAAN PASANGAN Meliputi pekerjaan : Pasangan Batu Bata tebal 1/2 bata; Camp 1 pc : 2 ps

Plesteran

D PEKERJAAN BETON Meliputi pekerjaan : #REF!

#REF!

E PEKERJAAN LANTAI Meliputi pekerjaan : Pasang Lantai Keramik 40 x 40

#REF!#REF!

Pasang Lantai Keramik 20 x 20 Pasang Dinding Keramik Kamar Mandi 20 x 25

### #REF! Meliputi pekerjaan : #REF!

#REF!#REF!#REF!#REF!

F PEKERJAAN PINTU DAN JENDELA Meliputi pekerjaan : #REF!

#REF! Mengerjakan Kusen Pintu dan Jendela Papan Listplank 2,5 cm

#REF!#REF!

Penutup plafond Rangka Plafond List Plafond Gypsum

#REF!

G PEKERJAAN ATAP Meliputi pekerjaan : Atap Genteng Metal

#REF!

I PEKERJAAN CAT-CATAN Meliputi pekerjaan : Mengecat Tembok, 1 x plamir, 2 x Mengecat

Mengecat plafond #REF!

### #REF! Meliputi pekerjaan : #REF!

#REF!#REF!#REF!#REF!#REF!

Page 18: Rumah Tinggal Tenggarong

#REF!

Page 19: Rumah Tinggal Tenggarong

J PEKERJAAN INSTALASI LISTRIK Meliputi pekerjaan : Stop Kontak

Lampu Phillips Saklar Box Panel + MCB 3 group

K PEKERJAAN SANITAIR Meliputi pekerjaan : Memasang Pipa PVC 3"

Memasang Pipa PVC 4" #REF!

Memasang Pipa PVC 3/4" Memasang kran pancar Memasang closed jongkok

L PEKERJAAN SEPTICKTANK Meliputi pekerjaan : #REF!

#REF!#REF!#REF!#REF!

Methode : Survey, pengukuran kemudian bouwplank merupaka tahap awal dalam pelaksanaan konstruksi untuk identitas pekerjaan ini perlu dipasang papan nama proyek. Setelah tahap diatas kemudian dilanjutkan pekerjaan konstruksi bawah bangunan dilanjutkan bangunan atas dan atap.

SANGATTA , 13 JULI 2010 DIBUAT OLEH :

CV. ANDIKA ALBANJARI

H. BARSANI DIREKTUR