     PROGRAM : PEMBANGUNAN JALAN DAN JEMBATAN

     KEGIATAN : PEMBANGUNAN JEMBATAN

     PEKERJAAN : PAKET I (SATU) PENGGANTIAN JEMBATAN KABUPATEN (DAK REGULER SPP JALAN)

    PENGGANTIAN JEMBATAN MEKARSARI

     LOKASI : KECAMATAN NARMADA BENTANG : 10.00 M

     TAHUN ANGGARAN : 2016

    JUMLAH

    HARGA (Rp.)

    1  SEKSI I UMUM

    2  SEKSI II PEKERJAAN DRAINASE

    3  SEKSI III PEKERJAAN TANAH

    4  SEKSI IV PEKERJAAN LAPIS PONDASI

    5  SEKSI V PEKERJAAN LAPIS PERMUKAAN

    6  SEKSI VI PEKERJAAN KONSTRUKSI

    7  SEKSI VII PEKERJAAN LAIN-LAIN

    TOTAL HARGA

    PPN 10 %

    TOTAL JUMLAH

    TOTAL PEMBULATAN

    Dengan Huruf : …………………………………………………………………….

    ………………….., …... ………………. 20…..

    PT./CV./Firma/Koperasi

    ………………………………….

    Nama Jelas

    Jabatan

    REK PITUL SI RENC N NGG R N BI Y

    NOMOR URAIAN PEKERJAAN

  • 8/16/2019 Rab Jembatan Mekarsari

    2/89

     PROGRAM : PEMBANGUNAN JALAN DAN JEMBATAN

     KEGIATAN : PEMBANGUNAN JEMBATAN

     PEKERJAAN : PAKET I (SATU) PENGGANTIAN JEMBATAN KABUPATEN (DAK REGULER SPP JALAN)

    PENGGANTIAN JEMBATAN MEKARSARI

     LOKASI : KECAMATAN NARMADA

     BENTANG : 10.00 M

     TAHUN ANGGARAN : 2016

    Mata No. Harga Sat. Jumlah Harga

    Pemb. Anal. Rp. Rp.

    I. PEKERJAAN UMUM

    1.1.1. Mobilisasi Pkt

    II. PEKERJAAN DRAINASE

    2.1.1. K.110 Galian saluran & kanal tanah m3

    2.1.2. K.112 Pasangan batu saluran m3

    III. PEKERJAAN TANAH3.1.1. K.320 Galian biasa m3

    3.1.2. 1.5xK.320  Galian batu/Bongkaran Beton dan Pas. Batu m3 1,000.51

    3.1.3. K.224 Galian tanah biasa untuk kontruksi m3 452.45

    3.1.4. K.225 Urugan dan Pemadatan m3 36.90

    3.1.5. K.225a Urugan dan Pemadatan bekas Galian (kepadatan 95%) m3 339.63

    3.1.6. K.342 Penyiapan tanah dasar m2 605.51

    3.1.7. K.410 Pembentukan bahu jalan m3

    IV. PEKERJAAN LAPIS PONDASI

    5.1.1. K.513 Lapis pondasi bawah klas B m3 7.31

    5.1.2. K.515 Lapis pondasi bawah klas C m3

    5.1.3. K.521 Lapis pondasi Atas klas A m3

    5.1.4. K.523 Lapis pondasi Atas klas B m3 7.31

    V. PEKERJAAN LAPIS PERMUKAAN6.3.1. K.615 Laburan aspal satu lapis ( BURTU ) m2

    6.3.2. K.617 Laburan aspal dua lapis ( BURDA ) m2

    6.3.3. K.618 Lapisan permukaan penetrasi m2 242.20

    6.3.4. K.636 Memasang Lataston ( HRS ) m2

    6.3.5. K.528 Memasang Aspal Beton Laston Atas (ATBL) Ton

    VI. KONSTRUKSI

    7.1.1. K.722 Beton Struktur Bangunan Atas K225 m3 48.80

    7.1.2. K.710 Acuan Beton Bangunan Atas (ketinggian rata-rata 8.5 m) m2 214.02

    7.1.3. K.715 Besi Tulangan Bangunan Atas Kg. 9,482.34

    7.1.4. K.722 Beton Struktur Bangunan Bawah K225 m3 191.20

    7.1.5. K.710 Acuan Beton Bangunan Bawah m2 506.87

    7.1.6. K.715 Besi Tulangan Bangunan Bawah Kg. 14,662.54

    7.1.7. K.720 Beton non-struktur (K175) m3 10.98

    7.1.8. K.810 Pasangan batu (termasuk plester/siar) m3 76.40

    7.1.9. 1.5 x K.710 Perancah Bangunan Atas (ketinggian rata-rata 8.5 m) m2 95.13

    7.2.0. Elastomer Bh 8.00

    VII. PEKERJAAN LAIN-LAIN

    8.1.1. M.163/6 Pengadaan Pipa Sandaran dan Pipa Drainase m' 90.94

    8.1.2. K.715a Pemasangan Pipa Sandaran dan Pipa Drainase kg 648.38

    J U M L A H

    PPN 10 %

    TOTAL JUMLAH

    TOTAL PEMBULATAN

    Jenis Pekerjaan Sat. Volume

    RENC N NGG R N BI Y

  • 8/16/2019 Rab Jembatan Mekarsari

    3/89

     SUB PEKERJAAN : I. PEKERJAAN UMUM

    NAMA JEMBATAN : JEMBATAN MEKARSARI

    Mata Nomor Harga Satuan Jumlah Harga

    Pemb. Analisa Rp. Rp.

    1.1.1. Mobilisasi Ls

    J U M L A H

    Jenis Pekerjaan Sat. Kuantitas

  • 8/16/2019 Rab Jembatan Mekarsari

    4/89

     SUB PEKERJAAN : II. PEKERJAAN DRAINASE

    NAMA JEMBATAN : JEMBATAN MEKARSARI

    Mata Nomor Harga Satuan Jumlah Harga

    Pemb. Analisa Rp. Rp.

    2.1.1. K.110 Galian saluran & kanal tanah m32.1.2. K.112 Pasangan batu saluran m3

    J U M L A H

    Jenis Pekerjaan Sat. Kuantitas

  • 8/16/2019 Rab Jembatan Mekarsari

    5/89

     SUB PEKERJAAN : III. PEKERJAAN TANAH

     NAMA JEMBATAN : JEMBATAN MEKARSARI

    Mata Nomor Harga Satuan Jumlah Harga

    Pemb. Analisa Rp. Rp.

    3.1.1. K.320 Galian biasa m33.1.2. 1.5xK.320 Galian batu/Bongkaran Beton dan Pas. Batu m3 1,000.51

    3.1.3. K.224 Galian tanah biasa untuk kontruksi m3 452.45

    3.1.4. K.225 Urugan dan Pemadatan m3 36.90

    3.1.5. K.225a Urugan dan Pemadatan bekas Galian (kepadatan 95%) m3 339.63

    3.1.6. K.342 Penyiapan tanah dasar m2 605.51

    3.1.7. K.410 Pembentukan bahu jalan m3

    J U M L A H

    Jenis Pekerjaan Sat. Kuantitas

  • 8/16/2019 Rab Jembatan Mekarsari

    6/89

     SUB PEKERJAAN : IV. PEKERJAAN LAPIS PONDASI

     NAMA JEMBATAN : JEMBATAN MEKARSARI

    Mata Nomor Harga Satuan Jumlah Harga

    Pemb. Analisa Rp. Rp.

    5.1.1. K.513 Lapis pondasi bawah klas B m3 7.315.1.2. K.515 Lapis pondasi bawah klas C m3

    5.1.3. K.521 Lapis pondasi Atas klas A m3

    5.1.4. K.523 Lapis pondasi Atas klas B m3 7.31

    J U M L A H

    Jenis Pekerjaan Sat. Kuantitas

  • 8/16/2019 Rab Jembatan Mekarsari

    7/89

     SUB PEKERJAAN : V. PEKERJAAN LAPIS PERMUKAAN

     NAMA JEMBATAN : JEMBATAN MEKARSARI

    Mata Nomor Harga Satuan Jumlah Harga

    Pemb. Analisa Rp. Rp.

    6.3.1. K.615 Laburan aspal satu lapis ( BURTU ) m26.3.2. K.617 Laburan aspal dua lapis ( BURDA ) m2

    6.3.3. K.618 Lapisan permukaan penetrasi m2 242.20

    6.3.4. K.636 Memasang Lataston ( HRS ) m2

    6.3.5. K.528 Memasang Aspal Beton Laston Atas (ATBL) Ton

    J U M L A H

    Jenis Pekerjaan Sat. Kuantitas

  • 8/16/2019 Rab Jembatan Mekarsari

    8/89

     SUB PEKERJAAN : VI. KONSTRUKSI

     NAMA JEMBATAN : JEMBATAN MEKARSARI

    Mata Nomor Harga Satuan Jumlah Harga

    Pemb. Analisa Rp. Rp.

    7.1.1. K.722 Beton Struktur Bangunan Atas K225 m3 48.807.1.2. K.710 Acuan Beton Bangunan Atas (ketinggian rata-rata 8.5 m) m2 214.02

    7.1.3. K.715 Besi Tulangan Bangunan Atas Kg. 9,482.34

    7.1.4. K.722 Beton Struktur Bangunan Bawah K225 m3 191.20

    7.1.5. K.710 Acuan Beton Bangunan Bawah m2 506.87

    7.1.6. K.715 Besi Tulangan Bangunan Bawah Kg. 14,662.54

    7.1.7. K.720 Beton non-struktur (K175) m3 10.98

    7.1.8. K.810 Pasangan batu (termasuk plester/siar) m3 76.40

    7.1.9. 1.5 x K.710 Perancah Bangunan Atas (ketinggian rata-rata 8.5 m) m2 95.13

    7.2.0. Elastomer Bh 8.00

    J U M L A H

    Jenis Pekerjaan Sat. Kuantitas

  • 8/16/2019 Rab Jembatan Mekarsari

    9/89

     SUB PEKERJAAN : VII. PEKERJAAN LAIN-LAIN

     NAMA JEMBATAN : JEMBATAN MEKARSARI

    Mata Nomor Harga Satuan Jumlah Harga

    Pemb. Analisa Rp. Rp.

    8.1.1. M.163/6 Pengadaan Pipa Sandaran dan Pipa Drainase m' 90.948.1.2. K.715a Pemasangan Pipa Sandaran dan Pipa Drainase kg 648.38

    J U M L A H

    Jenis Pekerjaan Sat. Kuantitas

  • 8/16/2019 Rab Jembatan Mekarsari

    10/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN PENGADAAN KERIKIL SUNGAI ( TIDAK DI SARING K.013

    LOKAL & KABUPATEN (MENGGUNAKAN BURUH)

    URAIAN ANGGAPAN/ASUMSI

     1. Truk diisi dengan tenaga manusia disungai 1. Menggu.tenaga manusia (60M3/hari) dlm kelompok 2. Truk mengangkut krkl kelokasi pek. penimbunan 2. muatan 5 truk perjam (1 M3/org/hari)

     3. Muatan dibongkar dengan tenaga manusia 3. Material dikirim kelokasi pekerjaan atau penimbunan

    4. Jarak angkut 10 km, 72 mnt per trip, 5 trip/hari/truk

     5. Pengambilan material dgn dipungut pembayaran ganti

    rugi royalti yang berlaku

     6. Volume yang diukur berdasarkan 3 T ( Lepas Bj = 1.5 )

     7. Penggunaan alat bantu rata-rata 1 set untuk 1 or/bln

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - Mandor 2 1 L.061 2 95,000.0 190,000.0

     - Sopir terampil 6 1 L.091 6 77,500.0 465,000.0

     - Buruh tak trampil 60 1 L.101 60 65,000.0 3,900,000.0

    SUB JUMLAH 4,555,000.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

      VOLUME SATUAN ( Rp ) ( Rp )

     - -- - . , . , , .

     - Alat bantu 2.50 Set M.170 300,000.0 750,000.0

      ( set @ 3 alat )

    SUB JUMLAH 10,950,000.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - truk bak terbuka 3.5 T 6 1 E.221 36 0.0 0.0

    SUB JUMLAH 0.00

    15,505,000.00

    VOLUME

    QUANTITY 60 M3 HARGA SATUAN 258,416.67 PER M3

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    11/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN PENGADAAN KERIKIL SUNGAI TERSARING K.016

    LOKAL & KABUPATEN ( MENGGUNAKAN ALAT )

    URAIAN ANGGAPAN/ASUMSI

     1. Buldozer menimbun stok disungai 1. Menggunakan alat berat (60 M3/hari)

     2. Loader mengangkat muatan truk 2. Wheel Loader mengisi 6 truk/jam ( 6 jam kerja )

     3. Kerikil disaring sesuai dengan ukuran 3. Pengangkutan pada jarak 10 km dari sumber.

     4. Dump truk mengkut kerikil sungai yang disaring 4. Pengambilan mtrl dipungut pembay.ganti rugi yg berlaku

      ke lokasi pekerjaan atau penimbunan 5. Vol. yg diukur berdasarkan 5 t/truk (lepas) BJ = 1,5

     6. 1.0 trip/jam/truk

     7. Penggunaan alat bantu rata-rata 1 set/1 orang/bulan

     8. Kpasitas screening. rata-rata 18 t/j, dgn ditambah

    bagian halus 20 % dan terjadi oversize 30 %

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 1 1 L.061 1 95,000.0 95,000.0

     - Operator Terampil 3 1 L.081 3 97,000.0 291,000.0

     - Operator Semi Terampil 1 1 L.082 1 71,500.0 71,500.0

     - Sopir terampil 4 1 L.091 4 77,500.0 310,000.0 - Buruh tak terampil 3 1 L.101 3 65,000.0 195,000.0

     - Buruh semi terampil 4 1 L.103 4 66,000.0 264,000.0

    SUB JUMLAH 1,226,500.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Kerikil sungai - Royalty 80.00 M3 MR.12 250,000.0 20,000,000.0

     - alat bantu 0.20 Set M.170 300,000.0 60,000.0

    SUB JUMLAH 20,060,000.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Buldozer 110 HP 1 1 E.001 3 0.0 0.0

     - Mesin Penyaring 80 HP 1 1 E.040 5 0.0 0.0

     - Wheel Loader 115 HP 1 1 E.052 6 0.0 0.0

     - Dump truk 5 ton 4 1 E.212 24 0.0 0.0

    SUB JUMLAH 0.00

    21,286,500.00

    VOLUME

    QUATITY 60 M3 HARGA SATUAN 354,775.00 PER M3

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    12/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN PRODUKSI KERIKIL PECAH TERSARING K.017

    LOKAL & KABUPATEN ( DENGAN ALAT )

    URAIAN ANGGAPAN/ASUMSI

     1. Buldozer membuat timbunan di pinggir sungai 1. Menggunakan alat berat (60 M3/hari),matrial diolah 2 x

     2. Whell Loader memuat ketruk yang membongkar 2. Krkl diambil dari sungai diangkut ketempat pemecah bt.

      batu ditempat penyaringan. 3. 33,3 bt lolos saringan pd mesin dng produksi 15 t/jam

     3. Batu over size dipecah dengan mesin 4. 70 % batu yang sudah dipecah dicampur kembali dgn

    4. Hasil pecahan batu dicampur kembali dgn batu batu dari sungai yang lolos saringan.

      dari sungai yang lolos saringan 5. Vol.yg diukur berdasarkan 5 T lepas/tr,1.0 trip/tr, bj=1,5

     8. Jarak kirim kelokasi pek.10 km 1 trip/jam.truk

     9. Umur alat bantu rata-rata 1 bln/orng/set

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 1 1 L.061 1 95,000.0 95,000.0

     - Operator Terampil 3 1 L.081 3 97,000.0 291,000.0

     - Pembantu semi operator 2 1 L.082 2 71,500.0 143,000.0

     - Sopir Terampil 4 1 L.091 4 77,500.0 310,000.0

     - Buruh tak terampil 4 1 L.101 4 65,000.0 260,000.0

     - Buruh semi terampil 4 1 L.103 4 66,000.0 264,000.0

    SUB JUMLAH 1,363,000.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Kerikil sungai - Royalty 80.00 M3 MR.12 250,000.0 20,000,000.0

     - Alat bantu set 3 alt 0.20 Set M.170 300 000.0 60 000.0  . . , . , .

    SUB JUMLAH 20,060,000.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Buldozer 110 HP 1 1 E.001 6 0.0 0.0

     - Alat Pemecah Batu 1 1 E.031 6 0.0 0.0

     - Wheel Loader 115 HP 1 1 E.052 6 0.0 0.0

     - Dump Truk 4 1 E.212 24 0.0 0.0

    SUB JUMLAH 0.00

    21,423,000.00

    VOLUME

    QUANTITY 60 M3 HARGA SATUAN 357,050.00 PER M3

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    13/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN MEMPRODUKSI CAMPURAN LATASIR K.020

    LOKAL & KABUPATEN (MENGGUNAKAN ALAT )

    URAIAN ANGGAPAN/ASUMSI

     1. Semua material dikirim oleh supplier ke AMP 1. LATASIR dihasilkan dari AMP produksi 100 ton/hari

     2. Wheel loader menjaga bin selalu penuh 2. Aspal dipanaskan agar tersedia pada waktunya

     3. Produksi mesin 100 Ton/hari 3. Hasil produksi termasuk pengangkutan 10 km dari AMP

     4. Hasil produksi diangkut dengan dump kelokasi 4. Hasil dimuat dump truk kap. 5 T & dikirim ketempat pek.

      pekerjaan 5. Rata-rata umur alat bantu,sebulan/orang per set

     6. Sesuai spesifikasi BM No. 12/PT/B/1983

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - Mandor 1 1 L.061 1 95,000.0 95,000.0

     - Mekanik terlatih 1 1 L.071 1 86,500.0 86,500.0

     - Buruh tak trampil 4 1 L.101 4 65,000.0 260,000.0

     - Operator terampil 2 1 L.081 2 97,000.0 194,000.0 - Sopir terampil 4 1 L.091 4 77,500.0 310,000.0

     - Buruh semi trampil 5 1 L.103 5 66,000.0 330,000.0

    SUB JUMLAH 1,275,500.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Pasir beton 45.00 M3 M.041 200,000.0 9,000,000.0 

    - Aspal 9,000.00 Kg M.061 13,000.0 117,000,000.0

     - Semen 70.40 50kg/zak M.080 68,000.0 4,787,200.0

     - Kapur 7.50 M3 M.081 10,500.0 78,750.0

    SUB JUMLAH 130,865,950.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Wheel loader 80 HP 1 1 E.052 5 0.0 0.0

     - Mesin Pencampur aspal 1 1 E.155 5 0.0 0.0

     - Dump truk ( 5 T ) 4 1 E.212 24 0.0 0.0

    SUB JUMLAH 0.00

    132,141,450.00

    VOLUME

    QUANTITY 100 M3 HARGA SATUAN 1,321,414.50 PER M3

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    14/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN MEMPRODUKSI CAMPURAN ASPAL BETON K.026

    LOKAL & KABUPATEN (LATASTON ATAS) (MENGGUNAKAN ALAT)

    URAIAN ANGGAPAN/ASUMSI

     1. Semua material dikirim pemasok 1. ATB dibuat di AMP produksi 100 ton/hari

     2. Loader menjaga bin tetap penuh 2. Dipakai agregat pecah tersaring

     3. produksi AMP 100 Ton/hari 3. Asp.dipanaskan lebih dulu agar asp.sudah siap dimulai

     4. Dimuat dengan dump truk ditutup terpal untuk 4. Biaya produksi termasuk pengangkutan sampai 10 km

      menjaga temperatur dari AMP

     5. Dimuat dlm dump truk 5 t dan dikirim ketempat pek.

     6. Rata-rata umur alat bantu 1 bulan (orang) set

     7. Spek.BM.No.03/PT/B/1983

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 2 1 L.061 2 95,000.0 190,000.0

     - Mekanik terlatih 1 1 L.071 1 86,500.0 86,500.0

     - Operator terlatih 4 1 L.081 4 97,000.0 388,000.0

     - Operator semi terlatih 3 1 L.082 3 71,500.0 214,500.0 - Sopir 6 1 L.091 6 77,500.0 465,000.0

     - Buruh tak terampil 7 1 L.101 7 65,000.0 455,000.0

     - Buruh semi terampil 7 1 L.103 7 66,000.0 462,000.0

    SUB JUMLAH 2,261,000.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Pasir beton 25.00 M3 M.041 200,000.0 5,000,000.0

     - A s p a l 5,900.00 Kg M.061 13,000.0 76,700,000.0

     - Alat bantu @ 3 set 0.20 Set M.170 300,000.0 60,000.0

     - Batu sungai pecah tersaring 47.00 M3 MR.12 250,000.0 11,750,000.0

    SUB JUMLAH 93,510,000.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Wheel Loader 80 HP 2 1 E.052 9 0.0 0.0

     - Mesin Pencampur aspal 1 1 E.155 5 0.0 0.0

     - Dump truk 5 ton - 68 HP 7 1 E.212 35 0.0 0.0

     - Bulldozer 110 HP 1 1 E.001 4 0.0 0.0

     - Pemecah batu 200 HP 1 1 E.031 4 0.0 0.0

    SUB JUMLAH 0.00

    95,771,000.00

    VOLUME

    QUANTITY 100.0 Ton 957,710.00 PER Ton

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    15/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN MEMPRODUKSI CAMPURAN ASPAL KODE

    SUB. DIT. PERENCANAAN JALAN BUTON AGREGAT ( LASBUTAG ) K.030

    LOKAL & KABUPATEN ( LASBUTAG ) ( MENGGUNAKAN BURUH )

    URAIAN ANGGAPAN/ASUMSI

     1. Asbuton ukuran besar dipecah dengan tenaga 1. Menggunakan tenaga manusia (30 ton/hari)

      manusia 2. Material dikirim kelokasi pencampuran

     2. Masukkan asbuton pilihan + minyak flux kedalam 3. Asbuton dipch dg tangan agar dpt melewati saringan 1 cm

      alat pencampur 4. Asbuton pilihan dicampur dg minyak flux atau minyak

    3. Bahan campuran tersebut disimpan dan dilindungi aspal lebih kurang 3 % dari vol.(20 l/t), waktu pencampuran

    4. Bahan campuran dimuat kedalam truk dan dikirim (satu kali pencampuran vol. 0,35 m3) adalah 10 menit.

      ketempat pekerjaan 5. Bahan camp. disimpan dan dilindungi selama 3 s/d 5 hari.

     6. Pengisisan ke truk dan pembongkaran dengan tenaga

    tenaga manusia sejauh 10 km

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 1 1 L.061 1 95,000.0 95,000.0

     - Operator semi Terampil 2 1 L.082 2 71,500.0 143,000.0

     - Sopir Terampil 2 1 L.091 2 77,500.0 155,000.0

     - Buruh tak terampil 25 1 L.101 25 65,000.0 1,625,000.0 - Buruh semi terampil 2 1 L.103 2 66,000.0 132,000.0

    SUB JUMLAH 2,150,000.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Pasir ayak utk beton 8.00 M3 M.041 200,000.0 1,600,000.0

     - Batu pecah 1-2 cm 6.00 M3 M.025 412,000.0 2,472,000.0

     - Aspal 600.00 kg M.061 13,000.0 7,800,000.0

     - Asbuton 6.00 tonne M.062 2,000,000.0 12,000,000.0

     - Minysk flux 600.00 ltr M.063 4,600.0 2,760,000.0

     - Minyak bakar 300.00 ltr M.065 15,000.0 4,500,000.0

     - Alat bantu 1.00 Set M.170 300,000.0 300,000.0

    SUB JUMLAH 31,432,000.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Dump truk 3,5 ton 2 1 E.211 10 0.0 0.0

     - Pengaduk beton 2 1 E.253 5 0.0 0.0

      (0.5 Ltr/20 Hp)

    SUB JUMLAH 0.00

    33,582,000.00

    VOLUME

    QUANTITY 30 Ton 1,119,400.00 PER Ton

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    16/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN LAPIS TIPIS ASPAL BETON (LATASTON) PRO- K.035

    LOKAL & KABUPATEN DUKSI & SUPLAI (MENGGUNAKAN ALAT)

    URAIAN ANGGAPAN/ASUMSI

     1. Semua material dikirim pemasok 1. HRS dibuat di AMP produksi 100 Ton/hari

     2. Loader menjaga bin tetap penuh 2. Dipakai agregat pecah tersaring

     3. Produksi AMP 100 Ton/har 3. Aspal dipanaskan duluan agar siap pada waktunya

     4. Dump truk dimuati dan ditutup terpal untuk 4. Biaya produksi termasuk pengangkutan sejauh 10 km dari AMP

      mempertahankan suhu 5. Produksi dimuat dengan truk 5 ton, diantar ketempat pekerjaan

     5. Dump truk membongkar langsung kedalam mesin 6. Umur alat2 bantu rata 1 bln/orang/set

    penghampar aspal 7. Spek BM.No.12/PT/B/1983 & Rev.spek.Umum ( tabel 3.3 )

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 1 1 L.061 1 95,000.0 95,000.0

     - Mekanik terlatih 1 1 L.071 1 86,500.0 86,500.0

     - Operator terampil 3 1 L.081 3 97,000.0 291,000.0

     - Operator semi Terampil 2 1 L.082 2 71,500.0 143,000.0 - Pembantu Sopir 5 1 L.099 5 65,000.0 325,000.0

     - Buruh tak terampil 5 1 L.101 5 65,000.0 325,000.0

     - Buruh semi terampil 6 1 L.103 6 66,000.0 396,000.0

    SUB JUMLAH 1,661,500.0

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Pasir ayak utk beton 38.00 M3 M.041 200,000.0 7,600,000.0

     - A s p a l 9,000.00 Kg M.061 13,000.0 117,000,000.0

     - Alat bantu (set @ 3 alat ) 0.20 Set M.170 300,000.0 60,000.0

     - Semen /PC 80.00 50 kg M.080 68,000.0 5,440,000.0

     - Batu sungai pecah tersaring 14.00 M3 K.017 357,050.0 4,998,700.0

    SUB JUMLAH 135,098,700.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Wheel loader 115 HP 1 1 E.052 6 0.0 0.0

     - Mesin pencampur aspal 1 1 E.155 5 0.0 0.0

     - Dump truk 5t.(145 HP) 5 1 E.212 28 0.0 0.0

     - Buldozer 110 HP 1 1 E.001 1 0.0 0.0

     - Alat Pemecah Batu 1 1 E.031 1 0.0 0.0

    SUB JUMLAH 0.00

    136,760,200.00

    VOLUME

    QUANTITY 100 Ton HARGA SATUAN 1,367,602.00 PER Ton

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    17/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN MEMBUAT PARIT K.110

    LOKAL & KABUPATEN (MENGGUNAKAN BURUH)

    URAIAN ANGGAPAN/ASUMSI

     1 . Gallian parit dengan tenaga manusia 1. Menggunakan tenaga manusia ( 100 m/hari )

     2. Membuang sisa galian menggunakan truk bak 2. Dimensi parit : Lebar bawah 0,50 M

      terbuka Lebar atas 1,30 M

      Kedalaman 0,60 M

      Volume 0,54 M3/m

     3. 25 % hasil galian dibuang setempat

     4. Sisa galian dibuang sejauh 2 Km

     5. Menggali dan membuang dihitung 1.5 M3/orang-hari

     6. Umur alat bantu rata-rata 1 bln/orang/set @ 3 alat

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 1 1 L.061 1 95,000.0 95,000.0

     - Sopir terampil 2 1 L.091 2 77,500.0 155,000.0

     - Buruh tak terampil 36 1 L.101 36 65,000.0 2,340,000.0

    SUB JUMLAH 2,590,000.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Alat bantu (set @ 3 alat) 1.50 Set M.170 300,000.0 450,000.0

    SUB JUMLAH 450,000.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Truk bak terbuka 3.5 T 2 1 E.221 10 0.0 0.0

    SUB JUMLAH 0.00

    3,040,000.00

    VOLUME

    QUANTITY 54 M3 HARGA SATUAN 56,296.30 PER M3

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    18/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN MEMBUAT PASANGAN BATU PADA PARIT K.112

    LOKAL & KABUPATEN GALIAN TANAH

    URAIAN ANGGAPAN/ASUMSI

     1. Galian tambahan ( 0,55 m3/m ) 1. Galian parit volume 0,43 M3/meter  

     2. Pasangan parit berdekatan dengan dinding penahan 2. Ukuran parit bagian dlm tebal 20 cm,lebar bawah 50 cm

      tanah bila diperlukan lebar atas 90 cm ; kedalaman 60 cm.

     3. tebal pasangan 20 cm. 3. 40 % pembunagan hasil galian dg truk biasa, sejauh 1 km

     4. 60 % dibuang setempat

     5. Bahan-bahan dikirim ketempat pek. oleh leperansir 

     6. Hasil pekerjaan 60 m/hari

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 1 6 L.061 6 95,000.0 570,000.0

     - Buruh tak terampil 6 6 L.101 36 65,000.0 2,340,000.0

     - Buruh semi terampil 2 6 L.103 12 66,000.0 792,000.0

     - Tukang batu 2 6 L.079 12 82,500.0 990,000.0 - Sopir 1 2 L.091 2 77,500.0 155,000.0

    SUB JUMLAH 4,847,000.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - alat bantu 1.50 Set M.170 300,000.0 450,000.0

     - Batu gunung 30.00 m3 M.010 165,000.0 4,950,000.0

     - Pasir beton 7.50 m3 M.041 200,000.0 1,500,000.0

     - Semen 91.20 50 kg/zak M.080 68,000.0 6,201,600.0

    SUB JUMLAH 13,101,600.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Truk bak terbuka 3.5 T 1 2 E.221 10 0.0 0.0

    SUB JUMLAH 0.00

    17,948,600.00

    VOLUME

    QUANTITY 60 M' HARGA SATUAN 299,143.0 PER M'

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    19/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN GALIAN TANAH UNTUK KONSTRUKSI K.224

    LOKAL & KABUPATEN ( MENGGUNAKAN BURUH )

    URAIAN ANGGAPAN/ASUMSI

     1. Penggalian tanah dengan tenaga manusia 1. Menggunakan tenaga manusia

     2. Tanah galian disingkirkan sejauh minimal 30 m 2. Kapasitas kerja kelompok 50 m3/hari

      dari lubang galian 3. Kedalaman rata-rata galian s/d 3 M

     4. Untuk jenis tanah berbatu, harga satuan pekerjaan K.224

    dikalikan dengan faktor 1,5

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 1 1 L.061 1 95,000.0 95,000.0

     - Buruh tak terampil 30 1 L.101 30 65,000.0 1,950,000.0

     - Buruh terampil 2 1 L.106 2 72,000.0 144,000.0

    SUB JUMLAH 2,189,000.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     -. Alat bantu 10.00 Set M.170 300,000.0 3,000,000.0

    SUB JUMLAH 3,000,000.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

    SUB JUMLAH 0.00

    5,189,000.00

    VOLUME

    QUANTITY 50 M3 HARGA SATUAN 103,780.00 PER M3

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    20/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN PENIMBUNAN & PEMADATAN UNT.JEMB. K.225

    LOKAL & KABUPATEN GORONG-2 (MENGGUNAKAN BURUH)

    URAIAN ANGGAPAN/ASUMSI

     1. Membersihkan struktur dari bahan-bahan organik 1. Bahan urugan dikirim kelokasi oleh pemasok

     2. Buruh mengurug bagian belakang struktur 

     3. Memadatkan dgn tamper dan mesin gilas bergetar 2. Urugan dipadatkan berlapis tebal 10 Cm.

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - Mandor 1 1 L.061 1 95,000.0 95,000.0

     - Buruh tak terampil 10 1 L.101 10 65,000.0 650,000.0

     - Buruh semi terampil 3 1 L.103 3 66,000.0 198,000.0

    SUB JUMLAH 943,000.00

    MATERIAL JUMLAH SATUAN KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - S i r t u 20.00 M3 M.042 170,000.0 3,400,000.0 

    - alat bantu 0.30 Set M.170 300,000.0 90,000.0

    SUB JUMLAH 3,490,000.00PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Mesin Gilas bergetar 1 1 E.087 5 0.0 0.0

     - T a m p e r 1 2 E.088 10 0.0 0.0

    SUB JUMLAH 0.00

    4,433,000.00

    VOLUME

    QUANTITY 15 M3 HARGA SATUAN 295,533.33 PER M3

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    21/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN PENIMBUNAN & PEMADATAN UNT.JEMB. K.225a

    LOKAL & KABUPATEN GORONG-2 (MENGGUNAKAN BURUH)

    URAIAN ANGGAPAN/ASUMSI

     1. Membersihkan struktur dari bahan-bahan organik 1. Bahan urugan hasil galian setempat

     2. Buruh mengurug bagian belakang struktur 

     3. Memadatkan dgn tamper dan mesin gilas bergetar 2. Urugan dipadatkan berlapis tebal 10 Cm.

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - Mandor 1 1 L.061 1 95,000.0 95,000.0

     - Buruh tak terampil 10 1 L.101 10 65,000.0 650,000.0

     - Buruh semi terampil 3 1 L.103 3 66,000.0 198,000.0

    SUB JUMLAH 943,000.00

    MATERIAL JUMLAH SATUAN KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

    0.0

     - alat bantu 0.30 Set M.170 300,000.0 90,000.0

    SUB JUMLAH 90,000.00PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Mesin Gilas bergetar 1 1 E.087 5 0.0 0.0

     - T a m p e r 1 2 E.088 10 0.0 0.0

    SUB JUMLAH 0.00

    1,033,000.00

    VOLUME

    QUANTITY 15 M3 HARGA SATUAN 68,866.67 PER M3

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    22/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN MEMB. BDN JLN/SUBGRADE DGN TIMBUNAN K.310

    LOKAL & KABUPATEN ( MENGGUNAKAN BURUH )

    URAIAN ANGGAPAN/ASUMSI

     1. Material dihampar maximum tebal setiap 20 Cm 1. Menggunakan tenaga buruh

     2. Setiap lapis dipadatkan minimum empat kali 2. Harga mtrl timbunan berdasarkan harga dilokasi pekerjaan

      lintasan dengan mesin gilas roda karet.

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 2 6 L.061 12 95,000.0 1,140,000.0

     - Operator Terlatih 1 6 L.081 6 97,000.0 582,000.0

     - Sopir 1 6 L.091 6 77,500.0 465,000.0

     - Buruh tak terampil 48 6 L.101 288 65,000.0 18,720,000.0

    SUB JUMLAH 20,907,000.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Pasir urug 450.0 M3 M.040 162,000.0 72,900,000.0

     - Alat bantu 8.0 Set M.170 300,000.0 2,400,000.0

    SUB JUMLAH 75,300,000.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Mesin G. Roda karet 8-15 T 1 6 E.084 30 0.0 0.0

     - Truk Tangki air 1 6 E.182 24 0.0 0.0

    SUB JUMLAH 0.00

    96,207,000.00

    VOLUME

    QUANTITY 375 M3 HARGA SATUAN 256,552.00 PER M3

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    23/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN MEMBENTUK BADAN JALAN / SUBGRADE KODE

    SUB. DIT. PERENCANAAN JALAN di DAERAH GALIAN TANAH K.320

    LOKAL & KABUPATEN ( MENGGUNAKAN BURUH )

    URAIAN ANGGAPAN/ASUMSI

     1. Digali dengan tenaga manusia 1. Menggunakan tenaga manusia (32 M3/hari)

     2. Permukaan tanah dibentuk dan diratakan dgn 2. 20 % dibuang ke lokasi tanpa diangkut dengan truk

      tenaga manusia 3. 80 % dibuang dan diangkut dengan truk

     3. Dimuat ke truk dengan manusia 4. Jarak 1rit pp < 2 Km

     4. Membuang tanah menggunakan truk 3.5 ton 5. Tidak termasuk pemadatan tanah dasar 

     7. 1,6 rit pp/jam/truk

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 1 1 L.061 1 95,000.0 95,000.0

     - Sopir 2 1 L.091 2 77,500.0 155,000.0

     - Buruh tak terampil 36 1 L.101 36 65,000.0 2,340,000.0

    SUB JUMLAH 2,590,000.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Alat bantu 1.50 Set M.170 300,000.0 450,000.0

    SUB JUMLAH 450,000.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Truk bak terbuka 2 1 E.221 10 0.0 0.0

    SUB JUMLAH 0.00

    3,040,000.00

    VOLUME

    QUANTITY 32 M3 95,000.00 PER M3

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    24/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN PEMADATAN TANAH DASAR K.342

    LOKAL & KABUPATEN ( MENGGUNAKAN ALAT )

    URAIAN ANGGAPAN/ASUMSI

     1. Pembentukan tanah dasar dengan grader 1. Menggunakan arat berat ( 8 x 500 ) m/hari

     2. Dipadatkan dgn mesin gilas roda baja samapai 100 % 2. Damija dibersihkan dari semak dll.

      (AASHTO T99) 3. Lebar dasar jalan 8 m

     4. Hasil kerja menyiapkan dasar jalan 500m/hari

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 1 2 L.061 2 95,000.0 190,000.0

     - Operator terampil 2 1 L.081 2 97,000.0 194,000.0

     - Pembantu Operator 2 1 L.089 2 66,000.0 132,000.0 - Buruh tak terampil 4 1 L.101 4 65,000.0 260,000.0

    SUB JUMLAH 776,000.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Alat bantu (set @ 3 alat) 0.16 Set M.170 300,000.0 48,000.0

    SUB JUMLAH 48,000.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Motor grader 100 HP 1 1 E.010 6 0.0 0.0

     - Mesin gilas 3 roda 6-8 ton 1 1 E.080 6 0.0 0.0

    SUB JUMLAH 0.00

    824,000.00

    VOLUME

    QUANTITY 4,000 M2 HARGA SATUAN 206.00 PER M2

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    25/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN PEMBENTUKAN BAHU JALAN KERAS K.410

    LOKAL & KABUPATEN ( MENGGUNAKAN BURUH)

    URAIAN ANGGAPAN/ASUMSI

     1. Material timbunan yang baik dihampar dengan 1. Memakai tenaga orang (96m3/h,pemadatn 960 m bahu jln)

      tenaga manusia 2. 10 Cm timb. padat dibutuhkan utk 1m lebar bahu jalan

     2. Pemadatan bahu jalan dengan mesin gilas bergetar 3. Material Pilihan dikirim kelokasi pek. oleh pemasok

     4 Pemasok menimbun material di sepanjang bahu jalan

     5. Material disebar dengan tenaga manusia

     7. Pemadatan dengan mesin gilas bergetar kecil

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 2 1 L.061 2 95,000.0 190,000.0

     - Buruh tak terampil 66 1 L.101 66 65,000.0 4,290,000.0

     - Buruh terampil 1 1 L.106 1 72,000.0 72,000.0

    SUB JUMLAH 4,552,000.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - S i r t u 120.00 M3 M.042 170,000.0 20,400,000.0

     - Alat bantu (set @ 3 alat) 2.50 Set M.170 300,000.0 750,000.0

    SUB JUMLAH 21,150,000.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Mesin gilas bergetar ( 1 ton ) 1 1 E.087 5 0.0 0.0

    SUB JUMLAH 0.00

    25,702,000.00

    VOLUME

    QUANTITY 96 M3 HARGA SATUAN 267,729.17 PER M3

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    26/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN MEMOTONG BAHU JALAN TINGGI K.420

    LOKAL & KABUPATEN (MENGGUNAKAN BURUH)

    URAIAN ANGGAPAN/ASUMSI

     1. Perbaikan bahu jalan yang tingginya melebihi lapisan 1. menggunakan tenaga manusia (48 M3/hari

      permukaan jalan antara parit pekerasan jalan 2. Rata-rata bahu jalan dipotong setinggi 10 cm

     2. Muat dan bongkar ke/dari dengan tenaga manusia 3. Semua sampah / kotoran dibuang sejauh 1 Km,

    3. Buang semua tanah buangan kapasitas 1,6 rit pp/jam/truk

     4. Memuat dan membuang dengan tenaga manusia

     5. Hasil kerja rata-rata 1,2 m2/hari-orang

     6. Penggunaan alat bantu 1 bulan - orang

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - Mandor 1 1 L.061 1 95,000.0 95,000.0

     - Sopir terampil 4 1 L.091 4 77,500.0 310,000.0

     - Buruh tak trampil 40 1 L.101 40 65,000.0 2,600,000.0

    SUB JUMLAH 3,005,000.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Alat bantu 1.60 Set M.170 300,000.0 480,000.0

      ( set @ 3 alat )

    SUB JUMLAH 480,000.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Dump truk 3,5 Ton 4.0 1 E.211 20 0.0 0.0

    SUB JUMLAH 0.00

    3,485,000.00

    VOLUME

    QUANTITY 48 M2 HARGA SATUAN 72,604.17 PER M2

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    27/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN MEMBERSIHKAN RUMPUT & TANAMAN DI K.422

    LOKAL & KABUPATEN BAHU JALAN (MENGGUNAKAN BURUH)

    URAIAN ANGGAPAN/ASUMSI

     1. Potong semak belukar yang tumbuh pada bahu jalan 1. Menggunakan tenaga manusia (2 x 1,5m x 500m/hari)

     2. Bersihkan rumput/semak dari bahu jalan dan aspal 2. Dengan lebar 1,5m dari tepi jalan, rata-rata luas yang

      dibersihkan 3000 m2 satu sisi.

     3. Hasil kerja : 60 m2 /orang-hari

     4. Sampah/reruntuhan dibuang sejauh 1 km

     5 Umur alat bantu rata-rata 1 bln-orang

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 1 1 L.061 1 95,000.0 95,000.0

     - Buruh tak terampil 25 1 L.101 25 65,000.0 1,625,000.0

    SUB JUMLAH 1,720,000.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Alat bantu 1.00 Set M.170 300,000.0 300,000.0

    SUB JUMLAH 300,000.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

    SUB JUMLAH 0.00

    2,020,000.00

    VOLUME

    QUANTITY 1,500 M2 HARGA SATUAN 1,346.67 PER M2

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    28/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN PEMBERSIHAN PARIT SAMPING K.424

    LOKAL & KABUPATEN ( MENGGUNAKAN BURUH )

    URAIAN ANGGAPAN/ASUMSI

     1. Membersihkan saluran samping dan gorong-2 dari 1. Menggunakan tenaga manusia

      kototran/sampah dan tumbuh-tumbuhan 2. Membersihkan sampah, kotoraon yang menyumbat,

     2. Buang sampah/kotoran tersebut dengan tumbuh-tumbuhan dari parit dan gorong-gorong.

      menggunakan truk 3. Pembuangan puing sejauh 1 Km

    4. Kapasitas 1,0 rit pp/jam/truk

     5. Umur alat bantu rata-rata 1 bln/orang

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 1 1 L.061 1 95,000.0 95,000.0

     - Sopir terampil 2 1 L.091 2 77,500.0 155,000.0

     - Buruh tak terampil 36 1 L.101 36 65,000.0 2,340,000.0

    SUB JUMLAH 2,590,000.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Alat bantu 1.20 Set M.170 300,000.0 360,000.0

    SUB JUMLAH 360,000.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Truk bak terbuka 2 1 E.221 10 0.0 0.0

    SUB JUMLAH 0.00

    2,950,000.00

    VOLUME

    QUANTITY 500 M' HARGA SATUAN 5,900.00 PER M'

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    29/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN KONSTRUKSI LAPIS PONDASI BAWAH ( LPB ) K.513

    LOKAL & KABUPATEN KLAS B (MENGGUNAKAN BURUH)

    URAIAN ANGGAPAN/ASUMSI

     1. Membentuk lagi permukaan jalan lama 1. Menggunakan tenaga manusia ( 60 M3/hari)

     2. Agregat ditempatkan disepanjang jalan 2. Dimulai dengan pekerjaan memperbaiki penurunan

     3. Menghampar agregat 3. Bahan dicampur dan diratakan 12 cm

     4. Jalan disiram denagn truk air 4. Harga material berdasarkan harga dilokasi

     5. Pemadatan dilakukan dengan mesin gilas 5. Tebal lapisan 10 cm

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 2 1 L.061 2 95,000.0 190,000.0

     - Operator terampil 1 1 L.081 1 97,000.0 97,000.0

     - Sopir terampil 1 1 L.091 1 77,500.0 77,500.0

     - Buruh tak terampil 66 1 L.101 66 65,000.0 4,290,000.0

    SUB JUMLAH 4,654,500.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Batu pecah 3-5 cm 10.00 M3 M.023 350,000.0 3,500,000.0

     - Batu pecah 2-3 cm 11.00 M3 M.024 375,000.0 4,125,000.0

     - Batu pecah 1-2 cm 7.50 M3 M.025 412,000.0 3,090,000.0

     - Batu pecah 0,5-1 cm 11.00 M3 M.026 412,000.0 4,532,000.0

     - Pasir urug 32.50 M3 M.040 162,000.0 5,265,000.0

     - Alat bantu 1.20 Set M.170 300,000.0 360,000.0

    SUB JUMLAH 20,872,000.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Mesin Gilas 3 Roda (8-10) T 1 1 E.080 5 0.0 0.0

     - Truk tangki 1 1 E.182 4 0.0 0.0

     - Mesin Gilas roda karet 8-15 To 1 1 E.084 5 0.0 0.0

    SUB JUMLAH 0.00

    25,526,500.00

    VOLUME

    QUANTITY 60 M3 HARGA SATUAN 425,441.67 PER M3

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    30/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN KONSTRUKSI LAPIS PONDASI BAWAH (LPB) K.515

    LOKAL & KABUPATEN KLAS C (MENGGUNAKAN BURUH )

    URAIAN ANGGAPAN/ASUMSI

     1. Agregat ditempatkan sepanjang jl oleh leveransir 1. Menggunakan tenaga orang setempat

     2. Menghampar agregat dengan tenaga orang 2. Kerikil ditimbun sepanjang jalan oleh leveransir 

     3. Pemadatan 2 lapis memakai mesin gilas roda baja 3. Kerikil dng ukuran lebih ( oversize) yg tersingkir saat

    4. Perapihan dengan tenaga orang penghamparan dihitung 6 %

     4. Dihampar dalam dua lapis dan dipadatkan

    5. Penggunaan alat bantu 1 bulan - orang

     6. Hasil kerja meng. & memadatkan 600 m2/h (4x150 m)

     7. Kerikil kali tanpa disaring dikirim leveransir sampai

    ditempat pekerjaan

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 3 1 L.061 3 95,000.0 285,000.0

     - Operator terampil 1 1 L.081 1 97,000.0 97,000.0

     - Sopir terampil 1 1 L.091 1 77,500.0 77,500.0

     - Buruh tak terampil 60 1 L.101 60 65,000.0 3,900,000.0

    SUB JUMLAH 4,359,500.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - S i r t u 75.00 M3 M.042 170,000.0 12,750,000.0

     - Alat bantu 2.50 Set M.170 300,000.0 750,000.0

    SUB JUMLAH 13,500,000.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Mesin Gilas 3 Roda (8-10) T 1 1 E.080 5 0.0 0.0

     - Truk tangki 1 1 E.182 5 0.0 0.0

    SUB JUMLAH 0.00

    17,859,500.00

    VOLUME

    QUANTITY 60 M3 HARGA SATUAN 297,658.33 PER M3

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    31/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN KONSTRUKSI LAPIS PONDASI ATAS ( LPA ) K.521

    LOKAL & KABUPATEN KLAS A (MENGGUNAKAN BURUH)

    URAIAN ANGGAPAN/ASUMSI

     1. Agg. ditimbun disepanjang jalan 1. Menggunakan tenaga manusia

     2. Material hihampar dengan tenaga manusia 2. Pengadaan barang oleh leveransir 

     3. Pemadatan perkerasan dengan mesin gilas roda 3. Buruh menghampar batu pecah diatas LPB ( 15 cm )

      baja dan tangki air 4. Menggunakan 135 m3 bt pch mesin dg binder (psr urug) -

      24 m3 atau 140 m3 kerikil pecah mesin degan

    binder (pasir urug) 15 m3

     5. Rongga ditutup dengan pasir uruh dengan tenaga orang

     6. Dipadat sampai 10 cm padat

     7. Hasil kerja menghampar dan memadatkan 600 m2/hari

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 2 1 L.061 2 95,000.0 190,000.0

     - Operator terampil 1 2 L.081 2 97,000.0 194,000.0

     - Sopir terampil 1 2 L.091 2 77,500.0 155,000.0

     - Buruh tak terampil 66 2 L.101 132 65,000.0 8,580,000.0

    SUB JUMLAH 9,119,000.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Batu sungai pecah tersaring 150.00 M3 K.017 357,050.0 53,557,500.0

     - Pasir Urug 15.00 M3 M.040 162,000.0 2,430,000.0

     - alat bantu (set @ 3 alat) 5.50 Set M.170 300,000.0 1,650,000.0

    SUB JUMLAH 57,637,500.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Mesin Gilas 3 roda (8-10) T 1 2 E.080 10 0.0 0.0

     - Truk tangki 1 2 E.182 10 0.0 0.0

    SUB JUMLAH 0.00

    66,756,500.00

    VOLUME

    QUANTITY 120 M3 HARGA SATUAN 556,304.17 PER M3

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    32/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN KONSTRUKSI PONDASI LAPIS ATAS ( LPA ) K.523

    LOKAL & KABUPATEN KLAS B (MENGGUNAKAN BURUH )

    URAIAN ANGGAPAN/ASUMSI

     1. Krkl pecah ditimbun disepanjang jln oleh leveransir 1. Menggunakan tenaga manusia

     2. Material hihampar dengan tenaga manusia 2. Pengadaan kerikil oleh leveransir 

     3. Pemadatan perkerasan dengan mesin gilas roda 3. Buruh menghampar kerikil pch diatas LPB dlm dua lapis

      baja dan disiram dengan truk tangki air 4. dipadatkan hingga padat yang ditentukan

     5. Hasil kerja menghampar dan memadatkan 750 m2 / hari

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 2 2 L.061 4 95,000.0 380,000.0

     - Operator terampil 1 2 L.081 2 97,000.0 194,000.0

     - Sopir terampil 1 2 L.091 2 77,500.0 155,000.0

     - Buruh tak terampil 50 2 L.101 100 65,000.0 6,500,000.0

    SUB JUMLAH 7,229,000.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Agregat disaring 200.00 M3 K.016 354,775.0 70,955,000.0

     - Alat bantu 4.00 Set M.170 300,000.0 1,200,000.0

    SUB JUMLAH 72,155,000.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Mesin Gilas 3 Roda (8-10) T 1 2 E.080 10 0.0 0.0

     - Truk tangki 1 2 E.182 10 0.0 0.0

    SUB JUMLAH 0.00

    79,384,000.00

    VOLUME

    QUANTITY 150 M3 HARGA SATUAN 529,226.67 PER M3

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    33/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN PENGHAMPARAN ( L P A ) ASPAL BETON K.528

    LOKAL & KABUPATEN LASTON ATAS (MENGGUNAKAN ALAT)

    URAIAN ANGGAPAN/ASUMSI

     1. Permukaan jalan dibersihkan dan kering 1. Menggunakan alat berat (45 M3/hari)

     2. Lapis back/pengikat aspal cutback 2. ATB dihampar dan di[adatkan ketebalan 10 cm

      dihampar @ 0,5 Lt/M2 3. Spesifikasi BM no-03/PT/B/1983

     3. ATB dihampar dengan aspal Finisher 

     4. Temperatur ATB 80 derajat C dan tidak kurang

      dari 60 derajad Celsius

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n do r 1 1 L.061 1 95,000.0 95,000.0

     - Operator terampil 4 1 L.081 4 97,000.0 388,000.0

     - Buruh tak terampil 12 1 L.101 12 65,000.0 780,000.0

     - Buruh terampil 8 1 L.106 8 72,000.0 576,000.0

    SUB JUMLAH 1,839,000.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - ATB (LASTON ATAS) 100.00 Ton K.026 957,710.0 95,771,000.0

     - Pasir ayak utk beton 0.60 M3 M.041 200,000.0 120,000.0

     - A s p a l 135.00 Kg M.061 13,000.0 1,755,000.0

     - Minyak bakar 90.00 Lt M.065 15,000.0 1,350,000.0

     - Alat bantu ( set @ 3 alat ) 0.50 Set M.170 300,000.0 150,000.0

    SUB JUMLAH 99,146,000.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Mesin gilas 3 roda (6-8)T 1 1 E.080 5 0.0 0.0

     - Mesin gilas roda karet 8-15 T 1 1 E.084 5 0.0 0.0

     - Mesin penyemprot aspal 1 1 E.153 3 0.0 0.0

     - Mesin penghampar 30 Hp 1 1 E.157 5 0.0 0.0

     - Compressor 21 M3/jam 1 1 E.301 4 0.0 0.0

    SUB JUMLAH 0.00

    100,985,000.00

    VOLUME

    QUANTITY 45 M3 HARGA SATUAN 2,244,111.11 PER M3

    1,009,850.00 PER Ton

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    34/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN LABURAN ASPAL SATU LAPIS K.615

    LOKAL & KABUPATEN (MENGGUNAKAN BURUH)

    URAIAN ANGGAPAN/ASUMSI

     1. Bersihkan permukaan tidak beraspal dari oli dan 1. Hasil kerja 600 M2/hari

      material lepas 2. Agg. halus hasil saringan 20 mm dari mesin pemecah

    2. Permukaan perkerasan dilapisi prime aspal cut back batu ditimbun dilokasi pekerjaan oleh pemasok

     3. Bersihkan dan tutup permukaan yang sudah dilapisi 3. Permukaan yang akan diaspal telah selesai dipadatkan

    prime lapis cut back dan serpihan dengan mesin dan terikat dengan binder.

     4. Tiap lapis digilas dg mesin gilas pneumatic roda karet 4. Lap. prime/resap permuk. memakai aspal "MC" @ 1 L/m2

     5. Menggunakan minyak residu +- 1,6 Liter/m2

     6. Agg. halus 1,2 cm disebar dari dump truk tiap 50 m2/m3

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 1 3 L.061 3 95,000.0 285,000.0

     - Operator terampil 3 3 L.081 9 97,000.0 873,000.0

     - Sopir terampil 2 3 L.091 6 77,500.0 465,000.0

     - Buruh semi terampil 2 3 L.103 6 66,000.0 396,000.0 - Buruh tak terampil 10 3 L.101 30 65,000.0 1,950,000.0

     - Buruh terampil 2 3 L.106 6 72,000.0 432,000.0

    SUB JUMLAH 4,401,000.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Batu sungai tersaring 36.00 M3 K.017 357,050.0 12,853,800.0

     - A s p a l 3,745.00 Kg M.061 13,000.0 48,685,000.0

     - Minyak bakar 580.00 Lt M.065 15,000.0 8,700,000.0

     - Alat bantu (set @ 3 alat) 1.50 Set M.170 300,000.0 450,000.0

    SUB JUMLAH 70,688,800.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Mesin gilas roda karet 8-15 t 1 3 E.084 15 0.0 0.0

     - Mesin Penyemprot aspal 1 3 E.153 15 0.0 0.0

     - Dump truk 3.5 ton 2 3 E.211 30 0.0 0.0

    SUB JUMLAH 0.00

    75,089,800.00

    VOLUME

    QUANTITY 1,800 M2 HARGA SATUAN 41,716.56 PER M2

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    35/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. D IT. PERENCANAAN JALAN LABURAN ASPAL DUA LAPIS ( BURDA ) K.617

    LOKAL & KABUPATEN (MENGGUNAKAN ALAT)

    URAIAN ANGGAPAN/ASUMSI

     1. Permukaan harus rata, kering dan bersih 1. Menggunakan alat berat, kapasitas 450 m2/hari

     2. Untuk permukaan jalan yang tak beraspal perlu 2. Agregat ukuran 1-2 cm timbun dikirim oleh leveransir 

      prime coat 0.7 liter/m2 3. Permukaan aspal yang diaspal harus sudah dipadatkan

    3. Menebarkan aggregat/batu pecah 1-2 dgn gradasi primer aspal cair 1 liter/m2

      seragam dua lapis 4. Bitumen residu yang dipakai : lapis 1, sebanyak 1,6 l/m2

     4. Pemadatan dengan PTR 4 - 6 : lapis 2, sebanyak 1,3 l/m2

     5. Chip dari dumptruk harus masuk spreader dengan

    rata-rata 50 m2/m3

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 1 4 L.061 4 95,000.0 380,000.0

     - Operator terampil 3 4 L.081 12 97,000.0 1,164,000.0

     - Sopir terampil 2 4 L.091 8 77,500.0 620,000.0

     - Buruh semi terampil 2 4 L.103 8 66,000.0 528,000.0 - Buruh tak terampil 10 4 L.101 40 65,000.0 2,600,000.0

     - Buruh terampil 2 4 L.106 8 72,000.0 576,000.0

    SUB JUMLAH 5,868,000.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Batu sungai pecah tersaring 54.00 M3 K.017 357,050.0 19,280,700.0

     - A s p a l 6,085.00 Kg M.061 13,000.0 79,105,000.0

     - Minyak bakar 580.00 Lt M.065 15,000.0 8,700,000.0

     - Alat bantu ( set @ 3 alat ) 2.50 Set M.170 300,000.0 750,000.0

    SUB JUMLAH 107,835,700.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Mesin gilas roda karet 8-15 t 1 3 E.084 20 0.0 0.0

     - Mesin Penyemprot aspal 1 3 E.153 20 0.0 0.0

     - Dump truk 3.5 ton 2 3 E.211 40 0.0 0.0

    SUB JUMLAH 0.00

    113,703,700.00

    VOLUME

    QUANTITY 1,800 M2 HARGA SATUAN 63,168.72 PER M2

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    36/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN LAPIS PENETRASI / PERMUKAAN MAC. 50 mm K.618

    LOKAL & KABUPATEN LAPEN (MENGGUNAKAN BURUH)

    URAIAN ANGGAPAN/ASUMSI

     1. Semprotkan Aspal Prime coat 0,8 ltr/m2 1. Menggunakan tenaga manusia

     2. Hampar batu pecah 3,5 cm 25 m2/m2 2. Harga material (agregat pokok, agregat pengunci, agregat

     2. Hampar batu pecah 2,3 cm 45 m2/m2 penutup aspal) adalahbharga di lokasi proyek

     4. Setiap lapis batu dipadatkan 3. Volume aspal cair untuk tack/prime coat 0.8 ltr/m2

     5. Semprutkan Aspal 2,5 ltr/m2 4. Tebal lapisan penetrasian + Cm

     6. Hampar batu pecah 1,2 cm, 90 m2/m3 5. Agregat dikirim sampai tempat pekerjaan oleh leveransir 

     7. Semprotkan Aspal 1,5 ltr/m2

     8. Hampar pasir (blinder) 400 m2/m3

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 2 3 L.061 6 95,000.0 570,000.0

     - Operator terampil 2 3 L.081 6 97,000.0 582,000.0

     - Sopir terampil 1 3 L.091 3 77,500.0 232,500.0

     - Buruh tak terampil 66 3 L.101 198 65,000.0 12,870,000.0 - Buruh terampil 2 3 L.106 6 72,000.0 432,000.0

    SUB JUMLAH 14,686,500.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Batu pecah 3 - 5 Cm 56.00 M3 M.023 350,000.0 19,600,000.0

     - Batu pecah 2 - 3 Cm 31.00 M3 M.024 375,000.0 11,625,000.0

     - Batu pecah 1 - 2 Cm 15.50 M3 M.025 412,000.0 6,386,000.0

     - Pasir ayak utk beton 3.50 M3 M.041 200,000.0 700,000.0

     - A s p a l 6,270.00 Kg M.061 13,000.0 81,510,000.0

     - Minyak bakar 450.00 Lt M.065 15,000.0 6,750,000.0

     - Alat bantu (set @ 3 alat) 8.10 Set M.170 300,000.0 2,430,000.0

    SUB JUMLAH 129,001,000.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Mesin gilas 3 roda (6-8)T 1 3 E.080 15 0.0 0.0

     - Mesin penyemprot aspal 1 3 E.153 15 0.0 0.0

     - Truk bak terbuka 3.5 T 1 3 E.221 15 0.0 0.0

    SUB JUMLAH 0.00

    143,687,500.00

    VOLUME

    QUANTITY 1,400 M2 HARGA SATUAN 102,633.93 PER M2

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    37/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN PENGHAMPAR LAPIS TIPIS ASPAL BETON K.636

    LOKAL & KABUPATEN LATASTON (MENGGUNAKAN ALAT)

    URAIAN ANGGAPAN/ASUMSI

     1. Pengisian mtrl sampai ke bin spreader oleh pemasok 1. Menggunakan alat berat 1500 M2/hari

     2. Material dihampar dg mesin speader, dipadatkan dg 2. Asbuton campuran panas dikirim ketempat pek. oleh lev.

      mesin gilas roda baja & pneimatic roda karet 3. BJ Asbutron padat 2.2 ton/m3

     4. Spec-BM No. 12/DT/B/1983

     5. Rata-rata tebal lapisan 3 cm

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 1 1 L.061 1 95,000.0 95,000.0

     - Operator terampil 4 1 L.081 4 97,000.0 388,000.0

     - Buruh tak terampil 12 1 L.101 12 65,000.0 780,000.0

     - Buruh terampil 8 1 L.106 8 72,000.0 576,000.0

    SUB JUMLAH 1,839,000.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - H.R.S (LATASTON) 100.00 Ton K.035 1,367,602.0 136,760,200.0

     - A s p a l 450.00 Kg M.061 13,000.0 5,850,000.0

     - Minyak bakar 300.00 Lt M.065 15,000.0 4,500,000.0

     - Alat bantu (set @ 3 alat) 0.50 Set M.170 300,000.0 150,000.0

    SUB JUMLAH 147,260,200.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Mesin gilas tandem (6-10)T 1 1 E.081 5 0.0 0.0

     - Mesin gilas Roda karet 8-15 T 1 1 E.084 5 0.0 0.0

     - Mesin penyemprot aspal 1 1 E.153 5 0.0 0.0

     - Mesin penghampar 30 Hp 1 1 E.157 5 0.0 0.0

     - Compressor 21 M3/jam 1 1 E.301 4 0.0 0.0

    SUB JUMLAH 0.00

    149,099,200.00

    VOLUME

    QUANTITY 1,500 M2 HARGA SATUAN 99,399.47 PER M2

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    38/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN PERANCAH (BEGESTING) BETON BERTULANG K.710

    LOKAL & KABUPATEN (MENGGUNAKAN BURUH)

    URAIAN ANGGAPAN/ASUMSI

     1. Pengadaan bahan oleh leveransir 1. Kelompok tk. kayu memasang 100 m2 dalam 5 hari kerja

     2. Tukang kayu memotong dan membuat acuan 2. 1/3 material dapat dipakai kembali

     3. Tk. kayu membongkar acuan setelah bt. cukup kuat 3. pengadaan bahan oleh leveransir 

     4. Kelompok tukang kayu membersihkan acuan 4. untuk 1 M3 beton dipakai 40 lb plywood

    untuk dipakai kembali (120 Cm x 240 Cmx1,7 Cm

     5. Kelompok tukang kayu membongkar perancah

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 1 5 L.061 5 95,000.0 475,000.0

     - T u k a n g 4 5 L.079 20 82,500.0 1,650,000.0

     - Buruh tak terampil 7 5 L.101 35 65,000.0 2,275,000.0

     - Buruh semi terampil 3 5 L.103 15 66,000.0 990,000.0

    SUB JUMLAH 5,390,000.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Paku Jembatan 20.00 Kg M.166 15,000.0 300,000.0

     - Kayu acuan 3.00 M3 M.180 1,800,000.0 5,400,000.0

     - Alat bantu (set @ 3 alat) 3.00 Set M.170 300,000.0 900,000.0

    SUB JUMLAH 6,600,000.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

    SUB JUMLAH 0.00

    11,990,000.00

    VOLUME

    QUANTITY 100 M2 HARGA SATUAN 119,900.00 PER M2

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    39/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN PENULANGAN BETON ( MEMOTONG, KODE

    SUB. DIT. PERENCANAAN JALAN MEMBENGKOK & MEMASANG BESI K.715

    LOKAL & KABUPATEN TULANGAN ) ( MENGGUNAKAN BURUH )

    URAIAN ANGGAPAN/ASUMSI

     1. Pemotongan, pembengkokan, perakitan tulangan 1. 200 Kg Tulangan jadi disiapkan dalam 1 hari

      dilakukan di tempat pekerjaan bersama-sama 2. Besi tulangan dikirim ketempat pekerjaan oleh pemasok

      persiapan pekerjaan beton 3. Penyusutan akibat pemotongan 10 % dan pakai kawat

    baja dan lain-lain dianggap 1 %.

     4. Batang-batang tulangan bengkok ditempat pekerjaan

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 1 1 L.061 1 95,000.0 95,000.0

     - Tukang 1 1 L.079 1 82,500.0 82,500.0

     - Buruh tak terampil 2 1 L.101 2 65,000.0 130,000.0 - Buruh semi terampil 2 1 L.103 2 66,000.0 132,000.0

    SUB JUMLAH 439,500.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Tulangan besi beton & Kawat 225.00 Kg M.167 12,000.0 2,700,000.0 

    - Alat bantu (set @ 3 alat) 0.20 Set M.170 300,000.0 60,000.0

    SUB JUMLAH 2,760,000.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

    SUB JUMLAH 0.00

    3,199,500.00

    VOLUME

    QUANTITY 200 Kg HARGA SATUAN 15,997.50 PER Kg

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    40/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN PENULANGAN BETON ( MEMOTONG, KODE

    SUB. DIT. PERENCANAAN JALAN MEMBENGKOK & MEMASANG BESI K.715a

    LOKAL & KABUPATEN TULANGAN ) ( MENGGUNAKAN BURUH )

    URAIAN ANGGAPAN/ASUMSI

     1. Pemotongan, pembengkokan, perakitan tulangan 1. 200 Kg dikerjakan dalam 1 hari

      dilakukan di tempat pekerjaan bersama-sama

    persiapan pekerjaan beton

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 1 1 L.061 1 95,000.0 95,000.0

     - Tukang 1 1 L.079 1 82,500.0 82,500.0

     - Buruh tak terampil 2 1 L.101 2 65,000.0 130,000.0 - Buruh semi terampil 2 1 L.103 2 66,000.0 132,000.0

    SUB JUMLAH 439,500.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Alat bantu (set @ 3 alat) 0.20 Set M.170 300,000.0 60,000.0

    SUB JUMLAH 60,000.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

    SUB JUMLAH 0.00

    499,500.00

    VOLUME

    QUANTITY 200 Kg HARGA SATUAN 2,497.50 PER Kg

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    41/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN BETON NON STRUKTUR K.720

    LOKAL & KABUPATEN KLAS K. 175

    URAIAN ANGGAPAN/ASUMSI

     1. Pemsok mengirim material 1. Bahan-2 dasar dikirim kelokasi pekerjaan oleh pemasok

     2. Acuan dan Tulangan besi beton dipasang 2. Dipakai agregat pecah tersaring

    3. Beton diaduk dilokasi pekerjaan 3. Dicor 5,75 m3/hari dengan 48 adukan/6 jam/ hari

     4. Beton dicor dan digetar sampai padat 4. Adukan 1 Pc: 3 Ps : 4 Kr. ( Yaitu 1 : 7 ) ; semen : 250 Kg/m3; air :

    130 kg/m3 ; 2359 kg/m3

     5. Anggap tiap adukan membutuhkan 3/4 zak (20,8 ltr lepas )

      Pc; 62,5 ltr ps ; 83,3 ltr krl dan 15,6 ltr air 

     6. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang

     7. Beton dipakai untu kepala jembatan / struktur beton tidak bertulang

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 1 4 L.061 4 95,000.0 380,000.0

     - Buruh tak terampil 12 4 L.101 48 65,000.0 3,120,000.0

     - Buruh semi terampil 2 4 L.103 8 66,000.0 528,000.0

    SUB JUMLAH 4,028,000.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Pasir ayak utk beton 12.00 M3 M.041 200,000.0 2,400,000.0

     - Semen / PC 115.20 50 kg/Zak M.080 68,000.0 7,833,600.0

     - Kerikil pecah Pecah Tersaring 16.00 M3 K.017 357,050.0 5,712,800.0

     - Alat bantu (set @ 3 alat) 1.92 Set M.170 300,000.0 576,000.0

    SUB JUMLAH 16,522,400.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Alat penggetar beton (4 HP) 1 4 E.089 24 0.0 0.0

     - Pengaduk beton (125 Ltr/5 HP) 1 4 E.251 24 0.0 0.0

     - Pompa air 30 M3/jam 1 4 E.341 8 0.0 0.0

    SUB JUMLAH 0.00

    20,550,400.00

    VOLUME

    QUANTITY 23 M3 HARGA SATUAN 893,495.65 PER M3

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    42/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN BETON STRUKTUR / UNTUK KONSTRUKSI K.722

    LOKAL & KABUPATEN KELAS K.225 (KLAS A )

    URAIAN ANGGAPAN/ASUMSI

     1. Pemasok mengirim material 1. Bahan2 dasar dikirim kelokasi pekerjaan oleh pemasok

     2. Acuan dan tulangan besi beton dipasang 2. Dipakai ag. pecah dan tersaring yang termurah

     3. Beton diaduk dilokasi pekerjaan 3. Dicor 6,17 M3/hari dengan 54 adukan / 6 jam/jam

     4. Beton dicor dan digetar sampai padat 4. Adukan 1 PC : 2 Psr : 3 Kr (atau 1:5) atau 350 Kg PC/M3;

      air 1600 kg/M3 :2487 kg/M3

     6. Anggap tiap adukan membutuhkan ;1 zak (27,8 Ltr lepas)

    Pc 55,6 Ltr, psr 83,3 Ltr kerikil & 18,3 ltr air 

     6. Tidak termasuk pekerjaan pembesian

     8. Dipakai Agregat pecah tersaring

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 1 6 L.061 6 95,000.0 570,000.0

     - Buruh tak terampil 12 6 L.101 72 65,000.0 4,680,000.0

     - Buruh terampil 2 6 L.106 12 72,000.0 864,000.0

    SUB JUMLAH 6,114,000.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Pasir ayak utk beton 18.00 M3 M.041 200,000.0 3,600,000.0

     - Semen / PC 259.20 50 kg/Zak M.080 68,000.0 17,625,600.0

     - Batu sungai pecah tersaring 27.00 M3 K.017 357,050.0 9,640,350.0

     - Alat bantu (set @ 3 alat) 2.88 Set M.170 300,000.0 864,000.0

    SUB JUMLAH 31,729,950.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Alat penggetar beton (4 HP) 1 6 E.089 36 0.0 0.0

     - Pengaduk beton (125 Ltr/5 HP) 1 6 E.251 36 0.0 0.0

     - Pompa air 30 M3/jam 1 6 E.341 12 0.0 0.0

    SUB JUMLAH 0.00

    37,843,950.00

    VOLUME

    QUANTITY 37 M3 HARGA SATUAN 1,022,809.46 PER M3

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    43/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN BETON NON STRUKTUR / RABAT K.724

    LOKAL & KABUPATEN KELAS K.125

    URAIAN ANGGAPAN/ASUMSI

     1. Pemasok mengirim material 1. Dipakai ag. pecah dan tersaring yang termurah

     2. Acuan dan tulangan besi beton dipasang 2. Dicor 6.0 M3/hari dengan 48 adukan /6 jam /hari

     3. Beton diaduk dilokasi pekerjaan 3. Adukan 2 Pc:5 Psr:7 rl ( yaitu 1 : 6 ); semen 300 Kg/M3;

     4. Beton dicor dan digetar sampai padat air 150 Kg/M3 ;2485 Kg.

     4. Anggap tiap adukan membutuhkan ;1,5 Zak (41,7 ltr lepas)

    Pc 104,2 Ltr;Psr 145,8 Ltr kerikil & 30,0 Ltr air.

     5. Tdk termasuk acuan & tul. besi beton yg sudah dipasang.

     6. Beton dgn tul. ringan dipakai utk pondasi plat.dinding dll

     7. Sesuai peraturan beton bertulang Ind. ( PBI 1971 M.2 )

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 1 5 L.061 5 95,000.0 475,000.0

     - Buruh tak terampil 25 5 L.101 125 65,000.0 8,125,000.0

     - Buruh terampil 3 5 L.106 15 72,000.0 1,080,000.0

    SUB JUMLAH 9,680,000.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Pasir ayak utk beton 25.00 M3 M.041 200,000.0 5,000,000.0

     - Semen / PC 288.00 50 kg/Zak M.080 68,000.0 19,584,000.0

     - Batu sungai pecah tersaring 35.00 M3 K.017 357,050.0 12,496,750.0

     - Alat bantu (set @ 3 alat) 5.00 Set M.170 300,000.0 1,500,000.0

    SUB JUMLAH 38,580,750.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Alat penggetar beton (4 HP) 2 5 E.089 60 0.0 0.0

     - Pengaduk beton (250 Ltr/10 H 1 5 E.252 30 0.0 0.0

     - Pompa air 30 M3/jam 1 5 E.341 10 0.0 0.0

    SUB JUMLAH 0.00

    48,260,750.00

    VOLUME

    QUANTITY 48 M3 HARGA SATUAN 1,005,432.29 PER M3

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    44/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN BETON STRUKTUR / UNTUK KONSTRUKSI K.725

    LOKAL & KABUPATEN KELAS K.175 (KLAS A )

    URAIAN ANGGAPAN/ASUMSI

     1. Material dikirim oleh leveransir 1. Keperluan material dikirim ke tempat pek. oleh leveransir 

     2. Pasang begesting ( lihat K 710 ) 2. Produksi 6,4 m3/hari-6 jam, 9 campuran/jam

     3. Pengadukan beton ditempat pekerjaan 3. Campuran beton 1:2:3 (atau 1=5 )

     4. Adukan beton dituang ditempat yang dikehendaki 4. Utk 1 m3 dibutuhkan 7,5 PC (40 kg/zak) atau 300 kg Pc/m3

      dan getar supaya padat 5. Perancah langsung dipasang ditempat

     6. Tidak termasuk pekerjaan pembesian

     7. Dipakai agregat pecah dan tersaring

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 1 1 L.061 1 95,000.0 95,000.0

     - Buruh tak terampil 12 1 L.101 12 65,000.0 780,000.0

     - Buruh semi terampil 2 1 L.103 2 66,000.0 132,000.0

    SUB JUMLAH 1,007,000.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Pasir ayak utk beton 3.00 M3 M.041 200,000.0 600,000.0

     - Semen / PC 38.40 50 kg/Zak M.080 68,000.0 2,611,200.0

     - Kerikil pecah tersaring 4.60 M3 K.017 357,050.0 1,642,430.0

     - Alat bantu (set @ 3 alat) 0.60 Set M.170 300,000.0 180,000.0

    SUB JUMLAH 5,033,630.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Alat penggetar beton (4 HP) 1 1 E.089 5 0.0 0.0

     - Pengaduk beton (125 Ltr/5 HP) 1 1 E.251 5 0.0 0.0

     - Pompa air 30 M3/jam 1 1 E.341 5 0.0 0.0

    SUB JUMLAH 0.00

    6,040,630.00

    VOLUME

    QUANTITY 6 M3 HARGA SATUAN 1,006,771.67 PER M3

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    45/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN KONSTRUKSI PASANGAN BATU K.810

    LOKAL & KABUPATEN (MENGGUNAKAN BURUH)

    URAIAN ANGGAPAN/ASUMSI

     1. Material ditimbun dilokasi pekerjaan oleh pemasok 1. Dilakukan untuk pekerjaan gorong-gorong,jembatan,

     2. Pekerja membawa batu pecah ketukang batu dinding penahan tnh dan struktur lainnya yg menggunakan

     3. Tk. batu memasang bt pecah dgn adukan pasir seme konstruksi pasangan batu

     2. Material dikirim ketempat pekerjaan oleh pemasok

     3. Tidak termasuk galian/timbun

     4. Biaya alat bantu tambahan sudah termasuk biaya kira_2

    ekivalen utk lubang drainase (diperbolehkan pakai bambu)

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 1 1 L.061 1 95,000.0 95,000.0

     - T u k an g 4 1 L.079 4 82,500.0 330,000.0

     - Buruh tak terampil 12 1 L.101 12 65,000.0 780,000.0

    SUB JUMLAH 1,205,000.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Batu quarry 5.00 M3 M.010 165,000.0 825,000.0

     - Pasir ayak untuk beton 1.20 M3 M.041 200,000.0 240,000.0

     - Semen / PC 15.20 50 kg/Zak M.080 68,000.0 1,033,600.0

     - Alat bantu (set @ 3 alat) 0.70 Set M.170 300,000.0 210,000.0

    SUB JUMLAH 2,308,600.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Pompa air (diameter 50 mm) 1 1 E.341 2 0.0 0.0

    SUB JUMLAH 0.00

    3,513,600.00

    VOLUME

    QUANTITY 5 M3 HARGA SATUAN 702,720.00 PER M3

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    46/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN BRONJONG PENAHAN K.815

    LOKAL & KABUPATEN

    URAIAN ANGGAPAN/ASUMSI

     1. Gali muka tanah untuk tempat bronjong 1. Batu dikirim kelapangan oleh Leveransir 

     2. Rangkai dan bentuk anyaman bronjong 2. Anyamn bronjong dikirim kelapangan oleh leveransir 

     3. Isi anyaman kawat dengan batu 3. Selesai dalam 2 hari

     4. Anyaman dibuat kokoh dengan ikatan kawat

     5. Timbun kembali hingga mantap

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 1 2 L.061 2 95,000.0 190,000.0

     - Buruh tak terampil 35 2 L.101 70 65,000.0 4,550,000.0

     - Buruh terampil 2 2 L.106 4 72,000.0 288,000.0 - Buruh semi terampil 5 2 L.103 10 66,000.0 660,000.0

    SUB JUMLAH 5,688,000.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Batu belah 25.00 M3 M.020 300,000.0 7,500,000.0

     - Kawat bronjong 200.00 Kg M.162 30,500.0 6,100,000.0

     - Alat bantu 3.30 Set M.170 300,000.0 990,000.0

    SUB JUMLAH 14,590,000.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

    SUB JUMLAH 0.00

    20,278,000.00

    VOLUME

    QUANTITY 25 M3 HARGA SATUAN 811,120.00 PER M3

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    47/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN PEMBENTUKAN dan PERATAAN BAHU JALAN K.855

    LOKAL & KABUPATEN (MENGGUNAKAN ALAT )

    URAIAN ANGGAPAN/ASUMSI

     1. Grader melakukan 1 lintasan untuk memotong dan 1. Menggunakan alat berat

    1 lintasan untuk meratakan sepanjang bahu jalan 2. Mandor mengawasi juga pekerjaan lain

     2. Buruh membersihkan sekeliling gorong2 dan rintanga 3. Meratakan bahu jalan 5 Km/hari

      rintangan nya 4. Harga satuan ini untuk satu sisi jalan

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - Mandor 1 1 L.061 1 95,000.0 95,000.0

     - Operator terampil 1 1 L.081 1 97,000.0 97,000.0

     - Buruh tak trampil 4 1 L.101 4 65,000.0 260,000.0

    SUB JUMLAH 452,000.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Alat bantu 0.20 Set M.170 300,000.0 60,000.0

      ( set @ 3 alat )

    SUB JUMLAH 60,000.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Motor Grader 1 1 E.010 5 0.0 0.0

    SUB JUMLAH 0.00

    512,000.00

    VOLUME

    QUANTITY 5 Km HARGA SATUAN 102,400.00 PER Km

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    48/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN PERATAAN KEMBALI JALAN KERIKIL K.860

    LOKAL & KABUPATEN (MENGGUNAKAN ALAT)

    URAIAN ANGGAPAN/ASUMSI

     1. Grader membuat lintasan pemotongan 2 kali dan 1. Menggunakan alat berat

      lintasan penyebaran 3 kali. 2. Mandor melakukan juga pengawasan pek.lain dengan baik

     3. Hasil kerja grader 2 Km/hari

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - Mandor 1 1 L.061 1 95,000.0 95,000.0

     - Operator terampil 1 1 L.081 1 97,000.0 97,000.0

     - Sopir terampil 1 1 L.091 1 77,500.0 77,500.0

     - Buruh tak trampil 2 1 L.101 2 65,000.0 130,000.0

    SUB JUMLAH 399,500.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Alat bantu 0.20 Set M.170 300,000.0 60,000.0

      ( set @ 3 alat )

    SUB JUMLAH 60,000.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Motor Grader 1 1 E.010 5 0.0 0.0

     - Truk tangki 1 1 E.182 5 0.0 0.0

    SUB JUMLAH 0.00

    459,500.00

    VOLUME

    QUANTITY 2 Km HARGA SATUAN 229,750.00 PER Km

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    49/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. D IT. PERENCANAAN JALAN PERBAIKAN LUBANG JALAN KERIKIL K.865

    LOKAL & KABUPATEN (MENGGUNAKAN BURUH)

    URAIAN ANGGAPAN/ASUMSI

     1. Digali persegi sampai dasar yang mantap 1. Kedalam rata-rata 10 Cm

     2. Mengganti bahan LPA 2. Termasuk pengadaan material

     3. Tutup dengan bahan agak halus 3. Rata-rata hasil kerja kelompok 40 M2/hari

     4. Padatkan rata dengan permukaan jalan 4. Umur alat bantu rata-rata 1 bln/orang /set

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 1 3 L.061 3 95,000.0 285,000.0

     - Operator terampil 1 1 L.081 1 97,000.0 97,000.0

     - Operator semi terampil 1 1 L.082 1 71,500.0 71,500.0

     - Sopir terampil 1 3 L.091 3 77,500.0 232,500.0 - Buruh semi terampil 1 1 L.103 1 66,000.0 66,000.0

     - Buruh tak terampil 12 3 L.101 36 65,000.0 2,340,000.0

     - Buruh terampil 1 3 L.106 3 72,000.0 216,000.0

    SUB JUMLAH 3,308,000.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Kerikil sungai - Royalti 18.00 M3 MR.12 250,000.0 4,500,000.0

     - Pasir urug 2.00 M3 M.040 162,000.0 324,000.0

     - Alat bantu 1.50 Set M.170 300,000.0 450,000.0

    SUB JUMLAH 5,274,000.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Tamper 1 2 E.088 9 0.0 0.0

     - truk bak terbuka 3.5 T 1 3 E.221 15 0.0 0.0

     - Buldozer 110 HP 1 1 E.001 2 0.0 0.0

     - Alat Pemecah Batu 1 1 E.031 2 0.0 0.0

     - Wheel Loader 115 HP 1 1 E.052 2 0.0 0.0

     - Dump Truk 1 1 E.212 6 0.0 0.0

    SUB JUMLAH 0.00

    8,582,000.00

    VOLUME

    QUANTITY 120 M2 HARGA SATUAN 71,516.67 PER M2

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    50/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN PERBAIKAN AMBLAS JALAN KERIKIL K.870

    LOKAL & KABUPATEN (MENGGUNAKAN BURUH)

    URAIAN ANGGAPAN/ASUMSI

     1. Gali dan buang mtrl LPA yg bercampur lempung 1. Pengadaan agregat dilokasi pekerjaan oleh pemasok

    2. Hampar mtrl yg tdk tercampur lempung & padatkan 2. Galian sedalam 40 cm

     3. Pasok, hampar dan padatkan agregat 3. Truk membuang tnh yg tdk dikehendaki sejauh 1 km

     4. Lapisan perkerasan lama setebal 10 cm dapat

    digunakan lagi (25%)

     5. Kapasitas kerja kelompok 25 M2/hari

     6. Umur alat bantu rata-rata 1 bln/orang/set @ 3 alat

    PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA SUB TOTAL

    ORANG OH Rp./Or/Hr ( Rp ) ( Rp )

     - M a n d o r 1 3 L.061 3 95,000.0 285,000.0

     - Operator terampil 1 2 L.081 2 97,000.0 194,000.0

     - Operator semi terampil 1 1 L.082 1 71,500.0 71,500.0

     - Sopir terampil 2 2 L.091 4 77,500.0 310,000.0 - Buruh semi terampil 1 2 L.103 2 66,000.0 132,000.0

     - Buruh tak terampil 13 3 L.101 39 65,000.0 2,535,000.0

     - Buruh terampil 2 3 L.106 6 72,000.0 432,000.0

    SUB JUMLAH 3,959,500.00

    MATERIAL JUMLAH SAT. KODE HARGA BIAYA SUB TOTAL

    VOLUME SATUAN ( Rp ) ( Rp )

     - Kerikil sungai - Royalti 40.00 M3 MR.12 250,000.0 10,000,000.0

     - Alat bantu 1.60 Set M.170 300,000.0 480,000.0

      ( set @ 3 alat )

    SUB JUMLAH 10,480,000.00

    PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL

     ALAT KERJA KERJA Rp/JAM ( Rp ) ( Rp )

     - Mesin Gilas bergetar 1 2 E.087 12 0.0 0.0

     - Tamper 1 2 E.088 9 0.0 0.0

     - truk bak terbuka 3.5 T 1 2 E.221 10 0.0 0.0

     - Buldozer 110 HP 1 1 E.001 3 0.0 0.0

     - Alat Pemecah Batu 1 1 E.031 3 0.0 0.0

     - Wheel Loader 115 HP 1 1 E.052 3 0.0 0.0

     - Dump Truk 1 1 E.212 12 0.0 0.0 0.00

    14,439,500.00

    VOLUME

    QUANTITY 75 M2 HARGA SATUAN 192,526.67 PER M2

    HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN,

    DAN PUNGUTAN RESMI LAINNYA KECUALI PPN

  • 8/16/2019 Rab Jembatan Mekarsari

    51/89

    DIREKTORAT JENDRAL BINA MARGA ANALISA BIAYA PEKERJAAN

    DIREKTORAT BINA PROGRAM JALAN KODE

    SUB. DIT. PERENCANAAN JALAN PENGHAMPARAN JLN KERIKIL 5 Cm PADAT K.875

    LOKAL & KABUPATEN (MENGGUNAKAN BURUH)

    URAIAN ANGGAPAN/ASUMSI

     1. Perkerasan lama dibentuk ulang dgn tenaga manusia 1.