TANGGAL PERUSAHAAN DIREKTUR JABATAN

Tangerang, 15 Pebruari 2012 PT. VISTHA SARANA UTAMA Direktur

REKAPITULASI PERHITUNGAN TINGKAT KOMPONEN DALAM NEGERI (TKDN)

URAIAN PEKERJAAN DN (a) A I BARANG Material Langsung (Bahan Baku) II Peralatan (Barang Jadi) A. Sub total Barang B III JASA Manajemen Proyek dan Perekayasaan IV Alat Kerja / Fasilitas Kerja V Kosntruksi dan Pabrikasi VI Jasa Umum (b)

NILAI GABUNGAN BARANG/JASA Rp Total LN Rp (c) (d)

TKDN % KDN (e) BARANG/JASA (f) GABUNGAN (g)

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

.

-

-

B. Sub Total Jasa C. TOTAL Biaya (A + B) Catatan ( Note ) * % TKDN Gabungan

-

-

-

-

-

-

=

Jumlah biaya Komponen Dalam Negeri Barang + Jasa Jumlah Biaya total

Tangerang, 15 Pebruari 2012 Penawar, PT. VISTHA SARANA UTAMA

0 Direktur

TIME SCHEDULE PENINGKATAN JALAN AREA PABRIK POLIGON UTAMA TANGERANG 2012WAKTU PELAKSANAAN 60 HARI KALENDER BULAN II MGG IV MGG V MGG VI MGG VII MGG VIII KETERANGAN (BOBOT %)

NO

URAIAN PEKERJAAN

BOBOT % MGG I

BULAN I MGG II MGG III

BULAN III MGG IX

I II III

PEKERJAAN PERSIAPAN PEKERJAAN BADAN JALAN PEK. PENYELESAIAN TOTAL RENCANA PROGRES MINGGUAN RENCANA KOMULATIF MINGGUAN

1.383 98.595 0.023 100.000

1.383 16.43 16.43 16.43 16.43 16.43 16.43 0.011 1.383 1.383 16.432 17.82 16.432 34.25 16.432 50.68 16.432 67.11 16.432 83.55 16.432 99.98 0.011 99.99 0.011 0.011 100.00

Tangerang, 15 Pebruari 2012 PT. VISTHA SARANA UTAMA

Direktur

NO I II III

URAIAN PEKERJAAN PEKERJAAN PERSIAPAN PEKERJAAN BADAN JALAN PEKERJAAN PENYELESAIAN TOTAL PPN 10% TOTAL DIBULATKAN

Terbilang : 0

JUMLAH 12,285,793.00 875,935,885.00 200,000.00 888,421,678.00 88,842,167.80 977,263,845.80 977,263,000.00

BOBOT %

REKAPITULASI RINCIAN ANGGARAN BIAYA PENINGKATAN JALAN AREA PABRIK POLIGON UTAMA TANGERANG

NO

URAIAN PEKERJAAN

JUMLAH

I II III

PEKERJAAN PERSIAPAN PEKERJAAN BADAN JALAN PEK. PENYELESAIAN TOTAL PPN 10% TOTAL DIBULATKAN

12,285,793.00 875,935,885.00 200,000.00 888,421,678.00 88,842,167.80 977,263,845.80 977,263,000.00

Terbilang : Sembilan ratus tujuh puluh tujuh juta dua ratus enam puluh tiga ribu rupiah.

Tangerang, 15 Pebruari 2012 PT. VISTHA SARANA UTAMA

Direktur

RINCIAN ANGGARAN BIAYA

Nama Kegiatan Pekerjaan Lokasi Volume NOa

: : : :

PENINGKATAN JALAN Peningkatan Jalan Beton Pabrik Poligon Utama - Tangerang Pj. 100 m' Lb. 25 m' VOLUME SATUAN KODE HARGA SATUAN JUMLAH HARGAc d e f g

URAIAN PEKERJAANb

I PEKERJAAN PERSIAPAN 1 Pek. Pembuatan Direksi Keet 2 Pek. Pengukuran Dan Pemasangan Patok 3 Pek. Papan Nama Proyek 4 Pek. Administrasi & Dokumentasi 5 Mobilisasi SUB TOTAL I II PEKERJAAN BADAN JALAN A PEKERJAAN PELEBARAN JALAN

12.00 100.00 1.00 1.00 1.00

m2 m bh Ls Ls

A 04 A 07 A 05 Ls Ls

512,906.00 2,411.00 389,821.00 500,000.00 5,000,000.00

6,154,872.00 241,100.00 389,821.00 500,000.00 5,000,000.00 12,285,793.00

1 Pek Galian Tanah tb. 40 cm, menggunakan Alat Berat 1,000.00 m3 2 Pek Buangan Tanah 1,000.00 m3 3 Pek Pas. LPA Kelas A Agregat Pecah Tersaring (badan Jalan), tb. 15 cm 375.00 m3 B PEKERJAAN PERKERASAN KAKU 1 2 3 4 5 6 Pek. Pek. Pek. Pek. Pek. Pek. Perancah Kayu Konstruksi Beton (Bekisting) , tinggi 20 cm 210.00 Beton Lantai Kerja B0 125.00 Pasangan Plastik Bond Breaker 2,500.00 Pas. Tulangan Wiremesh D8 mm 9,875.00 Beton Struktur K 350 Tb. 20 cm (Ready Mix Concrete) 500.00 Cutter Joint + Joint Sealent 475.00 SUB TOTAL II III PEK. PENYELESAIAN 1 Pek. Bongkaran Direksikeet 2 Pek. Pemberesan lapangan SUB TOTAL III 1.00 1.00 Ls Ls M3 m3 m2 kg M3 M

D 01 Q 04

31,485.00 60,000.00 249,032.00

31,485,000.00 60,000,000.00 93,387,000.00

I 01 F01 Q 13 R 14a F 06 Q14

130,306.00 689,792.00 3,300.00 14,173.00 849,842.00 9,150.00

27,364,260.00 86,224,000.00 8,250,000.00 139,958,375.00 424,921,000.00 4,346,250.00 875,935,885.00

Ls Ls

100,000.00 100,000.00

100,000.00 100,000.00 200,000.00

REKAPITULASI ANALISA HARGA PEKERJAAN PROYEK

NO

K. Baru

PEKERJAAN

SATUAN

HARGA SAT. PEKERJAAN (Rp) 27,583.00 512,906.00 389,821.00 2,411.00 8,299,500.00 6,971,250.00 4,438,500.00 47,242.00 28,506.00 18,736.00 395,989.00 94,820.00 59,400.00 31,485.00 43,450.00 53,460.00 63,646.00 57,816.00 69,960.00 19,030.00 12,232.00 31,900.00 206,140.00 341,954.00 187,954.00 170,115.00 100,155.00 171,669.00 55,913.00 33,799.00 226,442.00 246,840.00 137,772.71 291,957.00 970,986.00 161,929.00 40,328.00 728,068.00 689,792.00 712,892.00 760,192.00 779,442.00 820,142.00 849,842.00 851,350.00 122,655.00 108,043.00 3,392,840.00 6,933,300.00 4,894,208.00 44,946.00 73,650.00 130,306.00 174,772.00 117,550.00 345,074.00 498,854.00 161,726.00 28,110.00 51,089.00 45,743.00 22,110.00 20,295.00 249,032.00 299,769.00 273,552.00 249,032.00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67

A 02 A 04 A 05 A 07 B 01 B 02 B 03 B 04 B 05 B 06 C 01 C 02 C 04 D 01* D 01 D 02 D 03 D 06 D 08 D 10 D 11 D 12 D 13 D 14 D 15 D 16 D 17 D 18 D 19 D 21 D 22 D 23 D 24 D 25 E 01 E 05 E 08 E 11 F 01 F 02 F 03 F 04 F 05 F 06 F 08 G 05 G 06 H 02 H 03 H 04 H 14 H 15 I 01 I 02 I 03 I 04 I 05 I 06 I 08 J 03 J 04 N 11 N 12 Q 01 Q 02 Q 03 Q 04

1 M1 PEK. PASANGAN BOUWPLANK 1 M2 PEK. KANTOR DIREKSI 1 M2 PAPAN NAMA PROYEK PENGUKURAN DAN PEMASANGAN PATOK MOBILISASI ALAT BERAT (KHUSUS PEKERJAAN HOT MIX) JARAK JAUH/RIT MOBILISASI ALAT BERAT (KHUSUS PEKERJAAN HOT MIX) JARAK SEDANG/RIT MOBILISASI ALAT BERAT (KHUSUS PEKERJAAN HOT MIX) JARAK DEKAT/RIT MOBILISASI MATERIAL (UNTUK LANGSIR/KHUSUS PEKERJAAN BETON) JARAK JAUH / M3 (> 3 km) MOBILISASI MATERIAL (UNTUK LANGSIR/KHUSUS PEKERJAAN BETON) JARAK SEDANG / M3 (2 - 3 km) MOBILISASI MATERIAL (UNTUK LANGSIR/KHUSUS PEKERJAAN BETON) JARAK DEKAT / M3 (1 - 2 km) BONGKARAN BETON BERTULANG BONGKARAN BETON BERTULANG DENGAN MENGGUNAKAN ALAT BONGKARAN DINDING BATA/BATU GALIAN TANAH BIASA (MEKANIK) GALIAN TANAH BIASA SEDALAM 1 M GALIAN TANAH BIASA SEDALAM 2 M GALIAN TANAH BIASA SEDALAM 3 M GALIAN TANAH KERAS SEDALAM 1 M GALIAN TANAH LUMPUR SEDALAM 1 M PEMBUANGAN TANAH SEJAUH 30 M PERATAAN TANAH PEMADATAN TANAH URUGAN PASIR PENGURUGAN DAN PEMADATAN DGN SIRTU (MENGGUNAKAN BURUH) PENGURUGAN DAN PEMADATAN DGN TANAH PILIHAN (MENGGUNAKAN BURUH) PENIMBUNAN BADAN JALAN (MENGGUNAKAN BURUH) PEMADATAN BADAN JALAN (MENGGUNAKAN BURUH) PENYIAPAN TANAH DASAR (MENGGUNAKAN BURUH) PENYIAPAN TANAH DASAR (MENGGUNAKAN ALAT) PERATAAN TANAH DAN PEMADATAN SETIAP 20 CM DENGAN ALAT URUGAN PASIR DAN PEMADATAN SETIAP 20 CM DENGAN ALAT PEKERJAAN URUGAN SIRTU UNTUK PONDASI PEMBENTUKAN BAHU JALAN (MENGGUNAKAN BURUH) PEMBENTUKAN BAHU JALAN MATERIAL SPLIT 5 - 7 (MENGGUNAKAN BURUH) PEKERJAAN PONDASI BATAKO AD. 1 : 4 PEKERJAAN STOOTWERK PASANGAN SIARAN AD. 1 : 2 PASANGAN BATU BELAH 1 PC : 4 PS (MENGADUK MORTAR DENGAN CONCRETE MIXER) PENGHAMPARAN BETON NON STRUKTUR/RABAT KELAS Bo (READY MIX CONCRETE) PENGHAMPARAN BETON STRUKTUR K 125 (READY MIX CONCRETE) PENGHAMPARAN BETON STRUKTUR K 175 (READY MIX CONCRETE) PENGHAMPARAN BETON STRUKTUR K 225 (READY MIX CONCRETE) PENGHAMPARAN BETON STRUKTUR K 300 (READY MIX CONCRETE) PENGHAMPARAN BETON STRUKTUR K 350 (READY MIX CONCRETE) BETON STRUKTUR K 225 (SITE MIX) 1 M2 PASANGAN BATA MERAH 1 : 3 1 M2 PASANGAN BATA MERAH 1 : 4 1 M3 KUDA-KUDA BORNEO SUPER 1 M3 KUDA-KUDA KAMPER KRUING 1 M3 KUDA-KUDA KAMPER BANJAR PASANG ATAP SENG GELOMBANG PASANG BUBUNG SENG STEEL GELOMBANG PERANCAH KAYU KONSTRUKSI BETON (BEKISTING) PASANG RANGKA DINDING PEMISAH KAYU KAMPER PASANG RANGKA DINDING PEMISAH KAYU BORNEO PASANG DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KAMPER PASANG DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KAMPER PASANG DINDING TRIPLEKS & RANGKA KAYU BALOK BORNEO PASANG TRIPLEKS TEBAL 3 MM 1 M2 PLESTERAN DINDING 1 : 3 + ACIAN PLESTERAN 1 PC : 3 PS, TEBAL 15 MM PENGECATAN PERMUKAAN BAJA DOWEL DENGAN MENI BESI PENGECATAN PERMUKAAN BAJA GALVANIZE LAPIS PONDASI BAWAH KELAS A SIRTU TERSARING (MENGGUNAKAN ALAT) LAPIS PONDASI BAWAH KELAS C SIRTU TERSARING BERGRADASI (MENGGUNAKAN BURUH) LAPIS PONDASI BAWAH KELAS C AGREGAT PECAH TERSARING (MENGGUNAKAN BURUH) LAPIS PONDASI ATAS KELAS A AGREGAT PECAH TERSARING (MENGGUNAKAN BURUH)

m m2 m2 m Rit Rit Rit m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 ARE m3 m3 m3 m3 m3 m3 m3 m m2 m3 m3 m3 m3 m3 m3 m3 m3 m2 m2 m3 m3 m3 m2 m m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m3 m3 m3 m3

NO 68 69 70

K. Baru Q 05 Q 06 Q 07

PEKERJAAN PASANGAN LAPIS ATB (MENGGUNAKAN ALAT) LABUR ASPAL DUA LAPIS (BURDA) PASANGAN LAPEN

SATUAN m3 m2 m2

HARGA SAT. PEKERJAAN (Rp) 2,184,302.00 44,323.00 77,559.00

NO 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 95 96

K. Baru Q 08 Q 09 Q 10 Q 11 Q 12 Q 13 Q 14 Q 15 Q 19 R 10 R 11 R 14 R 14a S 01 S 06 S 07 S 08 S 09 S 10 S 11 S 12 S 13 S 14 S 15 S 16 K.112 K.705 DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT SNI-Bo SNI-PD5 SNI-CAT8 SNI-CAT14

PEKERJAAN LAPIS ASPAL RESAP PELEKAT (PRIME COAT) LAPIS ASPAL PELEKAT (TACK COAT) PENGHAMPARAN LAPIS TIPIS ASPAL BETON (MENGGUNAKAN ALAT) PENGHAMPARAN LAPIS TIPIS ASPAL BETON PENGHAMPARAN LAPIS ASPAL BETON-LASTON AC (MENGGUNAKAN ALAT) PLASTIK BOND BREAKER 1 M1 JOINT CUTTER & JOINT SEALENT PASANGAN CANSTEEN UK. 20.30.60 1 M2 PASANGAN PAVING BLOCK NATURAL 8 CM MENEMPA GELAGAR BESI PASANG GELAGAR BESI PENULANGAN BETON (BESI ULIR) PENULANGAN BETON (BESI POLOS) 1 M2 PASANGAN LEMPENGAN RUMPUT SAMPAI TUMBUH PAS. KISDAM + BONGKARAN (KARUNG) PAS. KISDAM + BONGKARAN (BAMBU) PASANGAN CERUCUK DOLKEN PASANGAN SULINGAN PEKERJAAN ANYAMAN BRONJONG TB. 3 MM UK. 1 M3 PASANGAN RAILING PIPA GALVANIS (2 BARIS) PELUMURAN BESI DOWEL DENGAN OLI 1 BUAH PASANG PVC 1" untuk DOWEL 1 BUAH PASANG DOP PVC 1" untuk DOWEL 1 M PASANG PVC 4" 1 M1 PASANG BESI SIKU 5 CM PASANGAN BATU PADA PARIT (MENGGUNAKAN BURUH) KONSTRUKSI PASANGAN BATU (MENGGUNAKAN BURUH) ADUKAN 1 : 5 1 M2 MARKA JALAN THERMOPLASTIK PEKERJAAN PASANGAN BRONJONG RANGKA KAYU PENGECATAN TEMBOK LAMA 1/2 BUIS BETON DIA. 20 / 1 M' 1/2 BUIS BETON DIA. 30 / 1 M' BUIS BETON DIA. 30 / 1 M' U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 40 X 40 U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 50 X 50 U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 60 X 60 U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 40 X 60 U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 50 X 70 U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 60 X 70 U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 60 X 80 U - DITCH PRECAST TANPA TUTUP, UK. 40 X 40 U - DITCH PRECAST TANPA TUTUP, UK. 50 X 50 U - DITCH PRECAST TANPA TUTUP. UK. 60 X 60 U - DITCH PRECAST TANPA TUTUP, UK. 80 X 80 U - DITCH PRECAST TANPA TUTUP, UK. 100 X 100 U - DITCH PRECAST TANPA TUTUP, UK. 40 X 60 U - DITCH PRECAST TANPA TUTUP, UK. 50 X 70 U - DITCH PRECAST TANPA TUTUP, UK. 60 X 70 U - DITCH PRECAST TANPA TUTUP, UK. 60 X 80 PEKERJAAN BOX CULVERT BETON BERTULANG PRECAST UK. 40 X 40 PEKERJAAN BOX CULVERT BETON BERTULANG PRECAST, UK. 50 X 50 PEKERJAAN BOX CULVERT BETON BERTULANG PRECAST, UK. 60 X 60 PEKERJAAN BOX CULVERT BETON BERTULANG PRECAST, UK. 80 X 80 PEKERJAAN BOX CULVERT BETON BERTULANG PRECAST, UK. 100 X 100 PAS . COVER LIGHT DUTY UK. 40 PAS . COVER HEAVY DUTY UK. 40 PAS . COVER LIGHT DUTY UK. 50 PAS . COVER HEAVY DUTY UK. 50 PAS . COVER LIGHT DUTY UK. 60 PAS . COVER HEAVY DUTY UK. 60 PAS . COVER LIGHT DUTY UK. 80 PAS . COVER HEAVY DUTY UK. 80 PAS . COVER LIGHT DUTY UK. 100 PAS . COVER HEAVY DUTY UK. 100 BETON NON STRUKTUR/RABAT KELAS Bo (SITE MIX) PASANG PONDASI BATU BELAH 1 PC : 4 PS PENGECATAN BIDANG KAYU BARU (1 LPS PLAMIR, 1 LPS CAT DASAR, 2 LPS CAT PENUTUP) PENGECATAN TEMBOK BARU (1 LPS PLAMIR, 1 LPS CAT DASAR, 2 LPS CAT PENUTUP) 1 M2 FINISHING GRID RIGID PAVEMENT / TROWEL BERGARIS 1 M2 CURING BETON

SATUAN m2 m2 m2 m2 m2 m2 m bh m2 kg kg kg kg m2 m m m2 m2 m m ltr bh bh m m m' m3 m m m3 m2 m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m3 m3 m2 m2 m m

HARGA SAT. PEKERJAAN (Rp) 15,490.00 3,659.00 80,331.00 78,435.00 115,579.00 3,300.00 9,150.00 54,846.00 120,274.00 30,162.00 1,485.00 18,257.00 14,173.00 49,720.00 333,098.00 92,070.00 115,280.00 21,385.00 227,111.00 120,508.00 3,869.00 4,224.00 3,399.00 54,890.00 23,027.00 447,422.00 779,680.00 237,512.00 480,155.00 2,517,075.00 7,146.00 180,923.00 224,868.00 206,239.00 494,731.00 723,952.00 866,701.00 633,121.00 897,079.00 958,429.00 1,047,579.00 355,077.00 520,463.00 618,817.00 935,976.00 1,617,752.00 446,052.00 657,055.00 695,804.00 760,754.00 927,133.00 1,074,629.00 1,412,257.00 2,618,586.00 3,159,285.00 196,200.00 253,800.00 252,000.00 347,400.00 302,400.00 437,400.00 385,200.00 594,000.00 579,600.00 747,000.00 708,813.00 721,336.00 45,364.00 32,708.00 4,081.37 3,150.24

-

Harga Satuan Harga Satuan Harga Satuan Harga Satuan

Pekerjaan sudah termasuk keuntungan 10% Pekerjaan belum termasuk PPN 10 % Pekerjaan per triwulan akan dievaluasi Pekerjaan belum termasuk antisipasi terhadap kenaikan BBM

0 0

NO

K. Baru

PEKERJAAN

SATUAN -

HARGA SAT. PEKERJAAN (Rp)

DAFTAR HARGA SATUAN UPAH PEKERJA

NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PEKERJA PEKERJA SETENGAH TERAMPIL PEKERJA TERAMPIL TUKANG GALI TUKANG BATU SETENGAH TERAMPIL TUKANG BATU TERAMPIL KEPALA TUKANG BATU TUKANG KAYU SETENGAH TERAMPIL TUKANG KAYU TERAMPIL KEPALA TUKANG KAYU

KOMPONEN

UPAH / HARI 50,000.00 60,000.00 70,000.00 50,000.00 60,000.00 70,000.00 80,000.00 60,000.00 70,000.00 80,000.00 60,000.00 70,000.00 80,000.00 60,000.00 70,000.00 80,000.00 60,000.00 70,000.00 80,000.00 80,000.00 80,000.00 70,000.00 60,000.00 50,000.00 50,000.00 50,000.00 50,000.00 60,000.00

KETERANGAN 1 ORG/ HR/ 8 JAM 1 ORG/ HR/ 8 JAM 1 ORG/ HR/ 8 JAM 1 ORG/ HR/ 8 JAM 1 ORG/ HR/ 8 JAM 1 ORG/ HR/ 8 JAM 1 ORG/ HR/ 8 JAM 1 ORG/ HR/ 8 JAM 1 ORG/ HR/ 8 JAM 1 ORG/ HR/ 8 JAM 1 ORG/ HR/ 8 JAM 1 ORG/ HR/ 8 JAM 1 ORG/ HR/ 8 JAM 1 ORG/ HR/ 8 JAM 1 ORG/ HR/ 8 JAM 1 ORG/ HR/ 8 JAM 1 ORG/ HR/ 8 JAM 1 ORG/ HR/ 8 JAM 1 ORG/ HR/ 8 JAM 1 ORG/ HR/ 8 JAM 1 ORG/ HR/ 8 JAM 1 ORG/ HR/ 8 JAM 1 ORG/ HR/ 8 JAM 1 ORG/ HR/ 8 JAM 1 ORG/ HR/ 8 JAM 1 ORG/ HR/ 8 JAM 1 ORG/ HR/ 8 JAM 1 ORG/ HR/ 8 JAM

TUKANG CAT / PELITUR SETENGAH TERAMPIL TUKANG CAT / PELITUR TERAMPIL KEPALA TUKANG CAT / PELITUR TUKANG BESI BETON SETENGAH TERAMPIL TUKANG BESI BETON TERAMPIL KEPALA TUKANG BESI BETON TUKANG BESI PROFIL SETENGAH TERAMPIL TUKANG BESI PROFIL TERAMPIL KEPALA TUKANG BESI PROFIL MANDOR OPERATOR ALAT BESAR PEMBANTU OPERATOR / MEKANIK/ OPERATOR ALAT SUPIR TRUK KENEK TRUK PENJAGA MALAM PETUGAS HARIAN TETAP BIDANG KEBERSIHAN, KETERTIBAN PASAR DAN MAKAM PHT PEMELIHARAAN RUAS JALAN SATGAS KEBERSIHAN/PENGANGKATAN SAMPAH DI SALURAN KALI

DAFTAR HARGA SATUAN BAHAN / MATERIAL

NO

BAHAN / MATERIAL

KODE

SATUAN

HARGA SATUAN

KET.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43

Abu Batu Alat Bantu Ampelas Halus Ampelas Kasar Ampelas Sedang Arang Kayu Aspal Bitumen Asphalt Liter (AC) Laston Asphalt Liter Emulsion Asphalt Liter Lataston (HRS) Asphalt Liter Treated Based (ATB) Bahan Bakar Residu Bambu dia 7 s/d 10 Bambu dia. 5 s/d 7 Bambu Gombong Bata BA-6-A (6 cm Abu) 1 m2= 44 Bh Bata BA-6-A (6 cm Merah) 1 m2= 44 Bh Bata BA-8-A (8 cm Abu) 1 m2= 44 Bh Bata BA-8-A (8 cm Abu) 1 m2= 44 Bh Bata Merah Bakar Kelas I Bata Merah Bakar Kelas II Bata Merah Oven (Klingker) Batako Besar 8 x 20 x 30 Batako Kecil 8 x 10 x 20 Batang Kelapa Batu Belah 10 - 15 cm Batu Belah Pondasi Batu Bronjol (untuk Bronjong) Batu Cadas Besar / Sedang Batu Pecah 0,5 - 1 cm Batu Pecah 1 - 2 cm Batu Pecah 2 - 3 cm Batu Pecah 3 - 5 cm Batu Pecah 5 - 7 cm Batu Pecah Tersaring A Batu Pecah Tersaring B Batu Pecah Tersaring C Batu Kali Baud (untuk jembatan) Besi BCR Lengkap Tiang (Tanpa Pondasi) Besi Beton U - 24 (Polos) Besi Beton U - 32 KS (Ulir) Besi Beton Diameter 6 mm M. 167 M. 163 M. 026 M. 025 M. 024 M. 023 M. 022 M. 012 M. 012 M. 012 M. 020 M. 020 M. 061 M. 170

m3 set lbr lbr lbr kg kg ton ltr ton ton ltr btg btg btg m2 m2 m2 m2 bh bh bh bh bh btg m3 m3 m3

Rp152,000.00 Rp120,000.00 Rp3,000.00 Rp3,000.00 Rp3,000.00 Rp10,000.00 Rp11,000.00 Rp837,000.00 Rp8,000.00 Rp960,000.00 Rp821,000.00 Rp5,500.00 Rp16,000.00 Rp13,000.00 Rp66,000.00 Rp51,200.00 Rp57,000.00 Rp66,500.00 Rp68,300.00 Rp500.00 Rp400.00 Rp1,000.00 Rp2,000.00 Rp1,500.00 Rp258,700.00 Rp185,000.00 Rp185,000.00 Rp132,000.00 Rp42,000.00 Rp169,000.00 Rp169,000.00 Rp169,000.00 Rp169,000.00 Rp169,000.00 Rp159,000.00 Rp159,000.00 Rp159,000.00 Rp185,000.00 Rp9,200.00 Rp282,400.00 Rp9,700.00 Rp13,000.00 Rp19,000.00 1 set @ 3 alat

m2 m3 m3 m3 m3 m3

m3 m3 m3 m3 bh m2

kg kg btg

NO

BAHAN / MATERIAL

KODE

SATUAN

HARGA SATUAN

KET.

44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98

Besi Beton Diameter 8 mm Besi Beton Diameter 10 mm Besi Beton Diameter 12 mm Besi Beton Diameter 16 mm Besi Beugel Kuda-kuda Besi Plat tebal 10 mm Besi Profil Besi Siku 3 x 30 x 30 mm ( 6 meter) Besi Siku 3 x 40 x 40 mm ( 6 meter) Besi Siku 3 x 50 x 50 mm (6 meter) Bilik Bambu (dengan Kulit) Bilik Bambu (tanpa Kulit) Blast Bit Bensin Premium Bondek Box Culvert 100.100.100 Box Culvert 40.40.100 Box Culvert 50.50.100 Box Culvert 60.60.100 Box Culvert 80.80.100 Buis Beton dia. 100 Buis Beton dia. 20 Buis Beton dia. 30 Buis Beton dia. 40 Buis Beton dia. 50 Buis Beton dia. 60 Buis Beton dia. 80 Buis Beton dia. 90 Cansteen 10.20.40 Cansteen 15.25.40 Cansteen 20.30.60 Cat Besi Duco Danaglos/ICI Cat Besi Sieve Cat Bronze Cat Cansteen Putih Cat Dasar Beton Eksterior (pelapis Alkali ICI) Cat Dasar Beton Interior (2 Pelapis) Cat Kayu Sieve Cat Menie Cat Minyak Cat Tembok ICI Eksterior Cat Tembok ICI Interior Cat Tembok Delux Cat Tembok Mowilex Cat Marka Chek Valve 1/2" Cover STU 100 Cm HD Cover STU 100 Cm LD Cover STU 40 Cm HD (Heavy Duty) Cover STU 40 Cm LD (Light Duty) Cover STU 50 Cm HD Cover STU 50 Cm LD Cover STU 60 Cm HD Cover STU 60 Cm LD Cover STU 80 Cm HD (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) m17b (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) m34

btg btg btg btg kg m kg btg btg btg lbr lbr kg ltr lbr m' (btg) m' (btg) m' (btg) m' (btg) m' (btg) bh bh bh bh bh bh bh bh bh bh bh kg kg kg 5 Kg ltr ltr kg kg kg galon galon galon galon kg bh btg btg btg btg btg btg btg btg btg

Rp34,000.00 Rp50,000.00 Rp79,000.00 Rp126,000.00 Rp31,100.00 Rp247,600.00 Rp10,200.00 Rp47,000.00 Rp67,400.00 Rp101,600.00 Rp98,900.00 Rp69,300.00 Rp42,800.00 Rp4,500.00 Rp119,400.00 Rp2,833,000.00 Rp843,000.00 Rp970,000.00 Rp1,273,000.00 Rp2,354,000.00 Rp476,000.00 Rp37,000.00 Rp48,000.00 Rp74,000.00 Rp148,000.00 Rp211,000.00 Rp338,000.00 Rp398,000.00 Rp16,000.00 Rp34,000.00 Rp41,000.00 Rp69,000.00 Rp37,000.00 Rp37,000.00 Rp43,000.00 Rp16,000.00 Rp38,000.00 Rp61,000.00 Rp21,000.00 Rp8,000.00 Rp1,014,000.00 Rp893,000.00 Rp330,000.00 Rp706,000.00 Rp88,000.00 Rp61,700.00 Rp415,000.00 Rp322,000.00 Rp141,000.00 Rp109,000.00 Rp193,000.00 Rp140,000.00 Rp243,000.00 Rp168,000.00 Rp330,000.00

NO

BAHAN / MATERIAL

KODE

SATUAN

HARGA SATUAN

KET.

99

Cover STU 80 Cm LD

(Kwalitas 1)

btg set kg kg kg kg kg kg btg btg m pasang pasang pasang bh bh bh bh bh bh bh bh bh bh bh bh m m m bh bh ikat bh bh m3/kg bh bh bh bh bh bh bh kg M. 167 M. 162 kg kg m2

Rp214,000.00 Rp223,668,200.00 Rp32,000.00 Rp40,000.00 Rp40,000.00 Rp15,000.00 Rp25,000.00 Rp20,000.00 Rp18,000.00 Rp22,000.00 Rp32,000.00 Rp13,000.00 Rp18,000.00 Rp34,000.00 Rp38,500.00 Rp29,000.00 Rp50,000.00 Rp18,000.00 Rp16,000.00 Rp20,000.00 Rp13,000.00 Rp11,000.00 Rp21,000.00 Rp19,000.00 Rp26,000.00 Rp32,000.00 Rp24,000.00 Rp27,000.00 Rp45,000.00 Rp13,000.00 Rp3,000.00 Rp11,000.00 Rp6,000.00 Rp6,000.00 Rp77,200.00 Rp1,370,900.00 Rp464,400.00 Rp624,300.00 Rp199,000.00 Rp82,400.00 Rp121,300.00 Rp6,200.00 Rp78,000.00 Rp17,000.00 Rp16,000.00 Rp13,000.00 Rp26,000.00 Rp73,700.00 Rp2,114,000.00 Rp4,862,000.00 Rp5,040,000.00 Rp7,721,300.00 Rp3,465,000.00 Rp3,354,800.00 Rp2,220,000.00

100 Deep Well dengan kelengkapannya kap. 150 liter/menit 101 Dempul San polac 102 Dempul sanpolac special polyester 103 Dempul Kayu 104 Dempul Lilin 105 Dempul Plastik 106 Dempul Plitur 107 Dolken 5 s/d 7 108 Dolken 7 s/d 10 109 Engsel Harmonika 110 Engsel Jendela 111 Engsel Patrun 112 Engsel Pintu 113 Gate Walve 1/2" 114 Gembok 115 Gergaji Besi 116 GIP Sambungan dia.1 1/2" 117 GIP Sambungan dia.1 1/4" 118 GIP Sambungan dia.1 3/4" 119 GIP Sambungan dia.1" 120 GIP Sambungan dia.1/2" 121 GIP Sambungan dia.2 1/2" 122 GIP Sambungan dia.2" 123 GIP Sambungan dia.3" 124 GIP Sambungan dia.4" 125 Grafel U 20 cm 126 Grafel U 30 cm 127 Grafel U 40 cm 128 Grendel 15 cm 129 Grendel 5 cm 130 Ijuk 131 Kape Kayu 132 Kape Tembok 133 Kapur pasang/Kapur Tembok 134 Karet Elastomerik 135 Karet Elastomerik (400 x 400 x 30 mm) 136 Karet Elastomerik (400 x 400 x 40 mm) 137 Karet Penyambung Pipa dia. 100 cm 138 Karet Penyambung Pipa dia. 60 cm 139 Karet Penyambung Pipa dia. 80 cm 140 Karung plastik 50 Kg 141 Kawat BC (Tembaga) 142 Kawat Beton 143 Kawat Bronjong 144 Kawat Harmonika 2 cm 145 Kawat Harmonika 4 cm 146 Kayu Bakar 147 Kayu Balok Borneo 148 Kayu Balok Kamper 149 Kayu Balok Kruing 150 Kayu Balok Kamper Samarinda 151 Kayu Balok Rasamala 152 Kayu Kamper Singkil 153 Kayu Papan Cor Borneo

m2 m3 m3 m3 m3 m3

m3 m3 m3

NO

BAHAN / MATERIAL

KODE

SATUAN

HARGA SATUAN

KET.

154 Kayu Borneo 5/7 155 Kayu Papan Kamper Singil 156 Kayu Papan Kruing 2 x 20 x 4m 157 Kayu Papan Kamper Samarinda 158 Kayu Reng 2/3 Borneo 159 Kayu Reng 2/3 Borneo 160 Kayu Reng 3/4 Borneo 161 Keramik 20 x 20 162 Keramik 20 x 25 163 Keramik 30 x 30 164 Kunci 2 Slaag Ancor Asli 165 Kunci 2 Slaag ISO 166 Kunci 2 Slaag Kuda Terbang 167 Kunci 2 Slaag ROYAL 168 Kunci 2 Slaag Silinder SEIS Asli Type 210 s/d 226 169 Kunci 2 Slaag Silinder Utama Standard 170 Kunci Gembok Besar 171 Kunci KM Bulat ALFA 172 Kunci KM Bulat Kualitas Biasa 173 Kunci Silinder ALFA Pintu Alumunium 174 Kwas 3 " 175 Lempengan Rumput 176 Lem Fox 177 Lem Kuning (Aibon) 178 Lem Mixed Epoxy Adhesive 179 Lem Paralon 180 Linggis 181 Macam2 Samb. Paralon 2 1/2" 182 Macam2 Samb. Paralon 3" 183 Macam2 Samb. Paralon 4" 184 Macam2 Sambungan GIP 1 1/4" 185 Macam2 Sambungan GIP 1" 186 Macam2 Sambungan GIP 1/2" 187 Macam2 Sambungan GIP 11/2" 188 Macam2 Sambungan GIP 13/4" 189 Macam2 Sambungan GIP 2 1/2" 190 Macam2 Sambungan GIP 2" 191 Macam2 Sambungan GIP 3" 192 Macam2 Sambungan GIP 3/4" 193 Macam2 Sambungan GIP 4" 194 Macam2 Sambungan Paralon 1 1/2" 195 Macam2 Sambungan Paralon 1 1/4" 196 Macam2 Sambungan Paralon 1 3/4" 197 Macam2 Sambungan Paralon 1" 198 Macam2 Sambungan Paralon 1/2" 199 Macam2 Sambungan Paralon 2" 200 Macam2 Sambungan Paralon 3/4" 201 Meni Kayu / Besi 202 Minyak Cat 203 Minyak Tanah 204 Multiplek 12 mm 120 x 240 205 Multiplek 18 mm 120 x 240 206 Multiplek 9 mm 120 x 240 207 Mur / Baut Beam 12 x 25 mm 208 Mur / Baut Blocking 16 x 30 mm M.065

m3 m3 m3 m3 m3 m3

Rp1,691,000.00 Rp6,195,000.00 Rp5,145,000.00 Rp5,285,000.00 Rp1,586,000.00 Rp1,586,000.00 Rp1,586,000.00 Rp41,000.00 Rp48,000.00 Rp48,000.00 Rp74,600.00 Rp74,600.00 Rp74,600.00 Rp74,600.00 Rp230,000.00 Rp275,600.00 Rp79,900.00 Rp47,900.00 Rp40,800.00 Rp258,000.00 Rp8,000.00 Rp35,000.00 Rp42,000.00 Rp48,000.00 Rp11,000.00 Rp7,000.00 Rp44,000.00 Rp12,800.00 Rp22,600.00 Rp32,400.00 Rp11,200.00 Rp9,000.00 Rp4,500.00 Rp12,800.00 Rp19,000.00 Rp37,700.00 Rp26,400.00 Rp45,300.00 Rp5,900.00 Rp52,800.00 Rp9,300.00 Rp8,200.00 Rp6,300.00 Rp4,700.00 Rp2,900.00 Rp13,400.00 Rp4,100.00 Rp27,000.00 Rp19,200.00 Rp13,000.00 Rp137,000.00 Rp192,000.00 Rp91,000.00 Rp2,000.00 Rp5,000.00

m3 m2 m2 m2 bh bh bh bh bh bh bh bh bh bh bh m2 kg kg kg bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh kg ltr ltr lbr lbr lbr bh bh

NO

BAHAN / MATERIAL

KODE

SATUAN

HARGA SATUAN

KET.

209 Mur / Baut Post 16 x 48 mm 210 Mur Baut Biasa dia.19 s/d 16 (5 cm) 211 Mur Baut HTB dia. 19 s/d 16 (5 cm) 212 Mur/Baut 0,25" 213 Mur/Baut 0,75" 214 Mur/Baut 10 cm 215 Oli (Drum) 216 Pagar BRC 217 Pagar Panel Beton t = 2 m 218 Paku 219 Paku Beton 7 cm 220 Palu 0,5 Kg 221 Papan 2/20 x 4 222 Pasir Beton 223 Pasir Pasang 224 Pasir Tras 225 Pasir Urug 226 Paving Block Natural 6 cm 227 Paving Block Natural 8 cm 228 Paving Block Warna 6 cm 229 Paving Block Warna 8 cm 230 Tebal 1.6 mm 600 mm 231 Pipa Btn Brtlg Dia. 0.50 M 232 Pipa Btn Brtlg Dia. 0.60 M 233 Pipa Btn Brtlg Dia. 0.80 M 234 Pipa Btn Brtlg Dia. 1 M 235 Pipa GIP Medium A 1 1/2" 236 Pipa GIP Medium A 1 1/4" 237 Pipa GIP Medium A 1 3/4" 238 Pipa GIP Medium A 1" 239 Pipa GIP Medium A 1/2" 240 Pipa GIP Medium A 2 1/2" 241 Pipa GIP Medium A 2" Tebal 1,8 mm 242 Pipa GIP Medium A 2" Tebal 2 mm 243 Pipa GIP Medium A 3" Tebal 2 mm 244 Pipa GIP Medium A 3/4" Tebal 1,8 mm 245 Pipa GIP Medium A 4" Tebal 1,8 mm 246 Pipa GIP Medium A 4" Tebal 2 mm 247 Pipa GIP Medium A 5" Tebal 1,8 mm 248 Pipa GIP Medium A 6" Tebal 1,8 mm 249 Pipa GIP Medium A 6" Tebal 2 mm 250 Pipa GIP Medium A 8" Tebal 1,8 mm 251 Pipa PVC (Sambungan) Jenis AW 4 " TY 252 Pipa PVC dia 1 1/2" (AW) 253 Pipa PVC dia 1 1/4" (AW) 254 Pipa PVC dia 1" (AW) 255 Pipa PVC dia 1/2" (AW) 256 Pipa PVC dia 2 1/2" (AW) 257 Pipa PVC U dia 2" (AW) 258 Pipa PVC dia 3" (AW) 259 Pipa PVC 3/4" (AW) 260 Pipa PVC dia 4" (AW) 261 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 1/2" 262 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 3/4" 263 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 1" M. 041 M.042 M. 041 M. 040 M. 166

bh bh bh bh bh bh Drum m2 m2 kg kg kg lbr m3 m3 m3 m3

Rp6,000.00 Rp5,000.00 Rp8,000.00 Rp2,000.00 Rp2,000.00 Rp5,000.00 Rp24,500.00 Rp338,000.00 Rp393,300.00 Rp15,000.00 Rp37,000.00 Rp26,600.00 Rp52,400.00 Rp187,000.00 Rp196,000.00 Rp243,000.00 Rp143,000.00 Rp37,000.00 Rp40,000.00 Rp37,000.00 Rp40,000.00 Rp512,900.00 Rp368,000.00 Rp519,000.00 Rp900,000.00 Rp1,423,000.00 Rp143,000.00 Rp119,000.00 Rp282,000.00 Rp95,000.00 Rp48,000.00 Rp264,000.00 Rp190,000.00 Rp211,000.00 Rp317,000.00 Rp79,000.00 Rp381,000.00 Rp611,000.00 Rp476,000.00 Rp571,000.00 Rp634,000.00 Rp761,000.00 Rp239,700.00 Rp47,000.00 Rp41,000.00 Rp27,000.00 Rp15,000.00 Rp88,000.00 Rp62,000.00 Rp119,000.00 Rp20,000.00 Rp196,000.00 Rp26,000.00 Rp32,000.00 Rp46,000.00

m2 m2 m2 m2 m' m' m' m' m' btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg bh btg btg btg btg btg btg btg btg btg btg btg btg

NO

BAHAN / MATERIAL

KODE

SATUAN

HARGA SATUAN

KET.

264 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 1 1/4" 265 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 1 1/2" 266 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 2" 267 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 2 1/2" 268 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 3" 269 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 4" 270 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 5" 271 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 6" 272 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 8" 273 Plamir tembok 274 Plat Besi Tipis 1 mm 275 Plat Strip 2 x 30 mm (6m) 276 Plat Strip 3 x 30 mm (6m) 277 Ply Wood 18 mm (120 x 240) 278 Plastik Bond Breaker 279 PVC (Sambungan) 1 1/4" 280 PVC (Sambungan) 1 3/4" 281 PVC (Sambungan) 1" 282 PVC (Sambungan) 1/2" 283 PVC (Sambungan) 2" 284 PVC (Sambungan) 3/4" 285 PVC (Sambungan) 1 1/2" 286 PVC (Sambungan) 2 1/2" 287 PVC (Sambungan) 3" 288 PVC (Sambungan) 4" 289 Pipa 200 CL Class 2 PC-I 290 Pipa 300 CL Class 2 PC-I 291 Pipa 400 CL Class 2 PC-I 292 Pipa 500 CL Class 2 PC-I 293 Pipa 600 CL Class 2 PC-I 294 Pipa 700 CL Class 2 PC-I 295 Pipa 800 CL Class 2 PC-I 296 Pipa 900 CL Class 2 PC-I 297 Pipa 1000 CL Class 2 PC-I 298 Pipa 1100 CL Class 2 PC-I 299 Pipa 1200 CL Class 2 PC-I 300 Pipa 1300 CL Class 2 PC-I 301 Pipa 1400 CL Class 2 PC-I 302 Pipa 1500 CL Class 2 PC-I 303 Pipa 1600 CL Class 2 PC-I 304 Pipa 1650 CL Class 2 PC-I 305 Pipa 1800 CL Class 2 PC-I 306 Pipa 2000 CL Class 2 PC-I 307 Pipa 2100 CL Class 2 PC-I 308 Pipa 300 FJ Class 2 309 Pipa 400 FJ Class 2 310 Pipa 500 FJ Class 2 311 Pipa 600 FJ Class 2 312 Pipa 700 FJ Class 2 313 Pipa 800 FJ Class 2 314 Pipa 900 FJ Class 2 315 Pipa 1000 FJ Class 2 316 Pipa 1100 FJ Class 2 317 Pipa 1200 FJ Class 2 318 Pipa 1300 FJ Class 2 Dusaspun (L=2.45 m) Dusaspun Dusaspun Dusaspun Dusaspun Dusaspun Dusaspun Dusaspun Dusaspun Dusaspun Dusaspun Dusaspun Dusaspun Dusaspun Dusaspun Dusaspun Dusaspun Dusaspun Dusaspun (L=2.45 m) (L=2.5 m) (L=2.5 m) (L=2.5 m) (L=2.5 m) (L=2.5 m) (L=2.5 m) (L=2.5 m) (L=2.5 m) (L=2.5 m) (L=2.5 m) (L=2.5 m)

btg btg btg btg btg btg btg btg btg kg kg btg btg lbr m2 bh bh bh bh bh bh bh bh bh bh btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg

Rp63,000.00 Rp82,000.00 Rp116,000.00 Rp149,000.00 Rp228,000.00 Rp352,000.00 Rp461,000.00 Rp692,000.00 Rp1,046,000.00 Rp16,600.00 Rp10,300.00 Rp29,400.00 Rp39,200.00 Rp262,100.00 Rp2,100.00 Rp6,000.00 Rp7,000.00 Rp4,000.00 Rp2,000.00 Rp13,000.00 Rp2,000.00 Rp8,000.00 Rp20,000.00 Rp30,000.00 Rp59,000.00 Rp219,000.00 Rp398,000.00 Rp594,000.00 Rp814,000.00 Rp1,166,000.00 Rp1,476,000.00 Rp1,823,000.00 Rp2,224,000.00 Rp2,643,000.00 Rp3,316,000.00 Rp4,200,000.00 Rp4,785,000.00 Rp5,299,000.00 Rp5,847,000.00 Rp8,468,000.00 Rp6,464,000.00 Rp7,731,000.00 Rp18,128,000.00 Rp15,430,000.00 Rp375,000.00 Rp558,000.00 Rp756,000.00 Rp1,045,000.00 Rp1,279,000.00 Rp1,560,000.00 Rp1,866,000.00 Rp2,132,000.00 Rp2,488,000.00 Rp2,945,000.00 Rp3,359,000.00

Dusaspun Dusaspun Dusaspun Dusaspun Dusaspun Dusaspun Dusaspun Dusaspun Dusaspun Dusaspun Dusaspun

NO

BAHAN / MATERIAL

KODE

SATUAN

HARGA SATUAN

KET.

319 Pipa 1400 FJ Class 2 320 Pipa 1500 FJ Class 2 321 Pipa 1650 FJ Class 2 322 Pipa 1800 FJ Class 2 323 Pipa 2100 FJ Class 2 324 Pipa 300 R Class L 325 Pipa 400 R Class L 326 Pipa 500 R Class L 327 Pipa 600 R Class L 328 Pipa 700 R Class L 329 Pipa 800 R Class L 330 Pipa 900 R Class L 331 Pipa 1000 R Class L 332 Pipa 1100 R Class L 333 Pipa 1200 R Class L 334 Pipa 1300 R Class L 335 Pipa 1500 R Class L

Dusaspun Dusaspun Dusaspun Dusaspun Dusaspun

(L=2.5 m) (L=2.5 m) (L=2.5 m) (L=2.5 m) (L=2.5 m)

btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg

Rp3,701,000.00 Rp4,106,000.00 Rp4,897,000.00 Rp5,758,000.00 Rp8,266,000.00 Rp284,000.00 Rp416,000.00 Rp608,000.00 Rp1,432,000.00 Rp1,908,000.00 Rp2,505,000.00 Rp3,195,000.00 Rp3,904,000.00 Rp4,835,000.00 Rp5,634,000.00 Rp6,577,000.00 Rp8,669,000.00 Rp279,000.00 Rp409,000.00 Rp600,000.00 Rp1,401,000.00 Rp1,866,000.00 Rp2,442,000.00 Rp3,126,000.00 Rp3,824,000.00 Rp597,000.00 Rp618,000.00

Witera (L=1.25 m) Witera (L=1.25 m) Witera (L=1.25 m) Witera (L=2.5 m) Witera (L=2.5 m) Witera (L=2.5 m) Witera (L=2.5 m) Witera (L=2.5 m) Witera (L=2.5 m) Witera (L=2.5 m) Witera (L=2.5 m) Witera (L=2.5 m)

336 Pipa 300 NR Witera (L=1.25 m) 337 Pipa 400 NR Witera (L=1.25 m) 338 Pipa 500 NR Witera (L=1.25 m) 339 Pipa 600 NR Witera (L=2.5 m) 340 Pipa 700 NR Witera (L=2.5 m) 341 Pipa 800 NR Witera (L=2.5 m) 342 Pipa 900 NR Witera (L=2.5 m) 343 Pipa 1000 NR Witera (L=2.5 m) 344 Readymix Beton B0 Tanpa Pompa (Selang) 345 Readymix Beton K 125, Tampa Pompa (Selang) 346 Readymix Beton K 175, Tampa Pompa (Selang) 347 Readymix Beton K 225, Tampa Pompa (Selang) 348 Readymix Beton K 300, Tampa Pompa (Selang) 349 Readymix Beton K 350, Tampa Pompa (Selang) 350 Roll Cat Tembok 351 Roll Meter 50 Meter (Bahan Plastik) 352 Roll Meter 30 Meter (Bahan Plastik) 353 Roll Meter 5 Meter (Bahan Plastik) 354 Rumah Panel 30 x 60 cm (Kosong) 355 Rumah TL In Bow / Out Bw 2 x 20 W (Kosong) 356 Saklar Broco Seri Standard ( 1 Phase) 357 Saklar Broco Tunggal Standard ( 1 Phase) 358 Sambungan Pipa PVC Jenis AW 4 " TY 359 Saringan Air Liter KM Stainless Steel 360 Sekring Kas 2 Group Biasa 361 Sekring Kas 3 Group Biasa 362 Sekring Kas 5 Group Biasa 363 Sekrup 364 Sealent 365 Selang Plastik untuk Water Pass dia 0,5 cm 366 Semen Portland/PC (50 Kg/zak) 367 Seng Gelombang 180 x 90 x 0,5 BJLS 30 368 Seng Plat 90 cm x 0,5 mm 369 Seng Plat BJLS 30 Lebar 60 cm 370 Seng Plat BJLS 30 Lebar 90 cm 371 Seng BJS 0.20 Gelombang 85 x 180 cm 372 Seng BJS 0.30 Gelombang 85 x 180 cm 373 Seng BJS 0.40 Gelombang 85 x 180 cm M. 080

m3 m3

Rp661,000.00 Rp676,000.00 Rp713,000.00 Rp740,000.00 Rp43,200.00 Rp69,900.00 Rp69,900.00 Rp15,400.00 Rp115,700.00 Rp88,200.00 Rp26,000.00 Rp20,000.00 Rp78,000.00 Rp40,800.00 Rp127,500.00 Rp161,400.00 Rp339,000.00 Rp2,200.00 Rp32,000.00 Rp5,100.00 Rp59,000.00 Rp42,000.00 Rp32,000.00 Rp71,000.00 Rp97,000.00 Rp45,000.00 Rp62,000.00 Rp94,000.00

m3 bh bh bh bh unit bh bh bh bh bh unit unit unit bh kg bh zak lbr lbr lbr lbr lbr lbr lbr

NO

BAHAN / MATERIAL

KODE

SATUAN

HARGA SATUAN

KET.

374 Sirtu Pecah Tersaring 375 Solar 376 Solatip Leideng 377 Stempet / Gemuk 378 Stop Kontak Broco 3 Phase (In Bow) 379 Stop Kontak Broco 3 Phase (Out Bow) 380 Stop Kontak Broco Standard (1 Phase) 381 Stop Kontak Handle 3 Phase 382 Stop Kran 1 1/2" KIT 383 Stop Kran 1" KIT 384 Stop Kran 2 1/2" KIT 385 Stop Kran 2" KIT 386 Stop Kran 3" KIT 387 Stop Kran 3/4" KIT 388 STU 100.100.120 Cm 389 STU 100.100.120 Cm + Support 390 STU 40.40.120 Cm 391 STU 40.40.120 Cm + Support 392 STU 40.50.120 Cm 393 STU 40.50.120 Cm + Support 394 STU 40.60.120 Cm 395 STU 40.60.120 Cm + Support 396 STU 50.50.120 Cm 397 STU 50.50.120 Cm + Support 398 STU 50.60.120 Cm 399 STU 50.60.120 Cm + Support 400 STU 50.70.120 Cm 401 STU 50.70.120 Cm + Support 402 STU 60.60.120 Cm 403 STU 60.60.120 Cm + Support 404 STU 60.70.120 Cm 405 STU 60.70.120 Cm + Support 406 STU 60.80.120 Cm 407 STU 60.80.120 Cm + Support 408 STU 80.100.120 Cm 409 STU 80.100.120 Cm + Support 410 STU 80.80.120 Cm 411 STU 80.80.120 Cm + Support 412 Tanah Urug 413 Tangki Air Polyetiline (Panda) 414 Tangki Air Polyetiline (Panda) 415 Tangki Air Polyetiline (Panda) 416 Teak Wood 3 mm 120 x 240 417 Teak Wood 3 mm 120 x 240 Ukuran Pintu 418 Teak Wood 4 mm 120 x 240 419 Teak Wood 4 mm 120 x 240 Ukuran Pintu 420 Terpal Plastik 421 Thinner 422 Timah Hitam 423 Timbunan Tanah Pilihan 424 Triplek tb. 4 mm 425 Tripleks 3 mm 120 x 240 426 Tripleks 4 mm 120 x 240 427 Tripleks 4 mm 120 x 240 Ukuran Pintu 428 Tripleks 6 mm 120 x 240 (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1)

M. 042 M. 183

m3 ltr bh kg bh bh bh bh bh bh bh bh bh bh bh btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg m3

Rp158,000.00 Rp4,500.00 Rp2,400.00 Rp19,400.00 Rp111,800.00 Rp65,600.00 Rp20,000.00 Rp65,600.00 Rp176,900.00 Rp117,900.00 Rp510,300.00 Rp221,100.00 Rp578,600.00 Rp86,900.00 Rp1,664,000.00 Rp2,499,000.00 Rp366,000.00 Rp523,000.00 Rp413,000.00 Rp590,000.00 Rp460,000.00 Rp655,000.00 Rp543,000.00 Rp777,000.00 Rp608,000.00 Rp872,000.00 Rp672,000.00 Rp960,000.00 Rp645,000.00 Rp925,000.00 Rp709,000.00 Rp1,013,000.00 Rp773,000.00 Rp1,105,000.00 Rp1,109,000.00 Rp1,588,700.00 Rp972,000.00 Rp1,390,000.00 Rp63,000.00 Rp671,000.00 Rp1,038,400.00 Rp1,730,600.00 Rp110,700.00 Rp87,400.00 Rp122,300.00 Rp104,900.00 Rp7,000.00 Rp18,000.00 Rp18,000.00 Rp53,000.00 Rp55,000.00 Rp44,000.00 Rp53,000.00 Rp79,000.00 Rp98,000.00

TB 32 TB 55 TB 110

bh bh bh lbr lbr lbr lbr m

m33 M. 050

liter kg m3 lbr lbr lbr lbr lbr

NO

BAHAN / MATERIAL

KODE

SATUAN

HARGA SATUAN

KET.

429 Tripleks 9 mm 120 x 240 430 Triplek 12 mm 431 Triplek 15 mm

lbr lbr lbr

Rp108,000.00 Rp140,000.00 Rp174,000.00

RpRp-

RpRp-

DAFTAR HARGA SATUAN SEWA PERALATAN PER JAM KERJA

NO.

ALAT

KODE

KAPASITAS ALAT

HARGA SATUAN

KETERANGAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

BULLDOZER MOTOR GRADER CRUSHER/SCR 30 T/H SCREENING PLANT LOADER WHEELED ROLLER, 3 WHEELED ROLLER, TANDEM ROLLER, VIBR. SELF-P6-7T ROLLER, PNEUMATIC ROLLER, VIBR. PED 1 TONE TAMPER, VIBR. PLATE CONCRETE VIBRATOR SPRAYER, SELFPROP ASP. SPRAYER, TOWED ASP. MIXING PLANT 30 T/H ASPHALT FINISHER WATER TANK TRUCK TRAILER, TOWED DUMP TRUCK 3.5 T DUMP TRUCK 5 T FLATBED TRUCK 3.5 T FLATBED TRUCK WITH CRANE CONCRETE MIXER 0.125 M3 COMPRESSOR, AIR PUMP, WATER (5 CM) CONCRETE MIXER 0.25 M3 CONCRETE MIXER 0.5 M3 BLOWER MESIN CUTTER CONCRETE JACK HAMMER

E-001 E-010 E-031 E-040 E-052 E-080 E-081 E-082 E-084 E-087 E-088 E-089 E-153 E-154 E-155 E-157 E-182 E-191 E-211 E-212 E-221 E-225 E-251 E-301 E-341 E-252 E-253 E-

110 Hp 110 Hp 30 T/jam - 185 Hp 115.0 Hp 6 - 8 Ton 6 - 8 Ton 6 - 15 Ton 1 Ton 4 Hp 1,000.0 Liter 6.0 Ton 30 T/jam 1820 mm / 30 Hp 4,000.0 Liter 10.0 Ton 3.5 Ton 5 Ton / 145 Hp 3,5 Ton / 115 Hp 125 Liter 210 M3/jam 30 M3/jam 250 Liter 500 Liter Jam/m Jam/m

Rp188,000.00 Rp188,000.00 Rp249,000.00 Rp125,000.00 Rp188,000.00 Rp76,000.00 Rp113,000.00 Rp125,000.00 Rp156,000.00 Rp63,000.00 Rp38,000.00 Rp31,000.00 Rp113,000.00 Rp38,000.00 Rp400,000.00 Rp188,000.00 Rp163,000.00 Rp438,000.00 Rp163,000.00 Rp188,000.00 Rp163,000.00 Rp313,000.00 Rp63,000.00 Rp81,000.00 Rp63,000.00 Rp38,000.00 Rp63,000.00 Rp17,000.00 Rp45,000.00 Rp25,000.00 Per Hari

REKAPITULASI ANALISA HARGA PEKERJAAN

NO 1 2 3 4

KODE A 02 A 04 A 05 A 07

PEKERJAAN1 M1 PEK. PASANGAN BOUWPLANK 1 M2 PEK. KANTOR DIREKSI 1 M2 PAPAN NAMA PROYEK PENGUKURAN DAN PEMASANGAN PATOK

SATUANm m2 m2 m

HARGA SATUANRp27,583.00 Rp512,906.00 Rp389,821.00 Rp2,411.00

- Harga Satuan Pekerjaan sudah termasuk jasa 10% 0 0

0 0

REKAPITULASI ANALISA HARGA PEKERJAAN

NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

KODE D 01* D 01 D 02 D 03 D 06 D 08 D 10 D 11 D 12 D 13 D 14 D 15 D 16 D 17 D 18 D 19 D 21 D 22 D 23 D 24 D 25GALIAN TANAH BIASA (MEKANIK) GALIAN TANAH BIASA SEDALAM 1 M GALIAN TANAH BIASA SEDALAM 2 M GALIAN TANAH BIASA SEDALAM 3 M GALIAN TANAH KERAS SEDALAM 1 M

PEKERJAAN

SATUANm3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 ARE m3 m3 m3 m3 m3 m3

HARGA SATUANRp31,485.00 Rp43,450.00 Rp53,460.00 Rp63,646.00 Rp57,816.00 Rp69,960.00 Rp19,030.00 Rp12,232.00 Rp31,900.00 Rp206,140.00 Rp341,954.00 Rp187,954.00 Rp170,115.00 Rp100,155.00 Rp171,669.00 Rp55,913.00 Rp33,799.00 Rp226,442.00 Rp246,840.00 Rp137,772.71 Rp291,957.00

GALIAN TANAH LUMPUR SEDALAM 1 M PEMBUANGAN TANAH SEJAUH 30 M PERATAAN TANAH PEMADATAN TANAH URUGAN PASIR PENGURUGAN DAN PEMADATAN DGN SIRTU (MENGGUNAKAN BURUH) PENGURUGAN DAN PEMADATAN DGN TANAH PILIHAN (MENGGUNAKAN BURUH) PENIMBUNAN BADAN JALAN (MENGGUNAKAN BURUH) PEMADATAN BADAN JALAN (MENGGUNAKAN BURUH) PENYIAPAN TANAH DASAR (MENGGUNAKAN BURUH) PENYIAPAN TANAH DASAR (MENGGUNAKAN ALAT) PERATAAN TANAH DAN PEMADATAN SETIAP 20 CM DENGAN ALAT URUGAN PASIR DAN PEMADATAN SETIAP 20 CM DENGAN ALAT PEKERJAAN URUGAN SIRTU UNTUK PONDASI PEMBENTUKAN BAHU JALAN (MENGGUNAKAN BURUH) PEMBENTUKAN BAHU JALAN MATERIAL SPLIT 5 - 7 (MENGGUNAKAN BURUH)

- Harga Satuan Pekerjaan sudah termasuk jasa 10% 0 0

0 0

REKAPITULASI ANALISA HARGA PEKERJAAN

NO 1 2 3 4 5 6 7

KODE F 01 F 02 F 03 F 04 F 05 F 06 F 08

PEKERJAANPENGHAMPARAN BETON NON STRUKTUR/RABAT KELAS Bo (READY MIX CONCRETE) PENGHAMPARAN BETON STRUKTUR K 125 (READY MIX CONCRETE) PENGHAMPARAN BETON STRUKTUR K 175 (READY MIX CONCRETE) PENGHAMPARAN BETON STRUKTUR K 225 (READY MIX CONCRETE) PENGHAMPARAN BETON STRUKTUR K 300 (READY MIX CONCRETE) PENGHAMPARAN BETON STRUKTUR K 350 (READY MIX CONCRETE) BETON STRUKTUR K 225 (SITE MIX)

SATUANm3 m3 m3 m3 m3 m3 m3

HARGA SATUANRp689,792.00 Rp712,892.00 Rp760,192.00 Rp779,442.00 Rp820,142.00 Rp849,842.00 Rp851,350.00

- Harga Satuan Pekerjaan sudah termasuk jasa 10% 0 0

0 0

REKAPITULASI ANALISA HARGA PEKERJAAN

NO 1 2 3 4 5 6 7

KODE I 01 I 02 I 03 I 04 I 05 I 06 I 08

PEKERJAANPERANCAH KAYU KONSTRUKSI BETON (BEKISTING) PASANG RANGKA DINDING PEMISAH KAYU KAMPER PASANG RANGKA DINDING PEMISAH KAYU BORNEO PASANG DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KAMPER PASANG DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KAMPER PASANG DINDING TRIPLEKS & RANGKA KAYU BALOK BORNEO PASANG TRIPLEKS TEBAL 3 MM

SATUANm2 m2 m2 m2 m2 m2 m2

HARGA SATUANRp130,306.00 Rp174,772.00 Rp117,550.00 Rp345,074.00 Rp498,854.00 Rp161,726.00 Rp28,110.00

- Harga Satuan Pekerjaan sudah termasuk jasa 10% 0 0

0 0

REKAPITULASI ANALISA HARGA PEKERJAAN

NO 1 2 3 4 5 6 7 8 9 10 11 12

KODE S 01 S 06 S 07 S 08 S 09 S 10 S 11 S 12 S 13 S 14 S 15 S 16

PEKERJAAN1 M2 PASANGAN LEMPENGAN RUMPUT SAMPAI TUMBUH PAS. KISDAM + BONGKARAN (KARUNG) PAS. KISDAM + BONGKARAN (BAMBU) PASANGAN CERUCUK DOLKEN PASANGAN SULINGAN PEKERJAAN ANYAMAN BRONJONG TB. 3 MM UK. 1 M3 PASANGAN RAILING PIPA GALVANIS (2 BARIS) PELUMURAN BESI DOWEL DENGAN OLI 1 BUAH PASANG PVC 1" untuk DOWEL 1 BUAH PASANG DOP PVC 1" untuk DOWEL 1 M PASANG PVC 4" 1 M1 PASANG BESI SIKU 5 CM

SATUANm2 m m m2 m2 m m ltr bh bh m m

HARGA SATUANRp49,720.00 Rp333,098.00 Rp92,070.00 Rp115,280.00 Rp21,385.00 Rp227,111.00 Rp120,508.00 Rp3,869.00 Rp4,224.00 Rp3,399.00 Rp54,890.00 Rp23,027.00

- Harga Satuan Pekerjaan sudah termasuk jasa 10% 0 0

0 0

REKAPITULASI ANALISA HARGA PEKERJAAN

NO 1 2

KODE N 11 N 12

PEKERJAANPENGECATAN PERMUKAAN BAJA DOWEL DENGAN MENI BESI PENGECATAN PERMUKAAN BAJA GALVANIZE

SATUANm2 m2

HARGA SATUANRp22,110.00 Rp20,295.00

- Harga Satuan Pekerjaan sudah termasuk jasa 10% 0 0

0 0

REKAPITULASI ANALISA HARGA PEKERJAAN

NO 1 2 3 4

KODE R 10 R 11 R 14 R 14aMENEMPA GELAGAR BESI PASANG GELAGAR BESI PENULANGAN BETON (BESI ULIR) PENULANGAN BETON (BESI POLOS)

PEKERJAAN

SATUANkg kg kg kg

HARGA SATUANRp30,162.00 Rp1,485.00 Rp18,257.00 Rp14,173.00

- Harga Satuan Pekerjaan sudah termasuk jasa 10% 0 0

0 0

REKAPITULASI ANALISA HARGA PEKERJAAN

NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

KODE Q 01 Q 02 Q 03 Q 04 Q 05 Q 06 Q 07 Q 08 Q 09 Q 10 Q 11 Q 12 Q 13 Q 14 Q 15 Q 19

PEKERJAANLAPIS PONDASI BAWAH KELAS A SIRTU TERSARING (MENGGUNAKAN ALAT) LAPIS PONDASI BAWAH KELAS C SIRTU TERSARING BERGRADASI (MENGGUNAKAN BURUH) LAPIS PONDASI BAWAH KELAS C AGREGAT PECAH TERSARING (MENGGUNAKAN BURUH) LAPIS PONDASI ATAS KELAS A AGREGAT PECAH TERSARING (MENGGUNAKAN BURUH) PASANGAN LAPIS ATB (MENGGUNAKAN ALAT) LABUR ASPAL DUA LAPIS (BURDA) PASANGAN LAPEN LAPIS ASPAL RESAP PELEKAT (PRIME COAT) LAPIS ASPAL PELEKAT (TACK COAT) PENGHAMPARAN LAPIS TIPIS ASPAL BETON (MENGGUNAKAN ALAT) PENGHAMPARAN LAPIS TIPIS ASPAL BETON PENGHAMPARAN LAPIS ASPAL BETON-LASTON AC (MENGGUNAKAN ALAT) PLASTIK BOND BREAKER 1 M1 JOINT CUTTER & JOINT SEALENT PASANGAN CANSTEEN UK. 20.30.60 1 M2 PASANGAN PAVING BLOCK NATURAL 8 CM

SATUANm3 m3 m3 m3 m3 m2 m2 m2 m2 m2 m2 m2 m2 m bh m2

- Harga Satuan Pekerjaan sudah termasuk jasa 10% 0 0

0 0

APITULASI ANALISA HARGA PEKERJAAN

HARGA SATUANRp249,032.00 Rp299,769.00 Rp273,552.00 Rp249,032.00 Rp2,184,302.00 Rp44,323.00 Rp77,559.00 Rp15,490.00 Rp3,659.00 Rp80,331.00 Rp78,435.00 Rp115,579.00 Rp3,300.00 Rp9,150.00 Rp54,846.00 Rp120,274.00

DAFTAR ANALISA SATUAN PEKERJAAN

NO 1 A 04

URAIAN 2 1 M2 PEK. KANTOR DIREKSIKayu Borneo Super Paku Seng Glb BJLS 30 Triplex 3 mm PC (50 kg) Pasir pasang Bata merah Klas I Peralatan Ongkos Pasang Jumlah Jasa 10% Jumlah Total Dibulatkan

VOL. 30.1000 0.2500 1.1000 0.5000 0.1000 0.2500 70.0000 0.0200 0.1500

SAT. 4m kg lbr lbr zak m bh lot ls

HARGA SAT. 52,114,000.00 15,000.00 71,000.00 44,000.00 59,000.00 196,000.00 500.00 353,400.00 360,400.00

JUMLAH 6=(3x5)211,400.00 3,750.00 78,100.00 22,000.00 5,900.00 49,000.00 35,000.00 7,068.00 54,060.00 466,278.00 46,627.80 512,905.80 512,906.00 274,820.00 3,750.00 8,000.00 31,912.50 35,900.00 354,382.50 35,438.25 389,820.75 389,821.00 35,000.00 24,780.00 10,584.00 25,740.00 12,840.00 1,680.00 880.00 111,504.00 11,150.40 122,654.40 122,655.00 35,000.00 19,786.24 11,368.00 19,308.00 10,830.00 1,264.00

A 05

1 M2 PAPAN NAMA PROYEKKayu Borneo Super Paku Cat Minyak Penulisan Ongkos Pasang Jumlah Jasa 10% Jumlah Total Dibulatkan 0.1300 0.2500 1.0000 0.1250 0.1250 m kg ls ls ls 2,114,000.00 15,000.00 8,000.00 255,300.00 287,200.00

G 05

1 M2 PASANGAN BATA MERAH 1 : 3Bata merah P.C (50 kg) Pasir pasang Pekerja setengah trampil Tk. batu setengah trampil Kep. Tukang batu Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 70.0000 0.4200 0.0540 0.4290 0.2140 0.0210 0.0110 bh zak m org org org org 500.00 59,000.00 196,000.00 60,000.00 60,000.00 80,000.00 80,000.00

G 06

1 M2 PASANGAN BATA MERAH 1 : 4Bata merah P.C (50 kg) Pasir pasang Pekerja setengah trampil Tk. batu setengah trampil Kep. Tukang batu 70.0000 0.3354 0.0580 0.3218 0.1805 0.0158 bh zak m org org org 500.00 59,000.00 196,000.00 60,000.00 60,000.00 80,000.00

NO 1Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan

URAIAN 2

VOL. 30.0083

SAT. 4org

HARGA SAT. 580,000.00

JUMLAH 6=(3x5)664.00 98,220.24 9,822.02 108,042.26 108,043.00 2,325,400.00 87,000.00 180,000.00 300,000.00 160,000.00 32,000.00 3,084,400.00 308,440.00 3,392,840.00 3,392,840.00

H 02

1 M3 KUDA-KUDA BORNEO SUPERKayu balok Borneo Super Paku Pekerja setengah terampil Tk. kayu setengah terampil Kep. Tukang kayu Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 1.1000 5.8000 3.0000 5.0000 2.0000 0.4000 m kg org org org org 2,114,000.00 15,000.00 60,000.00 60,000.00 80,000.00 80,000.00

NO 1 H 03

URAIAN 2 1 M3 KUDA-KUDA KAMPER KRUINGKayu balok kamper Kruing Paku Pekerja setengah terampil Tk. kayu setengah terampil Kep. Tukang kayu Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan

VOL. 31.1000 5.8000 3.0000 5.0000 2.0000 0.4000

SAT. 4m kg org org org org

HARGA SAT. 55,040,000.00 15,000.00 60,000.00 60,000.00 80,000.00 80,000.00

JUMLAH 6=(3x5)5,544,000.00 87,000.00 180,000.00 300,000.00 160,000.00 32,000.00 6,303,000.00 630,300.00 6,933,300.00 6,933,300.00 3,690,280.00 87,000.00 180,000.00 300,000.00 160,000.00 32,000.00 4,449,280.00 444,928.00 4,894,208.00 4,894,208.00 9,440.00 3,724.00 17,160.00 12,840.00 1,680.00 1,600.00 46,444.00 4,644.40 51,088.40 51,089.00 40,400.00 18,700.00 15,000.00 30,000.00 2,000.00 240.00 3,000.00 109,340.00 10,934.00 120,274.00 120,274.00 42,000.00 2,400.00 800.00 45,200.00 4,520.00 49,720.00 49,720.00

H 04

1 M3 KUDA-KUDA KAMPER BANJARKayu balok kamper Banjar Paku Pekerja setengah terampil Tk. kayu setengah terampil Kep. Tukang kayu Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 1.1000 5.8000 3.0000 5.0000 2.0000 0.4000 m kg org org org org 3,354,800.00 15,000.00 60,000.00 60,000.00 80,000.00 80,000.00

J 03

1 M2 PLESTERAN DINDING 1 : 3 + ACIANP.C (50 kg) Pasir pasang Pekerja setengah trampil Tk. batu setengah trampil Kep. Tukang batu Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 0.1600 0.0190 0.2860 0.2140 0.0210 0.0200 zak m3 oh oh oh oh 59,000.00 196,000.00 60,000.00 60,000.00 80,000.00 80,000.00

Q 19

1 M2 PASANGAN PAVING BLOCK NATURAL 8 CMPaving Block Natural 8 cm Pasir Beton Pekerja Setengah Terampil Tukang Batu Setengah Terampil Kepala Tukang Batu Mandor Peralatan Jumlah Jasa 10% Jumlah Total Dibulatkan 1.0100 0.1000 0.2500 0.5000 0.0250 0.0030 1.0000 m m org org org org lot 40,000.00 187,000.00 60,000.00 60,000.00 80,000.00 80,000.00 3,000.00

S 01

1 M2 PASANGAN LEMPENGAN RUMPUT SAMPAI TUMBUHLempengan Rumput Biasa (Teki) Pekerja Setengah Terampil Mandor Lempeng Rumput Jumlah Jasa 10% Jumlah Total Dibulatkan 1.2000 0.0400 0.0100 m org org 35,000.00 60,000.00 80,000.00

E 08

1 M2 PASANGAN SIARAN AD. 1 : 2Pasir Pasang Semen Portland Pekerja Tukang Batu Terampil 0.0085 0.1050 0.3600 0.1200 m3 zak oh oh 196,000.00 59,000.00 50,000.00 70,000.00 1,666.00 6,195.00 18,000.00 8,400.00

NO 1Kepala Tukang Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan

URAIAN 2

VOL. 30.0120 0.0180

SAT. 4oh oh

HARGA SAT. 580,000.00 80,000.00

JUMLAH 6=(3x5)960.00 1,440.00 36,661.00 3,666.10 40,327.10 40,328.00

NO 1 R 10

URAIAN 2 1 KG MENEMPA GELAGAR BESIBesi Profil Arang Kayu Pekerja Tukang Besi Terampil Kepala Tukang Jumlah Jasa 10% Jumlah Total Dibulatkan

VOL. 31.1000 0.3000 0.0900 0.0900 0.0300

SAT. 4kg kg oh oh oh

HARGA SAT. 510,200.00 10,000.00 50,000.00 70,000.00 80,000.00

JUMLAH 6=(3x5)11,220.00 3,000.00 4,500.00 6,300.00 2,400.00 27,420.00 2,742.00 30,162.00 30,162.00 1,000.00 350.00 1,350.00 135.00 1,485.00 1,485.00 50,000.00 4,000.00 54,000.00 5,400.00 59,400.00 59,400.00

R 11

1 KG PASANG GELAGAR BESIPekerja Tukang Besi Terampil Jumlah Jasa 10% Jumlah Total Dibulatkan 0.0200 0.0050 oh oh 50,000.00 70,000.00

C 04

1 M3 BONGKARAN DINDING BATAPekerja Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 1.0000 0.0500 oh oh 50,000.00 80,000.00

0 0

0 0

REKAPITULASI ANALISA HARGA PEKERJAAN PROYEK

NO

KODE

PEKERJAAN

SATUAN

HARGA SATUAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT

1 M3 RANGKA KAYU 1 M2 PENGECATAN TEMBOK LAMA 1/2 BUIS BETON DIA. 20 / 1 M' 1/2 BUIS BETON DIA. 30 / 1 M' BUIS BETON DIA. 30 / 1 M' U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 40 X 40 / 1 M' U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 50 X 50 / 1 M' U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 60 X 60 / 1 M' U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 40 X 60 / 1 M' U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 50 X 70 / 1 M' U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 60 X 70 / 1 M' U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 60 X 80 / 1 M' U - DITCH PRECAST TANPA TUTUP, UK. 40 X 40 / 1 M' U - DITCH PRECAST TANPA TUTUP, UK. 50 X 50 / 1 M' U - DITCH PRECAST TANPA TUTUP. UK. 60 X 60 / 1 M' U - DITCH PRECAST TANPA TUTUP, UK. 80 X 80 / 1 M' U - DITCH PRECAST TANPA TUTUP, UK. 100 X 100 / 1 M' U - DITCH PRECAST TANPA TUTUP, UK. 40 X 60 / 1 M' U - DITCH PRECAST TANPA TUTUP, UK. 50 X 70 / 1 M' U - DITCH PRECAST TANPA TUTUP, UK. 60 X 70 / 1 M' U - DITCH PRECAST TANPA TUTUP, UK. 60 X 80 / 1 M' BOX CULVERT BETON BERTULANG PRECAST UK. 40 X 40 / 1 M' BOX CULVERT BETON BERTULANG PRECAST, UK. 50 X 50 / 1M' PEKERJAAN BOX CULVERT BETON BERTULANG PRECAST, UK. 60 X 60 / 1M' PEKERJAAN BOX CULVERT BETON BERTULANG PRECAST, UK. 80 X 80 / 1M' BOX CULVERT BETON BERTULANG PRECAST, UK. 100 X 100 / 1M' PAS . COVER LIGHT DUTY UK. 40/M' PAS . COVER HEAVY DUTY UK. 40/M' PAS . COVER LIGHT DUTY UK. 50/M' PAS . COVER HEAVY DUTY UK. 50/M' PAS . COVER LIGHT DUTY UK. 60/M' PAS . COVER HEAVY DUTY UK. 60/M' PAS . COVER LIGHT DUTY UK. 80/M' PAS . COVER HEAVY DUTY UK. 80/M' PAS . COVER LIGHT DUTY UK. 100/M' PAS . COVER HEAVY DUTY UK. 100/M'

m3 m2 m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m

Rp2,517,075.00 Rp7,146.00 Rp180,923.00 Rp224,868.00 Rp206,239.00 Rp494,731.00 Rp723,952.00 Rp866,701.00 Rp633,121.00 Rp897,079.00 Rp958,429.00 Rp1,047,579.00 Rp355,077.00 Rp520,463.00 Rp618,817.00 Rp935,976.00 Rp1,617,752.00 Rp446,052.00 Rp657,055.00 Rp695,804.00 Rp760,754.00 Rp927,133.00 Rp1,074,629.00 Rp1,412,257.00 Rp2,618,586.00 Rp3,159,285.00 Rp196,200.00 Rp253,800.00 Rp252,000.00 Rp347,400.00 Rp302,400.00 Rp437,400.00 Rp385,200.00 Rp594,000.00 Rp579,600.00 Rp747,000.00

NO

KODE

PEKERJAAN

SATUAN

HARGA SATUAN

DAFTAR ANALISA SATUAN PEKERJAAN

NO 1 C 01

URAIAN 2 1 M3 BONGKARAN BETON BERTULANGPekerja Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan

VOL. 36.6670 0.3330

SAT. 4oh oh

HARGA SAT. 550,000.00 80,000.00

JUMLAH 6=(3x5)333,350.00 26,640.00 359,990.00 35,999.00 395,989.00 395,989.00 2,142.00 856.00 10,058.00 15,566.50 28,622.50 2,862.25 31,484.75 31,485.00 37,500.00 2,000.00 39,500.00 3,950.00 43,450.00 43,450.00 45,000.00 3,600.00 48,600.00 4,860.00 53,460.00 53,460.00 52,500.00 5,360.00 57,860.00 5,786.00 63,646.00 63,646.00 50,000.00 2,560.00 52,560.00 5,256.00 57,816.00 57,816.00 60,000.00 3,600.00 63,600.00 6,360.00 69,960.00 69,960.00 16,500.00 800.00 17,300.00 1,730.00

D 01*

1 M3 GALIAN TANAH BIASA (MEKANIK)Pekerja Mandor Excavator Dump Truck Jumlah Jasa 10% Jumlah Total Dibulatkan 0.0428 0.0107 0.0535 0.0955 oh oh oh oh 50,000.00 80,000.00 188,000.00 163,000.00

D 01

1 M3 GALIAN TANAH BIASA SEDALAM 1 MPekerja Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 0.7500 0.0250 oh oh 50,000.00 80,000.00

D 02

1 M3 GALIAN TANAH BIASA SEDALAM 2 MPekerja Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 0.9000 0.0450 oh oh 50,000.00 80,000.00

D 03

1 M3 GALIAN TANAH BIASA SEDALAM 3 MPekerja Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 1.0500 0.0670 oh oh 50,000.00 80,000.00

D 06

1 M3 GALIAN TANAH KERAS SEDALAM 1 MPekerja Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 1.0000 0.0320 oh oh 50,000.00 80,000.00

D 08

1 M3 GALIAN TANAH LUMPUR SEDALAM 1 MPekerja Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 1.2000 0.0450 oh oh 50,000.00 80,000.00

D 10

1 M3 PEMBUANGAN TANAH SEJAUH 30 MPekerja Mandor Jumlah Jasa 10% 0.3300 0.0100 oh oh 50,000.00 80,000.00

NO 1Jumlah Total Dibulatkan

URAIAN 2

VOL. 3

SAT. 4

HARGA SAT. 5

JUMLAH 6=(3x5)19,030.00 19,030.00

NO 1 D 11

URAIAN 2 1 M3 PERATAAN TANAHPekerja Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan

VOL. 30.1920 0.0190

SAT. 4oh oh

HARGA SAT. 550,000.00 80,000.00

JUMLAH 6=(3x5)9,600.00 1,520.00 11,120.00 1,112.00 12,232.00 12,232.00 25,000.00 4,000.00 29,000.00 2,900.00 31,900.00 31,900.00 171,600.00 15,000.00 800.00 187,400.00 18,740.00 206,140.00 206,140.00 222,000.00 192,340.00 101,920.00 75,000.00 52,500.00 6,000.00 6,000.00 655,760.00 65,576.00 721,336.00 721,336.00 203,500.00 192,340.00 101,920.00 75,000.00 42,000.00 4,800.00 6,000.00 4,000.00 12,160.00 20,160.00 661,880.00 66,188.00 728,068.00 728,068.00

D 12

1 M3 PEMADATAN TANAH (PER 20 CM)Pekerja Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 0.5000 0.0500 oh oh 50,000.00 80,000.00

D 13

1 M3 URUGAN PASIRPasir urug Pekerja Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 1.2000 0.3000 0.0100 m3 oh oh 143,000.00 50,000.00 80,000.00

SNI-PD5

1 M3 PASANG PONDASI BATU BELAH 1 PC : 4 PSBatu belah Semen Portland Pasir pasang Pekerja Tukang Batu Terampil Kepala Tukang Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 1.2000 3.2600 0.5200 1.5000 0.7500 0.0750 0.0750 m3 Zak m3 oh oh oh oh 185,000.00 59,000.00 196,000.00 50,000.00 70,000.00 80,000.00 80,000.00

E 11

1 M3 PASANGAN BATU BELAH 1 PC : 4 PS (MENGADUK MORTAR DENGAN CONCRETE MIXER)Batu belah 10-15 cm Semen Portland Pasir pasang Pekerja Tukang Batu Terampil Kepala Tukang Mandor Operator Concrete Mixer Concrete Mixer 0.25m3 Waterpump 50 mm Jumlah Jasa 10% Jumlah Total Dibulatkan 1.1000 3.2600 0.5200 1.5000 0.6000 0.0600 0.0750 0.0500 0.3200 0.3200 m3 zak m3 oh oh oh oh oh jam jam 185,000.00 59,000.00 196,000.00 50,000.00 70,000.00 80,000.00 80,000.00 80,000.00 38,000.00 63,000.00

J 04

1 M2 PLESTERAN 1 PC : 3 PP, TEBAL 15 MMSemen Portland Pasir pasang Pekerja Tukang Batu Terampil Kepala Tukang Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 0.1555 0.0230 0.3000 0.1500 0.0150 0.0150 Zak m3 oh oh oh oh 59,000.00 196,000.00 50,000.00 70,000.00 80,000.00 80,000.00 9,175.68 4,508.00 15,000.00 10,500.00 1,200.00 1,200.00 41,583.68 4,158.37 45,742.05 45,743.00

NO 1 I 02

URAIAN

VOL.

SAT. 4m3 m3 kg oh oh oh oh

HARGA SAT. 53,354,800.00 6,195,000.00 15,000.00 50,000.00 70,000.00 80,000.00 80,000.00

JUMLAH 6=(3x5)65,418.60 43,365.00 1,500.00 7,500.00 31,500.00 3,600.00 6,000.00 158,883.60 15,888.36 174,771.96 174,772.00 41,223.00 15,540.00 1,500.00 7,500.00 31,500.00 3,600.00 6,000.00 106,863.00 10,686.30 117,549.30 117,550.00 65,418.60 43,365.00 1,500.00 23,520.00 122,300.00 10,000.00 42,000.00 4,800.00 800.00 313,703.60 31,370.36 345,073.96 345,074.00 65,418.60 43,365.00 1,500.00 23,520.00 262,100.00 10,000.00 42,000.00 4,800.00 800.00 453,503.60 45,350.36 498,853.96 498,854.00 29,400.00 300.00 6,000.00 4,200.00 480.00 480.00 40,860.00 4,086.00 44,946.00 44,946.00

2 3 1 M2 PASANG RANGKA DINDING PEMISAH KAYU KAMPERKayu Kamper Singil, balok Kayu Kamper Singil, papan Paku biasa 2" - 5" Pekerja Tukang Kayu Terampil Kepala Tukang Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 0.0195 0.0070 0.1000 0.1500 0.4500 0.0450 0.0750

I 03

1 M2 PASANG RANGKA DINDING PEMISAH KAYU BORNEOKayu Borneo, balok Kayu Borneo, papan Paku biasa 2" - 5" Pekerja Tukang Kayu Terampil Kepala Tukang Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 0.0195 0.0070 0.1000 0.1500 0.4500 0.0450 0.0750 m3 m3 kg oh oh oh oh 2,114,000.00 2,220,000.00 15,000.00 50,000.00 70,000.00 80,000.00 80,000.00

I 04

1 M2 PASANG DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KAMPERKayu Kamper Singil, balok Kayu Kamper Singil, papan Paku biasa 2" - 5" Lem kayu Teakwood 4' x 8' x 4 mm Pekerja Tukang Kayu Terampil Kepala Tukang Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 0.0195 0.0070 0.1000 0.5600 1.0000 0.2000 0.6000 0.0600 0.0100 m3 m3 kg ltr lbr oh oh oh oh 3,354,800.00 6,195,000.00 15,000.00 42,000.00 122,300.00 50,000.00 70,000.00 80,000.00 80,000.00

I 05

1 M2 PASANG DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KAMPERKayu Kamper Singil, balok Kayu Kamper Singil, papan Paku biasa 2" - 5" Lem kayu Plywood 4' x 8' x 4 mm Pekerja Tukang Kayu Terampil Kepala Tukang Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 0.0195 0.0070 0.1000 0.5600 1.0000 0.2000 0.6000 0.0600 0.0100 m3 m3 kg ltr lbr oh oh oh oh 3,354,800.00 6,195,000.00 15,000.00 42,000.00 262,100.00 50,000.00 70,000.00 80,000.00 80,000.00

H 14

1 M2 PASANG ATAP SENG GELOMBANGSeng gelombang 3' x 6' bjls 30 Paku biasa 1/2" - 1" Pekerja Tukang Kayu Terampil Kepala Tukang Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 0.7000 0.0200 0.1200 0.0600 0.0060 0.0060 lbr kg oh oh oh oh 42,000.00 15,000.00 50,000.00 70,000.00 80,000.00 80,000.00

NO 1 SNI-CAT8

URAIAN

VOL.

SAT.

HARGA SAT.

JUMLAH

2 3 4 5 6=(3x5) 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR), 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUPCat meni Dempul kayu Cat dasar Cat penutup 2 kali Pekerja Tukang Cat Terampil Kepala Tukang Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan Plamir Cat dasar Cat penutup 2 kali Pekerja Tukang Cat Terampil Kepala Tukang Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 0.2000 0.1500 0.1700 0.2600 0.0700 0.0090 0.0060 0.0025 kg kg kg kg oh oh oh oh 21,000.00 40,000.00 61,000.00 61,000.00 50,000.00 70,000.00 80,000.00 80,000.00 4,200.00 6,000.00 10,370.00 15,860.00 3,500.00 630.00 480.00 200.00 41,240.00 4,124.00 45,364.00 45,364.00 1,660.00 6,100.00 15,860.00 1,000.00 4,410.00 504.00 200.00 29,734.00 2,973.40 32,707.40 32,708.00

SNI-CAT14 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)0.1000 0.1000 0.2600 0.0200 0.0630 0.0063 0.0025 kg kg kg oh oh oh oh 16,600.00 61,000.00 61,000.00 50,000.00 70,000.00 80,000.00 80,000.00

0 0

0 0

DAFTAR ANALISA SATUAN PEKERJAAN

NO 1 A 07

URAIAN 2 1 M' PENGUKURAN DAN PEMASANGAN PATOKKayu 5/7 Borneo Cat Kayu Sieve Tukang Kayu Setengah Terampil Pekerja Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan

VOL. 3

SAT. 4m3 kg oh oh oh

HARGA SAT. 51,691,000.00 37,000.00 60,000.00 50,000.00 80,000.00

JUMLAH 6=(3x5)41.43 1,850.00 120.00 100.00 80.00 2,191.43 219.14 2,410.57 2,411.00 40,020.00 13,360.00 74,400.00 42,336.00 17,000.00 108,000.00 7,700.00 302,816.00 30,281.60 333,097.60 333,098.00 6,000.00 2,000.00 65,000.00 7,700.00 3,000.00 83,700.00 8,370.00 92,070.00 92,070.00 68,000.00 4,800.00 6,400.00 7,000.00 86,200.00 8,620.00 94,820.00 94,820.00 99,000.00 5,000.00 800.00 104,800.00 10,480.00 115,280.00 115,280.00 10,750.00 5,520.00 3,010.00 11,445.60 30,725.60 3,072.56 33,798.16 33,799.00

0.00002 0.05000 0.0020 0.0020 0.0010

S 06

1 M' PAS. KISDAM + BONGKARAN (KARUNG)Pekerja Terampil Mandor Karung Tanah urugan Kawat Beton Kayu Dolken 5-7 cm Terpal plastik Jumlah Jasa 10% Jumlah Total Dibulatkan 0.6670 0.1670 12.0000 0.6720 1.0000 6.0000 1.1000 oh oh bh m3 kg btg m' 60,000.00 80,000.00 6,200.00 63,000.00 17,000.00 18,000.00 7,000.00

S 07

1 M' PAS. KISDAM + BONGKARAN (BAMBU)Pekerja Terampil Mandor Bambu Terpal plastik Paku Jumlah Jasa 10% Jumlah Total Dibulatkan 0.1000 0.0250 5.0000 1.1000 0.2000 oh oh bh m3 kg 60,000.00 80,000.00 13,000.00 7,000.00 15,000.00

C 02

1 M3 BONGKARAN BETON BERTULANG DENGAN MENGGUNAKAN ALATPekerja Mandor Operator Jack Hammer Jack Hammer Jumlah Jasa 10% Jumlah Total Dibulatkan 1.3600 0.0600 0.0800 0.2800 oh oh oh jam 50,000.00 80,000.00 80,000.00 25,000.00

S 08

1 M2 PASANGAN CERUCUK DOLKENDolken dia. 7-10 cm Pekerja Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 4.5000 0.1000 0.0100 btg oh oh 22,000.00 50,000.00 80,000.00

D 21

1 M3 PERATAAN TANAH DAN PEMADATAN SETIAP 20 CM DENGAN ALATPekerja Mandor Operator Tamper Temper Vibr Plate Jumlah Jasa 10% Jumlah Total Dibulatkan 0.2150 0.0690 0.0430 0.3012 oh oh jam jam 50,000.00 80,000.00 70,000.00 38,000.00

NO 1 D 22

URAIAN

VOL.

SAT.

HARGA SAT. 5

JUMLAH 6=(3x5)171,600.00 15,000.00 4,800.00 3,010.00 11,445.60 205,855.60 20,585.56 226,441.16 226,442.00 173,800.00 25,000.00 24,000.00 1,600.00 224,400.00 22,440.00 246,840.00 246,840.00 54,684.00 128,030.00 260,000.00 225,000.00 105,000.00 92,000.00 18,000.00 882,714.00 88,271.40 970,985.40 970,986.00 133,344.00 28,800.00 42,240.00 2,080.00 206,464.00 20,646.40 227,110.40 227,111.00 206,464.00 145,200.00 82,920.00 1,920.00 436,504.00 43,650.40 480,154.40 480,155.00 15,500.00 2,750.00 1,190.48 19,440.48 1,944.05 21,384.52 21,385.00 105,666.67 3,350.00 536.00 109,552.67 10,955.27 120,507.93 120,508.00

2 3 4 1 M3 URUGAN PASIR DAN PEMADATAN SETIAP 20 CM DENGAN ALATPasir urug Pekerja Mandor Operator Tamper Temper Vibr Plate Jumlah Jasa 10% Jumlah Total Dibulatkan 1.2000 0.3000 0.0600 0.0430 0.3012 m3 oh oh jam jam

143,000.00 50,000.00 80,000.00 70,000.00 38,000.00

D 23

1 M3 PEKERJAAN URUGAN SIRTU UNTUK PONDASISirtu Pecah Tersaring Pekerja Pekerja Terampil Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 1.1000 0.5000 0.4000 0.0200 m3 oh oh oh 158,000.00 50,000.00 60,000.00 80,000.00

E 01

1 M3 PEKERJAAN PONDASI BATAKO AD. 1 : 4Pasir Pasang Semen Portland Batako PSPM Pekerja Tukang Batu Terampil Kepala Tukang Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 0.2790 2.1700 130.0000 4.5000 1.5000 1.1500 0.2250 m3 zak bh oh oh oh oh 196,000.00 59,000.00 2,000.00 50,000.00 70,000.00 80,000.00 80,000.00

S 10

1 BH PEKERJAAN ANYAMAN BRONJONG TB. 3 MM UK. 1 M3Kawat Bronjong Pekerja Pekerja Terampil Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 8.3340 0.5760 0.7040 0.0260 kg oh oh oh 16,000.00 50,000.00 60,000.00 80,000.00

DIHIT

1 M3 PEKERJAAN PASANGAN BRONJONGBronjong Kawat Batu Bronjol 10 - 15 cm Pekerja Terampil Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 1.0000 1.1000 1.3820 0.0240 bh m3 oh oh 206,464.00 132,000.00 60,000.00 80,000.00

S 09

1 M2 PASANGAN SULINGANPipa PVC dia. 2" Ijuk Pekerja Jumlah Jasa 10% Jumlah Total Dibulatkan 0.2500 0.2500 0.0238 btg ikat oh 62,000.00 11,000.00 50,000.00

S 11

1 M PASANGAN RAILING PIPA GALVANIS (2 BARIS)Pipa Galvanis dia. 3" Pekerja Kepala Tukang Jumlah Jasa 10% Jumlah Total Dibulatkan 0.3333 0.0670 0.0067 btg oh oh 317,000.00 50,000.00 80,000.00

NO 1 Q 15

URAIAN

VOL.

SAT.

HARGA SAT.

JUMLAH 6=(3x5)41,000.00 2,043.56 3,600.00 1,800.00 840.00 480.00 96.00 49,859.56 4,985.96 54,845.52 54,846.00 154,000.00 246,960.00 64,400.00 258,700.00 70,000.00 33,600.00 294,000.00 56,000.00 147,207.50 14,720.75 161,928.25 161,929.00 17,600.00 750.00 1,250.00 5,250.00 600.00 104.00 25,554.00 2,555.40 28,109.40 28,110.00 2,114,000.00 2,250.00 60,000.00 70,000.00 40,000.00 2,000.00 2,288,250.00 228,825.00 2,517,075.00 2,517,075.00 41,223.00 15,540.00 1,500.00 11,760.00 26,500.00 8,750.00 36,750.00 4,200.00 800.00 147,023.00 14,702.30 161,725.30 161,726.00 39,444.44 13,200.00 4,200.00 8,750.00 1,040.00 320.00 66,954.44 6,695.44 73,649.89 73,650.00

2 3 4 5 1 BH PASANGAN CANSTEEN UK. 20.30.60 BERIKUT PLESTERAN + ACIAN NATCansteen Plesteran + Acian Alat bantu Pekerja Tukang Batu Terampil Kepala Tukang Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 1.0000 0.0400 0.0300 0.0360 0.0120 0.0060 0.0012 bh m2 set oh oh oh oh 41,000.00 51,089.00 120,000.00 50,000.00 70,000.00 80,000.00 80,000.00

E 05

8 M PEKERJAAN STOOTWERKDolken kayu dia. 7-10 cm Papan Kruing 2 x 20 x 4m Baud Batang Kelapa Pekerja Kepala Tukang Tukang Kayu Mandor Lapangan Jumlah per m' Jasa 10% Jumlah Total Dibulatkan 7.0000 3.0000 7.0000 1.0000 1.4000 0.4200 4.2000 0.7000 btg lbr bh btg oh oh oh oh 22,000.00 82,320.00 9,200.00 258,700.00 50,000.00 80,000.00 70,000.00 80,000.00

I 08

1 M2 PASANG TRIPLEKS TEBAL 3 MMTripleks tb. 3 mm Paku biasa 1/2" - 1" Pekerja Tukang Kayu Kepala Tukang Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 0.4000 0.0500 0.0250 0.0750 0.0075 0.0013 lbr kg oh oh oh oh 44,000.00 15,000.00 50,000.00 70,000.00 80,000.00 80,000.00

DIHIT

1 M3 RANGKA KAYUKayu Balok Borneo Paku Pekerja Terampil Tukang Kayu Terampil Kepala Tukang Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 1.0000 0.1500 1.0000 1.0000 0.5000 0.0250 m3 kg oh oh oh oh 2,114,000.00 15,000.00 60,000.00 70,000.00 80,000.00 80,000.00

I 06

1 M2 PASANG DINDING TRIPLEKS & RANGKA KAYU BALOK BORNEOKayu Balok Borneo Kayu Papan Borneo Paku biasa 2" - 5" Lem kayu Triplek 4' x 8' x 4 mm Pekerja Tukang Kayu Terampil Kepala Tukang Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 0.0195 0.0070 0.1000 0.2800 0.5000 0.1750 0.5250 0.0525 0.0100 m3 m3 kg ltr lbr oh oh oh oh 2,114,000.00 2,220,000.00 15,000.00 42,000.00 53,000.00 50,000.00 70,000.00 80,000.00 80,000.00

H 15

1 M' PASANG BUBUNG SENG STEEL GELOMBANGSeng gelombang BJLS 30 Paku sekrup 3,5" Pekerja Tukang Kayu Trampil Kepala Tukang Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 0.5556 6.0000 0.0840 0.1250 0.0130 0.0040 lbr bh oh oh oh oh 71,000.00 2,200.00 50,000.00 70,000.00 80,000.00 80,000.00

NO 1 N 11

URAIAN

VOL.

SAT. 4kg oh oh oh oh

HARGA SAT. 527,000.00 50,000.00 70,000.00 80,000.00 80,000.00

JUMLAH 6=(3x5)2,700.00 1,000.00 14,000.00 1,600.00 800.00 20,100.00 2,010.00 22,110.00 22,110.00 816.00 1,224.00 1,400.00 2,520.00 336.00 200.00 6,496.00 649.60 7,145.60 7,146.00 7,590.00 5,520.00 300.00 3,600.00 960.00 480.00 18,450.00 1,845.00 20,295.00 20,295.00 2,100.00 900.00 3,000.00 300.00 3,300.00 3,300.00 2,250.00 4,572.80 480.00 335.00 680.00 8,317.80 831.78 9,149.58 9,150.00 1,225.00 500.00 700.00 492.09 600.00 3,517.09 351.71 3,868.80 3,869.00 3,240.00 600.00 3,840.00 384.00 4,224.00 4,224.00 3,000.00 90.00 3,090.00 309.00 3,399.00 3,399.00

2 3 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESIMeni besi Pekerja Tukang Cat Terampil Kepala Tukang Mandor Jumlah Keuntungan max. 10% Jumlah Total Dibulatkan 0.1000 0.0200 0.2000 0.0200 0.0100

DIHIT

1 M2 PENGECATAN TEMBOKCat Dasar Cat Penutup Pekerja Tukang Cat Kepala Tukang Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 0.1200 0.1800 0.0280 0.0420 0.0042 0.0025 kg kg oh oh oh oh 6,800.00 6,800.00 50,000.00 60,000.00 80,000.00 80,000.00

N 12

1 M2 PENGECATAN PERMUKAAN BAJA GALVANIZECat Besi Duco (Dasar) Cat Besi Duco (Penutup) Pekerja Tukang Cat Kepala Tukang Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 0.1100 0.0800 0.0060 0.0600 0.0120 0.0060 kg kg oh oh oh oh 69,000.00 69,000.00 50,000.00 60,000.00 80,000.00 80,000.00

Q 13

PLASTIK BOND BREAKERPlastik Ongkos Pasang Jumlah Jasa 10% Jumlah Total Dibulatkan 1.0000 1.0000 m2 ls 2,100.00 900.00

Q 14

1 M1 JOINT CUTTER & JOINT SEALENTCutter Concrete Sealent PEKERJA TERAMPIL PEKERJA Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 0.0500 0.1429 0.0080 0.0067 0.0085 Jam/m kg Oh Oh Oh 45,000.00 32,000.00 60,000.00 50,000.00 80,000.00

S 12

PELUMURAN BESI DOWEL DENGAN OLIOli (Drum) Pekerja Tukang Cat Terampil Mandor Alat Bantu Jumlah Keuntungan max. 10% Jumlah Total Dibulatkan 0.0500 0.0100 0.0100 0.0062 0.0050 Liter oh oh oh set 24,500.00 50,000.00 70,000.00 80,000.00 120,000.00

S 13

1 BUAH PASANG PVC 1" untuk DOWELPVC AW 1 " Ongkos Pasang Jumlah Jasa 10% Jumlah Total Dibulatkan 0.1200 1.0000 batang ls 27,000.00 600.00

S 14

1 BUAH PASANG DOP PVC 1" untuk DOWELDop PVC AW 1 " Ongkos Pasang Jumlah Jasa 10% Jumlah Total Dibulatkan 1.0000 1.0000 Buah ls 3,000.00 90.00

NO 1 S 15

URAIAN 2 1 M PASANG PVC 4"Dop PVC AW 4 " Ongkos Pasang Jumlah Jasa 10% Jumlah Total Dibulatkan

VOL. 30.2500 1.0000

SAT. 4Buah ls

HARGA SAT. 5196,000.00 900.00

JUMLAH 6=(3x5)49,000.00 900.00 49,900.00 4,990.00 54,890.00 54,890.00 405.00 393.75 1,411.59 1,500.00 3,710.34 371.03 4,081.37 4,082.00 700.00 288.85 1,875.00 2,863.85 286.39 3,150.24 3,151.00 148,005.00 19,005.00 18,000.00 5,692.50 11,857.50 8,250.00 3,375.00 984.38 750.00 215,919.38 21,591.94 237,511.31 237,512.00 16,933.33 4,000.00 20,933.33 2,093.33 23,026.67 23,027.00 6,570,000.00 300,000.00 675,000.00 7,545,000.00 754,500.00 8,299,500.00 8,299,500.00 5,475,000.00 300,000.00 562,500.00 6,337,500.00 633,750.00 6,971,250.00 6,971,250.00 3,285,000.00 300,000.00 450,000.00 4,035,000.00 403,500.00 4,438,500.00 4,438,500.00

DIHIT

1 M2 FINISHING GRID RIGID PAVEMENT / TROWEL BERGARISBuruh Lapangan Terlatih Buruh Lapangan Tak Terlatih Mandor Alat Bantu Jumlah Jasa 10% Jumlah Total Dibulatkan 0.0090 0.0113 0.0176 0.0200 Oh Oh Oh set 45,000.00 35,000.00 80,000.00 75,000.00

DIHIT

1 M2 CURING BETONBuruh Lapangan Tak Terlatih Mandor Alat Bantu Jumlah Jasa 10% Jumlah Total Dibulatkan 0.0200 0.0036 0.0250 Oh Oh set 35,000.00 80,000.00 75,000.00

DIHIT

1 M2 MARKA JALAN THERMOPLASTIKCat Marka Thinner Blass Bit Compressor Dump Truck Alat Bantu Lainnya Pekerja Biasa Tukang Mandor Jumlah Jasa 10% Jumlah Total Dibulatkan 1.9500 1.0500 0.4500 0.0750 0.0750 0.1100 0.0750 0.0281 0.0094 kg liter kg jam jam Ls oh oh oh 75,900.00 18,100.00 40,000.00 75,900.00 158,100.00 75,000.00 45,000.00 35,000.00 80,000.00

S 16

1 M1 PASANG BESI SIKU 5 CMBesi Siku 3 x 50 x 50 mm Ongkos Pasang Jumlah Jasa 10% Jumlah Total Dibulatkan 0.1667 1.0000 m1 Ls 101,600.00 4,000.00

B 01

MOBILISASI ALAT BERAT (KHUSUS PEKERJAAN HOT MIX) JARAK JAUH/RITAlat Berat Trailer Towed Sopir Truck Solar Jumlah Jasa 10% Jumlah Total Dibulatkan 15.00 5.00 150.00 Jam HO liter 438,000.00 60,000.00 4,500.00

B 02

MOBILISASI ALAT BERAT (KHUSUS PEKERJAAN HOT MIX) JARAK SEDANG/RITAlat Berat Trailer Towed Sopir Truck Solar Jumlah Jasa 10% Jumlah Total Dibulatkan 12.50 5.00 125.00 Jam HO liter 438,000.00 60,000.00 4,500.00

B 03

MOBILISASI ALAT BERAT (KHUSUS PEKERJAAN HOT MIX) JARAK DEKAT/RITAlat Berat Trailer Towed Sopir Truck Solar Jumlah Jasa 10% Jumlah Total Dibulatkan 7.50 5.00 100.00 Jam HO liter 438,000.00 60,000.00 4,500.00

NO 1 B 04

URAIAN

VOL.

SAT.

HARGA SAT.

JUMLAH

2 3 4 5 6=(3x5) MOBILISASI MATERIAL (UNTUK LANGSIR/KHUSUS PEKERJAAN BETON) JARAK JAUH / M3 (> 3 km)Dump Truck 3.5 T Sopir Truck Solar Jumlah Jasa 10% Jumlah Total Dibulatkan 0.25 0.02 0.25 Jam HO liter 163,000.00 60,000.00 4,500.00 40,750.00 1,071.43 1,125.00 42,946.43 4,294.64 47,241.07 47,242.00 24,450.00 714.29 750.00 25,914.29 2,591.43 28,505.71 28,506.00 16,300.00 357.14 375.00 17,032.14 1,703.21 18,735.36 18,736.00

B 05

MOBILISASI MATERIAL (UNTUK LANGSIR/KHUSUS PEKERJAAN BETON) JARAK SEDANG / M3 (2 - 3 km)Dump Truck 3.5 T Sopir Truck Solar Jumlah Jasa 10% Jumlah Total Dibulatkan 0.15 0.01 0.17 Jam HO liter 163,000.00 60,000.00 4,500.00

B 06

MOBILISASI MATERIAL (UNTUK LANGSIR/KHUSUS PEKERJAAN BETON) JARAK DEKAT / M3 (1 - 2 km)Dump Truck 3.5 T Sopir Truck Solar Jumlah Jasa 10% Jumlah Total Dibulatkan 0.10 0.01 0.08 Jam HO liter 163,000.00 60,000.00 4,500.00

0 0

0 0

Analisa Harga Satuan ini hanya dipergunakan sebagai dasar/pendekatan dalam penyusunan DPA dan Mengevaluasi Harga Penawaran

ANALISA HARGA SATUAN LAPIS PONDASI ATAS KELAS A AGREGAT PECAH TERSARING (MENGGUNAKAN ALAT) Kota : Disiapkan Oleh : Tanggal : KODE Q 04

Propinsi :

Proses : 1. Agregat batu pecah tersaring bergradasi ditimbun disamping jalan oleh pemasok 2. Grader menghampar agregat 3. Jalan disiram air dengan truk air 4. Pemadatan dengan mesin gilas 6 - 8 ton sampai 100 % MDD

Anggapan : 1. Menggunakan alat berat (150 m3/detik) 2. Material ditimbun di sepanjang jalan oleh pemasok 3. Dihampar dan dipadatkan sampai tebal padat 10 cm 4. Koefisien pemadatan 1,3

No.

Pekerja

Vol.

Hari

Kode

Total Vol. Org-hari 1.00 2.00 2.00 1.00 1.00 6.00

Upah (Rp/Org/Hari) 80,000.00 80,000.00 70,000.00 60,000.00 50,000.00 50,000.00

Biaya Rp 80,000.00 160,000.00 140,000.00 60,000.00 50,000.00 300,000.00 Pekerja

Sub Total Rp

1 2 3 4 5 6

Mandor Operator Terlatih Pembantu Operator SUPIR TRUK KENEK TRUK Pekerja JUMLAH I

1.00 2.00 2.00 1.00 1.00 6.00

1.00 1.00 1.00 1.00 1.00 1.00

790,000.00 Sub Total (Rp)

No

Material

Satuan

Kode

Total Vol.

Harga (Rp/Unit) 159,000.00 120,000.00

Biaya (Rp) 31,005,000.00 28,800.00 Material

1 2

Batu Pecah Tersaring Bergradasi A Alat Bantu JUMLAH II

m3 Set

M.012 M.170

195.00 0.24

31,033,800.00 Sub Total (Rp)

No.

Peralatan

Jumlah

Hari Kerja

Kode

Jam Kerja

Harga (Rp/jam) 188,000.00 76,000.00 163,000.00

Biaya (Rp) 940,000.00 380,000.00 815,000.00 Peralatan Total (Rp)

1 2 3

Motor Grader 110 HP Mesin Gilas 3 Roda 6 - 8 Ton Truk Tangki Air JUMLAH III LAPIS PONDASI ATAS KELAS A AGREGAT VOLUME :

1.00 1.00 1.00

1.00 1.00 1.00

E.010 E.080 E.182

5.00 5.00 5.00

2,135,000.00 33,958,800.00

150.00 satuan m3

Sub. Total Harga Satuan Rp. Jasa 10 % Total Harga Satuan Rp. Dibulatkan Rp.

226,392.00 Per m3 22,639.20 249,031.20 Per m3 249,032.00 Per m3

Analisa Harga Satuan ini hanya dipergunakan sebagai dasar/pendekatan dalam penyusunan DPA dan Mengevaluasi Harga Penawaran

ANALISA HARGA SATUAN PERANCAH KAYU KONSTRUKSI BETON (BEKISTING) KAYU Kls III Kota : Disiapkan Oleh : Tanggal : KODE I 01

Propinsi :

Proses : 1. Kelompok tukang kayu memotong dan membuat acuan 2. Kelompok tukang kayu membongkar acuan setelah beton cukup kuat 3. Kelompok tukang kayu membersihkan acuan untuk dipakai kembali

Anggapan : 1. Kelompok tukang kayu memasang 20 m2 dalam 1 hari kerja 2. 1/3 material dapat dipakai kembali 3. Pengadaan bahan oleh Pemasok 4. Untuk 1 m3 beton dipakai 2 lbr plywood (120 cm x 240 cm x 1,75 cm) 5. Kelompok tukang kayu membongkar acuan

No.

Pekerja

Vol.

Hari

Kode

Total Vol. Org-hari 1.00 4.00 3.00 7.00

Upah (Rp/Org/Hari) 70,000.00 70,000.00 70,000.00 50,000.00

Biaya Rp 70,000.00 280,000.00 210,000.00 350,000.00 Pekerja

Sub Total Rp

1 2 3 4

KEPALA TUKANG KAYU Tukang Kayu Pekerja Terampil Pekerja JUMLAH I

1.00 4.00 3.00 7.00

1.00 1.00 1.00 1.00

910,000.00 Sub Total (Rp)

No

Material

Satuan

Kode

Total Vol.

Harga (Rp/Unit)

Biaya (Rp) 1,332,000.00 60,000.00 67,200.00 Material

1 2 3

Papan Cor Borneo Paku Alat Bantu JUMLAH II

m3 kg Set

M.180 M.166 M.170

0.60 4.00 0.56

2,220,000.00 15,000.00 120,000.00

1,459,200.00 Sub Total (Rp)

No.

Peralatan

Jumlah

Hari Kerja

Kode

Jam Kerja

Harga (Rp/jam)

Biaya (Rp)

1 JUMLAH III BEKISTING VOLUME : 20.00 satuan m2 Sub. Total Harga Satuan Rp. Jasa 10 % Total Harga Satuan Rp. Dibulatkan Rp. 118,460.00 Per m2 11,846.00 130,306.00 Per m2 130,306.00 Per m2 Peralatan Total (Rp) 2,369,200.00

Analisa Harga Satuan ini hanya dipergunakan sebagai dasar/pendekatan dalam penyusunan DPA dan Mengevaluasi Harga Penawaran

ANALISA HARGA SATUAN PENGHAMPARAN BETON STRUKTUR K 350 (READY MIX CONCRETE) KODE F 06 Kota : Disiapkan Oleh : Tanggal :

Provinsi :

Proses : 1. Pemasok mengirim Ready Mix 2. Beton dihampar di lokasi pekerjaan 3. Beton digetar sampai padat 4. Acuan dan tulangan besi beton sudah dipasang

Anggapan : 1. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang 2. Beton dipasang untuk bagian struktur pratekan, lantai jembatan, dll 3. Sesuai Peraturan Beton bertulang Indonesia (PBI 1971 N.1.2)

No.

Pekerja

Vol.

Hari

Kode

Total Vol. Org-hari 1.00 1.00 2.00 12.00

Upah (Rp/Org/Hari) 80,000.00 70,000.00 70,000.00 50,000.00

Biaya Rp 80,000.00 70,000.00 140,000.00 600,000.00 Pekerja

Sub Total Rp

1 2 3 4

Mandor Pekerja Terampil Operator Alat Pekerja JUMLAH I

1.00 1.00 2.00 12.00

1.00 1.00 1.00 1.00

890,000.00 Sub Total (Rp)

No

Material

Satuan

Kode

Total Vol.

Harga (Rp/Unit) 740,000.00 120,000.00

Biaya (Rp) 35,520,000.00 240,000.00 Material

1 2

Beton Ready Mix K.350 Alat Bantu JUMLAH II

m3 Set

M.041 M.170

48.00 2.00

35,760,000.00 Sub Total (Rp)

No.

Peralatan

Jumlah

Jam Kerja

Kode

Jam Kerja

Harga (Rp/jam) 31,000.00

Biaya (Rp) 434,000.00 Peralatan Total (Rp)

1

Alat Penggetar Beton 4 HP JUMLAH III BETON STRUKTUR K.350 VOLUME :

2.00

7.00

E.089

14.00

434,000.00 37,084,000.00

48.00 satuan m3

Sub. Total Harga Satuan Rp. Jasa 10 % Total Harga Satuan Rp. Dibulatkan Rp.

772,583.33 Per m3 77,258.33 849,841.67 Per m3 849,842.00 Per m3

Analisa Harga Satuan ini hanya dipergunakan sebagai dasar/pendekatan dalam penyusunan DPA dan Mengevaluasi Harga Penawaran

ANALISA HARGA SATUAN PENGHAMPARAN BETON NON STRUKTUR/RABAT KELAS Bo (READY MIX CONCRETE) KODE F 01 Kota : Disiapkan Oleh : Tanggal :

Provinsi :

Proses : 1. Pemasok mengirim Ready Mix 2. Beton dihampar di lokasi pekerjaan 3. Beton digetar sampai padat 4. Acuan dan tulangan besi beton sudah dipasang

Anggapan : 1. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang 2. Beton dipasang untuk bagian struktur pratekan, lantai jembatan, dll 3. Sesuai Peraturan Beton bertulang Indonesia (PBI 1971 N.1.2)

No.

PEKERJA

Vol.

Hari

Kode

Total Vol. Org-hari 1.00 1.00 2.00 12.00

Upah (Rp/Org/Hari) 80,000.00 70,000.00 70,000.00 50,000.00

Biaya Rp 80,000.00 70,000.00 140,000.00 600,000.00 Pekerja

Sub Total Rp

1 2 3 4

Mandor Pekerja Terampil Operator Alat Pekerja JUMLAH I

1.00 1.00 2.00 12.00

1.00 1.00 1.00 1.00

890,000.00 Sub Total (Rp)

No

MATERIAL

Satuan

Kode

Total Vol.

Harga (Rp/Unit) 597,000.00 120,000.00

Biaya (Rp) 28,656,000.00 120,000.00 Material

1 2

Beton Ready Mix Klas Bo Alat Bantu JUMLAH II

m3 Set

M.041 M.170

48.00 1.00

28,776,000.00 Sub Total (Rp)

No.

PERALATAN

Jumlah

Jam Kerja

Kode

Jam Kerja

Harga (Rp/jam) 31,000.00

Biaya (Rp) 434,000.00 Peralatan Total (Rp)

1

Alat Penggetar Beton 4 HP JUMLAH III BETON NON STRUKTUR / RABAT KELAS Bo VOLUME :

2.00

7.00

E.089

14.00

434,000.00 30,100,000.00

48.00 satuan m3

Sub. Total Harga Satuan Rp. Jasa 10 % Total Harga Satuan Rp. Dibulatkan Rp.

627,083.33 Per m3 62,708.33 689,791.67 Per m3 689,792.00 Per m3

Analisa Harga Satuan ini hanya dipergunakan sebagai dasar/pendekatan dalam penyusunan DPA dan Mengevaluasi Harga Penawaran

ANALISA HARGA SATUAN LAPIS PENETRASI/PERMUKAAN MAKADAM 50 MM LAPEN (MENGGUNAKAN BURUH) Kota : Disiapkan Oleh : Tanggal : KODE Q 07

Propinsi :

Proses : 1. Hamparan agregat pokok 3-5 cm 80 kg/m2 (20 m2/m3) 2. Digilas dan dipadatkan dengan mesin gilas roda baja 6 - 8 ton 3. Semprotan aspal 2,5 kg/m2 4. Hamparkan agregat pengunci 1 - 2 cm 25 kg/m2 (64 m2/m3), digilas & dipadatkan 5. Semprotan aspal 1,5 kg/m2 6. Hamparkan agregat penutup 0,5 - 1 cm 14 kg/m2 (80 m2/m3), digilas & dipadatkan

Anggapan : 1. Permukaan jalan yang akan dilapis sudah di prime/tack coat 2. Menggunakan tenaga buruh 3. Agregat pecah sesuai ukuran, siap dilokasi 4. Tebal padat perkerasan 5 cm 5. Faktor kehilangan agregat = 1.02

No.

Pekerja

Vol.

Hari

Kode

Total Vol. Org-hari 6.00 6.00 6.00 3.00 3.00 6.00 198.00

Upah (Rp/Org/Hari) 80,000.00 80,000.00 70,000.00 60,000.00 50,000.00 60,000.00 50,000.00

Biaya Rp 480,000.00 480,000.00 420,000.00 180,000.00 150,000.00 360,000.00 9,900,000.00 Pekerja

Sub Total Rp

1 2 3 4 5 6 7

Mandor Operator Terlatih Pembantu Operator SUPIR TRUK KENEK TRUK Pekerja Terampil Pekerja JUMLAH I

2.00 2.00 2.00 1.00 1.00 2.00 66.00

3.00 3.00 3.00 3.00 3.00 3.00 3.00

11,970,000.00 Sub Total (Rp)

No

Material

Satuan

Kode

Total Vol.

Harga (Rp/Unit)

Biaya (Rp) 12,066,600.00 3,770,390.00 2,112,500.00 62,832,000.00 979,200.00 Material

1 2 3 4 5

Batu Pecah 3 - 5 cm Batu Pecah 1 - 2 cm Batu Pecah 0,5 - 1 cm Aspal Bitumen Alat Bantu JUMLAH II

m3 m3

M.023 M.025 M.026 M.061 M.170

71.40 22.31 12.50 5,712.00 8.16

169,000.00 169,000.00 169,000.00 11,000.00 120,000.00

m3 Kg Set

81,760,690.00 Sub Total (Rp)

No.

Peralatan

Jumlah

Hari Kerja

Kode

Jam Kerja

Harga (Rp/jam) 76,000.00 38,000.00 163,000.00 17,000.00

Biaya (Rp) 1,140,000.00 1,140,000.00 2,445,000.00 255,000.00 Peralatan Total (Rp)

1 2 3 4

Mesin Gilas 3 Roda 6 - 8 Ton Asp. Sprayer Towed Dump Truck 3,5 Ton - 115 Hp Blower JUMLAH III

1.00 2.00 1.00 1.00

3.00 3.00 3.00 3.00

E.080 E.154 E.211

15.00 30.00 15.00 15.00

4,980,000.00 98,710,690.00

LAPIS PENETRASI/PERMUKAAN MAKADAM 50 MM LAPEN VOLUME : 1,400.00 satuan m2 Sub. Total Harga Satuan Rp. Jasa 10 % Total Harga Satuan Rp. 70,507.64 Per m2 7,050.76 77,558.40 Per m2

Dibulatkan Rp.

77,559.00 Per m2

Analisa Harga Satuan ini hanya dipergunakan sebagai dasar/pendekatan dalam penyusunan DPA dan Mengevaluasi Harga Penawaran

ANALISA HARGA SATUAN LAPIS ASPAL RESAP PELEKAT (PRIME COAT) Kota : Disiapkan Oleh : Tanggal : KODE Q 08

Propinsi :

Proses : Pekerjaan ini harus dilaksanakan sesuai : 1. Bab Satuan Pekerjaan ini, Spesifikasi Umum Jalan Kabupaten, Bina Marga Maret 1992 2. Tingkat Penyemprotan 1 Kg/m2 disemprot mempergunakan mesin penyemprot aspal

Anggapan : 1. Harga bahan, perangko (siap dilokasi) 2. Perbandingan aspal dengan minyak tanah = 100 bagian aspal : 100 bagian minyak tanah berdasarkan berat 3. Berat jenis minyak tanah 0,86 4. Berat jenis aspal 1,03

No.

Pekerja

Vol.

Hari

Kode

Total Vol. Org-hari 0.50 1.00 1.00 4.00

Upah (Rp/Org/Hari) 80,000.00 80,000.00 70,000.00 50,000.00

Biaya Rp 40,000.00 80,000.00 70,000.00 200,000.00 Pekerja

Sub Total Rp

1 2 3 4

Mandor Operator Terlatih Pembantu Operator Pekerja JUMLAH I

1.00 1.00 1.00 4.00

0.50 1.00 1.00 1.00

L.061 L.081 L.083 L.101

390,000.00 Sub Total (Rp)

No

Material

Satuan

Kode

Total Vol.

Harga (Rp/Unit) 11,000.00 13,000.00 120,000.00

Biaya (Rp) 5,610,000.00 7,787,000.00 19,200.00 Material

1 2 3

Aspal Bitumen Minyak Tanah Alat Bantu JUMLAH II

510.00 599.00 0.16

kg lt Set

M.061 M.065 M.170

510.00 599.00 0.16

13,416,200.00 Sub Total (Rp)

No.

Peralatan

Jumlah

Hari Kerja

Kode

Jam Kerja

Harga (Rp/jam) 38,000.00 17,000.00

Biaya (Rp) 190,000.00 85,000.00 Peralatan Total (Rp)

1 2

Asp. Sprayer Towed 200 ltr Blower JUMLAH III LAPIS ASPAL RESAP PELEKAT (Prime Coat) VOLUME :

1.00 1.00

1.00 1.00

E.154

5.00 5.00

275,000.00 14,081,200.00

1,000.00 satuan M2

Sub. Total Harga Satuan Rp. Jasa 10 % Total Harga Satuan Rp. Dibulatkan Rp.

14,081.20 Per m2 1,408.12 15,489.32 Per m2 15,490.00 Per m2

Analisa Harga Satuan ini hanya dipergunakan sebagai dasar/pendekatan dalam penyusunan DPA dan Mengevaluasi Harga Penawaran

ANALISA HARGA SATUAN PENULANGAN BETON (BESI ULIR) KODE R 14 Kota : Disiapkan Oleh : Tanggal :

Propinsi :

Proses : 1. Batang besi beton dipotong sesuai ukuran panjang yang diperlukan 2. Perakitan tulangan besi beton dan diikat dengan kawat baja

Anggapan : 1. 200 kg tulangan jadi disiapkan dalam 1 hari 2. Besi tulangan dikirim ke tempat pekerjaan oleh pemasok 3. Penyusutan akibat pemotongan dll dianggap 1 % 4. Membengkok dan memasang batang besi beton dilaksanakan dengan tangan 5. 0,8 orang/hari memotong 200 kg batang besi beton 6. 1,0 orang/hari membengkok 200 kg batang besi beton 7. 1,2 orang/hari memasang dan mengikat 200 kg tulangan besi beton 8. Umur alat bantu rata-rata 1 bulan/set @ 3 alat Total Vol. Org-hari 1.00 1.00 1.00 3.00 Upah (Rp/Org/Hari) 80,000.00 80,000.00 70,000.00 50,000.00 Biaya Rp 80,000.00 80,000.00 70,000.00 150,000.00 Pekerja Harga (Rp/Unit) 13,000.00 120,000.00 Biaya (Rp) 2,925,000.00 14,400.00 Material Harga (Rp/jam) Biaya (Rp) 2,939,400.00 Sub Total (Rp) 380,000.00 Sub Total (Rp) Sub Total Rp

No.

Pekerja

Vol.

Hari

Kode

1 2 3 4

Mandor Tukang Kepala Besi Beton Pekerja Terampil Pekerja JUMLAH I

1.00 1.00 1.00 3.00

1.00 1.00 1.00 1.00

No

Material

Satuan

Kode

Total Vol.

1 2

Besi Beton U - 32 Alat Bantu JUMLAH II

Kg Set

M.167 M.170

225.00 0.12

No.

Peralatan

Jumlah

Hari Kerja

Kode

Jam Kerja

1 JUMLAH III PENULANGAN BETON VOLUME : 200.00 satuan kg Sub. Total Harga Satuan Rp. Jasa 10 % Total Harga Satuan Rp. Dibulatkan Rp. 16,597.00 Per kg 1,659.70 18,256.70 Per kg 18,257.00 Per kg Peralatan Total (Rp) 3,319,400.00

DINAS BINA MARGA DAN SUMBER DAYA AIR JL. MARGONDA RAYA NO. 54 DEPOK

REKAPITULASI ANALISA HARGA PEKERJAAN PROYEK DINAS BINA MARGA DAN SUMBER DAYA AIR TAHUN ANGGARAN 2009

NO

K. Baru

KODE

PEKERJAAN

SATUAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65

D 14 D 15 D 16 D 17 D 18 D 19 D 24 D 25 Q 01 Q 02 Q 03 Q 04 Q 05 Q 06 Q 07 Q 08 Q 09 Q 10 Q 11 Q 12 I 01 R 14 R 14a F 01 F 02 F 03 F 04 F 05 F 08 C 01 D 01 D 02 D 03 D 06 D 08 D 10 D 11 D 12 D 13 E 11 J 04 I 02 I 03 I 04 I 05 H 14

K.112 K.225 K.225b K.310 K.310b K.341 K.342 K.410 K.410a K.510 K.515 K.515b K.520 K.528 K.617 K.618 K.619 K.620 K.636 K.636a K.641 K.705 K.710 K.715 K.715a K.719* K.720* K.721* K.725* K.730* SNI-Bo SNI-K.225 SNI-P13 SNI-T1 SNI-T2 SNI-T3 SNI-T4 SNI-T6 SNI-T8 SNI-T9 SNI-T10 SNI-T11 SNI-PD5 SNI-PD5* SNI-PL3 SNI-KY54 SNI-KY55 SNI-KY56 SNI-KY57 SNI-AT38 SNI-CAT8 SNI-CAT14 A 002 A 004 A 005 A 069 A 070 A 085 A 086 A 087 A 120 A 188 A 191 G.51c I.1

PASANGAN BATU PADA PARIT (MENGGUNAKAN BURUH) PENGURUGAN DAN PEMADATAN DGN SIRTU (MENGGUNAKAN BURUH) PENGURUGAN DA