REKAPITULASI BIAYA LANJUTAN PEMBUATAN PAGAR PESANTREN JABOI

DI KOTA SABANGKegiatan : Pembangunan Gedung Kantor Pekerjaan: Pembangunan Pagar Pesantren Jaboi Nomor Paket 06 : GK Lokasi : Desa Jaboy Kec.SukaJaya- Kota Sabang T.Anggaran2010 :

NO I 0 II 0 III 0 IV 0 V 0 VI 0

URAIAN PEKERJAAN

Jumlah PPn 10% Total Dibulatkan

Terbilang: Seratus delapan puluh tujuh juta sembilan ratus sembilan puluh dua rib

Sabang , 27 Juli 2010 CV.BANDAR BARU COY

HASBALLAH Direktur

KAPITULASI BIAYA UATAN PAGAR PESANTREN JABOI

KOTA SABANG

SUB JUMLAH 3,449,500.00 49,319,775.36 32,501,285.80 19,940,245.02 198,447,391.52 20,612,600.00 324,270,797.70 32,427,079.77 356,697,877.47 356,698,000.00 juta sembilan ratus sembilan puluh dua ribu rupiah

BILL OF QUANTITY (BoQ) LANJUTAN PEMBUATAN PAGAR PESANTREN JABOI DI KOTA SABANGKegiatan Pekerjaan Lokasi : Pembangunan Gedung Kantor : Pembangunan Pagar Pesantren Jaboi : Desa Jaboy Kec.SukaJaya- Kota Sabang

Nomor Paket GK 06 : T.Anggaran : 2010

NO 1

URAIAN PEKERJAAN

VOLUM SATUA E N 4 M LS

(ANALISA ) 5 (Taksir ) (Taksir )

2 3.00 I PEKERJAAN PERSIAPAN 1 Pengukuran dan Pemasangan Bowplank 173.50 2 Papan nama proyek 1.00 II 1 2 3 4 5 1 2 3 4 5 6 III 1 2 3 4 IV 1 2 3 PEKERJAAN PONDASI Pondasi Batu Gunung Galian Tanah Pondasi Urugan Bekas Galian Pasir Alas Pondasi Pasangan Batu Kosong Pondasi Batu Gunung Pondasi Tapak setempat Galian Tanah Pondasi Urug bekas Galian Pasir Alas Pondasi Beton Cor Lantai Kerja Poor Tapak pondasi Stik Kolom PEKERJAAN BETON BERTULANG Balok Sloof 18 x 25 cm Kolom Beton Bertulang 30 x 30 cm Kolom Praktis 13 x 13 cm Ring Balok 15/20 cm

88.98 22.25 5.93 11.86 35.59 21.50 5.38 1.02 1.02 3.14 2.30

M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3

(SNI.DT-91-0006-2007-01 ) (SNI.DT-91-0006-2007-08a ) (SNI.DT-91-0006-2007-10 ) (SNI.DT-91-0007-2007-01 ) (SNI.DT-91-0007-2007-03 ) (SNI.DT-91-0006-2007-01 ) (SNI.DT-91-0006-2007-08a ) (SNI.DT-91-0006-2007-10 ) (SNI.DT-91-0008-2007-01b ) (SNI.DT-91-0008-2007-P1 ) (SNI.DT-91-0008-2007-K1 )

6.67 4.75 0.78 4.45

M3 M3 M3 M3

(SNI.DT-91-0008-2007-SL1 ) (SNI.DT-91-0008-2007-K4 ) (SNI.DT-91-0008-2007-KP ) (SNI.DT-91-0008-2007-Bl )

PEKERJAAN PASANGAN BATU BATA Pasangan Bata 1pc : 4 ps 194.97 Plesteran Bata Baru 1pc : 4ps 389.94 Plesteran Bata lama 1pc : 4ps 261.00

M3 M3 M2

(SNI-DT-91-0009-2007-05 ) (SNI-DT-91-0010-2007-03 ) (SNI-DT-91-0010-2007-03 )

V PEKERJAAN PENGECATAN 1 Cat Dinding Baru dan Pagar Lama 689.94 M2 2 Cat Kolom dan Sloof pagar baru dan pagar lama M2 177.64

(RSNI.T-38-2000-C-TB ) (RSNI.T-38-2000-C-TB )

VI PEKERJAAN LAIN-LAIN 1 Relief Kolom Pagar dan perapian 2 Relief Dinding Pagar

32.00 258.04

bh M2

(Taksir ) (Taksir )

L OF QUANTITY (BoQ) UATAN PAGAR PESANTREN JABOI DI KOTA SABANG

(HARGA JUMLAH SATUAN (Rp.) HARGA (Rp.) ) 6 7

17,000.00 2,949,500.00 500,000.00 500,000.00 (Sub Jumlah ) ###

112,000.00 9,965,760.00 55,000.00 484,006.60 235,000.00 2,508,425.58 101,200.00 ### 112,000.00 2,408,000.00 55,000.00 83,252.40 210,000.00 721,988.64 3,057,000.00 8,031,479.44 3,365,000.00 7,757,840.20 (Sub Jumlah ) ### #VALUE! (Sub Jumlah ) ### ### ###

### - 7,995,213.00 (Sub Jumlah ) ### 284,600.00 ### 284,600.00 2,090,467.52 (Sub Jumlah ) ###

120,000.00 3,840,000.00 65,000.00 ### (Sub Jumlah ) ###

DAFTAR ANALISA HARGA SATUANKegiatan Pekerjaan Nomor Paket Lokasi T.Anggaran : Pembangunan Gedung Kantor : Pembangunan Pagar Pesantren Jaboi : GK 06 : Desa Jaboy Kec.SukaJaya- Kota Sabang : 2010

SNI-DT-91-0006-2007-01 1 M3 Galian tanah biasa sedalam 1 m (1) Tenaga 0.750 OH 0.025 OH

Pekerja @Rp Mandor @Rp (Jumlah ) (Dibulatkan )

SNI-DT-91-0006-2007-08a 1 M3 Urugan Kembali bekas galian (1) Tenaga 0.250 OH 0.008 OH

Pekerja @Rp Mandor @Rp (Jumlah ) (Dibulatkan )

SNI-DT-91-0006-2007-11 1 M3 Urugan Tanah Timbun (1) Bahan 1.200 M3 (2) Tenaga 0.250 OH 0.025 OH

Tanah Timbun @Rp Pekerja @Rp Mandor @Rp (Jumlah ) (Dibulatkan )

SNI-DT-91-0006-2007-10 1 M3 Urugan Pasir (1) Bahan 1.200 M3 (2) Tenaga 0.300 OH 0.010 OH

Pasir Urug @Rp Pekerja @Rp Mandor @Rp (Jumlah ) (Dibulatkan )

SNI-DT-91-0007-2007-01 1 M3 Pasangan Batu Kosong (Aanstamping) (1) Bahan 1.200 M3 0.432 M3 (2) Tenaga

Batu belah 15cm/20cm @Rp Pasir Urug @Rp

DAFTAR ANALISA HARGA SATUAN0.780 0.390 0.039 0.039 OH OH OH OH Pekerja @Rp Tukang batu @Rp Kepala Tukang @Rp Mandor @Rp (Jumlah ) (Dibulatkan )

DAFTAR ANALISA HARGA SATUANSNI-DT-91-0007-2007-03 1 M3 Pasangan Pondasi batu Kali 1pc : 4 ps (1) Bahan 1.200 M3 163.000 M3 0.520 M3 (2) Tenaga 1.500 OH 0.600 OH 0.060 OH 0.075 OH

Batu belah 15cm/20cm @Rp Semen PC @ 40 Kg @Rp Pasir Pasang @Rp Pekerja @Rp Tukang batu @Rp Kepala Tukang @Rp Mandor @Rp (Jumlah ) (Dibulatkan )

SNI-DT-91-0009-2007-03 1 M2 Pasangan bata merah tebal 1/2 bata adukan 1Pc:2Ps (1) Bahan 70.0000 Bh Batu Bata @Rp 18.9500 KG Semen PC @ 40 Kg @Rp 0.0380 M3 Pasir Pasang @Rp (2) Tenaga 0.3000 OH Pekerja @Rp 0.1000 OH Tukang batu @Rp 0.0100 OH Kepala Tukang @Rp 0.0150 OH Mandor @Rp (Jumlah ) (Dibulatkan ) SNI-DT-91-0009-2007-05 1 M2 Pasangan bata merah tebal 1/2 bata adukan 1Pc:4Ps (1) Bahan 70.0000 Bh Batu Bata @Rp 11.5000 KG Semen PC @ 40 Kg @Rp 0.0430 M3 Pasir Pasang @Rp (2) Tenaga 0.3000 OH Pekerja @Rp 0.1000 OH Tukang batu @Rp 0.0100 OH Kepala Tukang @Rp 0.0150 OH Mandor @Rp (Jumlah ) (Dibulatkan ) SNI-DT-91-0010-2007-01 1 M2 Plesteran 1 Pc : 2 Ps : tebal 15 mm (1) Bahan 10.2240 KG 0.0160 M3 (2) Tenaga 0.2000 OH 0.1500 OH

Semen PC @ 40 Kg @Rp Pasir Pasang @Rp Pekerja @Rp Tukang Batu @Rp

DAFTAR ANALISA HARGA SATUAN0.0150 OH 0.0100 OH Kepala Tukang @Rp Mandor @Rp (Jumlah ) (Dibulatkan )

DAFTAR ANALISA HARGA SATUANSNI-DT-91-0010-2007-02 1 M2 Plesteran 1 Pc : 3 Ps : tebal 15 mm (1) Bahan 7.7760 KG 0.0230 M3 (2) Tenaga 0.2000 OH 0.1500 OH 0.0150 OH 0.0100 OH

Semen PC @ 40 Kg @Rp Pasir Pasang @Rp Pekerja @Rp Tukang Batu @Rp Kepala Tukang @Rp Mandor @Rp (Jumlah ) (Dibulatkan )

SNI-DT-91-0010-2007-03 1 M2 Plesteran 1 Pc : 4 Ps : tebal 15 mm (1) Bahan 6.2406 KG 0.0240 M3 (2) Tenaga 0.2000 OH 0.1500 OH 0.0150 OH 0.0100 OH

Semen PC @ 40 Kg @Rp Pasir Pasang @Rp Pekerja @Rp Tukang Batu @Rp Kepala Tukang @Rp Mandor @Rp (Jumlah ) (Dibulatkan )

SNI-DT-91-0010-2007-04 1 M2 Plester Ciprat 1 Pc : 2 Ps (1) Bahan 4.3200 KG 0.0060 M3 (2) Tenaga 0.2500 OH 0.1000 OH 0.0100 OH 0.0130 OH

Semen PC @ 40 Kg @Rp Pasir Pasang @Rp Pekerja @Rp Tukang Batu @Rp Kepala Tukang @Rp Mandor @Rp (Jumlah ) (Dibulatkan )

SNI-DT-91-0010-2007-05 1 M2 Acian (1) Bahan 3.2500 KG (2) Tenaga 0.2500 OH 0.1000 OH 0.0100 OH 0.0130 OH

Semen PC @ 40 Kg @Rp Pekerja @Rp Tukang Batu @Rp Kepala Tukang @Rp Mandor @Rp

DAFTAR ANALISA HARGA SATUAN(Jumlah ) (Dibulatkan )

DAFTAR ANALISA HARGA SATUANSNI-DT-91-0008-2007-01a 1 M3 Membuat beton mutu F1 c - 7,4 Mpa ( K100) slump(122)cm,w/c=0.87 (1) Bahan 247.0000 869.0000 999.0000 215.0000 1.6500 0.2750 0.0280 0.0830 Kg kg Kg ltr (2) Tenaga OH OH OH OH Semen PC @ 40 Kg @Rp Pasir Beton @Rp Kerikil Beton @Rp Air @Rp Pekerja @Rp Tukang batu @Rp Kepala Tukang @Rp Mandor @Rp (Jumlah ) (Dibulatkan )

SNI-DT-91-0008-2007-01b 1 M3 Membuat beton mutu F1 c - 9,8 Mpa ( K125) slump(122)cm,w/c=0.78 (1) Bahan 276.0000 828.0000 1,012.0000 215.0000 1.6500 0.2750 0.0280 0.0830 Kg kg Kg ltr (2) Tenaga OH OH OH OH Semen PC @ 40 Kg @Rp Pasir Beton @Rp Kerikil Beton @Rp Air @Rp Pekerja @Rp Tukang batu @Rp Kepala Tukang @Rp Mandor @Rp (Jumlah ) (Dibulatkan )

SNI-DT-91-0008-2007-01c 1 M3 Membuat beton mutu F1 c - 12,2Mpa ( K150) slump(122)cm,w/c=0.72 (1) Bahan 299.0000 Kg Semen PC @ 40 Kg @Rp 799.0000 kg Pasir Beton @Rp 1,017.0000 Kg Kerikil Beton @Rp 215.0000 ltr Air @Rp (2) Tenaga 1.6500 OH Pekerja @Rp 0.2500 OH Tukang batu @Rp 0.0250 OH Kepala Tukang @Rp 0.0800 OH Mandor @Rp (Jumlah ) (Dibulatkan ) SNI-DT-91-0008-2007-01d 1 M3 Membuat beton mutu F1 c - 14,5Mpa ( K175) slump(122)cm,w/c=0.66 (1) Bahan 326.0000 760.0000 Kg kg Semen PC @ 40 Kg @Rp Pasir Beton @Rp

DAFTAR ANALISA HARGA SATUAN1,029.0000 215.0000 1.6500 0.2750 0.0280 0.0830 Kg ltr (2) Tenaga OH OH OH OH Kerikil Beton @Rp Air @Rp Pekerja @Rp Tukang batu @Rp Kepala Tukang @Rp Mandor @Rp (Jumlah ) (Dibulatkan )

DAFTAR ANALISA HARGA SATUANSNI-DT-91-0008-2007-01e 1 M3 Membuat beton mutu F1 c - 16,9 Mpa ( K200) slump(122)cm,w/c=0.61 (1) Bahan 352.0000 731.0000 1,031.0000 215.0000 1.6500 0.2750 0.0280 0.0830 Kg kg Kg ltr (2) Tenaga OH OH OH OH Semen PC @ 40 Kg @Rp Pasir Beton @Rp Kerikil Beton @Rp Air @Rp Pekerja @Rp Tukang batu @Rp Kepala Tukang @Rp Mandor @Rp (Jumlah ) (Dibulatkan )

SNI-DT-91-0008-2007-01f 1 M3 Membuat beton mutu F1 c - 19,3 Mpa ( K225) slump(122)cm,w/c=0.58 (1) Bahan 371.0000 698.0000 1,047.0000 215.0000 1.6500 0.2750 0.0280 0.0830 Kg kg Kg ltr (2) Tenaga OH OH OH OH Semen PC @ 40 Kg @Rp Pasir Beton @Rp Kerikil Beton @Rp Air @Rp Pekerja @Rp Tukang batu @Rp Kepala Tukang @Rp Mandor @Rp (Jumlah ) (Dibulatkan )

SNI-DT-91-0008-2007-04a 1 Kg Pembesian dengan Besi beton polos (1) Bahan 1.0500 Kg 0.0150 Kg (2) Tenaga 0.0070 Org 0.0070 Org 0.0007 Org 0.0004 Org

Besi beton polos @Rp Kawat beton @Rp Pekerja @Rp Tukang @Rp Kepala tukang @Rp Mandor @Rp (Jumlah ) (Dibulatkan )

SNI-DT-91-0008-2007-04b 1 Kg Pembesian dengan Besi beton ulir (1) Bahan 1.0500 Kg 0.0150 Kg

Besi beton polos @Rp Kawat beton @Rp

DAFTAR ANALISA HARGA SATUAN0.0070 0.0070 0.0007 0.0004 (2) Tenaga Org Org Org Org Pekerja @Rp Tukang @Rp Kepala tukang @Rp Mandor @Rp (Jumlah ) (Dibulatkan )

DAFTAR ANALISA HARGA SATUANSNI-DT-91-0008-2007-05a 1 M2 Pasang Bekisting untuk Pondasi (1) Bahan 0.0400 M3 0.3000 Kg 0.1000 ltr (2) Tenaga 0.3000 Org 0.2600 Org 0.0260 Org 0.0050 Org

Kayu papan@Rp Paku @Rp Minyak Bekisting @Rp Pekerja @Rp Tukang @Rp Kepala tukang @Rp Mandor @Rp (Jumlah ) (Dibulatkan )

SNI-DT-91-0008-2007-05b 1 M2 Pasang Bekisting untuk Sloof (1) Bahan 0.0450 M3 0.3000 Kg 0.1000 ltr (2) Tenaga 0.5200 Org 0.2600 Org 0.0260 Org 0.0260 Org

Kayu papan@Rp Paku @Rp Minyak Bekisting @Rp Pekerja @Rp Tukang @Rp Kepala tukang @Rp Mandor @Rp (Jumlah ) (Dibulatkan )

SNI-DT-91-0008-2007-05c 1 M2 Pasang Bekisting untuk Kolom (1) Bahan 0.0400 M3 0.4000 Kg 0.2000 ltr 0.0180 M3 0.3500 lbr 2.0000 btg (2) Tenaga 0.6660 Org 0.3300 Org 0.0330 Org 0.0330 Org

Kayu papan@Rp Paku @Rp minyak bekisting @Rp Balok Kayu klas III @Rp Plywod tbl 9mm @Rp Dolken Kayu galam O-8-10/4 m @Rp Pekerja @Rp Tukang @Rp Kepala tukang @Rp Mandor @Rp (Jumlah ) (Dibulatkan )

SNI-DT-91-0008-2007-05d 1 M2 Pasang Bekisting untuk Balok (1) Bahan

DAFTAR ANALISA HARGA SATUAN0.0400 M3 0.4000 Kg 0.2000 ltr 0.0180 M3 0.3500 lbr 2.0000 btg (2) Tenaga 0.6600 Org 0.3300 Org 0.0330 Org 0.0330 Org Kayu papan@Rp Paku @Rp minyak bekisting @Rp Balok Kayu klas III @Rp Plywod tbl 9mm @Rp Dolken Kayu galam O-8-10/4 m @Rp Pekerja @Rp Tukang @Rp Kepala tukang @Rp Mandor @Rp (Jumlah ) (Dibulatkan )

DAFTAR ANALISA HARGA SATUANSNI-DT-91-0008-2007-05e 1 M2 Pasang Bekisting untuk Lantai (1) Bahan 0.0415 M3 0.4000 Kg 0.2000 ltr 0.0150 M3 0.3500 lbr 6.0000 btg (2) Tenaga 0.3200 Org 0.3300 Org 0.0330 Org 0.0060 Org

Kayu papan@Rp Paku @Rp Minyak Bekisting @Rp Balok Kayu klas III @Rp Plywod tbl 9mm @Rp Dolken Kayu galam O-8-10/4 m @Rp Pekerja @Rp Tukang @Rp Kepala tukang @Rp Mandor @Rp (Jumlah ) (Dibulatkan )

REKAPITULASI BETON BERTULANG : POER PONDASI SNI-DT-91-0008-2007-P1 1 M3 Beton Poer Pondasipembesian 1.000 M3 114.290 Kg 2.331 M2

114.29 (Kg ) Beton Bertulang K225 SNI-DT-91-0008-2 @Rp Besi Polos SNI-DT-91-0008-2007-04a @Rp Bekisting SNI-DT-91-0008-2007-05a @Rp (Jumlah ) (Dibulatkan )

SLOOF BERTULANG SNI-DT-91-0008-2007-SL1 Beton Bertulang Sloof 18 x 25 Cm pembesian 1.000 M3 121.038 Kg 8.325 M2

121.04 (Kg ) Beton Bertulang K225 SNI-DT-91-0008-2 @Rp Besi Polos SNI-DT-91-0008-2007-04a @Rp Bekisting SNI-DT-91-0008-2007-05b @Rp (Jumlah ) (Dibulatkan )

SNI-DT-91-0008-2007-SL2 Beton Bertulang Sloof 15 x 20 Cm pembesian 1.000 M3 104.168 Kg 9.975 M2

104.17 (Kg ) Beton Bertulang K225 SNI-DT-91-0008-2 @Rp Besi Polos SNI-DT-91-0008-2007-04a @Rp Bekisting SNI-DT-91-0008-2007-05b @Rp (Jumlah ) (Dibulatkan )

SNI-DT-91-0008-2007-SL3 Beton Bertulang Sloof 20 x 30 Cm pembesian 1.000 M3 128.000 Kg

128.00 (Kg ) Beton Bertulang K225 SNI-DT-91-0008-2 @Rp Besi Polos SNI-DT-91-0008-2007-04a @Rp

DAFTAR ANALISA HARGA SATUAN7.500 M2 Bekisting SNI-DT-91-0008-2007-05b @Rp (Jumlah ) (Dibulatkan )

KOLOM BETON BERTULANG SNI-DT-91-0008-2007-K1 1 M3 Beton Bertulang Kolom 18 x 25Cm pembesian 1.000 M3 121.038 Kg 4.923 M2

121.04 (Kg ) Beton Bertulang K225 SNI-DT-91-0008-2 @Rp Besi Polos SNI-DT-91-0008-2007-04a @Rp Bekisting SNI-DT-91-0008-2007-05c @Rp (Jumlah ) (Dibulatkan )

DAFTAR ANALISA HARGA SATUANSNI-DT-91-0008-2007-K2 1 M3Beton Bertulang Kolom 20 x 20 Cm pembesian 1.000 M3 122.110 Kg 4.872 M2

122.11 (Kg ) Beton Bertulang K225 SNI-DT-91-0008-2 @Rp Besi Polos SNI-DT-91-0008-2007-04a @Rp Bekisting SNI-DT-91-0008-2007-05c @Rp (Jumlah ) (Dibulatkan )

SNI-DT-91-0008-2007-K3 1 M3Beton Bertulang Kolom 25 x 25Cm pembesian 1.000 M3 126.038 Kg 4.923 M2

126.04 (Kg ) Beton Bertulang K225 SNI-DT-91-0008-2 @Rp Besi Polos SNI-DT-91-0008-2007-04a @Rp Bekisting SNI-DT-91-0008-2007-05c @Rp (Jumlah ) (Dibulatkan )

SNI-DT-91-0008-2007-K4 1 M3Beton Bertulang Kolom 30 x 30 Cm pembesian 1.000 M3 122.650 Kg 5.423 M2

122.65 (Kg ) Beton Bertulang K225 SNI-DT-91-0008-2 @Rp Besi Polos SNI-DT-91-0008-2007-04a @Rp Bekisting SNI-DT-91-0008-2007-05c @Rp (Jumlah ) (Dibulatkan )

SNI-DT-91-0008-2007-K5 1 M3Beton Bertulang Kolom 30 x 60 Cm pembesian 1.000 M3 129.550 Kg 5.423 M2

129.55 (Kg ) Beton Bertulang K225 SNI-DT-91-0008-2 @Rp Besi Polos SNI-DT-91-0008-2007-04a @Rp Bekisting SNI-DT-91-0008-2007-05c @Rp (Jumlah ) (Dibulatkan )

SNI-DT-91-0008-2007-K6 1 M3Beton Bertulang Kolom 13 x 20 Cm pembesian 1.000 M3 138.000 Kg 3.923 M2

138.00 (Kg ) Beton Bertulang K225 SNI-DT-91-0008-2 @Rp Besi Polos SNI-DT-91-0008-2007-04a @Rp Bekisting SNI-DT-91-0008-2007-05c @Rp (Jumlah ) (Dibulatkan )

SNI-DT-91-0008-2007-Kp 1 M3Beton Bertulang Kolom Praktis 13 x 13 Cm pembesian 164.31 (Kg ) 1.00 M3 Beton Bertulang K225 SNI-DT-91-0008-2 @Rp 164.31 Kg Besi Polos SNI-DT-91-0008-2007-04a @Rp 2.50 M2 Bekisting SNI-DT-91-0008-2007-05c @Rp (Jumlah ) (Dibulatkan )

DAFTAR ANALISA HARGA SATUANBALOK BETON BERTULANG SNI-DT-91-0008-2007-B1 1 M3Beton Bertulang Ring Balok 15 x 20 Cm pembesian 169.01 (Kg ) 1.000 M3 Beton Bertulang K225 SNI-DT-91-0008-2007-01f @Rp (@Rp ) 169.010 Kg Besi Polos SNI-DT-91-0008-2007-04a @Rp (@Rp ) 2.500 M2 Bekisting SNI-DT-91-0008-2007-05d @Rp (Jumlah ) (Dibulatkan )

DAFTAR ANALISA HARGA SATUANSNI-DT-91-0008-2007-BT 1 M3 Beton Bertulang Ring Balok 20 x 40 Cm pembesian 1.000 M3 63.410 Kg 78.137 Kg 7.381 M2

141.55 (Kg ) Beton Bertulang K225 SNI-DT-91-0008-2 @Rp Besi Ulir SNI-DT-91-0008-2007-04b @Rp Besi Polos SNI-DT-91-0008-2007-04a @Rp Bekisting SNI-DT-91-0008-2007-05d @Rp (Jumlah ) (Dibulatkan )

SNI-DT-91-0008-2007-TG 1 M3 Beton Balok Latei/Balok T.Gvl 13x 13 Cm pembesian 243.19 (Kg ) 1.00 M3 Beton Bertulang K225 SNI-DT-91-0008-2 @Rp 243.19 Kg Besi Polos SNI-DT-91-0008-2007-04a @Rp 2.50 M2 Bekisting SNI-DT-91-0008-2007-05d @Rp (Jumlah ) (Dibulatkan )

RSNI.T-38-2000-C-TB 1 M2 Pengecatan Bidang Tembok Baru (1 x Lapis Plamir, 1 Cat Dasar + 2 x Cat Acrylic Emult (1) Kg Kg Kg (2) Org Org Org Org Bahan Plamur Tembok @Rp Cat Dasar @Rp Cat Penutup 2 kali @Rp Tenaga Kerja Pekerja @Rp Tukang @Rp Kepala Tukang @Rp Mandor @Rp Jumlah Dibulatkan

0.1000 0.1000 0.2600 0.0200 0.0630 0.0060 0.0030

RSNI.T-38-2000-C-KB 1 M2 Pengecatan Bidang Kayu Baru (1 x Lapis Plamir, 1 Cat Dasar + 3 x Cat Penutup) (1) Kg Kg Kg Kg (2) Org Org Org Org Bahan Cat Meni @Rp Plamur @Rp Cat Dasar @Rp Cat Penutup 3kali @Rp Tenaga Kerja Pekerja @Rp Tukang @Rp Kepala Tukang @Rp Mandor @Rp Jumlah Dibulatkan

0.2000 0.1500 0.1700 0.3500 0.0700 0.1050 0.0040 0.0030

DAFTAR ANALISA HARGA SATUAN

(Sabang , 27 Juli 2010 ) (CV. BANDAR BARU COY )

(HASBALLAH ) (Direktur )

NALISA HARGA SATUAN

50,000.00 62,000.00 112,000.00 112,000.00

(@Rp ) (@Rp ) -

52,000.00 (@Rp ) (@Rp ) 52,000.00 52,000.00

55,000.00 (@Rp ) (@Rp ) 55,000.00 55,000.00

100,000.00 (@Rp )

NALISA HARGA SATUAN(@Rp ) 60,000.00 75,000.00 (@Rp ) 235,000.00 235,000.00

NALISA HARGA SATUAN

(@Rp ) 1,200.00 100,000.00 (@Rp ) (@Rp ) (@Rp ) (@Rp ) 101,200.00 101,200.00

750.00 1,200.00 (@Rp ) (@Rp (@Rp (@Rp (@Rp ) ) ) ) 1,950.00 1,950.00

(@Rp ) (@Rp ) (@Rp ) (@Rp (@Rp (@Rp (@Rp ) ) ) ) -

(@Rp ) (@Rp ) (@Rp ) (@Rp )

NALISA HARGA SATUAN(@Rp ) (@Rp ) -

NALISA HARGA SATUAN

(@Rp ) (@Rp ) (@Rp (@Rp (@Rp (@Rp ) ) ) ) -

(@Rp ) (@Rp ) (@Rp (@Rp (@Rp (@Rp ) ) ) ) -

(@Rp ) (@Rp ) (@Rp (@Rp (@Rp (@Rp ) ) ) ) -

(@Rp ) (@Rp (@Rp (@Rp (@Rp ) ) ) )

NALISA HARGA SATUAN-

NALISA HARGA SATUAN

1,200.00 142.86 (@Rp ) 30.00 (@Rp ) 60,000.00 75,000.00 75,000.00 211,372.86 211,372.00

(@Rp (@Rp (@Rp (@Rp

) ) ) )

(@Rp ) 60,000.00 75,000.00 75,000.00 210,000.00 210,000.00

(@Rp (@Rp (@Rp (@Rp (@Rp (@Rp (@Rp (@Rp

) ) ) ) ) ) ) ) -

(@Rp ) (@Rp )

NALISA HARGA SATUAN(@Rp ) (@Rp ) (@Rp ) 60,000.00 75,000.00 75,000.00 210,000.00 210,000.00

NALISA HARGA SATUAN

(@Rp (@Rp (@Rp (@Rp (@Rp (@Rp (@Rp (@Rp

) ) ) ) ) ) ) ) -

(@Rp (@Rp (@Rp (@Rp (@Rp (@Rp (@Rp (@Rp

) ) ) ) ) ) ) ) -

12,000.00 15,000.00 (@Rp ) (@Rp ) (@Rp ) (@Rp ) 27,000.00 27,000.00

15,000.00 (@Rp )

NALISA HARGA SATUAN(@Rp ) (@Rp ) (@Rp ) (@Rp ) 15,000.00 15,000.00

NALISA HARGA SATUAN

3,000,000.00 20,000.00 10,000.00 (@Rp ) (@Rp ) (@Rp ) (@Rp ) 3,030,000.00 3,030,000.00

(@Rp ) (@Rp ) (@Rp ) (@Rp (@Rp (@Rp (@Rp ) ) ) ) -

(@Rp ) (@Rp ) (@Rp ) 3,200,000.00 125,000.00 40,000.00 (@Rp ) (@Rp ) (@Rp ) (@Rp ) 3,365,000.00 3,365,000.00

NALISA HARGA SATUAN(@Rp (@Rp (@Rp (@Rp (@Rp (@Rp (@Rp (@Rp (@Rp (@Rp ) ) ) ) ) ) ) ) ) ) -

NALISA HARGA SATUAN

(@Rp (@Rp (@Rp (@Rp (@Rp (@Rp (@Rp (@Rp (@Rp (@Rp

) ) ) ) ) ) ) ) ) ) -

27,000.00 3,030,000.00 3,057,000.00 3,057,000.00

(@Rp ) (@Rp ) -

(@Rp ) (@Rp ) (@Rp ) -

(@Rp ) (@Rp )

NALISA HARGA SATUAN(@Rp ) -

(@Rp ) (@Rp ) 3,365,000.00 3,365,000.00 3,365,000.00

NALISA HARGA SATUAN

(@Rp ) (@Rp ) (@Rp ) -

(@Rp ) (@Rp ) (@Rp ) -

(@Rp ) (@Rp ) (@Rp ) -

(@Rp ) (@Rp ) (@Rp ) -

(@Rp ) (@Rp ) (@Rp ) -

(@Rp ) (@Rp ) (@Rp ) -

NALISA HARGA SATUAN

#VALUE! #VALUE! #VALUE! #VALUE!

NALISA HARGA SATUAN

(@Rp ) 15,000.00 (@Rp ) 15,000.00 15,000.00

(@Rp ) (@Rp ) (@Rp ) -

u (1 x Lapis Plamir, 1 Cat Dasar + 2 x Cat Acrylic Emultion Paint)

7,400.00 14,000.00 16,200.00 50,000.00 60,000.00 75,000.00 62,000.00 284,600.00 284,600.00

1 x Lapis Plamir, 1 Cat Dasar + 3 x Cat Penutup)

30,000.00 (@Rp ) (@Rp ) 42,000.00 (@Rp (@Rp (@Rp (@Rp ) ) ) ) 72,000.00 72,000.00

NALISA HARGA SATUAN

(Sabang , 27 Juli 2010 ) (CV. BANDAR BARU COY )

DAFTAR UPAH DAN BAHANKegiatan Pekerjaan Nomor Paket Lokasi T.Anggaran : : : : : Pembangunan Gedung Kantor Pembangunan Pagar Pesantren Jaboi GK 06 Desa Jaboy Kec.SukaJaya- Kota Sabang 2010

NO A. 1 2 3 4 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37

URAIAN UPAH Pekerja Kepala Tukang (kayu,batu,besi &cat) Mandor Tukang BAHAN Air Batu Bata Batu Andesit Batu Kali/Batu Belah (Sungai/Gunung) 15/20 cm Batu Pecah 2-3 cm Batu Split /Koral Baut Ulir Baja Profil Besi Beton Polos Besi Beton Ulir Cat Dasar Kayu Cat Minyak Warna Cat Menie Cat Tembok Warna Dempul Kayu Dolken Kayu Kawat Beton Kawat Las Kawat Duri Kawat Seng Polos Kabel NY 2.5 x 3 mm Kayu Kelas I (Seumantok) Kayu Kelas II Kayu Kelas III Kayu Kelas IV Kayu rangka plafond Kayu Rangka Bowplank Kayu 5/7 Kayu papan 3/20 Kertas amplas Koral Beton Kosen Kayu KlasII (Kamper/Kruing/dll) Lem Kayu Meni Besi Minyak Cat /Thinner Minyak Bekisting Paku Asbes 1/ 1/ 1/ 1/

SATUAN Orang/Hari Orang/Hari Orang/Hari Orang/Hari

(NILAI ) 50,000.00 75,000.00 62,000.00 60,000.00

1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/

Liter Buah M M M M Buah Kg Kg Kg Kg Kg Kg Kg Kg Batang Kg Kg Kg Kg M1 M M M M M M M M Lembar M M Liter Kg Liter Liter Kg

30.00 750.00 200,000.00 100,000.00 200,000.00 200,000.00 1,500.00 19,200.00 12,000.00 15,000.00 14,000.00 42,000.00 30,000.00 16,200.00 30,000.00 40,000.00 15,000.00 10,000.00 12,900.00 15,000.00 1,018.00 4,500,000.00 3,600,000.00 3,200,000.00 3,000,000.00 3,600,000.00 3,000,000.00 3,000,000.00 3,000,000.00 3,000.00 200,000.00 3,600,000.00 15,000.00 30,000.00 10,000.00 10,000.00 25,000.00

NO 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64

URAIAN Paku Kayu Paku Biasa 2 "-5" Paku Biasa 1/2 "-1" Paku Ulir Pima dek Papan Bekisting Papan Lisplank Seumantok Papan Reider Papan Bowplank Plamuur Tembok Pasir Beton Kerikil Pasir Pasang Pasir Urug Paving Block PlAmiir Multypleks 3,6mm Multypleks 4 mm Multypleks 6 mm Multypleks 9 mm Semen Portland @ 40 Kg Semen Portland @ 40 Kg Semen Portland @ 50 Kg Semen Putih @ 50 Kg Semen Abu-abu Semen Warna @ 50 Kg Stutwerk Sirtu Tanah Timbun 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/ 1/

SATUAN Kg Kg Kg Kg M Lembar Lembar M Kg M M M M Kg Lembar Lembar Lembar Lembar zak Kg Kg zak Kg kg M M M

(NILAI ) 20,000.00 5,000.00 5,000.00 22,000.00 2,750,000.00 150,000.00 200,000.00 380,000.00 7,400.00 200,000.00 100,000.00 55,000.00 65,000.00 7,400.00 75,000.00 75,000.00 100,000.00 125,000.00 48,000.00 1,200.00 1,400.00 2,400.00 (- ) 2,400.00 2,557,286.00 150,000.00 52,000.00

Sabang , 27 Juli 2010 CV.BANDAR BARU COY

HASBALLAH Direktur

NO

URAIAN PEKERJAAN

BOBO T (%) 1 1 20.30

30.30

4

5

6

7

I

PEKERJAAN PERSIAPAN 1 Pengukuran dan Pemasangan Bowplank 2 Papan nama proyek PEKERJAAN PONDASI Pondasi Batu Gunung Galian Tanah Pondasi Urugan Bekas Galian Pasir Alas Pondasi Pasangan Batu Kosong Pondasi Batu Gunung Pondasi Tapak setempat Galian Tanah Pondasi Urug bekas Galian Pasir Alas Pondasi Beton Cor Lantai Kerja Poor Tapak pondasi Stik Kolom PEKERJAAN BETON BERTULANG Balok Sloof 18 x 25 cm Kolom Beton Bertulang 30 x 30 cm Kolom Praktis 13 x 13 cm Ring Balok 15/20 cm PEKERJAAN PASANGAN BATU BATA Pasangan Bata 1pc : 4 ps Plesteran Bata Baru 1pc : 4ps Plesteran Bata lama 1pc : 4ps

0.91 0.15

0.30

0.15

II 1 2 3 4 5 1 2 3 4 5 6 III 1 2 3 4 IV 1 2 3

100.00

3.07 0.1790.00 0.28 1.47 10.16 80.00 0.00 0.49 0.0470.00 0.05 0.42 4.7060.00 4.5450.00

0.44

0.44

0.29

0.29

0.00 9.69 1.6140.00 9.3230.00

0.00 6.99 4.6820.00

V PEKERJAAN PENGECATAN 1 Cat Dinding Baru dan Pagar Lama 60.55 10.00 2 Cat Kolom dan Sloof pagar baru dan pagar lama 1.22 VI PEKERJAAN LAIN-LAIN 1 Relief Kolom Pagar dan perapian 2 Relief Dinding Pagar0.00 10.30 0.30

1.18 9.81 ###

20.58 0.88

30.58 1.73

40.58 2.31

50.29 2.60

60.29 2.89

70.29 3.18

8

(BULAN KE I ) 2 8 9 10 11 12 13 14 15 16 17 3 18 19 20 21 22 23

0.29

0.29

0.29

0.07

0.07

0.07 0.24

0.07 0.24 0.24 0.25 0.24 0.24 0.25 0.25 0.24 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25

0.12 0.01 0.01 0.11 1.17 1.13

0.12

0.01 0.11

0.00

0.00

0.00 0.81

0.00

6

7

80.29 3.47

90.36 3.83

100.36 4.19

110.32 4.51

120.44 4.95

130.51 5.46

140.60 6.06

151.67 7.74

161.63 9.37

170.26 9.63

180.25 9.89

190.25 10.14

201.31 11.45

211.43 12.88

221.32 14.20

231.38 15.58

24

25

RENCAN LANJUTAN PEMBUATA DI KO

4 24 25 26 27 28 29 30 31

1 32 33 34 35 36 37 38

2 39

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.12 0.01 0.01 0.11 1.17 1.13 1.17 1.13 0.01

0.12

0.00 0.81 0.81 0.40

0.00

0.00 0.81 0.81 0.81 0.40

0.00

0.00

0.21

0.21

0.21

0.21

0.21

0.21

0.21

0.21 0.14

0.21 0.14

0.21 0.14

0.21 0.14

0.21 0.14

0.21 0.14

0.21 0.14

0.78

0.78

0.78

0.78

0.78

0.78

23

242.45

252.41

26

270.48

281.65

291.25 23.81

301.25 25.06

312.42 27.48

322.31 29.80

332.41 32.20

342.59 34.79

352.55 37.34

361.42 38.77

370.61 39.37

381.01 40.38

390.61 40.99

400.73 41.72

41

18.03

20.44

20.92

22.57

RENCANA PEKERJAAN N PEMBUATAN PAGAR PESANTREN JABOI DI KOTA SABANG(BULAN KE II ) 2 40 41 42 43 44 45 3 46 47 48 49 50 51 52 4 53 54 55

0.04

0.04

0.04

0.04

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.01 0.01 0.11 1.17 1.13

0.00

0.00

0.00 0.81 0.81 0.81 0.40

0.00

0.00

0.00 0.81 0.81 0.81

0.21 0.14

0.21 0.14

0.21 0.14

0.21 0.14

0.21 0.14

0.21 0.14

0.21 0.14

0.21 0.14

0.21 0.14

0.21 0.14

0.21 0.14

0.21 0.14

0.21 0.14

0.21 0.14

0.21 0.14

0.21 0.14

9

40

411.67 43.39

421.77 45.16

432.84 48.00

442.55 50.54

451.42 51.97

461.41 53.38

470.61 53.99

481.01 55.00

490.61 55.60

500.65 56.25

511.70 57.96

521.70

531.66

54

551.20

561.16

571.16

58

59.66

61.32

62.53

63.69

64.85

(BULAN KE III ) 1 56 57 58 59 60 61 62 63 64 65 66 2 67 68 69 70 71

0.40 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93

0.21 0.14

0.21 0.14

0.21 0.14

0.21 0.14

0.21 0.14

0.21 0.14

0.21 0.14

0.21 0.14

0.21 0.14

0.21 0.14

0.21 0.14

0.21 0.14

0.21 0.14

0.21 0.14

0.21 0.14

0.21 0.14

56

57

580.35 65.20

590.75 65.95

600.35 66.31

610.35 66.66

620.35 67.01

630.35 67.36

640.35 67.72

651.29 69.00

661.29 70.29

671.29 71.57

681.29 72.86

691.29 74.14

701.29 75.43

711.29 76.71

721.29 78.00

731.29 79.28

74

7

AN KE III ) 3 72 73 74 75 76 77 78 79 80 4 81 82 83 84 85 86

BULAN KE IV 1 87

0.93

0.21 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14

0.37

0.37

0.37 0.20

0.37 0.20

0.37

0.37

0.37 0.20

0.37 0.20

0.37

0.37

2

73

741.29 80.57

750.24 760.24 77 0.2478 0.2479 0.24 800.70 1.29 81.86 0.70 1.29 83.15 0.70 1.29 84.44 0.70 1.29 85.73 0.70 1.29 87.02 1.21

810.70 1.21

820.70

830.70 1.41

840.70 1.41

850.70 1.21

860.70 1.07 94.52

870.70 1.27 95.79

880.70 1.27 97.06

890.70 1.07 98.13

900.37 98.50

88.22

89.43

90.84

92.25

93.46

(Sabang , 27 Juli 2010 )

(CV.BANDAR BARU COY )

(HASBALLAH ) (Direktur )

BULAN KE IV 1 88 89 90100

50

0.37

4.66 0.20

4.66 0.20

83

84

85

86

87

88

89

9000.37 98.86 0.57 0.57 99.43 100.00

(Sabang , 27 Juli 2010 )

(CV.BANDAR BARU COY )