Page 1: PLTU Tanjung Jati B

PLTU

Adhitya Fauzan Hidayat 21060113120062Zya Jamaluddin Al-Rasyid 21060113120066Rizki Amali Husni 21060113120069Afan Risena 21060113120070Eko Satrio Danu 21060113120073Iqbal Anggiawan 21060113120095

Page 2: PLTU Tanjung Jati B

PLTU itu?

PLTU merupakan pembangkit listrik berbahan bakar batubara untuk memanaskan air murni untuk menghasilkan uap. Uap tersebut yang digunakan untuk memutar turbin.

Page 3: PLTU Tanjung Jati B

Proses Produksi Listrik dari PLTU

Page 4: PLTU Tanjung Jati B

Proses Produksi Listrik PLTU

Page 5: PLTU Tanjung Jati B

Air laut instalasi pengolahan air tawar bagian preteatment & tipe osmosis balik

tanki air murni (make up water) instalasi permunian

Hasil akhir : air tawar tanpa mineral (demineralized water)

Pengelolaan Air

Page 6: PLTU Tanjung Jati B

Circulating Water Pump memompa air laut ke sistem air pendingin, diolah menjadi air tawar di Desalination Plant. Air tawar diolah di Water Treatment Plant menjadi air denim -> kemudian dipompa untuk mengisi Boiler melalui Kondensor. Dialirkan lagi -> ke laut (open cycle)

Proses produksi air laut

Page 7: PLTU Tanjung Jati B

Kapal Coal Stockpile Coal

Silo

Ship unloader, conveyor Stacker reclaimer, conveyor

Ruang Bakar (Furnace) Coal pulverizer

Pengelolaan Batu Bara

Page 8: PLTU Tanjung Jati B

Proses produksi batu bara

•Batu bara diangkut menggunakan kapal, kemudian ditampung pada Coal Stockpile, kemudian disalurkan dan dihaluskan pada Coal Sile, dan Coal Pulvizer menuu ruang bakar untuk memanaskan Boiler.

•Bahan bakar yang digunakan pada PLTU adalah batubara dan bahan bakar minyak HSD. Minyak HSD digunakan saat start up, saat beban rendah dibawah 160MW.

Page 9: PLTU Tanjung Jati B

Proses produksi uap

•Air denim dipompa ke Deaerator Tank melalui 3 LP Heater untuk pemanasan awal.

•Air dipompa Boiler Feed Pump (BFP) ke Boiler Drum melalui 3 HP Heater dan Ekonomiser untuk pemanasan lanjut.

•Air yang menjadi uap berpisah dibagian atas Boiler Drum.

Page 10: PLTU Tanjung Jati B

•Uap basah di panaskan lanjut di Superheater menjadi uap kering

•Uap kering dipanaskan lagi di Reheater untuk memutar IP Turbin dan selanjutnya 2 buah LP Turbin untuk memutar Rotor.

•Uap buangan di embunkan kembali sehingga menjadi air di Kondensor -> dipompa ke Deareator Tank untuk siklus tertutup berikutnya.

Page 11: PLTU Tanjung Jati B

Penyaluran Energi Listrik

•Dengan berputarnya rotor turbin, generator juga ikut berputar, menghasilkan tegangan 22,8 kV -> dinaikan menggunakan trafo tenaga -> 500 kV.

Page 12: PLTU Tanjung Jati B

PLTU Tanjung Jati B

Page 13: PLTU Tanjung Jati B

PLTU TANJUNG JATI BDesa Tubanan, Kecamatan Kembang,

Kabupaten Jepara, Jawa Tengah.Nomor Surat keputusan Direksi PT. PLN

(Persero) : 171.K/010/DIR/2003 tanggal 27 Juni 2003.

Daya kotor 2 x 719 MW.Daya bersih 2 x 661 MW.

Page 14: PLTU Tanjung Jati B

Komponen pada PLTU Tanjung Jati B

Page 15: PLTU Tanjung Jati B

Boiler adalah salah satu alat penukar panas. Dalam Boiler, terjadi pembakaran bahan bakar (batubara).Konstruksi boiler terdiri dari ribuan tube (tube raiser, tube saturated, dan superheated steam)

Boiler

Page 16: PLTU Tanjung Jati B

Turbin berfungsi untuk mengubah energi potensial menjadi energi kinetik

Type Three cylinder Impulse type, Tandem Compound Reheat Condensing Turbine

Max. T-MCR 719MW Rated Output 710MW Heat rated (at ECR) 1861 kcal/kWh Steam Flow (at T-MCR) 2213.1 ton/hour Speed 3,000 rpm Steam pressure 167 bar abs Steam Temperature 538°C Reheat temp. at comb. heat vlv

538 °C

Exhaust pressure 0.0832 bar abs HP Turbine Bypass Capacity 35 % (at 176 bar)LP Turbine Bypass Capacity HP bypass steam flow + desuperheating spray water

flow

Turbin

Page 17: PLTU Tanjung Jati B

Generator

Generator adalah peralatan pengubah energi kinetik menjadi energi listrik

Type 3 phase synchronous gen. totally enclosed

Stator Wind. Cool Direct water cooled

Stator Core Cooling Hydrogen cooled

Rotor Wind. Cool. Direct hydrogen cooled

Excitation System Static excitation with thyristor rectifier

Active Power 721.8 MW

Apparent Power 802 MVA

Power Factor 0.9 (lag) - 0.95 (lead)

Voltage 22.8 kV

Speed Rotation 3,000 rpm

Frequency 50 Hz

Rated H2 Pressure 4.12 bar

Page 18: PLTU Tanjung Jati B

Ada dua jenis transformer utama, yakni step up dan step down

Rated power 786 MVA at 65°C winding temp.

Phase 3

Voltage 22.8/525 kV

Vector Groups YNd11

Cooling ODAF

Tap Changer NO-LOAD, .± 5 %, 5 steps

Transformer

Page 19: PLTU Tanjung Jati B

Kondensor berfungsi untuk mengembunkan uap air yang telah digunakan untuk memutar turbin menjadi air kondensat

Kondensasi dan Pendinginan

Page 20: PLTU Tanjung Jati B
Page 21: PLTU Tanjung Jati B

Perhitungan PLTU

Page 22: PLTU Tanjung Jati B

Perhitungan Daya PLTU

•1 hari2 x 661 x 24= 31.728 MWh

= 31,728 x 106 KWh•1 bulan (30 hari)

31,728 x 106 KWh x 30 = 951,840 x 106 KWh

•1 tahun (365 hari)31,728 x 106 KWh x 365 = 11580,72 x 106 KWh

Page 23: PLTU Tanjung Jati B

Perhitungan Kebutuhan Batubara0,7 kg batubara 1 KWh

•1 hari31,728 x 106 KWh x 0,7 = 22,2096 x 106 kg

=22.209,6 ton•1 bulan (30 hari)

22.209,6 ton x 30 = 666.288 ton •1 tahun (365 hari)

22.209,6 ton x 365 = 8.106.504 ton

Page 24: PLTU Tanjung Jati B

Perhitungan Estimasi Biaya Batubara

Dengan estimasi harga batubara sebesar 60 US$ per ton, dengan kurs 1US$=Rp 13.000

• 1 tahun (365 hari)8.106.504 ton x 60 x 13.000 = Rp 6.323.073.120.000

• Harga kotor per KWhRp 6.323.073.120.000 : 11580,72 x 106 KWh = Rp 546

Namun harga tersebut belum termasuk perhitungan rugi-rugi daya serta biaya operasional PLTU, sehingga harga ideal per KWh diatas Rp 546

Page 25: PLTU Tanjung Jati B

Distribusi daya

•dialirkan ke System Interkoneksi Jawa Bali Madura melalui:▫Sistem SUTET 500 kV, dari GIS 500 kV

Tanjung Jati -> GI 500 kV Ungaran.▫Sistem SUTT 150 kV, dari Trafo IBT

500/150 kV Tanjung Jati ke GI 150 kV Jepara.

▫Sistem 20 kV, melalui Town Feeder Trafo 15020 kV untuk Jaringan Distribusi 20 kV sekitar PLTU Tanjung Jati B.

Page 26: PLTU Tanjung Jati B

Sistem Pengendalian Lingkungan PLTU Tanjung Jati B

Page 27: PLTU Tanjung Jati B

Untuk menangkap abu yang terbang dengan kemampuan 99.3% abu terbang dapat ditangkap

Electro static precipitator (ESP)

Page 28: PLTU Tanjung Jati B

Untuk menurunkan kadar sulfur dalam gas buang menggunakan batu kapur

Flue Gas Desulphurization (FGD)

Page 29: PLTU Tanjung Jati B

Untuk menampung abu hasil pembakaran batu bara

Ash pond

Page 30: PLTU Tanjung Jati B

Wasta Water Treatment Plant (WWTP)

Untuk mengolah limbah padat dan cair

Page 31: PLTU Tanjung Jati B

Kelebihan dan Kekurang PLTU

Page 32: PLTU Tanjung Jati B

Kelebihan PLTU

•Dapat dibangun di dekat pusat beban•Mampu menghasilkan daya yang besar•Pembangunannya relatif cepat dan murah

Page 33: PLTU Tanjung Jati B

Kekurangan PLTU

•Biaya bahan bakar mahal•Proses start up lama•Dibandingkan dengan pembangkit lain,

PLTU termasuk pembangkit yang kurang ramah lingkungan

Page 34: PLTU Tanjung Jati B

TAMAT