galianVOLUME GALIAN : PARIT BETONPROYEK:Pembuatan Parit Beton
Dari Dusun I Ke Dusun II sep. 1.000mDesa Damar Condong Kec.
Pematang JayaPEKERJAAN:Pembuatan Parit BetonLOKASI:Kec. Pematang
JayaKONTRAKTOR:CV. KABAN MARGANAGambar
SaluranStationingPanjangGalian Tanah KonstruksiVolumeABCYang
Dibayar(m)(m)(m)(m)(m3)PT.0-PT. 2525.000.900.700.6012.00PT.25-PT.
5025.000.900.700.6012.001.1717171717PT.50-PT.
7525.000.900.700.6012.00PT.75-PT.
10025.000.900.700.6012.00PT.100-PT.
12525.000.900.700.6012.00PT.125-PT.
15025.000.900.700.6012.00PT.150-PT.
17525.000.900.700.5711.40PT.175-PT.
20025.000.900.700.5711.40PT.200-PT.
22525.000.900.700.5711.40PT.225-PT.
25025.000.900.700.5711.40PT.250-PT.
27525.000.900.700.5711.40PT.275-PT.
30025.000.900.700.5711.40PT.300-PT.
32525.000.900.700.6012.00PT.325-PT.
35025.000.900.700.6012.00PT.350-PT.
37525.000.900.700.6012.00PT.375-PT.
40025.000.900.700.6012.00181.56PT.400-PT.
42525.000.900.700.6012.00PT.425-PT.
45025.000.900.700.6012.00PT.450-PT.
47525.000.900.700.5711.40PT.475-PT.
50025.000.900.700.5711.40PT.500-PT.
52525.000.900.700.5711.40PT.525-PT.
55025.000.900.700.6012.00PT.550-PT.
57525.000.900.700.6012.00PT.575-PT.
60025.000.900.700.6012.00PT.600-PT.
62525.000.900.700.6012.00PT.625-PT.
65025.000.900.700.6012.00PT.650-PT.
67525.000.900.700.6012.00PT.675-PT.
70025.000.900.700.5711.40PT.700-PT.
72525.000.900.700.5711.40PT.725-PT.
75025.000.900.700.5711.40PT.750-PT.
77525.000.900.700.5711.40PT.775-PT.
80025.000.900.700.5811.50PT.800-PT.
82525.000.900.700.6012.00PT.825-PT.
85025.000.900.700.6012.00PT.850-PT.
87525.000.900.700.6012.00PT.875-PT.
90025.000.900.700.6012.00PT.900-PT.
92525.000.900.700.5711.40PT.925-PT.
95025.000.900.700.5711.4011962PT.950-PT.
97525.000.900.700.5711.40PT.975-PT.
100025.000.900.700.5711.40TOTAL1,000.00469.30VOLUME :
BEKISTINGPROYEK:Pembuatan Parit Beton Dari Dusun I Ke Dusun II sep.
1.000mDesa Damar Condong Kec. Pematang JayaPEKERJAAN:Pembuatan
Parit BetonLOKASI:Kec. Pematang JayaKONTRAKTOR:CV. KABAN
MARGANAGambar SaluranStationingPanjangBekistingVolumeTinggi
(t)VolumeYang Dibayar(m)(m)(m3)(m3)PT.0-PT.
2525.000.6516.2532.50PT.25-PT. 5025.000.6516.2532.50PT.50-PT.
7525.000.6516.2532.50PT.75-PT. 10025.000.6516.2532.50PT.100-PT.
12525.000.6516.2532.50PT.125-PT. 15025.000.6516.2532.50PT.150-PT.
17525.000.6516.2532.50PT.175-PT. 20025.000.6516.2532.50PT.200-PT.
22525.000.6516.2532.50PT.225-PT. 25025.000.6516.2532.50PT.250-PT.
27525.000.6516.2532.50PT.275-PT. 30025.000.6516.2532.50PT.300-PT.
32525.000.6516.2532.50PT.325-PT. 35025.000.6516.2532.50PT.350-PT.
37525.000.6516.2532.50PT.375-PT. 40025.000.6516.2532.50PT.400-PT.
42525.000.6516.2532.50PT.425-PT. 45025.000.6516.2532.50PT.450-PT.
47525.000.6516.2532.50PT.475-PT. 50025.000.6516.2532.50PT.500-PT.
52525.000.6516.2532.50PT.525-PT. 55025.000.6516.2532.50PT.550-PT.
57525.000.6516.2532.50PT.575-PT. 60025.000.6516.2532.50PT.600-PT.
62525.000.6516.2532.50PT.625-PT. 65025.000.6516.2532.50PT.650-PT.
67525.000.6516.2532.50PT.675-PT. 70025.000.6516.2532.50PT.700-PT.
72525.000.6516.2532.50PT.725-PT. 75025.000.6516.2532.50PT.750-PT.
77525.000.6516.2532.50PT.775-PT. 80025.000.6516.2532.50PT.800-PT.
82525.000.6516.2532.50PT.825-PT. 85025.000.6516.2532.50PT.850-PT.
87525.000.6516.2532.50PT.875-PT. 90025.000.6516.2532.50PT.900-PT.
92525.000.6516.2532.50PT.925-PT. 95025.000.6516.2532.50PT.950-PT.
97525.000.6516.2532.50PT.975-PT.
100025.000.6516.2532.50TOTAL1,000.00650.001,300.00VOLUME : URUGAN
TANAHPROYEK:Pembuatan Parit Beton Dari Dusun I Ke Dusun II sep.
1.000mDesa Damar Condong Kec. Pematang JayaPEKERJAAN:Pembuatan
Parit BetonLOKASI:Kec. Pematang JayaKONTRAKTOR:CV. KABAN
MARGANAGambar SaluranStationingPanjangUrugan Tanah Bekas
GalianVolumeLebarTinggi (t)VolumeYang
Dibayar(m)(m)(m)(m3)(m3)PT.0-PT. 2525.000.250.202.502.50PT.25-PT.
5025.000.250.202.502.50PT.50-PT. 7525.000.250.202.502.50PT.75-PT.
10025.000.250.202.542.54PT.100-PT.
12525.000.300.203.003.00PT.125-PT.
15025.000.300.203.003.00PT.150-PT.
17525.000.300.203.003.00PT.175-PT.
20025.000.260.202.602.60PT.200-PT.
22525.000.250.202.502.50PT.225-PT.
25025.000.260.202.582.58PT.250-PT.
27525.000.250.202.502.50PT.275-PT.
30025.000.300.203.003.00PT.300-PT.
32525.000.300.203.003.00PT.325-PT.
35025.000.250.202.502.50PT.350-PT.
37525.000.250.202.502.50PT.375-PT.
40025.000.260.202.602.60PT.400-PT.
42525.000.260.202.582.58PT.425-PT.
45025.000.250.202.502.50PT.450-PT.
47525.000.250.202.502.50PT.475-PT.
50025.000.260.202.602.60PT.500-PT.
52525.000.260.202.602.60PT.525-PT.
55025.000.300.203.003.00PT.550-PT.
57525.000.300.203.003.00PT.575-PT.
60025.000.300.203.003.00PT.600-PT.
62525.000.300.203.003.00PT.625-PT.
65025.000.300.203.003.00PT.650-PT.
67525.000.300.203.003.00PT.675-PT.
70025.000.300.203.003.00PT.700-PT.
72525.000.300.203.003.00PT.725-PT.
75025.000.300.203.003.00PT.750-PT.
77525.000.300.203.003.00PT.775-PT.
80025.000.300.203.003.00PT.800-PT.
82525.000.300.203.003.00PT.825-PT.
85025.000.300.203.003.00PT.850-PT.
87525.000.300.203.003.00PT.875-PT.
90025.000.300.203.003.00PT.900-PT.
92525.000.300.203.003.00PT.925-PT.
95025.000.300.203.003.00PT.950-PT.
97525.000.300.203.003.00PT.975-PT.
100025.000.300.203.003.00TOTAL1,000.00112.60112.60VOLUME : BETON
COR LANTAIPROYEK:Pembuatan Parit Beton Dari Dusun I Ke Dusun II
sep. 1.000mDesa Damar Condong Kec. Pematang JayaPEKERJAAN:Pembuatan
Parit BetonLOKASI:Kec. Pematang JayaKONTRAKTOR:CV. KABAN
MARGANAGambar SaluranStationingPanjangBeton Cor
LantaiVolumeLebarTinggi (t)VolumeYang
Dibayar(m)(m)(m)(m3)(m3)PT.0-PT. 2525.000.400.101.001.00PT.25-PT.
5025.000.400.101.001.00PT.50-PT. 7525.000.400.101.001.00PT.75-PT.
10025.000.400.101.001.00PT.100-PT.
12525.000.420.101.051.05PT.125-PT.
15025.000.400.101.001.00PT.150-PT.
17525.000.390.100.980.98PT.175-PT.
20025.000.400.101.001.00PT.200-PT.
22525.000.400.101.001.00PT.225-PT.
25025.000.400.101.001.00PT.250-PT.
27525.000.390.100.980.98PT.275-PT.
30025.000.400.121.201.20PT.300-PT.
32525.000.390.100.980.98PT.325-PT.
35025.000.400.101.001.00PT.350-PT.
37525.000.410.121.231.23PT.375-PT.
40025.000.420.101.051.05PT.400-PT.
42525.000.400.101.001.00PT.425-PT.
45025.000.400.101.001.00PT.450-PT.
47525.000.390.100.980.98PT.475-PT.
50025.000.380.100.950.95PT.500-PT.
52525.000.400.101.001.00PT.525-PT.
55025.000.400.101.001.00PT.550-PT.
57525.000.400.101.001.00PT.575-PT.
60025.000.400.101.001.00PT.600-PT.
62525.000.400.121.201.20PT.625-PT.
65025.000.390.100.980.98PT.650-PT.
67525.000.390.100.980.98PT.675-PT.
70025.000.380.100.950.95PT.700-PT.
72525.000.400.101.001.00PT.725-PT.
75025.000.420.101.051.05PT.750-PT.
77525.000.380.100.950.95PT.775-PT.
80025.000.390.100.980.98PT.800-PT.
82525.000.380.100.950.95PT.825-PT.
85025.000.380.100.950.9537.65PT.850-PT.
87525.000.380.100.950.95PT.875-PT.
90025.000.370.100.930.93PT.900-PT.
92525.000.390.100.980.98PT.925-PT.
95025.000.390.100.980.98PT.950-PT.
97525.000.370.100.930.93PT.975-PT.
100025.000.400.101.001.00TOTAL1,000.0040.1140.11
Diteliti Oleh : Pengawas 1
SAYRIFUDDINIP.19691217 200604 1 003Dibuat Oleh : CV. KABAN
MARGANA
SRI ADEK HANDAYANIWAKIL DIREKTRISDiperiksa
Oleh,KONSULTANSUPERVISI
ROBERTO TARIGANChief IspectorDiperiksa Oleh,ASISTEN TEHNIK
HASANNip. 1961116 200701 1 004Diperiksa Oleh,PEJAT ABAT PEMBUAT
KOMTMEN (PPK)
M. YUNAN BATUBARANip. 19600501 198602 1 002Diperiksa
Oleh,KONSULTANSUPERVISI
JAKUB TARIGAN, STSUPERVISI ENGINERDiteliti Oleh : Pengawas 1
SAYRIFUDDINIP.19691217 200604 1 003Dibuat Oleh : CV. KABAN
MARGANA
SRI ADEK HANDAYANIWAKIL DIREKTRISDiperiksa
Oleh,KONSULTANSUPERVISI
ROBERTO TARIGANChief IspectorDiperiksa Oleh,ASISTEN TEHNIK
HASANNip. 1961116 200701 1 004Diperiksa Oleh,PEJAT ABAT PEMBUAT
KOMTMEN (PPK)
M. YUNAN BATUBARANip. 19600501 198602 1 002Diperiksa
Oleh,KONSULTANSUPERVISI
JAKUB TARIGAN, STSUPERVISI ENGINERDiteliti Oleh : Pengawas 1
SAYRIFUDDINIP.19691217 200604 1 003Dibuat Oleh : CV. KABAN
MARGANA
SRI ADEK HANDAYANIWAKIL DIREKTRISDiperiksa
Oleh,KONSULTANSUPERVISI
ROBERTO TARIGANChief IspectorDiperiksa Oleh,ASISTEN TEHNIK
HASANNip. 1961116 200701 1 004Diperiksa Oleh,PEJAT ABAT PEMBUAT
KOMTMEN (PPK)
M. YUNAN BATUBARANip. 19600501 198602 1 002Diperiksa
Oleh,KONSULTANSUPERVISI
JAKUB TARIGAN, STSUPERVISI ENGINERDiteliti Oleh : Pengawas 1
SAYRIFUDDINIP.19691217 200604 1 003Dibuat Oleh : CV. KABAN
MARGANA
SRI ADEK HANDAYANIWAKIL DIREKTRISDiperiksa
Oleh,KONSULTANSUPERVISI
ROBERTO TARIGANChief IspectorDiperiksa Oleh,ASISTEN TEHNIK
HASANNip. 1961116 200701 1 004Diperiksa Oleh,PEJAT ABAT PEMBUAT
KOMTMEN (PPK)
M. YUNAN BATUBARANip. 19600501 198602 1 002Diperiksa
Oleh,KONSULTANSUPERVISI
JAKUB TARIGAN, STSUPERVISI ENGINER
pondasiVOLUME PONDASI : PARIT BETONPROYEK:Pembuatan Parit Beton
Dari Dusun I Ke Dusun II sep. 1.000mDesa Damar Condong Kec.
Pematang JayaPEKERJAAN:Pembuatan Parit BetonLOKASI:Kec. Pematang
JayaKONTRAKTOR:CV. KABAN MARGANAGambar
SaluranStationingPanjangBeton Cor PondasiVolume(a)(b)VolumeKedua
Sisi(m)(m)(m)(m3)(m3)PT. 0-PT. 2525.000.150.100.380.75PT. 25-PT.
5025.000.150.100.380.75PT. 50-PT. 7525.000.150.100.380.75PT. 75-PT.
10025.000.150.100.380.75PT. 100-PT. 12525.000.150.100.380.75PT.
125-PT. 15025.000.150.100.380.75PT. 150-PT.
17525.000.150.100.380.75PT. 175-PT. 20025.000.150.100.380.75PT.
200-PT. 22525.000.150.100.380.75PT. 225-PT.
25025.000.150.100.380.75PT. 250-PT. 27525.000.150.100.380.75PT.
275-PT. 30025.000.150.100.380.75PT. 300-PT.
32525.000.150.100.380.75PT. 325-PT. 35025.000.150.100.380.75PT.
350-PT. 37525.000.150.100.380.75PT. 375-PT.
40025.000.150.100.380.75PT. 400-PT. 42525.000.150.100.380.75PT.
425-PT. 45025.000.150.100.380.75PT. 450-PT.
47525.000.150.100.380.75PT. 475-PT. 50025.000.150.100.380.75PT.
500-PT. 52525.000.150.100.380.75PT. 525-PT.
55025.000.150.100.380.75PT. 550-PT. 57525.000.150.100.380.75PT.
575-PT. 60025.000.150.100.380.75PT. 600-PT.
62525.000.150.100.380.75PT. 625-PT. 65025.000.150.100.380.75PT.
650-PT. 67525.000.150.100.380.75PT. 675-PT.
70025.000.150.100.380.75PT. 700-PT. 72525.000.150.100.380.75PT.
725-PT. 75025.000.150.100.380.75PT. 750-PT.
77525.000.150.100.380.75165.50PT. 775-PT.
80025.000.150.100.380.75PT. 800-PT. 82525.000.150.100.380.75PT.
825-PT. 85025.000.150.100.380.75PT. 850-PT.
87525.000.150.100.380.75PT. 875-PT. 90025.000.150.100.380.75PT.
900-PT. 92525.000.150.100.380.75PT. 925-PT.
95025.000.150.100.380.75PT. 950-PT. 97525.000.150.100.380.75PT.
975-PT. 100025.000.150.100.380.75TOTAL1,000.0030.00VOLUME :
PELASTERAN DINDINGPROYEK:Pembuatan Parit Beton Dari Dusun I Ke
Dusun II sep. 1.000mDesa Damar Condong Kec. Pematang
JayaPEKERJAAN:Pembuatan Parit BetonLOKASI:Kec. Pematang
JayaKONTRAKTOR:CV. KABAN MARGANAGambar
SaluranStationingPanjangPelasteran DindingVolume(a)(b)volumeKedua
Sisi(m)(m)(m3)(m3)(m2)PT.0-PT. 2525.000.200.5518.7537.50PT.25-PT.
5025.000.200.5719.2538.50PT.50-PT.
7525.000.200.5719.2538.50PT.75-PT.
10025.000.200.5619.0038.00PT.100-PT.
12525.000.220.5519.2538.50PT.125-PT.
15025.000.300.5621.5043.00PT.150-PT.
17525.000.220.5719.7539.50PT.175-PT.
20025.000.220.5519.2538.50PT.200-PT.
22525.000.220.5719.7539.50PT.225-PT.
25025.000.220.5318.7537.50PT.250-PT.
27525.000.220.5419.0038.00PT.275-PT.
30025.000.210.5519.0038.00PT.300-PT.
32525.000.240.5720.2540.50PT.325-PT.
35025.000.220.5519.2538.50PT.350-PT.
37525.000.220.5519.2538.50PT.375-PT.
40025.000.200.5719.2538.50PT.400-PT.
42525.000.200.5218.0036.00PT.425-PT.
45025.000.220.5318.7537.50PT.450-PT.
47525.000.220.5419.0038.00PT.475-PT.
50025.000.220.5018.0036.0024PT.500-PT.
52525.000.220.5519.2538.50PT.525-PT.
55025.000.220.5519.2538.50PT.550-PT.
57525.000.200.5518.7537.50PT.575-PT.
60025.000.210.5218.2536.50PT.600-PT.
62525.000.210.5318.5037.00PT.625-PT.
65025.000.210.5518.8837.75PT.650-PT.
67525.000.200.5318.3336.65PT.675-PT.
70025.000.200.5719.2838.55105.68PT.700-PT.
72525.000.200.5618.9837.95PT.725-PT.
75025.000.200.5318.1836.35PT.750-PT.
77525.000.200.5217.8835.75PT.775-PT.
80025.000.190.5719.0838.15PT.800-PT.
82525.000.190.6019.7839.55PT.825-PT.
85025.000.190.5819.2338.45PT.850-PT.
87525.000.190.5819.1838.35PT.875-PT.
90025.000.190.6119.8839.75PT.900-PT.
92525.000.180.5618.5837.15PT.925-PT.
95025.000.180.5418.0336.05PT.950-PT.
97525.000.180.5818.9837.95PT.975-PT.100025.000.180.5417.9335.85TOTAL1,000.001,520.7589.48
Diteliti Oleh : Pengawas 1
SAYRIFUDDINIP.19691217 200604 1 003Dibuat Oleh : CV. KABAN
MARGANA
SRI ADEK HANDAYANIWAKIL DIREKTRISDiperiksa
Oleh,KONSULTANSUPERVISI
ROBERTO TARIGANChief IspectorDiperiksa Oleh,ASISTEN TEHNIK
HASANNip. 1961116 200701 1 004Diperiksa Oleh,PEJAT ABAT PEMBUAT
KOMTMEN (PPK)
M. YUNAN BATUBARANip. 19600501 198602 1 002Diperiksa
Oleh,KONSULTANSUPERVISI
JAKUB TARIGAN, STSUPERVISI ENGINERDiteliti Oleh : Pengawas 1
SAYRIFUDDINIP.19691217 200604 1 003Dibuat Oleh : CV. KABAN
MARGANA
SRI ADEK HANDAYANIWAKIL DIREKTRISDiperiksa
Oleh,KONSULTANSUPERVISI
ROBERTO TARIGANChief IspectorDiperiksa Oleh,ASISTEN TEHNIK
HASANNip. 1961116 200701 1 004Diperiksa Oleh,PEJAT ABAT PEMBUAT
KOMTMEN (PPK)
M. YUNAN BATUBARANip. 19600501 198602 1 002Diperiksa
Oleh,KONSULTANSUPERVISI
JAKUB TARIGAN, STSUPERVISI ENGINER
Sheet1BACK UP DATA VOLUME DINDING PARIT BETON
CORNOP.-P.TINGGITEBAL DINDINGPANJANGVOLUMEKET(M)(M)(M)(M)P. 0P.
25A0.56+0.55A0.21+0.20252.840.5650.205222.900.555M0.205MB0.54+0.55B0.22+0.20252.86220.545M0.210MP.
25P.
50A0.57+0.57A0.20+0.20252.85220.57M0.2MB0.57+0.57B0.20+0.20252.85220.57M0.200MP.
50P.
75A0.56+0.55A0.21+0.20252.84220.555M0.205MB0.57+0.55B0.20+0.20252.80220.56M0.200MP.
75P.
100A0.52+0.55A0.20+0.20252.68220.535M0.2MB0.54+0.55B0.20+0.20252.73220.545M0.200MP.
100P.
125A0.57+0.56A0.19+0.20252.75220.565M0.195MB0.55+0.55B0.19+0.20252.68220.55M0.195MP.
125P.
150A0.56+0.55A0.21+0.20252.84220.555M0.205MB0.56+0.56B0.22+0.20252.94220.56M0.210MP.
150P.
175A0.56+0.55A0.21+0.20252.84220.555M0.205MB0.57+0.56B0.18+0.20252.68220.565M0.190MP.
175P.
200A0.53+0.55A0.16+0.20252.43220.54M0.18MB0.55+0.55B0.16+0.20252.48220.55M0.180MP.
200P.
225A0.54+0.55A0.16+0.20252.45220.545M0.18MB0.57+0.55B0.16+0.20252.52220.56M0.180MVOLUME49.08BACK
UP DATA VOLUME DINDING PARIT BETON CORNOP.-P.TINGGITEBAL
DINDINGPANJANGVOLUMEKET(M)(M)(M)(M)P. 225P.
250A0.53+0.55A0.15+0.20252.36220.54M0.175MB0.53+0.55B0.18+0.20252.57220.54M0.190MP.
250P.
275A0.55+0.55A0.16+0.20252.48220.55M0.18MB0.55+0.55B0.20+0.20252.75220.55M0.200MP.
275P.
300A0.55+0.55A0.22+0.22253.03220.55M0.22MB0.55+0.55B0.22+0.22253.03220.55M0.220MP.
300P.
325A0.56+0.55A0.17+0.20252.57220.555M0.185MB0.57+0.55B0.16+0.20252.52220.56M0.180MP.
325P.
350A0.55+0.55A0.15+0.20252.41220.55M0.175MB0.55+0.55B0.16+0.20252.48220.55M0.180MP.
350P.
375A0.56+0.55A0.14+0.20252.36220.555M0.17MB0.55+0.56B0.17+0.20252.57220.555M0.185MP.
375P.
400A0.56+0.55A0.18+0.20252.64220.555M0.19MB0.57+0.56B0.17+0.20252.61220.565M0.185MP.
400P.
425A0.52+0.55A0.15+0.20252.34220.535M0.175MB0.52+0.55B0.15+0.20252.34220.535M0.175MP.
425P.
450A0.53+0.55A0.21+0.20252.77220.54M0.205MB0.52+0.55B0.17+0.20252.47220.535M0.185MVOLUME46.27BACK
UP DATA VOLUME DINDING PARIT BETON CORNOP.-P.TINGGITEBAL
DINDINGPANJANGVOLUMEKET(M)(M)(M)(M)P. 450P.
475A0.54+0.55A0.20+0.20252.73220.545M0.2MB0.53+0.55B0.16+0.17252.23220.54M0.165MP.
475P.
500A0.50+0.50A0.20+0.20252.50220.5M0.2MB0.50+0.50B0.21+0.20252.56220.5M0.205MP.
500P.
525A0.55+0.55A0.22+0.22253.03220.55M0.22MB0.55+0.55B0.20+0.22252.89220.55M0.210MP.
525P.
550A0.54+0.55A0.16+0.16252.18220.545M0.16MB0.56+0.55B0.16+0.16252.22220.555M0.160MP.
550P.
575A0.52+0.55A0.15+0.15252.01220.535M0.15MB0.59+0.55B0.15+0.15252.14220.57M0.150MP.
575P.
600A0.51+0.55A0.20+0.20252.65220.53M0.2MB0.53+0.56B0.19+0.20252.66220.545M0.195MP.
600P.
625A0.50+0.51A0.17+0.20252.34220.505M0.185MB0.55+0.56B0.16+0.20252.50220.555M0.180MP.
625P.
650A0.56+0.55A0.17+0.20252.57220.555M0.185MB0.56+0.55B0.17+0.20252.57220.555M0.185MP.
650P.
675A0.52+0.53A0.19+0.20252.56220.525M0.195MB0.53+0.52B0.20+0.20252.63220.525M0.200MVOLUME44.93BACK
UP DATA VOLUME DINDING PARIT BETON CORNOP.-P.TINGGITEBAL
DINDINGPANJANGVOLUMEKET(M)(M)(M)(M)P. 675P.
700A0.56+0.55A0.17+0.17252.36220.555M0.17MB0.57+0.55B0.17+0.17252.38220.56M0.170MP.
700P.
725A0.46+0.46A0.25+0.50254.31220.46M0.375MB0.55+0.55B0.23+0.23253.16220.55M0.230MP.
725P.
750A0.41+0.41A0.16+0.16251.64220.41M0.16MB0.56+0.55B0.16+0.16252.22220.555M0.160MP.
750P.
775A0.40+0.41A0.13+0.12251.27220.405M0.125MB0.55+0.55B0.17+0.16252.27220.55M0.165MP.
775P.
800A0.33+0.33A0.15+0.15251.24220.33M0.15MB0.60+0.60B0.15+0.15252.25220.6M0.150MP.
800P.
825A0.51+0.55A0.15+0.15251.99220.53M0.15MB0.53+0.56B0.15+0.15252.04220.545M0.150MP.
825P.
850A0.56+0.55A0.23+0.20252.98220.555M0.215MB0.57+0.56B0.19+0.20252.75220.565M0.195MP.
850P.
875A0.60+0.60A0.22+0.20253.15220.6M0.21MB0.60+0.60B0.18+0.20252.85220.6M0.190MVOLUME38.86BACK
UP DATA VOLUME DINDING PARIT BETON CORNOP.-P.TINGGITEBAL
DINDINGPANJANGVOLUMEKET(M)(M)(M)(M)P. 875P.
900A0.57+0.56A0.18+0.19252.61220.565M0.185MB0.58+0.57B0.20+0.20252.88220.575M0.200MP.
900P.
925A0.57+0.56A0.17+0.16252.33220.565M0.165MB0.59+0.60B0.16+0.17252.45220.595M0.165MP.
925P.
950A0.61+0.60A0.19+0.19252.87220.605M0.19MB0.62+0.61B0.18+0.18252.77220.615M0.180MP.
950P.
975A0.56+0.56A0.19+0.18252.59220.56M0.185MB0.56+0.56B0.17+0.18252.45220.56M0.175MP.
975P.
1.000A0.55+0.55A0.19+0.18252.54220.55M0.185MB0.54+0.55B0.17+0.18252.38220.545M0.175MVOLUME25.88VOLUME
TOTAL205.02
MBD0011DCCC.unknown
MBD001245AA.unknown
MBD00120541.unknown
MBD0000265F.unknown
MBD0011B1F7.unknown