REPUBLIK INDONESIA KEMENTRIAN PEKERJAAN UMUM DIREKTORAT JENDERAL SUMBER DAYA AIR SNVT PELAKSANAAN JARINGAN PEMANFAATAN AIR MESUJI SEKAMPUNG P.C.M. P.C.M. (Pre Construction Meeting) (Pre Construction Meeting) KEGIATAN : IRIGASI DAN RAWA I PEKERJAAN : REHABILITASI JARINGAN IRIGASI DI WAY PENGUBUAN TAHUN ANGGARAN: 2012
51

PCM WAY PENGUBUAN.ppt

Oct 26, 2015

Download

Documents

Daniel Burgess

pcm
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PCM WAY PENGUBUAN.ppt

REPUBLIK INDONESIAKEMENTRIAN PEKERJAAN UMUM

DIREKTORAT JENDERAL SUMBER DAYA AIRSNVT PELAKSANAAN JARINGAN PEMANFAATAN AIR MESUJI SEKAMPUNG

P.C.M.P.C.M.(Pre Construction Meeting)(Pre Construction Meeting)

KEGIATAN :IRIGASI DAN RAWA I

PEKERJAAN :REHABILITASI JARINGAN IRIGASI DI WAY PENGUBUAN

TAHUN ANGGARAN:2012

Page 2: PCM WAY PENGUBUAN.ppt

Nama Satuan Kerja : SNVT Pelaksanaan Jaringan Pemanfaatan Air Mesuji Sekampung

Nama Kegiatan : Irigasi dan Rawa I

Nama Pekerjaan : Rehabilitasi Jaringan Irigasi DI Way Pengubuan

Lokasi Pekerjaan : Kabupaten Lampung Tengah

No. Kontrak : HK.02.07/08.04/SNVT-PJPAMS/IRA-I/VIII/2012

Tanggal Kontrak : 07 Agustus 2012

Nilai Kontrak : Rp. 5.998.698.000,-

Pembiayaan : APBN Murni

Tahun Anggaran : 2012

Masa Pelaksanaan : 145 (Seratus Empat Puluh Lima) Hari Kalender

Masa Pemeliharaan : 180 (Seratus Delapan Puluh) Hari Kalender

Kontraktor Pelaksana : PT. SUCI KARYA BADINUSA

DATA PROYEK

Page 3: PCM WAY PENGUBUAN.ppt

LINGKUP PEKERJAAN

•PEKERJAAN PERSIAPAN1.Mobilisasi dan Demobilisasi : Ls2.Pemeliharaan Jalan Masuk : Ls

•PEKERJAAN SALURAN PRIMER1.Pembersihan Lapangan : 5.895,00 m2

2.Galian Tanah (Alat Berat) : 8.441,00 m3

3.Timbunan Tanah Dipadatkan (Stamper) : 2.006,38 m3

4.Perkerasan Jalan Inspeksi (Sirtu) : 10.500,00 m2

5.Bongkaran Bangunan Lama (Man power) : 1.530,00 m3

6.Beton K.175 : 1.729,00 m3

7.Begisting (untuk nad) : 581,10 m2

8.Deletasi : 5.491,20 m1

9.Gebalan Rumput : 964,80 m2

•PEKERJAAN SALURAN SEKUNDER1.Pembersihan Lapangan : 13.979,50 m2

2.Galian Tanah ( Man Power ) : 269.36 m3

3.Galian Tanah Sedimen ( Man Power ) : 1.522,10 m3

4.Timbunan Tanah dipadatkan (Stamper) : 1.483,11 m3

5.Bongkaran Bangunan Lama (Man power) : 966,13 m3

6.Perkerasan Jalan Inspeksi (Sirtu) : 12.270,00 m2

7.Pasangan Batu Belah Ad. 1 Pc : 4 Ps : 188,00 m3

8.Plesteran adk. 1 Pc : 4 Ps : 285,00 m2

9.Beton K. 175 : 1.006,725 m3

10.Beton K. 225 : 40,75 m3

11.Pembesian : 2.788,50 Kg 12.Begisting (Plat. Kolom dan Balok) : 65,76 m2

13.Begisting (untuk nad) : 601,80 m2

14.Deletasi : 6.128,85 m1

15.J Bronjong Kawat Uk. 0,50 x 1,00 x 2,00 m : 250,00 m3

16.Gebalan Rumput : 796,00 m2

Page 4: PCM WAY PENGUBUAN.ppt

•PEKERJAAN PEMBUATAN DAN PEMASANGAN PINTU AIR1.Pintu Air, B = 1,50 m : 3,00 Unit2.Pintu Air, B = 1,00 m : 4,00 Unit3.Pintu Air, B = 0,80 m : 5,00 Unit4.Pintu Air, B = 0,60 m : 6,00 Unit5.Pintu Air, B = 0,50 m : 7,00 Unit6.Pintu Air, B = 0,40 m : 6,00 Unit7.Pintu Air, B = 0,30 m : 2,00 Unit

•PEKERJAAN PERBAIKAN PINTU AIR1.Perbaikan Pintu Air B = 0,40 m : 5,00 Unit

•PEKERJAAN PERBAIKAN RUMAH TYPE 84 1. Perbaikan Rumah Type 84 : 3.00 Unit

LINGKUP PEKERJAAN

Page 5: PCM WAY PENGUBUAN.ppt

STRUKTUR ORGANISAS PELAKSANAAN PEKERJAAN

KEPALA SNVT PJPA MSFALIANSYAH, ST. M. Dev.Plg

KEPALA SNVT PJPA MSFALIANSYAH, ST. M. Dev.Plg

PPK KEGIATAN IRIGASI DAN RAWA IM. JAILANI, ST. MT.

PPK KEGIATAN IRIGASI DAN RAWA IM. JAILANI, ST. MT.

PELAKSANA TEKNIK

PONIRAN, ST

PELAKSANA TEKNIK

PONIRAN, ST

PENGAWASWIBOWO RBS

ALBERTUS PUJIOTO

PENGAWASWIBOWO RBS

ALBERTUS PUJIOTO

PELAKSANA ADMINISTRASIA. JOKO CAHYONO,

SE

PELAKSANA ADMINISTRASIA. JOKO CAHYONO,

SE

DIREKSIRISDIANTO

DIREKSIRISDIANTO

PUMK/BPPBAMBANG SUHENDRO

PUMK/BPPBAMBANG SUHENDRO

STRUKTUR ORGANISAS PENGGUNA JASA

Page 6: PCM WAY PENGUBUAN.ppt

STRUKTUR ORGANISAS PELAKSANAAN PEKERJAAN

DIREKTUR UTAMAHi.SIBRON AZISDIREKTUR UTAMA

Hi.SIBRON AZIS

SITE MANAGERALEXIUS YULIUS, ST

SITE MANAGERALEXIUS YULIUS, ST

QUALITY ASSURANCE/MANAJEMEN MUTU

ZAINAL ABIDIN, ST

QUALITY ASSURANCE/MANAJEMEN MUTU

ZAINAL ABIDIN, ST

QUANTITY ENGINEERSRI FATIMAH, STQUANTITY ENGINEERSRI FATIMAH, ST

PELAKSANA1. JONUDIN, ST

2. ANTOK SISWANTONO, ST

PELAKSANA1. JONUDIN, ST

2. ANTOK SISWANTONO, ST

DIREKSIRISDIANTO

DIREKSIRISDIANTO

KEPALA SNVT PJPA MSFALIANSYAH, ST. M. Dev.Plg

KEPALA SNVT PJPA MSFALIANSYAH, ST. M. Dev.Plg

QUANTITY ENGINEEREKA ZULFIANTI, STQUANTITY ENGINEER

EKA ZULFIANTI, ST

SURVEYORHENDRASURVEYORHENDRA

MANDOR, TUKANG, KEPALA TUKANG, PEKERJA, OPERATOR

& SOPIR

MANDOR, TUKANG, KEPALA TUKANG, PEKERJA, OPERATOR

& SOPIR

STRUKTUR ORGANISAS PENYEDIA JASA

Page 7: PCM WAY PENGUBUAN.ppt

JADWAL WAKTU PELAKSANAAN

NO URAIAN

KUANTITAS

PERIODE PELAKSANAAN

KET. BOBOT AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER

SAT VOLUME% MINGGU KE -

1 2 3 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

I. PEKERJAAN PERSIAPAN

1 Mobilisasi dan Demobilisasi Ls 1.00 0.72 0.12 0.12 0.12 0.18 0.18 100%2 Pemeliharaan Jalan Masuk Ls 1.00 0.51 0.13 0.13 0.13 0.13 0.12 0.12 0.25 - - - 0.13 - - - 0.13 - - - 0.13 - - 0.18 0.18

II. PEKERJAAN SALURAN PRIMER 1 Pembersihan Lapangan M2 5,895.00 0.14 0.05 0.05 0.05 2 Galian Tanah (Alat Berat) M3 8,441.00 3.42 0.49 0.49 0.49 0.49 0.49 0.49 0.49

3 Timbunan Tanah Dipadatkan (Stamper) M3 2,006.38 1.32 0.19 0.19 0.19 0.19 0.19 0.19 0.19

4 Perkerasan Jalan Inspeksi (Sirtu) M2 10,500.00 12.86 2.14 2.14 2.14 2.14 2.14 2.14

5 Bongkaran Bangunan Lama (Man power) M3 1,530.00 1.04 0.17 0.17 0.17 0.17 0.17 0.17

6 Beton K.175 M3 1,729.00 27.14 2.71 2.71 2.71 2.71 2.71 2.71 2.71 2.71 2.71 2.71 7 Begisting (untuk nad) M2 581.10 0.35 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 8 Deletasi M' 5,491.20 0.70 0.18 0.18 0.18 0.18 75%9 Gebalan Rumput M2 964.80 0.22 0.11 0.11 0.05 0.22 0.71 0.85 3.60 3.60 3.60 3.43 3.43 2.94 2.75 5.07 5.07 5.07 2.43 2.25 2.14 - -

III. PEKERJAAN SALURAN SEKUNDER 1 Pembersihan Lapangan M2 13,979.50 0.32 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 2 Galian Tanah ( Man Power ) M3 269.36 0.15 0.04 0.04 0.04 0.04 3 Galian Tanah Sedimen ( Man Power ) M3 1,522.10 1.00 0.17 0.17 0.17 0.17 0.17 0.17 4 Timbunan Tanah dipadatkan (Stamper) M3 1,483.11 0.97 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12

5 Bongkaran Bangunan Lama (Man power) M3 966.13 0.65 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08

6 Perkerasan Jalan Inspeksi (Sirtu) M2 12,270.00 15.03 2.50 2.50 2.50 2.50 2.50 2.50 7 Pasangan Batu Belah Ad. 1 Pc : 4 Ps M3 188.00 1.89 0.63 0.63 0.63 8 Plesteran adk. 1 Pc : 4 Ps M2 285.00 0.13 0.07 0.07 9 Beton K.175 M3 1,006.73 15.80 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 50%10 Beton K. 225 M3 40.75 0.76 0.38 0.38 11 Pembesian Kg 2,788.50 0.89 0.30 0.30 0.30 12 Begisting (Plat. Kolom dan Balok) M2 65.76 0.10 0.03 0.03 0.03 13 Begisting (untuk nad) M2 601.80 0.36 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 14 Deletasi M' 6,128.85 0.78 0.20 0.20 0.20 0.20

15 Bronjong Kawat Uk. 0,50 x 1,00 x 2,00 m M3 250.00 2.82 0.94 0.94 0.94

16 Gebalan Rumput M2 796.00 0.18 0.06 0.06 0.06 0.03 0.11 0.28 0.44 2.06 2.06 2.69 2.65 2.55 2.78 2.71 2.89 4.65 4.99 3.08 2.70 2.57 2.57 0.06

IV. PEKERJAAN PEMBUATAN DAN PEMASANGAN PINTU AIR

1 Pintu Air, B = 1,50 m Unit 3.00 1.02 0.26 0.26 0.26 0.26 2 Pintu Air, B = 1,00 m Unit 4.00 0.91 0.23 0.23 0.23 0.23 25%3 Pintu Air, B = 0,80 m Unit 5.00 0.91 0.23 0.23 0.23 0.23 4 Pintu Air, B = 0,60 m Unit 6.00 0.83 0.21 0.21 0.21 0.21 5 Pintu Air, B = 0,50 m Unit 7.00 0.80 0.20 0.20 0.20 0.20 6 Pintu Air, B = 0,40 m Unit 6.00 0.55 0.14 0.14 0.14 0.14 7 Pintu Air, B = 0,30 m Unit 2.00 0.14 0.03 0.03 0.03 0.03 - - - - - - - 0.26 0.48 0.71 0.92 0.86 0.77 0.58 0.37 0.17 0.03 - -

V. PEKERJAAN PERBAIKAN PINTU AIR

1 Perbaikan Pintu Air B = 0,40 m Unit 5.00 0.24 0.04 0.04 0.04 0.04 0.04 0.04 - - - - - - - - - - - 0.04 0.04 0.04 0.04 0.04 0.04 - -

VI. PEKERJAAN PERBAIKAN RUMAH TYPE 84

1 Perbaikan Rumah Type 84 Ls 3.00 4.33 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0% - - - 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 - - - - - -

JUMLAH NILAI PEKERJAAN 100.00

RENCANA FISIK MINGGUAN 0.20 0.45 1.24 1.72 6.09 6.09 6.84 6.76 6.89 6.86 6.94 9.29 10.96 10.68 6.05 5.17 4.78 2.75 0.24

KOMULATIF RENCANA FISIK MINGGUAN 0.20 0.65 1.88 3.61 9.70 15.79 22.63 29.39 36.28 43.14 50.08 59.37 70.33 81.01 87.06 92.23 97.01 99.76 100.00

REALISASI FISIK MINGGUAN

KOMULATIF REALISASI FISIK MINGGUAN

DEVIASI (+)

DEVIASI ( - )

Page 8: PCM WAY PENGUBUAN.ppt

BAGAN ALIR KEGIATAN

SOSIALISASI

Termobilisasi Alat

Termobilisasi SDM

Cek

I PEKERJAAN PERSIAPANSPMK

MOBILISASI

A

Cek

Termobilisasi Material

Page 9: PCM WAY PENGUBUAN.ppt

BAGAN ALIR KEGIATAN

Page 10: PCM WAY PENGUBUAN.ppt

BAGAN ALIR KEGIATAN

DELATASI

PEKERJAAN TERLAKSANA

GEBALAN RUMPUT

PEKERJAAN TERLAKSANA

I. PEKERJAAN PASANGAN

BONGKARAN

PEKERJAAN TERLAKSANA

CEK

GALIAN TANAH

PEKERJAAN TERLAKSANA

CEK

TIMBUNAN TANAH DIPADATKAN

PEKERJAAN TERLAKSANA

CEK

BEKISTING

PEKERJAAN TERLAKSANA

CEK

CEK

II

PEKERJAAN SALURAN PRIMER

CEK

BETON LINNING K.175

PEKERJAAN TERLAKSANA

CEK

PEMBERSIHAN LAPANGAN

PEKERJAAN TERLAKSANA

CEK

Page 11: PCM WAY PENGUBUAN.ppt

BAGAN ALIR KEGIATAN

II

III.PEKERJAAN PINTU AIR

BONGKARAN PINTU AIR

PEKERJAAN TERLAKSANA

CEK

PERBAIKAN PINTU AIR (PABRIKASI)

PEKERJAAN TERLAKSANA

CEK

PEMASANGAN PINTU AIR

PEKERJAAN TERLAKSANA

CEK

III

Page 12: PCM WAY PENGUBUAN.ppt

BAGAN ALIR KEGIATAN

III

III. PEKERJAAN JALAN INSPEKSI

PEMBERSIHAN BADAN JALAN

PEKERJAAN TERLAKSANA

CEK

PENGHAMPARAN MATERIAL SIRTU

PEKERJAAN TERLAKSANA

CEK

PEMADATAN

PEKERJAAN TERLAKSANA

CEK

B

Page 13: PCM WAY PENGUBUAN.ppt

BAGAN ALIR KEGIATAN

I. PEKERJAAN TANAH SEDIMEN

PEMBERSIHAN LAPANGAN

PEKERJAAN TERLAKSANA

CEK

PENGANGKATAN SEDIMEN

PEKERJAAN TERLAKSANA

CEK

PEMBUANGAN KE AREA PEMBUANGAN

PEKERJAAN TERLAKSANA

CEK

II

Page 14: PCM WAY PENGUBUAN.ppt

BAGAN ALIR KEGIATAN

DELATASI

PEKERJAAN TERLAKSANA

GEBALAN RUMPUT

PEKERJAAN TERLAKSANA

II. PEKERJAAN PASANGAN

BONGKARAN

PEKERJAAN TERLAKSANA

CEK

GALIAN TANAH

PEKERJAAN TERLAKSANA

CEK

TIMBUNAN TANAH DIPADATKAN

PEKERJAAN TERLAKSANA

CEK

BEKISTING

PEKERJAAN TERLAKSANA

CEK

CEK

III

II

CEK

BETON LINNING K.175

PEKERJAAN TERLAKSANA

CEK

PASANGAN BATU

PEKERJAAN TERLAKSANA

CEK

PLESTERAN

PEKERJAAN TERLAKSANA

CEK

PAS. BRONJONG

PEKERJAAN TERLAKSANA

CEK

Page 15: PCM WAY PENGUBUAN.ppt

BAGAN ALIR KEGIATAN

III

III.PEKERJAAN PINTU AIR

BONGKARAN PINTU AIR

PEKERJAAN TERLAKSANA

CEK

PERBAIKAN PINTU AIR (PABRIKASI)

PEKERJAAN TERLAKSANA

CEK

PEMASANGAN PINTU AIR

PEKERJAAN TERLAKSANA

CEK

IV

Page 16: PCM WAY PENGUBUAN.ppt

BAGAN ALIR KEGIATAN

IV

IV. PEKERJAAN JALAN INSPEKSI

PEMBERSIHAN BADAN JALAN

PEKERJAAN TERLAKSANA

CEK

PENGHAMPARAN MATERIAL SIRTU

PEKERJAAN TERLAKSANA

CEK

PEMADATAN

PEKERJAAN TERLAKSANA

CEK

C

Page 17: PCM WAY PENGUBUAN.ppt

BAGAN ALIR KEGIATAN

PENGUKURAN DATA MC 100

PERHITUNGAN VOLUME -ASBUILT DRAWING

CEK

CEK

MASA PEMELIHARAAN

CEK

FHO

B & C

MUTUAL CEK AKHIR (MC 100)

PHO

PEMELIHARAAN PEKERJAAN

SELESAI

KET : YA

TIDAK

Page 18: PCM WAY PENGUBUAN.ppt
Page 19: PCM WAY PENGUBUAN.ppt

MOBILISASIJADWAL MOBILISASI DAN PENYEDIAAN PERSONIL

NO NAMA JABATAN

KUANTITASPERIODE PELAKSANAAN

KET.AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER

SAT VOLUMEMINGGU KE -

1 2 3 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

1 ALEXIUS YULIUS, ST SITE MANAGER ORANG 1.00

2 JONUDIN, ST PELAKSANA ORANG 1.00

3 ANTOK SISWANTONO, ST PELAKSANA ORANG 1.00

4 ZAINAL ABIDIN, ST QUALITY ASSURANCE ORANG 1.00

5 EKA ZULFIANTI, ST QUANTITY ENGINEER ORANG 1.00

6 SRI FATIMAH, ST QUALITY ENGINEER ORANG 1.00

7 SURVEYOR HENDRA ORANG 1.00

                                                       

                                                         

Page 20: PCM WAY PENGUBUAN.ppt

MOBILISASIJADWAL MOBILISASI DAN PENYEDIAAN MATERIAL

NO URAIAN

PERIODE PELAKSANAAN

KET.AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER

SATMINGGU KE -

1 2 3 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

1 Batu Belah Hitam M3

2 Agregat Kasar / Split M3

3 Semen Portland Zak

4 Pasir Beton M3

5 Pasir Pasang M3

6 Pasir Urug M3

7 Sirtu M3

8 Kayu Bekisting (Papan) M3

9 Kayu Bekisting/Perancah (Kasau) M3

10 Kayu Bakar M3

11 Paku Kg

12 Besi Beton Kg

13 Kawat Beton Kg

14 Kawat Bronjong Kawat Uk. 0,50 x 1,00 x 2,00 m Unit

15 Aspal Kg

16 Bensin Ltr

17 Solar Ltr

18 Karosen/Minyak Tanah Ltr

19 Minyak Pelumas Ltr

20 Pintu Air, B = 1,50 m Unit

21 Pintu Air, B = 1,00 m Unit

22 Pintu Air, B = 0,80 m Unit

23 Pintu Air, B = 0,60 m Unit

24 Pintu Air, B = 0,50 m Unit

25 Pintu Air, B = 0,40 m Unit

26 Pintu Air, B = 0,30 m Unit

27 Rumput Kualitas Baik M2

28 Cerucuk bambu P = 30 Cm dia. 3 Cm Btg

29 Tanah Humus Kualitas Baik Bh

30 Pipa PVC Dia. 2" Btg                                                      

                                                     

Page 21: PCM WAY PENGUBUAN.ppt

MOBILISASIJADWAL MOBILISASI DAN PENYEDIAAN PERALATAN

NO URAIAN

KUANTITASPERIODE PELAKSANAAN

KET.AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER

SAT VOLUMEMINGGU KE -

1 2 3 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

1 EXCAVATOR UNIT 1.00

2 DUMP TRUCK UNIT 6.00

3 CONCRETE MIXER UNIT 6.00

4 VIBRATOR ROLLER UNIT 2.00

5 STAMPER UNIT 1.00

6 BABY ROLLER UNIT 1.00

                                                     

                                                       

Page 22: PCM WAY PENGUBUAN.ppt

GALIAN TANAH

KET : YA

TIDAK

PERSIAPAN

INSPEKSI

- Gambar Kerja - Tenaga Kerja - Alat - K3

PENGUKURAN & PROFIL DESIGN

INSPEKSI

PASANG BOUPLANK ATAU PATOK RAMBU SEBAGAI PETUNJUK GALIAN

INSPEKSI

GALI TANAH SESUAI BENTUK DAN DIMENSI YANG TELAH DIRENCANAKAN

INSPEKSI

HENTIKAN PENGGALIAN, BONGKAR BOUPLANK BILA GALIAN TELAH MENCAPAI DIMENSI YANG

TELAH DITENTUKAN

INSPEKSI

MULAI

SELESAI

ANGKUT DAN BUANG HASIL GALIAN KE LOKASI YANG TELAH DITENTUKAN

INSPEKSI

Page 23: PCM WAY PENGUBUAN.ppt

GALIAN SEDIMEN

PERSIAPAN

INSPEKSI

- Gambar Kerja - Tenaga Kerja - Alat - K3

PENGUKURAN & PROFIL DESIGN

INSPEKSI

PASANG BOUPLANK ATAU PATOK RAMBU SEBAGAI PETUNJUK GALIAN

INSPEKSI

GALI SEDIMEN DENGAN TENAGA MANUSIA

INSPEKSI

HENTIKAN PENGGALIAN, BONGKAR BOUPLANK BILA GALIAN TELAH MENCAPAI DIMENSI YANG

TELAH DITENTUKAN

INSPEKSI

MULAI

SELESAI

KET : YA

TIDAK

ANGKUT DAN BUANG HASIL GALIAN KE LOKASI YANG TELAH DITENTUKAN

INSPEKSI

Page 24: PCM WAY PENGUBUAN.ppt

PERSIAPAN

INSPEKSI

- Gambar Kerja - Tenaga Kerja - Bahan/Material - Alat - K3

PENGUKURAN & PROFIL DESIGN

INSPEKSI

PASANG BOUPLANK ATAU PATOK RAMBU SEBAGAI PETUNJUK PENIMBUNAN

INSPEKSI

HAMPAR MATERIAL SECARA MANUAL DAN BENTUK MENJADI DINDING LINNING

INSPEKSI

PADATKAN PER LAYER DENGAN STAMPER SAMPAI KEPADATAN MAKSIMUM YANG

DISYARATKAN

INSPEKSI

MULAI

SELESAI

KET : YA

TIDAK

TIMBUNAN TANAH DIPADATKAN

Page 25: PCM WAY PENGUBUAN.ppt

PERSIAPAN

INSPEKSI

- Gambar Kerja - Tenaga Kerja - Bahan/Material - Alat - K3

PENGUKURAN & PROFIL DESIGN

INSPEKSI

PASANG BOUPLANK ATAU PATOK RAMBU SEBAGAI PETUNJUK PEMASANGAN

INSPEKSI

HAMPAR PUPUK/TANAH HUMUS

INSPEKSI

TANAM RUMPUT SUBUR DAN LAKUKAN PENYIRAMAN SAMPAI RUMPUT TUMBUH

INSPEKSI

MULAI

SELESAI

KET : YA

TIDAK

GEBALAN RUMPUT

Page 26: PCM WAY PENGUBUAN.ppt

BONGKARAN

PERSIAPAN

INSPEKSI

- Gambar Kerja - Tenaga Kerja - Alat - K3

PENGUKURAN

INSPEKSI

PASANG TANDA RAMBU SEBAGAI PETUNJUK BONGKARAN

INSPEKSI

BONGKAR LINNING BETON YANG RUSAK SESUAI YANG TELAH

DIRENCANAKAN

INSPEKSI

ANGKUT DAN BUANG HASIL BONGKARAN DI LOKASI YANG TELAH DITENTUKAN

INSPEKSI

MULAI

SELESAI

KET : YA

TIDAK

HENTIKAN BONGKARAN MENCAPAI DIMENSI YANG TELAH DITENTUKAN

INSPEKSI

Page 27: PCM WAY PENGUBUAN.ppt

PERSIAPAN

INSPEKSI

- Gambar Kerja - Tenaga Kerja - Bahan/material - Alat - K3

PENGUKURAN & PROFIL DESIGN

INSPEKSI

PASANG BOUPLANK ATAU PATOK RAMBU SEBAGAI PETUNJUK PEMASANGAN

INSPEKSI

PASANG BEGISTING SESUAI BENTUK DAN DIMENSI YANG TELAH

DIRENCANAKAN

INSPEKSI

MULAI

SELESAI

KET : YA

TIDAK

BEGISTING

Page 28: PCM WAY PENGUBUAN.ppt

LINNING BETON

PERSIAPAN

INSPEKSI

- Gambar Kerja - Tenaga Kerja - Bahan/material - JMF - Alat - K3

PENGUKURAN & PROFIL DESIGN

INSPEKSI

PASANG BOUPLANK ATAU PATOK RAMBU SEBAGAI PETUNJUK PENGECORAN

INSPEKSI

MASUKAN CAMPURAN BETON (AIR, SEMEN, PASIR DAN SPLIT) KEDALAM CONCRETE

MIXER/TRUCK MIXER, ADUK SAMPAI RATA MENJADI ADUKAN BETON ± 3 MENIT

INSPEKSI & TEST

ANGKAT DAN TUANGKAN CAMPURAN ADUKAN BETON KELOKASI LINNING BETON YANG TELAH

TERPASANG BEGISTING

INSPEKSI

MULAI

SELESAI

KET : YA

TIDAK

BONGKAR BEGISTING APABILA BETON TELAH CUKUP KERAS

INSPEKSI

Page 29: PCM WAY PENGUBUAN.ppt

PASANGAN BATU

PERSIAPAN

INSPEKSI

- Gambar Kerja - Tenaga Kerja - Bahan/Material - Alat - K3

PENGUKURAN & PROFIL DESIGN

INSPEKSI

PASANG BOUPLANK ATAU PATOK RAMBU SEBAGAI PETUNJUK PEMASANGAN

INSPEKSI

MULAI

KET : YA

TIDAK

MASUKAN CAMPURAN MORTAR (AIR, SEMEN, PASIR ) KEDALAM CONCRETE MIXER/TRUCK

MIXER, ADUK SAMPAI RATA MENJADI ADUKAN MORTAR ± 3 MENIT

INSPEKSI

HAMPAR PASIR URUG SEBAGAI ALAS AKAN DIPASANG BATU

INSPEKSI

SUSUN BATU SATU DEMI SATU SEHINGGA MENYISAKAN RONGGA SEDIKIT MUNGKIN

INSPEKSI

A

Page 30: PCM WAY PENGUBUAN.ppt

PASANGAN BATU

KET : YA

TIDAK

HAMPAR MORTAR SEHINGGA PASANGAN BATU SATU DENGAN LAINNYA TERISI DENGAN PENUH

INSPEKSI

RAPIHKAN PASANGAN SETELAH PEMASNAGAN BATU SELESAI

INSPEKSI

SELESAI

A

Page 31: PCM WAY PENGUBUAN.ppt

PASANGAN BRONJONG

PERSIAPAN

INSPEKSI

- Gambar Kerja - Tenaga Kerja - Bahan/Material - Alat - K3

PENGUKURAN & PROFIL DESIGN

INSPEKSI

PASANG BOUPLANK ATAU PATOK RAMBU SEBAGAI PETUNJUK PEMASANGAN

INSPEKSI

MULAI

KET : YA

TIDAK

HAMPAR IJUK PADA ALAS YANG AKAN DIPASANG BRONJONG

INSPEKSI

RENTANGKAN KAWAT BRONJONG YANG TELAH DISIAPKAN

INSPEKSI

SUSUN BATU SATU DEMI SATU SEHINGGA MENYISAKAN RONGGA SEDIKIT MUNGKIN DI DALAM KAWAT BRONJONG

INSPEKSI

A

Page 32: PCM WAY PENGUBUAN.ppt

PASANGAN PINTU AIR

PERSIAPAN

INSPEKSI

- Gambar Kerja - Tenaga Kerja - Bahan/Material - Alat - K3

PENGUKURAN & PROFIL DESIGN

INSPEKSI

PASANG BOUPLANK ATAU PATOK RAMBU SEBAGAI PETUNJUK PEMASANGAN

INSPEKSI

MULAI

KET : YA

TIDAK

RAKIT RANGKA PINTU SESUAI GAMBAR

INSPEKSI

PASANG RANGKA PINTU YANG TELAH DIRAKIT

INSPEKSI

PASANG PINTU SESUAI GAMBAR

INSPEKSI

A

Page 33: PCM WAY PENGUBUAN.ppt

PASANGAN PINTU AIR

KET : YA

TIDAK

PERHATIKAN/KENCANGKAN PADA SAMBUANGAN BAUT

INSPEKSI

BERI PELUMAS PADA BAUT SAMBUNGAN

INSPEKSI

SELESAI

A

Page 34: PCM WAY PENGUBUAN.ppt

JALAN INSPEKSI

PERSIAPAN

INSPEKSI

- Gambar Kerja - Tenaga Kerja - Bahan/Material - Alat - K3

PENGUKURAN & PROFIL DESIGN

INSPEKSI

PASANG BOUPLANK ATAU PATOK RAMBU SEBAGAI PETUNJUK PENIMBUNAN

INSPEKSI

HAMPAR MATERIAL DENGAN SECARA MANUAL DENGAN KETEBALAN SESUAI YANG DISYARATKAN

INSPEKSI

PADATKAN PER LAYER DENGAN VIBRATOR SAMPAI KEPADATAN MAKSIMUM YANG

DISYARATKAN

INSPEKSI

MULAI

SELESAI

KET : YA

TIDAK

Page 35: PCM WAY PENGUBUAN.ppt

JADWAL RENCANA INSPEKSI

NO URAIAN

KUANTITAS

PERIODE PELAKSANAAN

KET. BOBOT AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER

SAT VOLUME% MINGGU KE -

1 2 3 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

I. PEKERJAAN PERSIAPAN

1 Mobilisasi dan Demobilisasi Ls 1.00 0.72

2 Pemeliharaan Jalan Masuk Ls 1.00 0.51

- - - - - - - - - - - - - - - - - - -

II. PEKERJAAN SALURAN PRIMER

1 Pembersihan Lapangan M2 5,895.00 0.14

2 Galian Tanah (Alat Berat) M3 8,441.00 3.42

3 Timbunan Tanah Dipadatkan (Stamper) M3 2,006.38 1.32

4 Perkerasan Jalan Inspeksi (Sirtu) M2 10,500.00 12.86

5 Bongkaran Bangunan Lama (Man power) M3 1,530.00 1.04

6 Beton K.175 M3 1,729.00 27.14

7 Begisting (untuk nad) M2 581.10 0.35

8 Deletasi M' 5,491.20 0.70

9 Gebalan Rumput M2 964.80 0.22

- - - - - - - - - - - - - - - - - - -

III. PEKERJAAN SALURAN SEKUNDER

1 Pembersihan Lapangan M2 13,979.50 0.32

2 Galian Tanah ( Man Power ) M3 269.36 0.15

3 Galian Tanah Sedimen ( Man Power ) M3 1,522.10 1.00

4 Timbunan Tanah dipadatkan (Stamper) M3 1,483.11 0.97

5 Bongkaran Bangunan Lama (Man power) M3 966.13 0.65

6 Perkerasan Jalan Inspeksi (Sirtu) M2 12,270.00 15.03

7 Pasangan Batu Belah Ad. 1 Pc : 4 Ps M3 188.00 1.89

8 Plesteran adk. 1 Pc : 4 Ps M2 285.00 0.13

9 Beton K.175 M3 1,006.73 15.80

10 Beton K. 225 M3 40.75 0.76

11 Pembesian Kg 2,788.50 0.89

12 Begisting (Plat. Kolom dan Balok) M2 65.76 0.10

13 Begisting (untuk nad) M2 601.80 0.36

14 Deletasi M' 6,128.85 0.78

15 Bronjong Kawat Uk. 0,50 x 1,00 x 2,00 m M3 250.00 2.82

16 Gebalan Rumput M2 796.00 0.18

- - - - - - - - - - - - - - - - - - -

IV. PEKERJAAN PEMBUATAN DAN PEMASANGAN PINTU AIR

1 Pintu Air, B = 1,50 m Unit 3.00 1.02

2 Pintu Air, B = 1,00 m Unit 4.00 0.91

3 Pintu Air, B = 0,80 m Unit 5.00 0.91

4 Pintu Air, B = 0,60 m Unit 6.00 0.83

5 Pintu Air, B = 0,50 m Unit 7.00 0.80

6 Pintu Air, B = 0,40 m Unit 6.00 0.55

7 Pintu Air, B = 0,30 m Unit 2.00 0.14

- - - - - - - - - - - - - - - - - - -

V. PEKERJAAN PERBAIKAN PINTU AIR

1 Perbaikan Pintu Air B = 0,40 m Unit 5.00 0.24

- - - - - - - - - - - - - - - - - - -

VI. PEKERJAAN PERBAIKAN RUMAH TYPE 84

1 Perbaikan Rumah Type 84 Ls 3.00 4.33

- - - - - - - - - - - - - - - - - - -

Page 36: PCM WAY PENGUBUAN.ppt
Page 37: PCM WAY PENGUBUAN.ppt

FOTO DOKUMENTASI

Saluran Sekunder Padang Manis Kondisi Saat ini

Page 38: PCM WAY PENGUBUAN.ppt

Saluran Sekunder Padang Manis (BPM)Kondisi Saat ini

Page 39: PCM WAY PENGUBUAN.ppt

KONDISI DINDING TEGAK YANG PATAH

Page 40: PCM WAY PENGUBUAN.ppt

Saluran Primer Bba.13Kondisi Rumah Saat ini

Page 41: PCM WAY PENGUBUAN.ppt

Kondisi Rumah Saat ini

Page 42: PCM WAY PENGUBUAN.ppt

Jalan Inspeksi Kondisi Saat ini

Page 43: PCM WAY PENGUBUAN.ppt

Jalan Inspeksi Kondisi Saat ini

Page 44: PCM WAY PENGUBUAN.ppt

PATOK BM.01

Page 45: PCM WAY PENGUBUAN.ppt
Page 46: PCM WAY PENGUBUAN.ppt

Saluran Primer Gedong HartaKondisi Saat ini

Page 47: PCM WAY PENGUBUAN.ppt

Saluran Primer Gedong HartaKondisi Saat ini

Page 48: PCM WAY PENGUBUAN.ppt

Saluran Primer Gedong HartaKondisi Saat ini

Page 49: PCM WAY PENGUBUAN.ppt
Page 50: PCM WAY PENGUBUAN.ppt
Page 51: PCM WAY PENGUBUAN.ppt