  • 8/19/2019 Pabrikasi Kiln

    1/31

    T=32x6380mm =1 Ea ,T=35x8320mm DI FAB

    NO URAIAN

    QTY sat unit totalkg Satuan

    Rp

    1 Fabr.Plate Sheel (16M03 N)

    2 32x2150x7500 6,00  lb 4050,6 24.303,60  26.000 

    3 35x2150x7500 8,00  lb 4430,3438 35.442,75  26.000 

    4 55x2200x7500 4,00  lb 7.123,88  28.495,50  30.000 

    5 90x2900x7500 2,00  lb 17.073,75  34.147,50  30.000 

    6 Sheel Bracing (L100x100x10 )SS400 7.638,00 kg 7.638,00  7.638,00  8.500 

    7 Plate Simpul Bracing (Plate 13mm) A36 297,70  kg 297,70  297,70  8.500 

    8 Plate Center Bracing (Plate 13mm) A36 871,00  kg 871,00  871,00  7.800 

    9 Stud Bolt F/ Joint dia 36x610mm Gr88 126,00  Ea 126,00  126,00  65.000 

    10 L130x130x16x100Lg(126EA ) SS400 882,00  kg 882,00  882,00  8.500 

    11  Ajusting Lug( Plate 100mm )126EA A36 1.593,00 kg 1.593,00  1.593,00  7.800 

    12 Bolt Hew.HD M36x100LG 126,00  ea 126,00  126,00  45.000 

    13 Painting 208,77  m2 208,77  82.000 

    T O T A L 133.671,05 

    MATERIAL kg Rp/kg

    1 Fabr.Plate Sheel (16M03)

    2 32x2150x7500 24.303,60  26.000 

    3 35x2150x7500 35.442,75  26.000 

    4 55x2200x7500 28.495,50  30.000 

    5 90x2900x7500 34.147,50  30.000 

    6 Sheel Bracing (L100x100x10 )SS400 4.368,00  8.500 

    7 Plate Simpul Bracing (Plate 13mm) A36 297,70  8.500 

    8 Plate Center Bracing (Plate 13mm) A36 871,00  7.800 

    9 Stud Bolt F/ Joint dia 36x610mm Gr88 126,00  65.000 

    10 L130x130x16x100Lg(126EA ) SS400 882,00  8.500 

    11  Ajusting Lug( Plate 100mm )126EA A36 1.593,00  7.800 

    12 Bolt Hew.HD M36x100LG 126,00  45.000 

     A Fabrikasi 

     

    F

    T=

    Berat

    M

    I. Fabrikasi SheellKiln 21700mmLG

  • 8/19/2019 Pabrikasi Kiln

    2/31

    1 Eng

    2 JO/JM/Bbantu

    3  Assymble

    4 Machining

    5 Painting

    B Sub

    1 Pas ray2 Packing/ Transport

    C Pemasangan 

    upah

    Bbantu

     Alat

     Alat Berat

    Site Fas

    Paxsray Lap

    D Peralatan

     Alat BantuPemeliharaan Alat

    Litrik Pabrik

    E Biaya Tidak lansung

    Bi Seketariat

    Bi Fasilitas

    Bi Personalia

    Bi Keuangan

    F OV 3%

    BB 3%

    Res/Keut 5%

    PPH 4%

    T O T A L PENAWARAN

  • 8/19/2019 Pabrikasi Kiln

    3/31

    OPTION 111

    L=21700mm

    HARGA KETERANGANTotal Satuan Total TOTAL

    Rp

    631.893.600  26.323  639.747.978  1.271.641.578 

    921.511.500  26.323  932.965.802  1.854.477.302 

    854.865.000  26.323  750.092.106  1.604.957.106 

    1.024.425.000  30.823  1.052.534.456  2.076.959.456 

    64.923.000  22.014  168.144.663  233.067.663 

    2.530.450  22.014  6.553.635  9.084.085 

    6.793.800  22.014  19.174.391  25.968.191 

    8.190.000  22.014  2.773.793  10.963.793 

    7.497.000  22.014  19.416.548  26.913.548 

    12.425.400  22.014  35.068.663  47.494.063 

    5.670.000  22.014  2.773.793  8.443.793 

    17.119.356 

    3.540.724.750  7.187.089.933 

    hpp

    53.766,99  13.000,00  4,135922

    Tot /Rp

    631.893.600,00 

    921.511.500,00 

    854.865.000,00 

    1.024.425.000,00 

    37.128.000,00 

    2.530.450,00 

    6.793.800,00 

    8.190.000,00 

    7.497.000,00 

    12.425.400,00 

    5.670.000,00 

    3.512.929.750,00  1

    BILL OF QUANTITY

    brikasi Sheel Kiln D=4523

    5& 90mmx7000mm u/disammbung

    HARGA (RP)

    TERIAL UPAH

  • 8/19/2019 Pabrikasi Kiln

    4/31

    13.392.305,00 

    900.021.788,94 

    330.670.500,39 

    153.663.750,00 

    17.119.355,99 

    1.414.867.700,32  2

    52.495.700,04 337.727.662,82 

    390.223.362,86  3

    ############

    43.025.000,00 

    ############

    ############

    91.200.000,00 

    18.000.000,00  1.841.274.120,26  4

    65.865.513,39 64.433.654,40 

    63.001.795,41 

    193.300.963,20  5

    64.433.654,40 

    60.854.006,93 

    66.581.442,88 

    68.013.301,87 

    259.882.406,08  6

    7.612.478.302,74  1+2+3+4+5+6

    228.374.349,08 

    228.374.349,08 

    380.623.915,14 

    304.499.132,11 

    1.141.871.745,41 

    8.754.350.048,15  sph

    65.491,74   rp

    5,04  

  • 8/19/2019 Pabrikasi Kiln

    5/31

    Index 1

    Unit Total

    32 2,15 7,5 7,85 4.050,60  26.000  631.893.600,00 

    35 2,15 7,5 7,85 4.430,34  26.000  921.511.500,00 

    55 2,2 7,5 7,85 7.123,88  30.000  854.865.000,00 

    100 2,9 7,5 7,85 17.073,75  30.000  1.024.425.000,00 

    8.500  64.923.000,00 

    8.500  2.530.450,00 

    7.800  6.793.800,00 

    65.000  8.190.000,00 

    #REF! 8.500  7.497.000,00 

    7.800  12.425.400,00 

    45.000  5.670.000,00 

    T O T A L 3.540.724.750,00 

    usd

    Material

  • 8/19/2019 Pabrikasi Kiln

    6/31

    #######

    0,92%0,90%

    0,88%

    0,90%

    0,85%

    0,93%

    0,95%

    usd

  • 8/19/2019 Pabrikasi Kiln

    7/31

    Unit Total Unit Total Unit

    100  2.430.360,00  7.055  171.452.051,29 2.469 

    100  3.544.275,00  7.055  250.034.241,47 2.469 

    100,00  2.849.550,00  7.055  201.024.207,43 2.469 

    100,00  3.414.750,00  7.055  240.896.777,50 4.500,00 153.663.750,00  2.469 

    100,00  763.800,00  3.175  24.247.347,94  2.469 

    100,00  29.770,00  3.175  945.068,80  2.469 

    100,00  87.100,00  3.175  2.765.048,45  2.469 

    100,00  12.600,00  3.175  399.995,53  2.469 

    100,00  88.200,00  3.175  2.799.968,69  2.469 

    100,00  159.300,00  3.175  5.057.086,32  2.469 

    100,00  12.600,00  3.175  399.995,53  2.469 

    13.392.305,00  900.021.788,94 153.663.750,00 

    e fab machining

    Eng Fabrikasi Machiningt

  • 8/19/2019 Pabrikasi Kiln

    8/31

  • 8/19/2019 Pabrikasi Kiln

    9/31

    Total Unit Total Unit Total Unit

    60.008.217,95  429  10.424.391,46  2.522  61.288.912,00  13.749 

    87.511.984,51  429  15.202.237,55  2.522  89.379.663,33  13.749 

    70.358.472,60  429  12.222.396,97  2.522  71.860.061,55  13.749 

    84.313.872,12  429  14.646.674,05  2.522  86.113.296,90  13.749 

    18.859.048,40  2.522  19.261.537,79  13.749 

    735.053,51  2.522  750.741,01  13.749 

    2.150.593,24  2.522  2.196.491,15  13.749 

    311.107,63  2.522  317.747,28  13.749 

    2.177.753,43  2.522  2.224.230,99  13.749 

    3.933.289,36  2.522  4.017.233,53  13.749 

    311.107,63  2.522  317.747,28  13.749 

    330.670.500,39  52.495.700,04  337.727.662,82 

    asymbly pasray pac/transport

    ssymbly Pacray Packing/Transport J

  • 8/19/2019 Pabrikasi Kiln

    10/31

  • 8/19/2019 Pabrikasi Kiln

    11/31

    T OT T AL

    Total

    334.144.045,47  1.271.641.578,18 

    487.293.399,65  1.854.477.301,52 

    391.777.417,66  1.604.957.106,20 

    469.485.335,21  2.076.959.455,78 

    105.012.928,92  233.067.663,06 

    4.093.001,96  9.084.085,27 

    11.975.158,56  25.968.191,40 

    1.732.342,11  10.963.792,56 

    12.126.394,78  26.913.547,89 

    21.901.753,83  47.494.063,03 

    1.732.342,11  8.443.792,56 

    17.119.355,99 

    1.841.274.120,26  7.187.089.933,45 

    lapangan

    ointDiLap

  • 8/19/2019 Pabrikasi Kiln

    12/31

  • 8/19/2019 Pabrikasi Kiln

    13/31

  • 8/19/2019 Pabrikasi Kiln

    14/31

  • 8/19/2019 Pabrikasi Kiln

    15/31

  • 8/19/2019 Pabrikasi Kiln

    16/31

  • 8/19/2019 Pabrikasi Kiln

    17/31

  • 8/19/2019 Pabrikasi Kiln

    18/31

  • 8/19/2019 Pabrikasi Kiln

    19/31

  • 8/19/2019 Pabrikasi Kiln

    20/31

  • 8/19/2019 Pabrikasi Kiln

    21/31

  • 8/19/2019 Pabrikasi Kiln

    22/31

  • 8/19/2019 Pabrikasi Kiln

    23/31

    T=32x638 DI FAB

    NO URAIAN

    QTY sat unit total

    kg

    1 Fabr.Plate Sheel (16M03 N)

    2 32x2150x7 6,00  lb 4050,6 #######

    3 35x2150x7 8,00  lb 4430,344 #######

    4 55x2200x7 4,00  lb 7.123,88 #######

    5 90x2900x7 2,00  lb ####### #######

    6 Sheel Brac 7.638,00 kg 7.638,00 7.638,00

    7 Plate Simp 297,70  kg 297,70  297,70 

    8 Plate Cent 871,00  kg 871,00  871,00 

    9 Stud Bolt F 126,00  Ea 126,00  126,00 

    10 L130x130x 882,00  kg 882,00  882,00 

    11  Ajusting Lu 1.593,00 kg 1.593,00 1.593,00

    12 Bolt Hew.H 126,00  ea 126,00  126,00 

    13 Painting -  m2 -  - 

    T O T A L #######

    MATERIAL kg

    1 Fabr.Plate Sheel (16M03)

    2 32x2150x7500 #######

    3 35x2150x7500 #######

    Fab

    I. Fabrikasi SheellKil

    Berat

  • 8/19/2019 Pabrikasi Kiln

    24/31

    4 55x2200x7500 #######

    5 90x2900x7500 #######

    6 Sheel Bracing (L100x100x10 )SS400 4.368,00

    7 Plate Simpul Bracing (Plate 13mm) A36 297,70 

    8 Plate Center Bracing (Plate 13mm) A36 871,00 

    9 Stud Bolt F/ Joint dia 36x610mm Gr88 126,00 

    10 L130x130x16x100Lg(126EA ) SS400 882,00 

    11  Ajusting Lug( Plate 100mm )126EA A36 1.593,0012 Bolt Hew.HD M36x100LG 126,00 

     A Fabrikasi 

    1 Eng

    2 JO/JM/Bbantu

    3  Assymble

    4 Machining

    5 Painting

    B Sub

    1 Pas ray

    2 Packing/ Transport

    C Pemasangan 

    upah

    Bbantu

     Alat

     Alat Berat

    Site Fas

    Paxsray Lap

    D Peralatan

     Alat Bantu

    Pemeliharaan AlatLitrik Pabrik

    E Biaya Tidak lansung

    Bi Seketariat

    Bi Fasilitas

    Bi Personalia

    Bi Keuangan

    F OV 3%BB 3%

    Res/Keut 5%

    PPH 4%

    T O T A L PENAWARAN

  • 8/19/2019 Pabrikasi Kiln

    25/31

    OPTION 111

    L=21700mm

    HARGA KETERANGAN

    Satuan Total Satuan Total TOTAL

    Rp Rp

    26.000  ####### -  -  ####### 32 2,15

    26.000  ####### -  -  ####### 35 2,15

    30.000  ####### -  -  ####### 55 2,2

    30.000  ####### 4.500  ####### ####### 100 2,9

    8.500  ####### 100  763.800  #######

    8.500  ####### 100  29.770  #######

    7.800  ####### 100  87.100  #######

    65.000  ####### 100  12.600  #######

    8.500  ####### 100  88.200  ####### #REF!

    7.800  ####### 2.569  ####### #######

    45.000  ####### 2.569  323.708  #######

    ####### #######

    hpp

    ####### ####### 2,129099 usd

    Rp/kg Tot /Rp

    26.000  #######

    26.000  #######

    BILL OF QUANTITY

    rikasi Sheel Kiln D=4523

    T=55& 90mmx7000mm u/disammbung

    HARGA (RP)

    MATERIAL UPAH

  • 8/19/2019 Pabrikasi Kiln

    26/31

    30.000  #######

    30.000  #######

    8.500  #######

    8.500  #######

    7.800  #######

    65.000  #######

    8.500  #######

    7.800  #######45.000  #######

    ####### 1

    #######

    #######

    #######

    ####### 2

    - -  3

    -  -  4

    #######

    ##############

    ####### 5

    #######

    #######

    #######

    #######

    ####### 6

    ####### 1+2+3+4+5+6

    ##############

    #######

    #######

    #######

    ####### sph

    ####### rp

    2,58   usd

  • 8/19/2019 Pabrikasi Kiln

    27/31

    Index 1

    Unit Total Unit Total Unit

    7,5 7,85 4.050,60 26.000  ####### -  -  - 

    7,5 7,85 4.430,34 26.000  ####### -  -  - 

    7,5 7,85 7.123,88 30.000  ####### -  -  - 

    7,5 7,85 ####### 30.000  ####### -  -  - 

    8.500  ####### 100,00  ####### - 

    8.500  ####### 100,00  ####### - 

    7.800  ####### 100,00  ####### - 

    65.000  ####### 100,00  ####### - 

    8.500  ####### 100,00  ####### - 

    7.800  ####### 100,00  ####### - 

    45.000  ####### 100,00  ####### - 

    T O T A L ####### #######

    e

    Material Eng Fabr  

  • 8/19/2019 Pabrikasi Kiln

    28/31

    #######

    0,92%

    0,90%0,88%

    0,90%

    0,85%

    0,93%

    0,95%

  • 8/19/2019 Pabrikasi Kiln

    29/31

    Total Unit Total Unit Total Unit Total

    -  -  -  -  -  -  - 

    -  -  -  -  -  -  - 

    -  -  -  -  -  -  - 

    -  4.500,00 ####### -  -  -  -  -  - 

    -  -  -  -  - 

    -  -  -  -  - 

    -  -  -  -  - 

    -  -  -  -  - 

    -  -  -  -  - 

    -  2.469  ####### -  - 

    -  2.469  ####### -  - 

    -  ####### ####### -  - 

    fab machining asymbly pasray pac/transp

    Assymbly Pacray Packing/Transportikasi Machiningt

  • 8/19/2019 Pabrikasi Kiln

    30/31

  • 8/19/2019 Pabrikasi Kiln

    31/31

    T OT T AL

    Unit Total

    -  -  #######

    -  -  #######

    -  -  #######

    -  -  #######

    -  -  #######

    -  -  #######

    -  -  #######

    -  -  #######

    -  -  #######

    -  -  #######

    -  -  #######

    -  #######

    rt lapangan

    JointDiLap