Manajemen Konstruksi Project Life Cycle Lecture 2 Ferdinand Fassa
30

Manajemen Konstruksi Project Life Cycle - …ocw.upj.ac.id/files/Slide-TSP305-TSP-305-002-Manajemen-Konstruksi… · Outline A. Review Lecture 1 B. Project & Project life cycle C.

Aug 11, 2018

Download

Documents

truongthuy
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Manajemen Konstruksi Project Life Cycle - …ocw.upj.ac.id/files/Slide-TSP305-TSP-305-002-Manajemen-Konstruksi… · Outline A. Review Lecture 1 B. Project & Project life cycle C.

Manajemen Konstruksi

Project Life Cycle

Lecture 2

Ferdinand Fassa

Page 2: Manajemen Konstruksi Project Life Cycle - …ocw.upj.ac.id/files/Slide-TSP305-TSP-305-002-Manajemen-Konstruksi… · Outline A. Review Lecture 1 B. Project & Project life cycle C.

Outline

A. Review Lecture 1

B. Project & Project life cycle

C. Project Initiation (Tahapan perencanaan dalam daur

hidup proyek)

D. Feasibility Study (Studi kelayakan)

E. Preliminary engineering and design (Perencanaan

umum )

F. Detail Engineering Design (Perencanaan Teknik)

G. Technical Specification

H. Discussion

Page 3: Manajemen Konstruksi Project Life Cycle - …ocw.upj.ac.id/files/Slide-TSP305-TSP-305-002-Manajemen-Konstruksi… · Outline A. Review Lecture 1 B. Project & Project life cycle C.

A. Review Pertemuan 1

1. What is the role of the owner, Designer and engineer, and also construction manager on a construction project (minimum 3 roles) ?

2. Name two construction associations offer voluntary certification programs for construction managers in Indonesia

3. Identify at least three characteristics that make the construction project unique from other industry sector projects.

4. Why the construction project unique from other industry sector projects? (Stated clearly)

5. What advantages do you see in consolidating the roles of owner, designer and engineer, contractor? What disadvantages could it have?

Page 4: Manajemen Konstruksi Project Life Cycle - …ocw.upj.ac.id/files/Slide-TSP305-TSP-305-002-Manajemen-Konstruksi… · Outline A. Review Lecture 1 B. Project & Project life cycle C.

B. WHAT IS A PROJECT?

Definition of a Project

A project is made up of a group of interrelated

work activities constrained by a specific scope,

budget, and schedule to deliver capital assets

needed to achieve the strategic

goals of an Agency.

Construction Project Management Handbook

Federal Transit Administration (FTA), 2007

Page 5: Manajemen Konstruksi Project Life Cycle - …ocw.upj.ac.id/files/Slide-TSP305-TSP-305-002-Manajemen-Konstruksi… · Outline A. Review Lecture 1 B. Project & Project life cycle C.

B. Project Life Cycle Phases

Project life cycle phases for a typical

construction project are initiation,

planning, design, construction,

commissioning, and closeout.

Page 6: Manajemen Konstruksi Project Life Cycle - …ocw.upj.ac.id/files/Slide-TSP305-TSP-305-002-Manajemen-Konstruksi… · Outline A. Review Lecture 1 B. Project & Project life cycle C.

Project Life Cycle Phases

Page 7: Manajemen Konstruksi Project Life Cycle - …ocw.upj.ac.id/files/Slide-TSP305-TSP-305-002-Manajemen-Konstruksi… · Outline A. Review Lecture 1 B. Project & Project life cycle C.

Project Initiation

Page 8: Manajemen Konstruksi Project Life Cycle - …ocw.upj.ac.id/files/Slide-TSP305-TSP-305-002-Manajemen-Konstruksi… · Outline A. Review Lecture 1 B. Project & Project life cycle C.

C. Project Initiation

In a traditional design/bid/build (D/B/B) project,

the project life cycle begins with the initiation of

planning and design

Page 9: Manajemen Konstruksi Project Life Cycle - …ocw.upj.ac.id/files/Slide-TSP305-TSP-305-002-Manajemen-Konstruksi… · Outline A. Review Lecture 1 B. Project & Project life cycle C.

The design phase continues through the

preliminary engineering effort to further analyze,

validate, and define the preferred alternative and

arrive at the baseline scope, budget, and

schedule.

Page 10: Manajemen Konstruksi Project Life Cycle - …ocw.upj.ac.id/files/Slide-TSP305-TSP-305-002-Manajemen-Konstruksi… · Outline A. Review Lecture 1 B. Project & Project life cycle C.
Page 11: Manajemen Konstruksi Project Life Cycle - …ocw.upj.ac.id/files/Slide-TSP305-TSP-305-002-Manajemen-Konstruksi… · Outline A. Review Lecture 1 B. Project & Project life cycle C.

D. Feasibility Study

The first step in any project is conceptual definition and

refinement of the facility that will meet that need.

FS consist of:

• Construction Size

• Site Location

• Availability of labor

• Supporting resources (raw material, energy, water, etc)

• Environmental impact

• Access connection

• Convenient communication

• Sociological and economic impact on the community

Page 12: Manajemen Konstruksi Project Life Cycle - …ocw.upj.ac.id/files/Slide-TSP305-TSP-305-002-Manajemen-Konstruksi… · Outline A. Review Lecture 1 B. Project & Project life cycle C.

E. Preliminary engineering and design

These phases are traditionally the domain of

architects and design-oriented engineers

The design stressed on architectural concept,

evaluation of technological process alternatives, size

and comparative economic studies.

It evolve directly from the concept and feasibility stage

Page 13: Manajemen Konstruksi Project Life Cycle - …ocw.upj.ac.id/files/Slide-TSP305-TSP-305-002-Manajemen-Konstruksi… · Outline A. Review Lecture 1 B. Project & Project life cycle C.

F. Detail Engineering Design

Detailed Design is broken into seven phases:

1.Scope Definition and Engineering Execution Strategy

2.Commencement of Detailed Design

3.Initial Design Development and Hazard Identification

4.Initial Design Review & Audit

5.Approval for Design (AFD)

6.Approval for Construction (AFC)

7.Design Close-Out

Page 14: Manajemen Konstruksi Project Life Cycle - …ocw.upj.ac.id/files/Slide-TSP305-TSP-305-002-Manajemen-Konstruksi… · Outline A. Review Lecture 1 B. Project & Project life cycle C.

Detail Engineering Design

Phase 1:

Scope Definition and Engineering Execution Strategy

Preparation for commencement of detail design. To

evaluate FEED(Front End Engineering Design)

deliverables to ensure engineering is sufficiently mature for

detail design to progress in a controlled and minimal

change environment. To confirm Engineering Execution

Plan.

Page 15: Manajemen Konstruksi Project Life Cycle - …ocw.upj.ac.id/files/Slide-TSP305-TSP-305-002-Manajemen-Konstruksi… · Outline A. Review Lecture 1 B. Project & Project life cycle C.
Page 16: Manajemen Konstruksi Project Life Cycle - …ocw.upj.ac.id/files/Slide-TSP305-TSP-305-002-Manajemen-Konstruksi… · Outline A. Review Lecture 1 B. Project & Project life cycle C.
Page 17: Manajemen Konstruksi Project Life Cycle - …ocw.upj.ac.id/files/Slide-TSP305-TSP-305-002-Manajemen-Konstruksi… · Outline A. Review Lecture 1 B. Project & Project life cycle C.

Detail Engineering Design

Phase 2:

Commencement of Detailed Design

To formally kick off the Engineering Design Process in

accordance with the project execution plan and to ensure

that key engineering strategies / philosophies are in place.

Page 18: Manajemen Konstruksi Project Life Cycle - …ocw.upj.ac.id/files/Slide-TSP305-TSP-305-002-Manajemen-Konstruksi… · Outline A. Review Lecture 1 B. Project & Project life cycle C.
Page 19: Manajemen Konstruksi Project Life Cycle - …ocw.upj.ac.id/files/Slide-TSP305-TSP-305-002-Manajemen-Konstruksi… · Outline A. Review Lecture 1 B. Project & Project life cycle C.

Detail Engineering Design

Phase 3:

Initial Design Development and Hazard Identification

To develop initial design deliverables to Inter Discipline

Review (IDC) stage and identify key hazards.

Page 20: Manajemen Konstruksi Project Life Cycle - …ocw.upj.ac.id/files/Slide-TSP305-TSP-305-002-Manajemen-Konstruksi… · Outline A. Review Lecture 1 B. Project & Project life cycle C.
Page 21: Manajemen Konstruksi Project Life Cycle - …ocw.upj.ac.id/files/Slide-TSP305-TSP-305-002-Manajemen-Konstruksi… · Outline A. Review Lecture 1 B. Project & Project life cycle C.

Detail Engineering Design

Phase 4:

Initial Design Review & Audit

To confirm that the initial design development is

robust/strong.

Page 22: Manajemen Konstruksi Project Life Cycle - …ocw.upj.ac.id/files/Slide-TSP305-TSP-305-002-Manajemen-Konstruksi… · Outline A. Review Lecture 1 B. Project & Project life cycle C.
Page 23: Manajemen Konstruksi Project Life Cycle - …ocw.upj.ac.id/files/Slide-TSP305-TSP-305-002-Manajemen-Konstruksi… · Outline A. Review Lecture 1 B. Project & Project life cycle C.

Detail Engineering Design

Phase 5:

Approval for Design (AFD)

To ‘Freeze’ the Process design, and develop dependent

design & procurement activities.

Page 24: Manajemen Konstruksi Project Life Cycle - …ocw.upj.ac.id/files/Slide-TSP305-TSP-305-002-Manajemen-Konstruksi… · Outline A. Review Lecture 1 B. Project & Project life cycle C.

Provision and Use of Work Equipment Regulations 1998 (PUWER)

Page 25: Manajemen Konstruksi Project Life Cycle - …ocw.upj.ac.id/files/Slide-TSP305-TSP-305-002-Manajemen-Konstruksi… · Outline A. Review Lecture 1 B. Project & Project life cycle C.

Detail Engineering Design

Phase 6:

Approval for Construction (AFC)

To ensure that sufficient design information &

certification is available to facilitate safe installation,

operation & maintenance.

Page 26: Manajemen Konstruksi Project Life Cycle - …ocw.upj.ac.id/files/Slide-TSP305-TSP-305-002-Manajemen-Konstruksi… · Outline A. Review Lecture 1 B. Project & Project life cycle C.
Page 27: Manajemen Konstruksi Project Life Cycle - …ocw.upj.ac.id/files/Slide-TSP305-TSP-305-002-Manajemen-Konstruksi… · Outline A. Review Lecture 1 B. Project & Project life cycle C.

Detail Engineering Design

Phase 7:

Design Close-Out

To ensure all final design deliverables are completed

and that client and statutory obligations are

satisfactorily resolved.

Page 28: Manajemen Konstruksi Project Life Cycle - …ocw.upj.ac.id/files/Slide-TSP305-TSP-305-002-Manajemen-Konstruksi… · Outline A. Review Lecture 1 B. Project & Project life cycle C.

http://www.amec.com

Page 29: Manajemen Konstruksi Project Life Cycle - …ocw.upj.ac.id/files/Slide-TSP305-TSP-305-002-Manajemen-Konstruksi… · Outline A. Review Lecture 1 B. Project & Project life cycle C.

G. Technical Specification

Page 30: Manajemen Konstruksi Project Life Cycle - …ocw.upj.ac.id/files/Slide-TSP305-TSP-305-002-Manajemen-Konstruksi… · Outline A. Review Lecture 1 B. Project & Project life cycle C.

H. Discussion

• Project Lifecycle (residential)

• Find Technical Specification for

construction activities (Excavation work,

painting work, etc)

On a group (3-4 students)