Top Banner
TUGAS AKHIR Dosen Pembimbing Erma Suryani S.T, M.T, Ph.D NIP. 197004272005012001 JURUSAN SISTEM INFORMASI Fakultas Teknologi Informasi Institut Teknologi Sepuluh Nopember Surabaya 2014 Ayunda Puspa Kinanti 5210100023 MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK UNTUK MENINGKATKAN KEANDALAN JARINGAN DISTRIBUSI MENGGUNAKAN SISTEM DINAMIK (STUDI KASUS PT.PLN (PERSERO) APJ SURABAYA SELATAN)
37

MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Jul 19, 2019

Download

Documents

doantruc
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

TUGAS AKHIR

Dosen PembimbingErma Suryani S.T, M.T, Ph.DNIP. 197004272005012001

JURUSAN SISTEM INFORMASI Fakultas Teknologi Informasi Institut Teknologi Sepuluh Nopember Surabaya 2014

Ayunda Puspa Kinanti5210100023

MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK UNTUKMENINGKATKAN KEANDALAN JARINGAN DISTRIBUSI MENGGUNAKAN SISTEMDINAMIK (STUDI KASUS PT.PLN (PERSERO) APJ SURABAYA SELATAN)

Page 2: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Outline

Latarbelakang Tujuan Rumusan Masalah

Batasan Tugas Akhir

Metodologi Model dan Implementasi Analisa Hasil Kesimpulan 

dan Saran

Page 3: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Latar Belakang

PLN (Persero) sebagai satu‐satunya perusahaan BUMNYang menyediakan usaha jasa ketenaga listrikan di tuntut untuk memberikan pelayanan yang terbaik untuk seluruh lapisan masyarakat

Page 4: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Latar Belakang

susut energi listrik yang terbesar Pada tahun 2003  PT.PLN (Persero) kehilangan sebesar Rp. 4,8 triliun

Page 5: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Latar Belakang

wilayah APJ Surabaya Selatan losses (susut) distribusinya dari kisaran diatas 7 %  Dan 1% susut distribusi kurang lebih setara dengan 3.000.000 kWH per bulan atau dengan tarif rata‐rata Rp. 809 / kWH setara dengan Rp. 2,4 M / bulan.

Page 6: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Latar BelakangPenggunaan manajemen aset dan simulasi sistem dinamik

Riset Proyek di Jerman pada sistemmanajemen aset dalam jaringan distribusimemberikan prospek perkembangandimasa depan (CIGRE Australian AssetManagement Working Group, 2000)

Sistem Dinamik dapat menginvestigasiSecara tidak terbatas untuk mendapatkanparameterDan sistem ini dikembangkan untukmenyelidiki beberapa hubunganYang penting dari waktu ke waktu (Senge etall, 1994)

Manajemen Aset pada jaringan distribusiMemperhatikan proses manajemen, pemanfaatanYang optimal umur aset untuk meningkatkan keandalan layanan, distribusi yang konstan, dan pemeliharaan yang sesuai ( Asset management techniques,2006)

Page 7: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Rumusan masalah

1. Bagaimana membuat model simulasi kondisi asetjaringan saat ini dan dampaknya terhadap losses (susut)distribusi energi listrik?

2. Bagaimana membuat model sekenario manajemen asetjaringan untuk meningkatkan keandalan danmenurunkan losses (susut) distribusi energi listrik?

Page 8: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Batasan Tugas Akhir

1. Data aset perusahaan yang digunakan untuk distribusi jaringan tenaga listrik di PT.PLN (Persero) APJ Surabaya Selatan

2. Losses (susut) yang dibahas dalam tugas akhir ini adalah losses (susut) teknik

Page 9: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Tujuan 

1. Mengembangkan model simulasi kondisi aset jaringan saat ini dan dampaknya terhadap losses (susut) distribusi energi listrik

2. Mengembangkan model sekenario terhadap manajemen aset jaringan untuk meningkatkan keandalan dan menurunkan losses (susut) distribusi energi listrik di masa depan

Page 10: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Manfaat 

1. Dengan terciptanya model simulasi manajemen aset jaringan distribusi tenaga listrik dapat memberikan gambaran tentang kondisi aset serta keandalan jaringan saat ini

2. Dari sekenario yang dikembangkan, dapat memberikan masukan kepada manajemen PT.PLN (Persero) APJ Surabaya Selatan dalam menentukan skala prioritas aset jaringan distribusi yang mesti diperbaiki serta hal‐hal apa saja yang perlu dilakukan dalam perbaikan aset untuk meningkatkan keandalan dan mengurangi losses (susut) 

Page 11: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

PT PLN (Persero) APJ Surabaya SelatanArea Surabaya Selatan mempunyai area pengusahaan yang luas danpadat dengan jumlah pelanggan 427.223 yang terdiri dari lima golongantarif, dengan pendapatan total sekitar Rp 196,6 Milyar per bulan dantotal daya terpasang sebesar 1.399.244.885 VA. Beban sebesar itudisuplai oleh 9 gardu induk dan disalurkan melalui sekitar 130 penyulang.GI tersebut antara lain : GIS Ngagel, GI Waru, GI Sukolilo, GI Rungkut, GITandes, GI Sukolilo, GI Alta Prima, GI Darmo Grande, GI Wonokromo.

Page 12: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Metodologi Pengerjaan Tugas Akhir• Survei ke perusahaan

Pustaka mengenai distribusi tenaga listrik, manajemen aset, simulasi dinamik, causal loop diagram

Menggambarkan variable yang sudah didapatkan dengan Causal Loop Diagram

Pembuatan model menggunakan software VENSIM

Analisa hasil dari keluaran sistem dan membuat sekenariosasi

Menentukan apakah model dan hasil tidak menyimpang

Perumusan masaah yang ada di Perusahaan

Page 13: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

MODEL DAN IMPLEMENTASI

Page 14: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Data MasukanData aset untuk wilayah APJ Surabaya Selatanyaitu daerah Darmo Permai, Dukuh Kupang,Ngagel, Rungkut dan Gedangan (Lampiran)

Data susut (losses) (Lampiran)

Data indikator keandalan (Lampiran)

Data Jumlah Pelanggan (Lampiran)

Page 15: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Causal Loop Diagram

Page 16: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Base‐Model 

extenal factor

overload

climate

geographic

temperature

design lifetimetransformer

TransformerConditionmaintenance rate deteriorate

usable lifetime trans

former

average standartlife time

acelerate lifetime

aceleration factor

condition effectquality

TotalCustomercustomer rate

networkreliability

MeterConditionmaintenance meter deteriorate meter

design lifetimemeter

usable lifetimemeter

PoleConditionmaintenance pole deteriorate pole

design lifetime pole

usable lifetime pole

Cable Conditionmaintenance JT deteriorate JT

design lifetimecable

usable lifetime JT

Averageasset

Condition

network quality

SAIDI target

SAIFI target

SAIDIPercent

SAIFIPercent

difference

<INITIAL TIME>

year1990-1

996

year1997-20

06

year2007-20

13

<INITIAL TIME>

year1990-1

997

year1998-2

002

year2003-2

006

year2006-2

013

<INITIAL TIME>

year1991-20

00

year2001-2

010

year 2011-2013

<INITIAL TIME>

year1990-1

995

year1996-2

005

averagetransformercondition

averagemeter

condition

averagepole

condition

averagecable

condition

leaving customer

rate customer2006-2013

rate customer1990-2005

<Time>

InterruptDurationduration in duration out

rate duration1990-2005

rate duration2006-2013

<Time>

customerinterruptcustomer

interrupt incustomer

interrupt out

rate customerinterrupt 1990-2005

rate customerinterrupt 2006-2013

<Time>

SystemAverage

InterruptionDuration

Index

SystemAverage

InterruptionFrequance

Index

total transformer1990-1996

total transformer1997-2006

total transformer2007-2013

total meter1990-1997

total meter1998-2002

total meter2003-2006

total meter2006-2013

Total Pole1991-2000

total pole2001-2010

total pole2011-2013

total cable1991-1995

total cable1996-2009

total cable2010-2013

year 2006-2013cable

Total PowerDistributiondistribution in distribution out

rate distribution2006-2013

rate distribution1990-2005

<Time>

Total Customer'spower received

power received in power receivedout

rate received2006-2013

rate received1990-2005

<Time>

TecnicalLosses

Technical Losses Percentage

Page 17: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Pengkategorian AssetPengkategorian Asset dan Lifetime Asset

Jenis Asset Kategori

Jaringan TeganganMenengah, Jaringan Tegangan Rendah

Cable

Tiang TM, Tiang TR Pole

Meter 1 Fasa, Meter 3 Fasa

Meter

Trafo Transformer

JenisAsset

DesignLifetime

UseableLifetime

Transformer

50 tahun 20 tahun

Meter 30 tahun 12 tahun

Pole 50 tahun 20 tahun

Cable 45 tahun 18 tahun

Page 18: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Pengkategorian Pemasangan Asset

Jenis Asset Tahun Pemasangan Jumlah Asset

Transformer 1990‐1996 406151997‐2006 812292007‐2013 284303

Meter 1990‐1997 1387381998‐2002 3237232003‐2006 41621542007‐2013 2081077

Pole 1990‐2000 1166442001‐2010 2332882011‐2013 816509

Cable 1990‐1995 75221996‐2005 150442006‐2013 52657

Dilakukan pengolongan berdasarkan tahun pemasangan untuktiap asset yaitu: (Hadi T, 2014)

Page 19: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Sub‐Model Condition EffectMerupakan faktor eksternal (external factor) dan (aceleration factor)yang mempengaruhi kondisi asset pada saat ini faktor eksternalyang mempengaruhi yaitu: (Anita Oommen,2005) (Jennifer J Crisp,2003) (murata,2012)

Eksternal Faktor yang mempengaruhi adalahQuality 10 %Temperature 25%Geographic 15%Climate 40%Overload 10%

Acelerate Factor yang mempengaruhi adalah Acelerate Life time 17,5 tahunAverage Standart Life time 43,75

Page 20: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Sub‐Model Asset Condition

Page 21: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Sub‐Model Technical Losses

Page 22: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Sub‐Model SAIDI SAIFI

Page 23: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Sub‐Model Network Reliability

Page 24: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Running Base‐ModelTransformer Condition

100

75

50

25

01990 1993 1996 1999 2002 2005 2008 2011

Time (Year)Transformer Condition : basemodel

Meter Condition100

70

40

10

-201990 1993 1996 1999 2002 2005 2008 2011

Time (Year)Meter Condition : basemodel

Pole Condition100

75

50

25

01990 1993 1996 1999 2002 2005 2008 2011

Time (Year)Pole Condition : basemodel

Cable Condition100

75

50

25

01990 1993 1996 1999 2002 2005 2008 2011

Time (Year)Cable Condition : basemodel

average transformer condition100

75

50

25

01990 1993 1996 1999 2002 2005 2008 2011

Time (Year)average transformer condition : basemodel

average pole condition100

75

50

25

01990 1993 1996 1999 2002 2005 2008 2011

Time (Year)average pole condition : basemodel

average cable condition100

75

50

25

01990 1993 1996 1999 2002 2005 2008 2011

Time (Year)average cable condition : basemodel

Tahun 2005 < 50%Tahun 2002 <50%

Tahun 2011 < 50%Tahun 2003 < 50%

73% 64%89% 63%

average meter condition100

75

50

25

01990 1993 1996 1999 2002 2005 2008 2011

Time (Year)average meter condition : basemodel

Page 25: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Running Base‐ModelSystem Average Interruption Duration Index

250

245

240

235

2301990 1993 1996 1999 2002 2005 2008 2011

Time (Year)

min

utue

s

System Average Interruption Duration Index : basemodel

Technical Losses Percentage8

7

6

5

41990 1992 1994 1996 1998 2000 2002 2004 2006 2008 2010 2012

Time (Year)Technical Losses Percentage : basemodel

Average asset Condition100

75

50

25

01990 1993 1996 1999 2002 2005 2008 2011

Time (Year)Average asset Condition : basemodel

242 menit/pelanggan 7,9% 72%network reliability100

75

50

25

01990 1993 1996 1999 2002 2005 2008 2011

Time (Year)network reliability : basemodel

68%

Page 26: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Verifikasi 

Page 27: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Validasi

E1 (Rata‐Rata)35548200,5 33882605

4,9%

E2 (Standev)8694110,841 7609444,335

14%

Tenaga Listrik yang di Terima Pelanggan

E1 (Rata‐Rata)34531908,48 33314852

3,7%

E2 (Standev) 7341171,541 6932018,694

6%

Lama Padam

E1 (Rata‐Rata) 10595,01025 10365,02782%

E2 (Stdev) 2908,537324 2800,6205954%

Total Pelanggan

E1 (Rata‐Rata) 476447,3 477706,17320,26%

E2 (Stdev) 3848,004 3367,29608314%

Pelanggan Padam

Tenaga Listrik yang di Distribusikan

E1 (Rata‐Rata)14637,62496 14518,19

1%

E2 (Stdev)1167,639718 1181,443

1,2%

Page 28: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Skenario 1

extenal factor

overload

climate

geographic

temperature

design lifetimetransformer

TransformerConditionmaintenance rate deteriorate

usable lifetime transformer

average standartlife time

acelerate lifetime

aceleration factor

condition effect

quality

TotalCustomercustomer rate

networkreliability

MeterConditionmaintenance meter deteriorate meter

design lifetimemeter

usable lifetimemeter

PoleConditionmaintenance pole deteriorate pole

design lifetime pole

usable lifetime pole

Cable Conditionmaintenance cable deteriorate cable

design lifetimecable

usable lifetimecable

Averageasset

Condition

network quality

SAIDI target

SAIFI target

SAIDIPercent

SAIFIPercent

difference

<INITIAL TIME>

year1997-20

06

year2007-20

13

<INITIAL TIME>

year1998-2

002

year2003-2

006

year 2007-2013 meter

<INITIAL TIME>

year2001-2

010

year 2011-2013

<INITIAL TIME>

year1996-2

005

averagetransformercondition

averagemeter

condition

averagepole

condition

averagecable

condition

leaving customer

rate customer2006-2013

rate customer1990-2005

<Time>

InterruptDurationduration in duration out

rate duration1990-2005

rate duration2006-2013

<Time>

customerinterruptcustomer

interrupt incustomer

interrupt out

rate customerinterrupt 1990-2005

rate customerinterrupt 2006-2013

<Time>

SystemAverage

InterruptionDuration

Index

SystemAverage

InterruptionFrequance

Index

total transformer1997-2006

total transformer2007-2013

total meter1998-2002

total meter2003-2006

total meter2007-2013

total pole2001-2010

total pole2011-2013

total cable1996-2005

total cable2006-2013

year2006-2013 cable

Total PowerDistributiondistribution in distribution out

rate distribution2006-2013

rate distribution1990-2005

<Time>

Total Customer'spower received

power received in power receivedout

rate received2006-2013

rate received1990-2005

<Time>

TecnicalLosses

Technical Losses Percentage

rate transformer

rate meter

rate pole

rate cable

year2014-2025

total transformer2014-2025

year 2014-2025 meter

total meter2014-2025

year 2014-2025 pole

total pole2014-2025

year 2014-2025 cable

total cable2014-2025

Melakukan Pemasangan AssetBaru pada tahun 2014 denganJumlah asset sesuai dengan jumlah assetYang di pasang pada tahun 1990

Page 29: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Hasil Skenario 1Average Condition Asset Scn 1

100

75

50

25

01990 1995 2000 2005 2010 2015 2020 2025

Time (Year)Average asset Condition : basemodelAverage asset Condition : sekenario

Network Reliability Scn 1100

75

50

25

01990 1995 2000 2005 2010 2015 2020 2025

Time (Year)network reliability : basemodelnetwork reliability : sekenario

Technical Losses Scn 110

7.5

5

2.5

01990 1995 2000 2005 2010 2015 2020 2025

Time (Year)Technical Losses Percentage : basemodelTechnical Losses Percentage : sekenario 1

2014=75%2025=27%

2014=71%2025=46%

2014=240 menit/pelanggan2025=242 menit/pelanggan

2014=6,9%2025=8,4%

System Average Interruption Duration Index250

245

240

235

2301990 1995 2000 2005 2010 2015 2020 2025

Time (Year)

min

utue

s

System Average Interruption Duration Index : skenario 1System Average Interruption Duration Index : basemodel

Page 30: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Skenario 2

extenal factor

overload

climate

geographic

temperature

design lifetimetransformer

TransformerConditionmaintenance rate deteriorate

usable lifetime transformer

average standartlife time

acelerate lifetime

aceleration factor

condition effect

quality

TotalCustomercustomer rate

networkreliability

MeterConditionmaintenance meter deteriorate meter

design lifetimemeter

usable lifetimemeter

PoleConditionmaintenance pole deteriorate pole

design lifetime pole

usable lifetime pole

Cable Conditionmaintenance cable deteriorate cable

design lifetimecable

usable lifetimecable

Averageasset

Condition

network quality

SAIDI target

SAIFI target

SAIDIPercent

SAIFIPercent

difference

<INITIAL TIME>

year 2020 transfo

rmer

year2007-20

13

<INITIAL TIME>

year2020meter

year2003-2

006

year 2007-2013 meter

<INITIAL TIME>

year2020pole

year 2011-2013

<INITIAL TIME>

year2020cable

averagetransformercondition

averagemeter

condition

averagepole

condition

averagecable

condition

leaving customer

rate customer2006-2013

rate customer1990-2005

<Time>

InterruptDurationduration in duration out

rate duration1990-2005

rate duration2006-2013

<Time>

customerinterruptcustomer

interrupt incustomer

interrupt out

rate customerinterrupt 1990-2005

rate customerinterrupt 2006-2013

<Time>

SystemAverage

InterruptionDuration

Index

SystemAverage

InterruptionFrequance

Index

total transformer2020

total transformer2007-2013

total meter2020

total meter2003-2006

total meter2007-2013

total pole2020

total pole2011-2013

total cable2020

total cable2006-2013

year2006-2013 cable

Total PowerDistributiondistribution in distribution out

rate distribution2006-2013

rate distribution1990-2005

<Time>

Total Customer'spower received

power received in power receivedout

rate received2006-2013

rate received1990-2005

<Time>

TecnicalLosses

Technical Losses Percentage

rate transformer

rate meter

rate pole

rate cable

year2014-2025

total transformer2014-2025

year 2014-2025 meter

total meter2014-2025

year 2014-2025 pole

total pole2014-2025

year 2014-2025 cable

total cable2014-2025

impact networkconfiguration

impact additionalproject

Melakukan Pemasangan Asset BaruPada tahun 2020Menurunkan susut dengan rekonfigurasiJaringanMenurunkan SAIDI dengan melakukan Proyek yang dilakukan penyulang

Page 31: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Skenario 2Menurunkan Technical Losses yaitu dengan Rekonfigurasi jaringan(Network Reconfiguration) merupakan suatu usaha merubah bentukkonfigurasi jaringan distribusi dengan mengoperasikan pensakelaranterkontrol jarak jauh (switching remotely controlled) pada jaringandistribusi tanpa menimbulkan akibat yang beresiko pada operasi danbentuk sistem jaringan distribusi secara keseluruhan. Dapatmenurunkan 1% technical Losses (Zimmerman,Ray Daniel, 2005).

Menurunkan SAIDI yaitu dengan proyek yang dilakukan oleh penyulangdengan cara pengoperasian otomatis switch untuk mengisolasikesalahan, perbaikan alat sensor untuk mengurangi overloadingtransformator, mengembangkan otomatisasi alat pendeteksi kesalahanuntuk mengontrol alat distribusi (American Recovery and InvestmentAct of 2009, 2012) dapat menurunkan SAIDI 25 menit/pelanggan

Page 32: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Hasil Perbandingan Basemodel, Skenario 1 dan Skenario 2

Average asset Condition100

75

50

25

01990 1995 2000 2005 2010 2015 2020 2025

Time (Year)Average asset Condition : sekenario 2Average asset Condition : basemodelAverage asset Condition : sekenario 1

Technical Losses Scn 210

7.5

5

2.5

01990 1995 2000 2005 2010 2015 2020 2025

Time (Year)Technical Losses Percentage : basemodelTechnical Losses Percentage : sekenario 1Technical Losses Percentage : sekenario 2

network reliability100

75

50

25

01990 1995 2000 2005 2010 2015 2020 2025

Time (Year)network reliability : sekenario 2network reliability : basemodelnetwork reliability : sekenario 1

System Average Interruption Duration Index400

350

300

250

2001990 1995 2000 2005 2010 2015 2020 2025

Time (Year)

min

utue

s

System Average Interruption Duration Index : skenario 2System Average Interruption Duration Index : skenario 1System Average Interruption Duration Index : basemodel

2014= 215 menit/pelanggan2025 = 217 menit/pelanggan

2014 = 75%2025 = 53%

2014= 5,9%2025 = 7%

2014= 82%2025=41%

Page 33: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Analisa HasilBase‐Model Skenario 1 Skenario 2

Average AssetCondition

72% 75% 82%

Technical Losses 7,9% 6,9% 5,9%

Network Reliability 68% 71% 75%

SAIDI 242 menit/pelanggan

240 menit/pelanggan

215 menit/pelanggan

Skenario 2 lebih baik dari pada skenario 1 yaitu dengan cara pemasangan asset baru pada tahun2020, melakukan konfigurasi jaringan, dan adanya proyek yang dilakukan oleh penyulang

Page 34: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Kesimpulan dan SaranValidasiTenaga Listrik yang di Distribusikan E1 = 4,9%, E2 = 14%Tenaga Listrik yang di Terima Pelanggan E1 = 3,7%, E2 = 6%Total Pelanggan E1 = 0,26%, E2 = 14%Pelanggan Padam E1 = 1%, E2 = 1,2% Lama Padam E1 = 2%, E2 = 4%

Skenario 1 average asset condition meningkat 3%, keandalan jaringan (network reliability) meningkat3%, SAIDI menurun 2 menit/pelanggan, dan technical losses menurun 1%.

Skenario 2 average asset condition meningkat 7% network reliability meningkat 4% SAIDI 25menit/pelanggan, technical losses 1%

skenario yang tepat digunakan oleh perusahaan adalah menggabungkan skenario 1 dan skenario 2karena manajemen asset tidak hanya diperhatikan dari pemasangan asset baru saja melainkanpengwasan dari susutnya tenaga listrik dan durasi pemadaman harus diperhatikan dengan cararekonfigurasi jaringan, dan proyek pengoptimalan pengawasan oleh penyulang.

Saran adalah Perkiraan cost akibat dari pemasangan asset baru, melakukan rekonfigurasi jaringan, danadanya proyek oleh penyulang dapat di jadikan pertimbangan untuk mengembangan tugas akhir ini.Karena apa yang menjadi keputusan perusahaan juga mempertimbangkan biaya yang akan dikeluarkan

Page 35: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Daftar Pustaka

American Recovery and Investment Act of 2009. (2012). Reliability Improvements from the Application of Distribution Automation Technologies .United State : SMART GRID.GOV.AusNet, S. (2006). ELECTRICITY DISTRIBUTION 5 YEAR ASSET MANAGEMENT PLAN.Basyaib, F. (2006). Teori Pembuatan Keputusan. Jakarta: Grasindo.Crisp, J. J. (2004). Asset Management in Electricity Transmission factor that affect Asset Management Policies and Practices of Electricity and their impact on performance. Brisbane, Australia.Darmono, R. (2005). Pemodelan System Dynamics pada perencanaan Penataan Ruang Kota.Ivo, W. (2005). Development of an asset management strategy for a network utility company . lessons from a dynamic business simulation.Simulat Gaming.KEPUTUSAN DIREKSI PT PLN (PERSERO). (2010). Kriteria Desain Enjinering Konstruksi Jaringan Distribusi Energi Listrik. Jakarta Selatan:PT PLN (PERSERO).Law, A. M., & Kelton, W. D. (1991). Simulation Modeling and Analysis.Muhammadi, E. A. (2001). Analisis Sistem Dinamis: Lingkungan Hidup, Sosial, Ekonomi, Manajemen.Murata. (2012). Reliability Of Electronic Components. MuRata Manufacturing.Oommen, A. (2005). A Case Study Evaluation Of The Causes For The Premature Failure Of Transformers On the ESKOM Transmision Network.Calgary,CANADA: CIGRE .

Page 36: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran

Daftar PustakaRaymond McLeod, J., & Schell, G. P. (2007). Management Information System. Pearson/Prentice Hall.Suhadi, d. (2008). TEKNIK DISTRIBUSI TENAGA LISTRIK JILID 1. DirektoratPembinaan Sekolah Menengah Kejuruan.Suryani. (2010). Demand Scenario Analysis and Planned Capacity Expansion. A System Dynamics Framework.Suryani, E. (2010). Validation Model.Suryani, E., Chou, S.-Y., & Chen, C.-H. (2010). Demand scenario analysis and planned capacity expansion: A system. Simulation Modelling Practice and Theory, 732-751.Suryani, E., Chou, S.-Y., & Chen, C.-H. (2012). Dynamic simulation model of air cargo demand forecast and terminal capacity planning.Simulation Modelling Practice and

Theory, 27-41.Tasrif, M. (2005). Pengamat Kelistrikan. Diambil kembali darihttp://www.tempointeraktif.comY, B. (1996). Formal aspects of model validity and validation in system dynamics.

Page 37: MANAJEMEN ASET JARINGAN DISTRIBUSI TENAGA LISTRIK …digilib.its.ac.id/public/ITS-paper-39520-5210100023-Presentation.pdfjaringan distribusi tenaga listrik dapat memberikan gambaran