Job Safety Analysis JSA Full Scale Task Risk Assessment (TRA) INSTALLATION MINI PLATFORM ( CENTRAL PROCECING PLATFORM AREA ) Job title/task : JSA No. : Job Sequence no: Job Sequences 1. PJSM (Pre Job Safety Meeting) / (Penjabaran langkah / tahapan kerja sebelum memulai pekerjaan) 2. Tools and equipments preparation (Persiapan perlengkapan peralatan) 3. Install Scaffolding (Pemasangan Perancah) 4. Loading material to site (Pengangkatan material ke lokasi kerja) 5. Installs Mini Platform, Leg mini platform, Handrail, and ladder (Pemasangan mini platform, kolom, handrail, dan tangga) 6. Dismantling Scaffolding (Pembongkaran Perancah) 7. House keeping and demobilization all tools and equipment. (Kebersihan dan kerapihan, serta mengembalikan semua peralatan yang digunakan) Job Risk Assessment Form
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Job Risk Assessment Form
Job Safety Analysis
JSA Full ScaleTask Risk Assessment (TRA)
INSTALLATION MINI PLATFORM( CENTRAL PROCECING PLATFORM AREA )
Job title/task : JSA No. :
Job Sequence no: Job Sequences1. PJSM (Pre Job Safety Meeting) / (Penjabaran langkah / tahapan kerja sebelum memulai pekerjaan)
2. Tools and equipments preparation (Persiapan perlengkapan peralatan)
3. Install Scaffolding (Pemasangan Perancah)
4. Loading material to site (Pengangkatan material ke lokasi kerja)
5. Installs Mini Platform, Leg mini platform, Handrail, and ladder (Pemasangan mini platform, kolom, handrail, dan tangga)
Make sure all Man Power have given safety briefing about job and how to minimize risk of accident at each step of work before start to work.(Pastikan bahwa smua pekerja telah mendapatkan pengarahan tentang pekerjaan dan bagaimana meminimalisir resiko dari bahaya sebelum memulai pekerjaan)
1 B L
2 Tools and Equipment preparation (Persiapan perlengkapan & peralatan )
Slip and Trip (Terpeleset, dan tersandung)
Pinch point and impact injury (Terjepit dan megakibatkan luka)
Personal certification as a scaffolder(Personil bersertifikat sebagai scaffolder)
(Permit, PTW & JSA tersedia dilapangan)
Ensure the worksite is free from trip hazard before the jobs start. (Pastikan area kerja aman dari bahaya tersadung dan terpeleset sebelum pekerjaan dimualai)
Make sure personal in right position during dismantling of scaffolds(Pastikan semua personel dalam posisi yang benar selama pembongkaran perancah)
Proper manual handling practice (Melakukan dengan tata cara pengangkatab yang benar)
Proper PPE Mandatory is required (Alat pelindung diri wajib dipersyaratkan)
4. Loading material to site (Pengangkatan material ke lokasi kerja)
Slip and Trip (Terpeleset, dan tersandung)
Pinch point and impact injury (Terjepit dan megakibatkan luka)
5. Installs Mini Platform, Leg mini platform, Handrail, and ladder (Pemasangan mini platform, kolom, handrail, dan tangga)
Slip, trip, & fall hazard(Bahaya terpeleset, tersandung & terjatuh)
Pinch point (Terjepit)
Personnal and other equipment hit by pipe material during rig down and remove (Personel dan equipment lainnya terkena material pipa selama membongkar dan memindahkan)
Ergonomic issue (Salah posisi badan saat melakukan pekerjaan)
Personnal and other equipment hit by pipe material during rig down and remove (Personel dan equipment lainnya terkena material pipa selama membongkar dan memindahkan)
Ergonomic issue (Salah posisi badan saat melakukan pekerjaan)
Drop Object(kejatuhan benda/material)
(Peralatan rusak)
kerja) Manual Handling
Procedure(Tata cara pengangkatan manual)
Completness & PPE awareness(penggunaan APD dan ketepatan pemakaian)
Permanent contact/communicate with authorized company personnel at site/operator(ijin dan komunikasi dengan personel/operator di lapangan)
Approved Work Methodology(Work methodology yang sudah disetujui)
sebelum pekerjaan dimulai) Proper tools and equipment and
inspected by SAKA team).(Peralatan dan perlengkapan dalam kondisi baik, layak pakai dan telah diinspksi oleh team SAKA)
Proper manual handling practice(Melakukan pengangkatan dengan benar)
Proper PPE mandatory is required.(Alat pelindung diri (APD) wajib dipersyaratkan)
Follow the approved work methodology (Ikuti langkah-langkah yang ada di work methodology yang sudah disetujui)
7. House keeping and demobilization all tools and equipment.(Kebersihan dan kerapihan, serta mengembalikan semua peralatan yang digunakan)
Slip, Trip, and fall hazards (Bahaya tersandung dan terpeleset)
Pinch point and impact injury. (Terjepit dan mengakibatkan luka)
Personal & back pain injury (Luka dan sakit tulang belakang / keseleo)
Manual Handling Procedure (Tata cara pengangkatan manual)
2 B M
Obtained PTW, JSA in place (Permit, JSA, tersedia dilapangan)
Ensure the worksite is free from trip hazard before the jobs start. (Pastikan area kerja aman dari bahaya tersandung dan terpeleset sebelum pekerjaan dimualai)
Proper PPE Mandatory is required (Alat pelindung diri yang wajib