Top Banner
Jalan Ks Tubun Gg. Wira Tirta Rt.18 No. 27 Telp. S A M A R I N D A Pendapatan Excavator Tanggal Jumlah Jam Harga Satuan Jumlah Pendapatan 30-Dec-99 - 15,000.00 - 30-Dec-99 - 15,000.00 - 30-Dec-99 - 15,000.00 - 30-Dec-99 - 15,000.00 - 30-Dec-99 - 15,000.00 - 30-Dec-99 - 15,000.00 - - 15,000.00 - - 15,000.00 - - 15,000.00 - - 15,000.00 - - 15,000.00 - - 15,000.00 - - 15,000.00 - - 15,000.00 - - - Basic 1,000,000.00 Upah Jam Jaman Kerja - Total Gaji Bulan Maret 1,000,000.00 Potong Bon 500,000.00 Gaji diterima Rp 500,000.00 JUH RATUS SEMBILAN PULUH DUA RIBU LIMA RATUS RUPI Jumlah Total
21

Gaji Excavator 2010

Nov 30, 2015

Download

Documents

Caesar Wahaf

Contoh slip gaji
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Gaji Excavator 2010

Jalan Ks Tubun Gg. Wira Tirta Rt.18 No. 27 Telp. ( 0541 ) 7241734

S A M A R I N D A

Pendapatan Excavator

Tanggal Jumlah Jam Harga Satuan Jumlah Pendapatan

30-Dec-99 - 15,000.00 - 30-Dec-99 - 15,000.00 - 30-Dec-99 - 15,000.00 - 30-Dec-99 - 15,000.00 - 30-Dec-99 - 15,000.00 - 30-Dec-99 - 15,000.00 -

- 15,000.00 - - 15,000.00 - - 15,000.00 - - 15,000.00 - - 15,000.00 - - 15,000.00 - - 15,000.00 - - 15,000.00 -

- -

Basic 1,000,000.00

Upah Jam Jaman Kerja -

Total Gaji Bulan Maret 1,000,000.00

Potong Bon 500,000.00

Gaji diterima Rp 500,000.00

TUJUH RATUS SEMBILAN PULUH DUA RIBU LIMA RATUS RUPIAH

Diterima oleh,

Jumlah Total

Page 2: Gaji Excavator 2010

PRAPTO

sisa jan 2,000,000.00 bon feb 1,000,000.00 bon maret -

- - -

D K STTL BON 3,000,000.00 - 3,000,000.00 ptng feb 500,000.00 2,500,000.00 maret 500,000.00 2,000,000.00 april - 2,000,000.00 mey - 2,000,000.00 juni - 2,000,000.00 juli - 2,000,000.00

2,000,000.00

Page 3: Gaji Excavator 2010

Jalan Ks Tubun Gg. Wira Tirta Rt.18 No. 27 Telp. ( 0541 ) 7241734

S A M A R I N D A Jalan Ks Tubun Gg. Wira Tirta Rt.18 No. 27 Telp. ( 0541 ) 7241734

Pendapatan Excavator S A M A R I N D A

Tagihan Excavator Keterangan

Tanggal Harga Satuan

- - ### - - - ### - - - ### - - - ### - - - ### - -

### - - ### - - ### - - ### - - ### - - ### - -

TOTAL - -

PEMAKAIAN EXCAVATOR

BON

BON

BON

BON

TOTAL SISA TAGIHAN H.HASAN

Diketahui,

PT.HASANAH JAYA

Jumlah Jam

Page 4: Gaji Excavator 2010

Pemakai

H. Hasan Basri

Direktur utama0

Page 5: Gaji Excavator 2010

PENDAPATAN EXCAVATOR MARET

Jalan Ks Tubun Gg. Wira Tirta Rt.18 No. 27 Telp. ( 0541 ) 7241734

S A M A R I N D A

Tagihan Excavator

Jumlah Pendapatan Keterangan

- - - - - - - -

TOTAL PENDAPATAN BERSIH EXCAVATOR - - - - - - KET : - - - - - - - - -

-

-

-

0

0

-

Mar

-09

Page 6: Gaji Excavator 2010

Diketahui,PT.HASANAH JAYA

H.HASAN BASRIDirektur Utama

Page 7: Gaji Excavator 2010

PENDAPATAN EXCAVATOR MARET

PENDAPATANTOTAL

POTONGANPENDAPATAN

JML JAM SOLAR HRG. SATUAN EXCAVATOR OPERATOR HELPER

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 500,000.00 0.00 0.00 0.00

TOTAL PENDAPATAN BERSIH EXCAVATOR

1 DRUM = 10 JAM 1 JAM = 100,000.00

Mar

-09

Page 8: Gaji Excavator 2010

PENDAPATAN EXCAVATOR MARET PENDAPATAN

PEMAKAI BERSIH

EXCAVATOR

0.00 0.00

0.00

Diketahui,PT.HASANAH JAYA

Page 9: Gaji Excavator 2010

PENDAPATAN EXCAVATOR JANUARY

PENDAPATANTOTAL

POTONGAN PENDAPATAN

PENDAPATAN BERSIH

JML JAM SOLAR HRG. SATUAN EXCAVATOR OPERATOR HELPER EXCAVATOR

70.50 500,000.00 35,250,000.00 2,057,500.00 1,250,000.00 24,892,500.00100,000.00

70.50 7,050,000.00 35,250,000.00 2,057,500.00 1,250,000.00

TOTAL PENDAPATAN BERSIH EXCAVATOR 24,892,500.00

JANUARI 2

009

Page 10: Gaji Excavator 2010

PENDAPATAN EXCAVATOR FEBRUARY

PENDAPATANTOTAL

POTONGAN PENDAPATAN

PENDAPATAN PEMAKAI BERSIH

JML JAM SOLAR/JAM HRG. SATUAN EXCAVATOR OPERATOR HELPER EXCAVATOR

12.00 100,000.00 500,000.00 6,000,000.00 1,840,000.00 1,250,000.00 HRIRIN

41.00 450,000.00 18,450,000.00 H. NANANG

53.00 5,300,000.00 24,450,000.00 1,840,000.00 1,250,000.00 16,060,000.00

TOTAL PENDAPATAN BERSIH EXCAVATOR 16,060,000.00

Diketahui,PT.HASANAH JAYA

H.HASAN BASRI

Direktur Utama

FEBRUARY 200

9

Page 11: Gaji Excavator 2010

Jalan Ks Tubun Gg. Wira Tirta Rt.18 No. 27 Telp. ( 0541 ) 7241734

S A M A R I N D A

Gaji OperatorBulan Maret

Tanggal Jumlah Jam Harga Satuan Jumlah Pendapatan Keterangan

1-Mar-09 1.50 15,000.00 22,500.00 Gali Batu, hujan5-Mar-09 2.00 15,000.00 30,000.00 Gali Batu 9-Mar-09 6.00 15,000.00 90,000.00 Gali Batu

10-Mar-09 5.00 15,000.00 75,000.00 Gali batu, Buang Tanah 27-Mar-09 2.50 15,000.00 37,500.00 Gali Batu, hujan 28-Mar-09 2.50 15,000.00 37,500.00 Gali batu, Hujan

- 15,000.00 - - 15,000.00 - - 15,000.00 - - 15,000.00 - - 15,000.00 - - 15,000.00 - - 15,000.00 - - 15,000.00 -

19.5 292,500.00

Basic 1,000,000.00

Upah Jam Jaman Kerja 292,500.00

Total Gaji Bulan Maret 1,292,500.00

Potong Bon 500,000.00

Gaji diterima Rp 792,500.00 Sisa Bon Rp 2,000,000.00

Bon '03 April 2009 Rp 600,000.00

Total Bon Rp 2,600,000.00

Bon '04 Mei 2009 Rp 2,000,000.00

Bon '03 Juni 2009 Rp 1,500,000.00

Bon '18 Juni 2009 - '20 Juni 2009 Rp 450,000.00

Jumlah Total Bon Rp 6,550,000.00

TUJUH RATUS SEMBILAN PULUH DUA RIBU LIMA RATUS RUPIAH

Diterima oleh, Diketahui,

PT.HASANAH JAYA

PRAPTO H. Hasan Basri

Direktur utama

Jumlah Total

Page 12: Gaji Excavator 2010

Jalan Ks Tubun Gg. Wira Tirta Rt.18 No. 27 Telp. ( 0541 ) 7241734

S A M A R I N D A

Gaji OperatorBulan APRIL

Tanggal Jumlah Jam Harga Satuan Jumlah Pendapatan Keterangan

4-Apr-09 8.00 15,000.00 120,000.00 5-Apr-09 8.00 15,000.00 120,000.00 14-Apr-09 4.00 15,000.00 60,000.00 25-Apr-09 8.00 15,000.00 120,000.00 26-Apr-09 4.50 15,000.00 67,500.00 27-Apr-09 8.50 15,000.00 127,500.00 28-Apr-09 8.50 15,000.00 127,500.00 29-Apr-09 8.00 15,000.00 120,000.00 30-Apr-09 2.00 15,000.00 30,000.00

Jumlah Total 59.5 892,500.00

Basic 1,000,000.00 Upah Jam Jaman Kerja 892,500.00 Total Gaji Bulan April 1,892,500.00 Potong Bon 2,550,000.00

Sisa Bon dipotong Gaji Rp (657,500.00)

Sisa Bon Rp 1,950,000.00 Bon '03 April 2009 Rp 600,000.00

Total Bon Rp 2,550,000.00

Diterima oleh, Diketahui,

PT.HASANAH JAYA

PRAPTO H. Hasan Basri

Direktur utama

Page 13: Gaji Excavator 2010

Jalan Ks Tubun Gg. Wira Tirta Rt.18 No. 27 Telp. ( 0541 ) 7241734

S A M A R I N D A

Gaji OperatorBulan Mei

Tanggal Jumlah Jam Harga Satuan Jumlah Pendapatan Keterangan

1-May-09 8.00 15,000.00 120,000.00 2-May-09 8.50 15,000.00 127,500.00 3-May-09 6.50 15,000.00 97,500.00 4-May-09 8.50 15,000.00 127,500.00 5-May-09 8.50 15,000.00 127,500.00 6-May-09 9.00 15,000.00 135,000.00 7-May-09 9.50 15,000.00 142,500.00 8-May-09 8.50 15,000.00 127,500.00 9-May-09 8.50 15,000.00 127,500.00 10-May-09 8.50 15,000.00 127,500.00 11-May-09 6.50 15,000.00 97,500.00 12-May-09 5.50 15,000.00 82,500.00 13-May-09 8.50 15,000.00 127,500.00 14-May-09 9.00 15,000.00 135,000.00 15-May-09 9.00 15,000.00 135,000.00 16-May-09 6.00 15,000.00 90,000.00 17-May-09 8.00 15,000.00 120,000.00 18-May-09 8.50 15,000.00 127,500.00 19-May-09 7.00 15,000.00 105,000.00 20-May-09 - 15,000.00 - 21-May-09 - 15,000.00 -

22 Mei 2009 7.00 15,000.00 105,000.00 24 Mei 2009 2.00 15,000.00 30,000.00 25 Mei 2009 8.00 15,000.00 120,000.00 26 Mei 2009 3.00 15,000.00 45,000.00 28 Mei 2009 8.00 15,000.00 120,000.00 30 Mei 2009 8.00 15,000.00 120,000.00 31 Mei 2009 9.50 15,000.00 142,500.00

Jumlah Total 197.5 2,962,500.00

Basic 1,000,000.00 Upah Jam Jaman Kerja 2,962,500.00

Total Gaji Bulan Mei 3,962,500.00 Sisa Bon April Rp 657,500.00 Bon '04 Mei 2009 Rp 2,000,000.00

Jumlah Total Bon Rp 2,657,500.00

Sisa Gaji Rp 1,305,000.00

SatuJuta Tiga Ratus Lima Ribu Rupiah

Diterima oleh, Diketahui,

PT.HASANAH JAYA

PRAPTO H. Hasan Basri

Direktur utama

Page 14: Gaji Excavator 2010

Jalan Ks Tubun Gg. Wira Tirta Rt.18 No. 27 Telp. ( 0541 ) 7241734

S A M A R I N D A

Gaji OperatorBulan Juni

Tanggal Jumlah Jam Harga Satuan Jumlah Pendapatan Keterangan

01 Juni 2009 9.50 15,000.00 142,500.00 02 Juni 2009 10.00 15,000.00 150,000.00 03 Juni 2009 10.00 15,000.00 150,000.00 04 Juni 2009 10.00 15,000.00 150,000.00 05 Juni 2009 9.50 15,000.00 142,500.00 06 Juni 2009 8.00 15,000.00 120,000.00 08 Juni 2009 9.00 15,000.00 135,000.00 11 Juni 2009 9.50 15,000.00 142,500.00 12 Juni 2009 4.00 15,000.00 60,000.00 13 Juni 2009 4.00 15,000.00 60,000.00 14 Juni 2009 8.00 15,000.00 120,000.00 15 Juni 2009 8.00 15,000.00 120,000.00 16 Juni 2009 8.00 15,000.00 120,000.00 17 Juni 2009 8.00 15,000.00 120,000.00 18 Juni 2009 8.00 15,000.00 120,000.00 19 Juni 2009 8.00 15,000.00 120,000.00 20 Juni 2009 9.50 15,000.00 142,500.00 21 Juni 2009 9.50 15,000.00 142,500.00 22 Juni 2009 10.00 15,000.00 150,000.00 23 Juni 2009 10.00 15,000.00 150,000.00 24 Juni 2009 7.00 15,000.00 105,000.00 25 Juni 2009 9.50 15,000.00 142,500.00 26 Juni 2009 9.00 15,000.00 135,000.00

Jumlah Total 196.0 2,940,000.00

Basic 1,000,000.00 Upah Jam Jaman Kerja 2,940,000.00 Total Gaji Bulan Juni 3,940,000.00

Gaji diterima Rp 3,940,000.00 Bon '03 Juni 2009 Rp 1,500,000.00 Bon '18 Juni 2009 - '20 Juni 2009 Rp 450,000.00

Jumlah Total Bon Rp 1,950,000.00 Sisa Gaji Rp 1,990,000.00

Satu Juta Sembilan Ratus Sembilan Puluh Ribu Rupiah

Diterima oleh, Diketahui,

PT.HASANAH JAYA

PRAPTO H. Hasan Basri

Direktur utama

Page 15: Gaji Excavator 2010

Jalan Ks Tubun Gg. Wira Tirta Rt.18 No. 27 Telp. ( 0541 ) 7241734

S A M A R I N D A

Gaji OperatorBulan JULI 2009

Tanggal Jumlah Jam Harga Satuan Jumlah Pendapatan Keterangan

27 Juni 2009 9.00 15,000.00 135,000.00 28 Juni 2009 9.00 15,000.00 135,000.00 29 Juni 2009 8.00 15,000.00 120,000.00 30 Juni 2009 9.00 15,000.00 135,000.00 01 Juli 2009 9.00 15,000.00 135,000.00 02 Juli 2009 4.00 15,000.00 60,000.00 03 Juli 2009 8.00 15,000.00 120,000.00

5.00 15,000.00 75,000.00 Lembur 04 Juli 2009 8.00 15,000.00 120,000.00

4.50 15,000.00 67,500.00 Lembur 05 Juli 2009 3.00 15,000.00 45,000.00 10 Juli 2009 8.00 15,000.00 120,000.00

5.50 15,000.00 82,500.00 Lembur 11 Juli 2009 1.50 15,000.00 22,500.00 18 Juli 2009 7.50 15,000.00 112,500.00 20 Juli 2009 5.50 15,000.00 82,500.00 21 Juli 2009 8.00 15,000.00 120,000.00 22 Juli 2009 5.50 15,000.00 82,500.00

Jumlah Total 118.0 1,770,000.00

Basic 1,000,000.00 Upah Jam Jaman Kerja 1,770,000.00 Total Gaji Bulan Juni 2,770,000.00

Gaji diterima Rp 2,770,000.00

Jumlah Total Bon Rp 2,500,000.00 Potongan Bon Rp 500,000.00 Sisa Gaji Rp 2,270,000.00 Sisa Bon Rp 2,000,000.00

DUA JUTA DUA RATUS TUJUH PULUH RIBU RUPIAN

Diterima oleh, Diketahui,

PT.HASANAH JAYA

PRAPTO H. Hasan Basri

Direktur utama

Catatan :

- Di print Tanggal 05 Agustus 2009 Jam 04.30 PM

Page 16: Gaji Excavator 2010

Jalan Ks Tubun Gg. Wira Tirta Rt.18 No. 27 Telp. ( 0541 ) 7241734

S A M A R I N D A

Gaji OperatorBulan Agustus 2009

Tanggal Jumlah Jam Harga Satuan Jumlah Pendapatan Keterangan

02 6.00 15,000.00 90,000.00 03 7.50 15,000.00 112,500.00 04 6.00 15,000.00 90,000.00 05 7.50 15,000.00 112,500.00 06 5.00 15,000.00 75,000.00 08 8.00 15,000.00 120,000.00 09 6.00 15,000.00 90,000.00 11 8.00 15,000.00 120,000.00 15 7.50 15,000.00 112,500.00 16 5.00 15,000.00 75,000.00 20 8.00 15,000.00 120,000.00 23 8.00 15,000.00 120,000.00 24 8.00 15,000.00 120,000.00 25 7.50 15,000.00 112,500.00 26 7.50 15,000.00 112,500.00 27 7.50 15,000.00 112,500.00 29 7.50 15,000.00 112,500.00 30 6.50 15,000.00 97,500.00

Jumlah Total 127.0 1,905,000.00

Basic 1,000,000.00 Upah Jam Jaman Kerja 1,905,000.00 Total Gaji Bulan Juni 2,905,000.00

Gaji diterima Rp 2,905,000.00

Jumlah Total Bon Rp 2,350,000.00 Potongan Bon Rp 1,500,000.00 Sisa Gaji Rp 1,405,000.00 Sisa Bon Rp 850,000.00

SATU JUTA EMPAT RATUS LIMA RIBU RUPIAH

Diterima oleh, Diketahui,

PT.HASANAH JAYA

PRAPTO H. Hasan Basri

Direktur utama

Catatan :

- Di print Tanggal 04 September 2009 Jam 08.30 Wita

Page 17: Gaji Excavator 2010

Jalan Ks Tubun Gg. Wira Tirta Rt.18 No. 27 Telp. ( 0541 ) 7241734

S A M A R I N D A

Gaji OperatorBulan September 2009

Tanggal Jumlah Jam Harga Satuan Jumlah Pendapatan Keterangan

01 2.00 15,000.00 30,000.00 02 7.50 15,000.00 112,500.00 03 6.00 15,000.00 90,000.00 05 6.00 15,000.00 90,000.00 12 3.00 15,000.00 45,000.00

Jumlah Total 24.5 367,500.00

Basic 1,000,000.00 Upah Jam Jaman Kerja 367,500.00 Total Gaji Bulan Juni 1,367,500.00

Gaji diterima Rp 1,367,500.00

Jumlah Total Bon Rp 850,000.00 Potongan Bon Rp 500,000.00

Sisa Gaji Rp 867,500.00 Sisa Bon Rp 350,000.00

SATU JUTA EMPAT RATUS LIMA RIBU RUPIAH

Diterima oleh, Diketahui,

PT.HASANAH JAYA

PRAPTO H. Hasan Basri

Direktur utama

Catatan :

- Di print Tanggal 16 September 2009 Jam 10.25 Wita

Page 18: Gaji Excavator 2010

Jalan Ks Tubun Gg. Wira Tirta Rt.18 No. 27 Telp. ( 0541 ) 7241734

S A M A R I N D A

Gaji OperatorBulan Mei 2013

Tanggal Jumlah Jam Harga Satuan Jumlah Pendapatan Keterangan

2/5/2013 14.00 15,000.00 210,000.00 3/5/2013 18.00 15,000.00 270,000.00 4/5/2013 4.00 15,000.00 60,000.00

31/05/2013 6.60 15,000.00 99,000.00 1/6/2013 7.60 15,000.00 114,000.00 2/6/2013 8.40 15,000.00 126,000.00 6/6/2013 6.50 15,000.00 97,500.00 8/6/2013 7.50 15,000.00 112,500.00 9/6/2013 6.50 15,000.00 97,500.00 10/6/2013 1.00 15,000.00 15,000.00 11/6/2013 1.50 15,000.00 22,500.00 15/06/2013 3.50 15,000.00 52,500.00 16/06/2013 1.50 15,000.00 22,500.00

86.6 1,299,000.00

Basic 1,500,000.00 Upah Jam Jaman Kerja 1,299,000.00 Total Gaji Bulan April 2,799,000.00

Gaji diterima Rp 2,799,000.00

Sisa Bon

Bon Bulan Juni

Jumlah Total Bon

Sisa Gaji Bulan Lalu

Sisa Gaji Rp 2,799,000.00 Sisa Bon

Diterima oleh, Diketahui,

PT.HASANAH JAYA

BOGANG H. Hasan Basri

Direktur utama

Catatan :

Page 19: Gaji Excavator 2010

Jalan Ks Tubun Gg. Wira Tirta Rt.18 No. 27 Telp. ( 0541 ) 7241734

S A M A R I N D A

Gaji OperatorBulan Februari 2013

Tanggal Jumlah Jam Harga Satuan Jumlah Pendapatan Keterangan

1/20/2013 11.00 13,000.00 143,000.00 2/6/2013 8.00 13,000.00 104,000.00 2/7/2013 8.00 13,000.00 104,000.00 2/8/2013 8.00 13,000.00 104,000.00 2/10/2013 8.00 13,000.00 104,000.00 2/11/2013 7.00 13,000.00 91,000.00 2/12/2013 8.00 13,000.00 104,000.00 2/13/2013 8.00 13,000.00 104,000.00 2/14/2013 10.00 13,000.00 130,000.00 2/15/2013 11.00 13,000.00 143,000.00 2/17/2013 7.00 13,000.00 91,000.00 2/18/2013 6.00 13,000.00 78,000.00 2/19/2013 10.00 13,000.00 130,000.00 2/20/2013 8.00 13,000.00 104,000.00 2/22/2013 8.00 13,000.00 104,000.00 2/23/2013 7.00 13,000.00 91,000.00

133.0 1,729,000.00

Basic 1,250,000.00 Upah Jam Jaman Kerja 1,729,000.00 Total Gaji Bulan 2,979,000.00

Gaji diterima Rp 2,979,000.00

Sisa Bon

Bon Bulan bln 3 Rp 200,000.00 Jumlah Total Bon

Sisa Gaji Bulan Lalu

Sisa Gaji

Sisa Bon

dibayar 1 jta sisa 500 rbu bln 5 tgl 1

Diterima oleh, Diketahui,

PT.HASANAH JAYA

UMAR H. Hasan Basri

Direktur utama

Catatan :