Top Banner
1 CAPAIAN SEMESTER I - 2018 Jakarta, 6 Juli 2018
11

CAPAIAN SEMESTER I - 2018 - migasreview.com fileV. Capaian Penerimaan Negara dari Hulu Migas sebesar US$8,5 milliar, atau 71% dari Target ... 5 CNOOC 30,000 30,876 102.9 30,857 102.9

May 26, 2019

Download

Documents

dinhdang
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CAPAIAN SEMESTER I - 2018 - migasreview.com fileV. Capaian Penerimaan Negara dari Hulu Migas sebesar US$8,5 milliar, atau 71% dari Target ... 5 CNOOC 30,000 30,876 102.9 30,857 102.9

1

CAPAIAN

SEMESTER I - 2018

Jakarta, 6 Juli 2018

Page 2: CAPAIAN SEMESTER I - 2018 - migasreview.com fileV. Capaian Penerimaan Negara dari Hulu Migas sebesar US$8,5 milliar, atau 71% dari Target ... 5 CNOOC 30,000 30,876 102.9 30,857 102.9

2

20

18

© S

KK

Mig

as –

All

righ

ts r

eser

ved

WILAYAH KERJA MIGAS KONVENSIONAL & NONKONVENSIONALStatus per 30 Juni 2018

WK EKSPLORASI

103 WK

WK HNK43 WK

WK EKSPLOITASI

92 WKTOTAL WILAYAH KERJA

238 WK

PRODUKSI : 77 WK

ONSHORE 126 WK

OFFSHORE 79 WK

ONSHORE/ OFFSHORE

33 WK

PENGEMBANGAN : 15 WK

AKTIF : 78 WK

PROSES TERMINASI : 25 WK

PROSES TERMINASI : 8 WK

AKTIF : 35 WK

Keterangan 1 Januari 2018 - Sekarang:1. 19 WK telah disetujui Terminasi: WK Belayan, Obi, Budong-Budong, East Simenggaris, West Tanjung, Ranau, Kalyani, East Sokang, Halmahera II, Menduwai, Semai II,

Malunda, South East Seram GMB Suban II, GMB Barito Banjar I , GMB Air Komering, GMB Kutai Barat, GMB West Sanga-Sanga I, dan GMB Kuala Kapuas II2. 5 WK telah disetujui menjadi WK Eksploitasi: WK Batanghari, Wain, Kasuri, East Sepinggan, dan SW Bukit Barisan3. 2 GS PSC baru telah ditandatangani : WK Andaman I dan WK Andaman II

Page 3: CAPAIAN SEMESTER I - 2018 - migasreview.com fileV. Capaian Penerimaan Negara dari Hulu Migas sebesar US$8,5 milliar, atau 71% dari Target ... 5 CNOOC 30,000 30,876 102.9 30,857 102.9

3

20

18

© S

KK

Mig

as –

All

righ

ts r

eser

ved

I. Reserve Replacement Ratio (RRR) sebagai parameter peningkatan Cadangan Migas Mencapai 148% dari target RRR sebesar 100% --> Outlook akhir tahun 2018 = 74%.

II. Capaian lifting migas sebesar 1.923 ribu BOEPD, atau 96% dari Target APBN 2018 sebesar 2.000 ribu BOEPD --> Outlook akhir tahun 2018 = 1.891 ribu BOEPD (95%)

• Realisasi lifting Minyak Bumi sebesar 771 ribu BOPD, atau 96% dari Target APBN 2018sebesar 800 ribu BOPD --> Outlook akhir tahun 2018 = 775 ribu BOPD (97%)

• Realisasi lifting Gas Bumi sebesar 1.152 ribu BOEPD, atau 96% dari Target APBN 2018sebesar 1.200 ribu BOEPD --> Outlook akhir tahun 2018 = 1.116 ribu BOEPD (93%)

III. Capaian Pengembalian Biaya Operasi (Cost Recovery) sebesar US$5,2 miliar, atau 51% dari Target APBN 2018 sebesar US$10,1 milliar (unaudited) --> Outlook akhir tahun 2018 = US$11,3

miliar (112%)

IV. Investasi Migas telah mencapai US$3,9 Miliar, atau 27% dari target 2018 sebesar US$14,2 Miliar --> Outlook akhir tahun 2018 = US$11,1 miliar (78%)

V. Capaian Penerimaan Negara dari Hulu Migas sebesar US$8,5 milliar, atau 71% dari Target APBN 2018 sebesar US$11,9 milliar --> Outlook akhir tahun 2018 = US$14,2 miliar (120%)

Ringkasan Capaian Hulu Migas – Semester I 2018Outlook (operasional) status per 30 Juni 2018

Page 4: CAPAIAN SEMESTER I - 2018 - migasreview.com fileV. Capaian Penerimaan Negara dari Hulu Migas sebesar US$8,5 milliar, atau 71% dari Target ... 5 CNOOC 30,000 30,876 102.9 30,857 102.9

4

20

18

© S

KK

Mig

as –

All

righ

ts r

eser

ved

Jan Feb Mar Apr Mei Jun Jul Ags Sep Okt Nov Des

Target RRR 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

RRR POD Approved 30.20% 15.74% 31.79% 189.06% 153.58% 147.78% 126.36% 110.54% 98.60% 88.83% 80.81% 74.05%

30.20%

15.74%

31.79%

189.06%

153.58%147.78%

126.36%

110.54%

98.60%88.83%

80.81%74.05%

0%

40%

80%

120%

160%

200%

Reserves Replacement Ratio Outlook 2018

RRR YTD 28 Juni 2018, POD yang disetujui1 POD Sikladi 0.61 MMBOE 14 POP Haur Gede 2.85 MMBOE2 POD Pematang Phase 2 2.64 MMBOE 15 POD Kujung Gas 15.63 MMBOE3 POD Ampuh 2.06 MMBOE 16 Optimasi Ujung Pangkah (5 Sumur) 2.87 MMBOE4 POD West Pangkah 3.80 MMBOE 17 POD I NW Kenanga 7.77 MMBOE5 Optimasi POD DSF Area 1-10 5.74 MMBOE 18 POD I Karamba 6.61 MMBOE6 POD Benggala 1.01 MMBOE 19 POD I Merakes 145.36 MMBOE7 POD Komplek Gandaria 0.27 MMBOE 20 POD I Asap, Kido, dan Merah 270.74 MMBOE8 POD Meliwis 4.01 MMBOE 21 POD Papa 9.66 MMBOE9 POD Panen 10.41 MMBOE 22 Optimasi POD Kaji Semoga 1.43 MMBOE

10 POD Hitam 0.93 MMBOE 23 Optimasi POD Jati Asri 15.88 MMBOE11 POD Petapahan Phase 4 2.38 MMBOE 24 POD Uniform East 14.81 MMBOE12 POD Sidingin 0.48 MMBOE 25 POP NEB Basement-1 0.95 MMBOE13 POD Semberah 9.39 MMBOE 26 POD I Sinamar 42.00 MMBOE

RRR Outlook 2018Status 30 Juni 2018

Page 5: CAPAIAN SEMESTER I - 2018 - migasreview.com fileV. Capaian Penerimaan Negara dari Hulu Migas sebesar US$8,5 milliar, atau 71% dari Target ... 5 CNOOC 30,000 30,876 102.9 30,857 102.9

5

20

18

© S

KK

Mig

as –

All

righ

ts r

eser

ved

NO KKKS APBNSEMESTER - I OUTLOOK 2018

BOPD (%) BOPD (%)

1 PT. CHEVRON PACIFIC INDONESIA 213,551 207,148 97.0 205,952 96.4

2 MOBIL CEPU LTD 205,000 209,922 102.4 210,285 102.6

3 PT. PERTAMINA EP 85,869 70,031 81.6 79,315 92.4

4 PHM 48,271 46,376 96.1 42,994 89.1

5 CNOOC 30,000 30,876 102.9 30,857 102.9

6 PERTAMINA HULU ENERGI ONWJ LTD 33,000 30,489 92.4 30,251 91.7

7 MEDCO E & P NATUNA 18,600 18,801 101.1 17,141 92.2

8 PETRONAS CARIGALI (KETAPANG) LTD 14,433 15,698 108.8 15,768 109.3

9 CHEVRON INDONESIA COMPANY 13,000 14,410 110.8 13,507 103.9

10 PETROCHINA INTERNATIONAL JABUNG LTD 13,936 14,302 102.6 14,552 104.4

11 VICO INDONESIA 10,000 7,674 76.7 9,437 94.4

12 BOB PT. BUMI SIAK PUSAKO - PERTAMINA HULU 10,970 10,411 94.9 10,081 91.9

KKKS LAINNYA 103,370 94,855 91.8 89,860 86.9

PENGURASAN STOK 2018 5,000

TOTAL 800,000 770,999 96.4 775,000 96,9

Kontribusi 12 KKKS Utama 88%

PROFIL LIFTING MINYAK BUMI – 12 KKKS UTAMAdi atas 10.000 BOPD; YTD per 30 Juni 2018

2018 : Rata-rata Semester I, per 30 Juni 2018

Page 6: CAPAIAN SEMESTER I - 2018 - migasreview.com fileV. Capaian Penerimaan Negara dari Hulu Migas sebesar US$8,5 milliar, atau 71% dari Target ... 5 CNOOC 30,000 30,876 102.9 30,857 102.9

6

20

18

© S

KK

Mig

as –

All

righ

ts r

eser

ved

Kontribusi 12 KKKS Utama 85%

PROFIL PENYALURAN GAS BUMI – 12 KKKS UTAMAdi atas 90-100 MMSCFD ; YTD per 30 Juni 2018

NO KKKS APBNSEMESTER - I OUTLOOK 2018

MMSCFD (%) MMSCFD (%)

1 BP BERAU LTD (TANGGUH) 1,000 1,049 104.9 1,023 102.3

2 PERTAMINA HULU MAHAKAM 1,100 916 83.3 844 76.7

3 CONOCOPHILLIPS (GRISSIK) LTD. 810 841 103.8 798 98.5

4 PT. PERTAMINA EP 832 816 98.1 800 96.2

5 ENI MUARA BAKAU 435 670 154.0 670 154.0

6 JOB PN - MEDCO TOMORI SULAWESI LTD 285 265 93.0 267 93.7

7 PREMIER OIL INDONESIA 200 221 110.5 214 107.0

8 KANGEAN ENERGI INDONESIA 204 187 91.7 184 90.2

9 MEDCO E & P NATUNA 145 159 109.7 155 106.9

10 PETROCHINA INTL. JABUNG LTD 170 158 92.9 159 93.5

11 PERTAMINA HULU ENERGI WMO 135 125 92.6 123 91.0

12 VICO INDONESIA 80 97 121.3 68 85.0

KKKS LAINNYA 1,324 951 71.8 940 71.0

TOTAL 6,720 6,452 96.0 6,245 92.9

2018 : Rata-rata Semester I, per 30 Juni 2018

Page 7: CAPAIAN SEMESTER I - 2018 - migasreview.com fileV. Capaian Penerimaan Negara dari Hulu Migas sebesar US$8,5 milliar, atau 71% dari Target ... 5 CNOOC 30,000 30,876 102.9 30,857 102.9

7

20

18

© S

KK

Mig

as –

All

righ

ts r

eser

ved

Resume Kegiatan Utama Hulu Migas(Survei, Pemboran, KUPS s.d. 30 Juni 2018)

KEGIATAN WP&B 2018 Realisasi YTD Juni 2018%

ThdWP&B

a. Rencana Program Survei Seismik

2D 14 kegiatan 4.666 km 2 kegiatan 237 km 4%

3D 17 kegiatan 5.382 km² 2 kegiatan 1.541 km² 26%

b. Rencana Program Survei Non Seismik

11 kegiatan 8 kegiatan 72%

c. Rencana Program Pemboran Eksplorasi

104 sumur 11 sumur 10%

d. Rencana Program Pemboran Sumur Pengembangan

289 Sumur 129 Sumur 45%

e. Rencana Program Kerja Ulang 637 Sumur 324 Sumur 51%

f. Rencana Program PerawatanSumur

56.184 Kegiatan 31.151 Kegiatan 55%

g. Rencana Program PenutupanSumur

262 Sumur 105 Sumur 40%

Page 8: CAPAIAN SEMESTER I - 2018 - migasreview.com fileV. Capaian Penerimaan Negara dari Hulu Migas sebesar US$8,5 milliar, atau 71% dari Target ... 5 CNOOC 30,000 30,876 102.9 30,857 102.9

8

20

18

© S

KK

Mig

as –

All

righ

ts r

eser

ved

No KKKS ProyekKapasitas Fasilitas Produksi

Estimasi Produksi Puncak

Target OnstreamStatus EPC

(Actual vs Plan)AFE EPC

(US$ juta)

1 PT Medco E&P Malaka

Block A Gas Field Development

3100 bopd55 MMscfd

3100 bopd55 MMscfd

(G)

Full scale gas Juli 2018 (P) *

90,59%(A) vs 90,81%(P)Tie in ke pipa Pertagas

sudah selesai dilaksanakan

164

2 PT Medco E&P Indonesia

OptimisasiFasilitas Produksi Lica

4000 bopd 3700 bopd(G)

Oktober 2018 (P) 90,2% (A) vs 92% (P) 8,5

3 PT PHE ONWJ SP 30 MMscfd 30 MMscfd(G)

Oktober 2018 (P) 92,50% (A) vs 81,40% (P)Sudah Ready For Drilling

(RFD)

50,7

4 PT Medco E&P Indonesia

Pengaliran Gas Temelat ke Gunung Kembang Stasiun

13 MMscfd 10 MMscfd(G)

Desember 2018 (P) 49% (A) vs 75% (P) 11,8

5 PT Pertamina EP

Pembangunan Subsea Pipeline Gas Lift BW Field Poleng

700 bopd 700 bopd(M)

Desember 2018 (P) 36% (A) vs 87% (P) 16,1

PROYEK HULU MIGAS - TARGET ONSTREAM 2018status per 30 Juni 2018

# Catatan:1. Pengaliran gas Proyek Block A tergantung kesiapan pembeli gas.2. Untuk Proyek Ario Damar-Sriwijaya Phase 2 KKKS Tropik Energi Pandan dikeluarkan dari tabel onstream 2018 karena rencana onstream

bergeser dari Des 2018 ke Maret 2019 karena tender ulang.3. Proyek CPS Modification KKKS PetroChina Intl. Jabung Ltd. dikeluarkan dari tabel onstream 2018 karena rencana onstream bergeser dari Des 2018 ke

2019 karena perubahan lingkup pekerjaan.

Page 9: CAPAIAN SEMESTER I - 2018 - migasreview.com fileV. Capaian Penerimaan Negara dari Hulu Migas sebesar US$8,5 milliar, atau 71% dari Target ... 5 CNOOC 30,000 30,876 102.9 30,857 102.9

9

20

18

© S

KK

Mig

as –

All

righ

ts r

eser

ved

11,895 8,470

14,235

10,089

5,229

11,338

4,218

3,492

4,914 26,202

17,191

30,487 48.00

66.55

60.00

0.00

20.00

40.00

60.00

80.00

-

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

50,000

APBN YTD Juni Outlook (Jan Des)

Indonesia Share Cost Recovery Contractor Share Gross Revenue ICP

Resume Pencapaian Penerimaan Hulu Migas

Keterangan:Outlook capaian Semester-I per 30 Juni 2018

USD

JU

TA

USD

/ B

BL

(71%)(120%)

Page 10: CAPAIAN SEMESTER I - 2018 - migasreview.com fileV. Capaian Penerimaan Negara dari Hulu Migas sebesar US$8,5 milliar, atau 71% dari Target ... 5 CNOOC 30,000 30,876 102.9 30,857 102.9

10

20

18

© S

KK

Mig

as –

All

righ

ts r

eser

ved

SULAWESI SELATAN

SUMATERA UTARA

JAWA TIMUR

MALUKU

PAPUA BARAT

ACEH

SULAWESI TENGAH

ANDE ANDE LUMUT MERAKES IDD

KALIMANTAN TIMUR

SUMATERA SELATAN

LAMPUNGJAWA BARAT

KEP. RIAU

SENORO

ABADI

TANGGUH TRAIN-3

POD DISETUJUIPeak Prod (Q1-2021) :391 MMScfd*)

BANGKA : 80 MMscfd, 2200 bcpd

GENDALO-GEHEM: Pre FEED sudah selesai, Pembahasan Revisi POD 1Gendalo Hub: (Q4-2022)Gehem Hub : (Q2-2023)

Pre-FEEDRevisi POD 1 diajukanpada Nov 2018

Pre FEEDProses POD II 155 MMscfd

KonstruksiProd (Q2-2020):3,8 MTPA (700 MMscfd), 3200 bopd***)

EPC TENDERProduction(Q1-2021) : 25000 bopd

JAMBARAN TIUNG BIRU MDA dan MBH

JAMBU AYE UTARA

KonstruksiProd (Q2-2019): 175 MMscfd**)

FEED TENDER PREPProd (Q2-2022):108 MMscfd, 3300 bopd

POFD L-PARIGI

FEED TENDERProd (Q2-2021)60 MMscfd

FEED TENDERProd (Q3-2020):60 MMscfd, 3000 bopd

BADIK & WEST BADIK

BISON-IGUANA-GAJAH PUTERI

KonstruksiProd (Q3-2019):BISON: 45 MMscfd,IGUANA: 45 MMscfdGAJAH PUTERI: 73 MMscfd

Progress Proyek Utama Hulu Migas s.d. 2025Status per 30 Juni 2018

ASAP MERAH KIDO (AMK)

POD I DISETUJUIPlateau Prod (Q1 – 2023) : 170 MMScfd, 737 bcpd

*) Addition to Jangkrik Muara Bakau 600 MMscfd**) Addition to MBD 100 MMscfd***) Addition to 7.6 MTPA Tangguh 1 & 2

KonstruksiProd(2020)190 MMscfd (Netto Gas)

BUKIT TUA (Phase II)

FEEDProd (Q4-2021): 30 MMscfd**)

WASAMBO

FEEDProd (Q4-2020): 40 MMscfd**)

Page 11: CAPAIAN SEMESTER I - 2018 - migasreview.com fileV. Capaian Penerimaan Negara dari Hulu Migas sebesar US$8,5 milliar, atau 71% dari Target ... 5 CNOOC 30,000 30,876 102.9 30,857 102.9