REKAPREKAPITULASI BIAYAPEKERJAAN UPGRADING SP SUBANGNOURAIAN PEKERJAANVOLUME PEKERJAANHARGA SATUANJUMLAH HARGA (RP)TOTAL HARGA (RP)MATERIALBAHAN/ALATUPAHMATERIALBAHAN/ALATUPAH1Persiapana.Survey dan perijinan1.00LsX0.000.00X0.000.000.00b.Direksi kit (site office & site warehouse)1.00LsX0.000.00X0.000.000.00c.Mobilisasi material & peralatan1.00LsXX0.00XX0.000.00X0.000.000.002Project Managementa.Project Leader (1 orang)1.00LsXX0.00XX0.000.00b.Project Control (1 orang)1.00LsXX0.00XX0.000.00c.HSE Officer (2 orang)1.00LsXX0.00XX0.000.00d.Security (2 orang)1.00LsXX0.00XX0.000.00e.Tools (gas detector 2 unit)1.00LsXX0.00XX0.000.00f.Administrasi Project (laporan, persuratan, ATK, dll)1.00LsX0.000.00X0.000.000.00X0.000.000.003Rekap Pekerjaan Kontruksia.Pekerjaan sipil0.000.000.000.000.000.000.00b.Pekerjaan Mekanik0.000.000.000.000.000.000.00c.Pekerjaan listrik0.000.000.000.000.000.000.00d.Pekerjaan Instrument0.000.000.000.000.000.000.000.000.000.000.004Sertifikasi & Commissioning1.00LsXX0.00XX0.000.005Finishing ( Perapihan dan demobilisasi)1.00LsXX0.00XX0.000.00TOTAL BIAYA PEKERJAAN0.000.000.000.00

BQ rev.01VOLUME PEKERJAAN (BQ)UPGRADING SP. SUBANGSCOPE OF WORK MECHANICAL & PIPINGRev.01No.U R A I A N PEKERJAANVolumeSatuanHARGA SATUAN (Rp)JUMLAH HARGA (Rp)UpahAlat & Bahan HabisMaterialUpahAlat & Bahan HabisMaterialTOTALIKonstruksi & Instalasi Peralatan Utama1.Pemasangan Package Unit Inlet Production Separator TAG No 2-11-19 A/B, ukuran ID. 2000 mm x TL/TL. 6000 mm material CS + Clad.316L2set0.000.00x0.000.00x0.002.Pemasangan Package Unit LP Production Separator TAG No 2-11-20 A/B, ukuran ID. 1350 mm x TL/TL. 4100 mm material SS.316L2set0.000.00x0.000.00x0.003.Pengadaan Package Unit Flare KO Drum (Closed Drain Vessel) c/w accessories Tag. No. 2-11-D26, mengacu doc. no. 106591-13-MS-03-DS-020 Rev.0 dan No.106591-52-PE-01-PD-002 rev.01setxx0.00xx0.000.004.Pemasangan Package Unit Flare KO Drum (Closed Drain Vessel) Tag. No. 2-11-D261set0.000.00x0.000.00x0.005.Pembangunan FWKO Tank c/w accessories ukuran ID. 9600 mm x h. 11.000 mm, mengacu doc. No. 116639-11-MS-03-DS-004, including engineering, material, fabrication, inspeksi & test1Ls0.000.000.000.000.000.000.006.Pengadaan Unit Dry Air Receiver Drum Tag.No. 2-11-D31, mengacu doc. no. 116639-11-MS-03-DS-003 Rev.01setxx0.00xx0.000.007.Pemasangan Unit Dry Air Receiver Drum Tag.No. 2-11-D311set0.000.00x0.000.00x0.00JUMLAH I0.000.000.000.00II.Konstruksi & Instalasi Sistem Perpipaan (Piping System)A. Process Piping Class 600#1Pipe dia.20" ASTM A106 Gr.B Sch.80 BE x L.6000 mm5jtsxx0.00xx0.000.002Pipe dia.16" ASTM A106 Gr.B Sch.80 BE x L.6000 mm4jtsxx0.00xx0.000.003Pipe dia.12" ASTM A106 Gr.B Sch.80 BE x L.6000 mm5jtsxx0.00xx0.000.004Pipe dia.8" ASTM A106 Gr.B Sch.80 BE x L.6000 mm2jtsxx0.00xx0.000.005Pipe dia.6" ASTM A106 Gr.B Sch.80 BE x L.6000 mm4jtsxx0.00xx0.000.006Pipe dia.1" ASTM A106 Gr.B Sch.80 PE x L.6000 mm1jtsxx0.00xx0.000.007Flange dia.20" ASTM A105 ANSI 600# WN RF Neck Sch.80, ASME B.16.55pcsxx0.00xx0.000.008Flange dia.16" ASTM A105 ANSI 600# WN RF Neck Sch.80, ASME B.16.512pcsxx0.00xx0.000.009Flange dia.12" ASTM A105 ANSI 600# WN RF Neck Sch.80, ASME B.16.524pcsxx0.00xx0.000.0010Flange dia.8" ASTM A105 ANSI 600# WN RF Neck Sch.80, ASME B.16.56pcsxx0.00xx0.000.0011Flange dia.6" ASTM A105 ANSI 600# WN RF Neck Sch.80, ASME B.16.514pcsxx0.00xx0.000.0012Flange dia.1" ASTM A105 ANSI 600# SW RF, ASME B16.58pcsxx0.00xx0.000.0013Blind Flange dia.20" ASTM A105 ANSI 600# RF, ASME B16.53pcsxx0.00xx0.000.0014Blind Flange dia.12" ASTM A105 ANSI 600# RF, ASME B16.52pcsxx0.00xx0.000.0015Blind Flange dia.8" ASTM A105 ANSI 600# RF, ASME B16.52pcsxx0.00xx0.000.0016Blind Flange dia.6" ASTM A105 ANSI 600# RF, ASME B16.52pcsxx0.00xx0.000.0017Spectacle Blind dia.12" ANSI 600# RF as per datasheet doc.no. 116639-11-PP-02-DS-002 Rev.012pcsxx0.00xx0.000.0018Elbow dia.20" - 90 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.92pcsxx0.00xx0.000.0019Elbow dia.16" - 90 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.96pcsxx0.00xx0.000.0020Elbow dia.12" - 90 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.910pcsxx0.00xx0.000.0021Elbow dia.12" - 45 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.94pcsxx0.00xx0.000.0022Elbow dia.8" - 90 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.94pcsxx0.00xx0.000.0023Elbow dia.6" - 90 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.98pcsxx0.00xx0.000.0024Elbow dia.6" - 45 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.94pcsxx0.00xx0.000.0025Straight Tee dia.16" x 16" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.92pcsxx0.00xx0.000.0026Straight Tee dia.12" x 12" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.910pcsxx0.00xx0.000.0027Straight Tee dia.8" x 8" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.92pcsxx0.00xx0.000.0028Straight Tee dia.6" x 6" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.94pcsxx0.00xx0.000.0029Reducing Tee dia.20" x 16" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.92pcsxx0.00xx0.000.0030Reducing Tee dia.20" x 12" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.92pcsxx0.00xx0.000.0031Reducing Tee dia.12" x 8" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.92pcsxx0.00xx0.000.0032Reducing Tee dia.12" x 6" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.96pcsxx0.00xx0.000.0033Eccentric Reducer dia.12" x 6" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.92pcsxx0.00xx0.000.0034Weldolet dia.1" ASTM A105 CL.3000 LB, ASME B.16.114pcsxx0.00xx0.000.0035Nipple dia.1" ASTM A106 Gr.B Sch.80 x L.150 mm Plain One End (POE) x Thread One End (TOE)4pcsxx0.00xx0.000.0036Ball Valve dia.20"- ANSI 600# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.011pcsxx0.00xx0.000.0037Ball Valve dia.16"- ANSI 600# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.012pcsxx0.00xx0.000.0038Ball Valve dia.12"- ANSI 600# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.018pcsxx0.00xx0.000.0039Ball Valve dia.8"- ANSI 600# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.012pcsxx0.00xx0.000.0040Ball Valve dia.6"- ANSI 600# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.014pcsxx0.00xx0.000.0041Ball Valve dia.1"- ANSI 600# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.014pcsxx0.00xx0.000.0042Spiral Wound Gasket dia.20"- ANSI 600# refers to doc.no. 116639-11-PP-02-GS-001 Rev.015pcsxx0.00xx0.000.0043Spiral Wound Gasket dia.16"- ANSI 600# refers to doc.no. 116639-11-PP-02-GS-001 Rev.0112pcsxx0.00xx0.000.0044Spiral Wound Gasket dia.12"- ANSI 600# refers to doc.no. 116639-11-PP-02-GS-001 Rev.0124pcsxx0.00xx0.000.0045Spiral Wound Gasket dia.8"- ANSI 600# refers to doc.no. 116639-11-PP-02-GS-001 Rev.016pcsxx0.00xx0.000.0046Spiral Wound Gasket dia.6"- ANSI 600# refers to doc.no. 116639-11-PP-02-GS-001 Rev.0114pcsxx0.00xx0.000.0047Spiral Wound Gasket dia.1"- ANSI 600# refers to doc.no. 116639-11-PP-02-GS-001 Rev.018pcsxx0.00xx0.000.0048Stud Bolt & Nut M42 x L. min. 285 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.01120pcsxx0.00xx0.000.0049Stud Bolt & Nut M39 x L. min. 260 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.01240pcsxx0.00xx0.000.0050Stud Bolt & Nut M33 x L. min. 235 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.01520pcsxx0.00xx0.000.0051Stud Bolt & Nut M30 x L. min. 260 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.0132pcsxx0.00xx0.000.0052Stud Bolt & Nut M30 x L. min. 205 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.0196pcsxx0.00xx0.000.0053Stud Bolt & Nut M27 x L. min. 185 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.01192pcsxx0.00xx0.000.0054Stud Bolt & Nut M16 x L. min. 90 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.0132pcsxx0.00xx0.000.0055Fit-up & welding pipe dia.20" A106 Gr.B Sch.8010Ttk0.000.00x0.000.00x0.0056Fit-up & welding pipe dia.16" A106 Gr.B Sch.8012Ttk0.000.00x0.000.00x0.0057Fit-up & welding pipe dia.12" A106 Gr.B Sch.8015Ttk0.000.00x0.000.00x0.0058Fit-up & welding pipe dia.8" A106 Gr.B Sch.808Ttk0.000.00x0.000.00x0.0059Fit-up & welding pipe dia.6" A106 Gr.B Sch.8024Ttk0.000.00x0.000.00x0.0060Fit-up & welding pipe dia.1" A106 Gr.B Sch.808Ttk0.000.00x0.000.00x0.0061Fit-up & welding flange dia.20" A105 ANSI 600# WN RF Neck Sch.805pcs0.000.00x0.000.00x0.0062Fit-up & welding flange dia.16" A105 ANSI 600# WN RF Neck Sch.8012pcs0.000.00x0.000.00x0.0063Fit-up & welding flange dia.12" A105 ANSI 600# WN RF Neck Sch.8024pcs0.000.00x0.000.00x0.0064Fit-up & welding flange dia.8" A105 ANSI 600# WN RF Neck Sch.806pcs0.000.00x0.000.00x0.0065Fit-up & welding flange dia.6" A105 ANSI 600# WN RF Neck Sch.8014pcs0.000.00x0.000.00x0.0066Fit-up & welding flange dia.1" A105 ANSI 600# WN RF Neck Sch.808pcs0.000.00x0.000.00x0.0067Fit-up & welding elbow dia.20" A234 WPB (SML) Sch.80 BE2pcs0.000.00x0.000.00x0.0068Fit-up & welding elbow dia.16" A234 WPB (SML) Sch.80 BE6pcs0.000.00x0.000.00x0.0069Fit-up & welding elbow dia.12" A234 WPB (SML) Sch.80 BE14pcs0.000.00x0.000.00x0.0070Fit-up & welding elbow dia.8" A234 WPB (SML) Sch.80 BE4pcs0.000.00x0.000.00x0.0071Fit-up & welding elbow dia.6" A234 WPB (SML) Sch.80 BE12pcs0.000.00x0.000.00x0.0072Fit-up & welding straight tee dia.16" x 16" A234 WPB (SML) Sch.80 BE2pcs0.000.00x0.000.00x0.0073Fit-up & welding straight tee dia.12" x 12" A234 WPB (SML) Sch.80 BE10pcs0.000.00x0.000.00x0.0074Fit-up & welding straight tee dia.8" x 8" A234 WPB (SML) Sch.80 BE2pcs0.000.00x0.000.00x0.0075Fit-up & welding straight tee dia.6" x 6" A234 WPB (SML) Sch.80 BE4pcs0.000.00x0.000.00x0.0076Fit-up & welding reducing tee dia.20" x 16" A234 WPB (SML) Sch.80 BE2pcs0.000.00x0.000.00x0.0077Fit-up & welding reducing tee dia.20" x 12" A234 WPB (SML) Sch.80 BE2pcs0.000.00x0.000.00x0.0078Fit-up & welding reducing tee dia.12" x 8" A234 WPB (SML) Sch.80 BE2pcs0.000.00x0.000.00x0.0079Fit-up & welding reducing tee dia.12" x 6" A234 WPB (SML) Sch.80 BE6pcs0.000.00x0.000.00x0.0080Fit-up & welding eccentric reducer dia.12" x 6" A234 WPB (SML) Sch.80 BE2pcs0.000.00x0.000.00x0.0081Fit-up & welding weldolet dia.1" A105 CL.3000 LB4pcs0.000.00x0.000.00x0.0082Install pipe dia.20" Sch.80 on support/piping system/piping interface existing30m-run0.000.00x0.000.00x0.0083Install pipe dia.16" Sch.80 on support/piping system/piping interface existing24m-run0.000.00x0.000.00x0.0084Install pipe dia.12" Sch.80 on support/piping system/piping interface existing30m-run0.000.00x0.000.00x0.0085Install pipe dia.8" Sch.80 on support/piping system/piping interface existing12m-run0.000.00x0.000.00x0.0086Install pipe dia.6" Sch.80 on support/piping system/piping interface existing24m-run0.000.00x0.000.00x0.0087Install Valves dia.12" - ANSI 600# on support/piping system/piping interface existing8pcs0.000.00x0.000.00x0.0088Install Valves dia.8" - ANSI 600# on support/piping system/piping interface existing2pcs0.000.00x0.000.00x0.0089Install Valves dia.6" - ANSI 600# on support/piping system/piping interface existing4pcs0.000.00x0.000.00x0.0090Install Valves dia.1" - ANSI 600# on support/piping system/piping interface existing4pcs0.000.00x0.000.00x0.0091Install Blind Flanges dia.20" - ANSI 600# on piping system/piping interface existing3pcs0.000.00x0.000.00x0.0092Install Blind Flanges dia.12" - ANSI 600# on piping system/piping interface existing2pcs0.000.00x0.000.00x0.0093Install Blind Flanges dia.8" - ANSI 600# on piping system/piping interface existing2pcs0.000.00x0.000.00x0.0094Install Blind Flanges dia.6" - ANSI 600# on piping system/piping interface existing2pcs0.000.00x0.000.00x0.0095Cutting existing piping dia.12" A106 Gr.B Sch.80 by rotary cold cutter, including remove any obstacle4Ttk0.000.00x0.000.00x0.0096Cutting existing piping dia.6" A106 Gr.B Sch.80 by rotary cold cutter, including remove any obstacle4Ttk0.000.00x0.000.00x0.0097Demolish/dismatle existing piping dia.12", including disconnect flange any flange connection30m-run0.000.00x0.000.00x0.0098Demolish/dismatle existing piping dia.6" , including disconnect flange any flange connection24m-run0.000.00x0.000.00x0.00JUMLAH II.A0.000.000.000.00B. Process Piping Class 300#1Pipe dia.18" ASTM A106 Gr.B Sch.80 BE x L.6000 mm2jtsxx0.00xx0.000.002Pipe dia.16" ASTM A106 Gr.B Sch.80 BE x L.6000 mm4jtsxx0.00xx0.000.003Pipe dia.14" ASTM A106 Gr.B Sch.80 BE x L.6000 mm2jtsxx0.00xx0.000.004Pipe dia.6" ASTM A106 Gr.B Sch.80 BE x L.6000 mm4jtsxx0.00xx0.000.005Flange dia.16" ASTM A105 ANSI 300# WN RF Neck Sch.80, ASME B.16.58pcsxx0.00xx0.000.006Flange dia.14" ASTM A105 ANSI 300# WN RF Neck Sch.80, ASME B.16.58pcsxx0.00xx0.000.00`7Flange dia.12" ASTM A105 ANSI 300# WN RF Neck Sch.80, ASME B.16.58pcsxx0.00xx0.000.008Flange dia.6" ASTM A105 ANSI 300# WN RF Neck Sch.80, ASME B.16.58pcsxx0.00xx0.000.009Flange dia.1" ASTM A105 ANSI 300# SW RF, ASME B16.54pcsxx0.00xx0.000.0010Blind Flange dia.12" ASTM A105 ANSI 300#, ASME B.16.52pcsxx0.00xx0.000.0011Elbow dia.16" - 45 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.94pcsxx0.00xx0.000.0012Elbow dia.14" - 90 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.94pcsxx0.00xx0.000.0013Straight Tee dia.16" x 16" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.92pcsxx0.00xx0.000.0014Reducing Tee dia.18" x 14" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.92pcsxx0.00xx0.000.0015Reducing Tee dia.18" x 12" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.92pcsxx0.00xx0.000.0016Weldolet dia.1" ASTM A105 CL.3000 LB, ASME B.16.114pcsxx0.00xx0.000.0017Nipple dia.1" ASTM A106 Gr.B Sch.80 x L.150 mm Plain One End (POE) x Thread One End (TOE)4pcsxx0.00xx0.000.0018Ball Valve dia.16"- ANSI 300# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.012pcsxx0.00xx0.000.0019Ball Valve dia.14"- ANSI 300# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.012pcsxx0.00xx0.000.0020Ball Valve dia.12"- ANSI 300# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.012pcsxx0.00xx0.000.0021Ball Valve dia.6"- ANSI 300# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.012pcsxx0.00xx0.000.0022Ball Valve dia.1"- ANSI 300# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.014pcsxx0.00xx0.000.0023Check Valve dia.14"- ANSI 300# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.012pcsxx0.00xx0.000.0024Spiral Wound Gasket dia.16"- ANSI 300# refers to doc.no. 116639-11-PP-02-GS-001 Rev.018pcsxx0.00xx0.000.0025Spiral Wound Gasket dia.14"- ANSI 300# refers to doc.no. 116639-11-PP-02-GS-001 Rev.018pcsxx0.00xx0.000.0026Spiral Wound Gasket dia.12"- ANSI 300# refers to doc.no. 116639-11-PP-02-GS-001 Rev.018pcsxx0.00xx0.000.0027Spiral Wound Gasket dia.6"- ANSI 300# refers to doc.no. 116639-11-PP-02-GS-001 Rev.018pcsxx0.00xx0.000.0028Spiral Wound Gasket dia.1"- ANSI 300# refers to doc.no. 116639-11-PP-02-GS-001 Rev.014pcsxx0.00xx0.000.0029Stud Bolt & Nut M33 x L. min. 200 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.01160pcsxx0.00xx0.000.0030Stud Bolt & Nut M30 x L. min. 185 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.01160pcsxx0.00xx0.000.0031Stud Bolt & Nut M20 x L. min. 120 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.0132pcsxx0.00xx0.000.0032Stud Bolt & Nut M16 x L. min. 90 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.0116pcsxx0.00xx0.000.0033Fit-up & welding pipe dia.18" A106 Gr.B Sch.804Ttk0.000.00x0.000.00x0.0034Fit-up & welding pipe dia.16" A106 Gr.B Sch.8012Ttk0.000.00x0.000.00x0.0035Fit-up & welding pipe dia.14" A106 Gr.B Sch.804Ttk0.000.00x0.000.00x0.0036Fit-up & welding pipe dia.6" A106 Gr.B Sch.8012Ttk0.000.00x0.000.00x0.0037Fit-up & welding pipe dia.1" A106 Gr.B Sch.806Ttk0.000.00x0.000.00x0.0038Fit-up & welding flange dia.16" A105 ANSI 300# WN RF Neck Sch.808pcs0.000.00x0.000.00x0.0039Fit-up & welding flange dia.14" A105 ANSI 300# WN RF Neck Sch.808pcs0.000.00x0.000.00x0.0040Fit-up & welding flange dia.6" A105 ANSI 300# WN RF Neck Sch.808pcs0.000.00x0.000.00x0.0041Fit-up & welding flange dia.1" A105 ANSI 300# WN RF Neck Sch.804pcs0.000.00x0.000.00x0.0042Fit-up & welding elbow dia.16" A234 WPB (SML) Sch.80 BE4pcs0.000.00x0.000.00x0.0043Fit-up & welding elbow dia.14" A234 WPB (SML) Sch.80 BE4pcs0.000.00x0.000.00x0.0044Fit-up & welding straight tee dia.16" x 16" A234 WPB (SML) Sch.80 BE2pcs0.000.00x0.000.00x0.0045Fit-up & welding reducing tee dia.18" x 14" A234 WPB (SML) Sch.80 BE2pcs0.000.00x0.000.00x0.0046Fit-up & welding reducing tee dia.18" x 12" A234 WPB (SML) Sch.80 BE2pcs0.000.00x0.000.00x0.0047Fit-up & welding weldolet dia.1" A105 CL.3000 LB4pcs0.000.00x0.000.00x0.0048Install pipe dia.18" Sch.80 on support/piping system/piping interface existing12m-run0.000.00x0.000.00x0.0049Install pipe dia.16" Sch.80 on support/piping system/piping interface existing24m-run0.000.00x0.000.00x0.0050Install pipe dia.14" Sch.80 on support/piping system/piping interface existing12m-run0.000.00x0.000.00x0.0051Install pipe dia.6" Sch.80 on support/piping system/piping interface existing24m-run0.000.00x0.000.00x0.0052Install blind flange dia.12" ANSI 300# on support/piping system/piping interface existing2pcs0.000.00x0.000.00x0.0053Install Valves dia.16" - ANSI 300# on support/piping system/piping interface existing2pcs0.000.00x0.000.00x0.0054Install Valves dia.14" - ANSI 300# on support/piping system/piping interface existing2pcs0.000.00x0.000.00x0.0055Install Valves dia.6" - ANSI 300# on support/piping system/piping interface existing2pcs0.000.00x0.000.00x0.0056Install Valves dia.1" - ANSI 300# on support/piping system/piping interface existing4pcs0.000.00x0.000.00x0.00JUMLAH II.B0.000.000.000.00C. Process Piping Class 150#1Pipe dia.12" ASTM A106 Gr.B Sch.40 BE x L.6000 mm4jtsxx0.00xx0.000.002Pipe dia.10" ASTM A106 Gr.B Sch.40 BE x L.6000 mm2jtsxx0.00xx0.000.003Pipe dia.8" ASTM A106 Gr.B Sch.40 BE x L.6000 mm16jtsxx0.00xx0.000.004Pipe dia.6" ASTM A106 Gr.B Sch.40 BE x L.6000 mm50jtsxx0.00xx0.000.005Pipe dia.4" ASTM A106 Gr.B Sch.40 BE x L.6000 mm2jtsxx0.00xx0.000.006Pipe dia.3" ASTM A106 Gr.B Sch.40 BE x L.6000 mm1jtsxx0.00xx0.000.007Pipe dia.6" ASTM A106 Gr.B Sch.80 BE x L.6000 mm55jtsxx0.00xx0.000.008Pipe dia.4" ASTM A106 Gr.B Sch.80 BE x L.6000 mm6jtsxx0.00xx0.000.009Pipe dia.3" ASTM A106 Gr.B Sch.80 BE x L.6000 mm35jtsxx0.00xx0.000.0010Pipe dia.2" ASTM A106 Gr.B Sch.80 BE x L.6000 mm6jtsxx0.00xx0.000.0011Pipe dia.'' ASTM A106 Gr.B Sch.80 PE x L.6000 mm1jtsxx0.00xx0.000.0012Flange dia.12" ASTM A105 ANSI 150# WN RF Neck Sch.40, ASME B.16.58pcsxx0.00xx0.000.0013Flange dia.10" ASTM A105 ANSI 150# WN RF Neck Sch.40, ASME B.16.56pcsxx0.00xx0.000.0014Flange dia.8" ASTM A105 ANSI 150# WN RF Neck Sch.40, ASME B.16.58pcsxx0.00xx0.000.0015Flange dia.6" ASTM A105 ANSI 150# WN RF Neck Sch.40, ASME B.16.510pcsxx0.00xx0.000.0016Flange dia.4" ASTM A105 ANSI 150# WN RF Neck Sch.40, ASME B.16.524pcsxx0.00xx0.000.0017Flange dia.3" ASTM A105 ANSI 150# WN RF Neck Sch.40, ASME B.16.52pcsxx0.00xx0.000.0018Flange dia.6" ASTM A105 ANSI 150# WN RF Neck Sch.80, ASME B.16.54pcsxx0.00xx0.000.0019Flange dia.4" ASTM A105 ANSI 150# WN RF Neck Sch.80, ASME B.16.510pcsxx0.00xx0.000.0020Flange dia.3" ASTM A105 ANSI 150# WN RF Neck Sch.80, ASME B.16.512pcsxx0.00xx0.000.0021Flange dia.2" ASTM A105 ANSI 150# WN RF Neck Sch.80, ASME B.16.512pcsxx0.00xx0.000.0016Blind Flange dia.4" ASTM A105 ANSI 150# RF, ASME B.16.52pcsxx0.00xx0.000.0022Elbow dia.12" - 90 deg. ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.94pcsxx0.00xx0.000.0023Elbow dia.12" - 45 deg. ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.94pcsxx0.00xx0.000.0024Elbow dia.10" - 90 deg. ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.92pcsxx0.00xx0.000.0025Elbow dia.10" - 45 deg. ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.92pcsxx0.00xx0.000.0026Elbow dia.8" - 90 deg. ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.98pcsxx0.00xx0.000.0027Elbow dia.8" - 45 deg. ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.94pcsxx0.00xx0.000.0028Elbow dia.6" - 90 deg. ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.910pcsxx0.00xx0.000.0029Elbow dia.6" - 45 deg. ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.94pcsxx0.00xx0.000.0030Elbow dia.4" - 90 deg. ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.92pcsxx0.00xx0.000.0031Elbow dia.6" - 90 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.916pcsxx0.00xx0.000.0032Elbow dia.6" - 45 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.96pcsxx0.00xx0.000.0033Elbow dia.4" - 90 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.96pcsxx0.00xx0.000.0034Elbow dia.4" - 45 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.94pcsxx0.00xx0.000.0035Elbow dia.3" - 90 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.912pcsxx0.00xx0.000.0036Elbow dia.3" - 45 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.98pcsxx0.00xx0.000.0037Elbow dia.2" - 90 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.94pcsxx0.00xx0.000.0038Elbow dia.2" - 45 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.94pcsxx0.00xx0.000.0039Straight tee dia.12" x 12" ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.92pcsxx0.00xx0.000.0040Straight tee dia.10" x 10" ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.92pcsxx0.00xx0.000.0041Straight tee dia.8" x 8" ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.92pcsxx0.00xx0.000.0042Straight tee dia.6" x 6" ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.92pcsxx0.00xx0.000.0043Straight tee dia.4" x 4" ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.93pcsxx0.00xx0.000.0044Reducing tee dia.12" x 8" ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.92pcsxx0.00xx0.000.0045Reducing tee dia.10" x 6" ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.92pcsxx0.00xx0.000.0046Reducing tee dia.8" x 6" ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.92pcsxx0.00xx0.000.0047Reducing tee dia.6" x 4" ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.92pcsxx0.00xx0.000.0048Reducing tee dia.6" x 4" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.92pcsxx0.00xx0.000.0049Reducing tee dia.6" x 3" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.94pcsxx0.00xx0.000.0050Reducing tee dia.4" x 2" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.94pcsxx0.00xx0.000.0051Reducing tee dia.3" x 2" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.94pcsxx0.00xx0.000.0052Eccentric reducer dia.4" x 3" ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.92pcsxx0.00xx0.000.0053Full coupling dia. '' ASTM A105 SW 3000 LB, ASME B16.1110pcsxx0.00xx0.000.0054Weldolet dia. '' ASTM A105 SW 3000 LB, ASME B16.1110pcsxx0.00xx0.000.0055Elbow dia. '' ASTM A105 SW 3000 LB, ASME B16.118pcsxx0.00xx0.000.0056Nipple dia.'' ASTM A106 Gr.B Sch.40 x L.150 mm Plain One End (POE) x Thread One End (TOE)10pcsxx0.00xx0.000.0057Ball Valve dia.12"- ANSI 150# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.012pcsxx0.00xx0.000.0058Ball Valve dia.10"- ANSI 150# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.012pcsxx0.00xx0.000.0059Ball Valve dia.8"- ANSI 150# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.012pcsxx0.00xx0.000.0060Ball Valve dia.6"- ANSI 150# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.012pcsxx0.00xx0.000.0061Ball Valve dia.4"- ANSI 150# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.012pcsxx0.00xx0.000.0062Ball Valve dia.3"- ANSI 150# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.012pcsxx0.00xx0.000.0063Ball Valve dia.2"- ANSI 150# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.014pcsxx0.00xx0.000.0064Gate Valve dia.4" - ANSI 150# as per datasheet doc.no. 116639-11-PP-02-DS-003 Rev.013pcsxx0.00xx0.000.0065Gate Valve dia.'' - CL.800 as per datasheet doc.no. 116639-11-PP-02-DS-003 Rev.0110pcsxx0.00xx0.000.0066Check Valve dia.3"- ANSI 150# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.012pcsxx0.00xx0.000.0067Y-Strainer dia.4" - ANSI 150# RF ASTM A216 WCB Body, SS.316L Mesh 40 Strainer Element2pcsxx0.00xx0.000.0068Spiral Wound Gasket dia.12"- ANSI 150# refers to doc.no. 116639-11-PP-02-GS-001 Rev.018pcsxx0.00xx0.000.0069Spiral Wound Gasket dia.10"- ANSI 150# refers to doc.no. 116639-11-PP-02-GS-001 Rev.016pcsxx0.00xx0.000.0070Spiral Wound Gasket dia.8"- ANSI 150# refers to doc.no. 116639-11-PP-02-GS-001 Rev.018pcsxx0.00xx0.000.0071Spiral Wound Gasket dia.6"- ANSI 150# refers to doc.no. 116639-11-PP-02-GS-001 Rev.0114pcsxx0.00xx0.000.0072Spiral Wound Gasket dia.4"- ANSI 150# refers to doc.no. 116639-11-PP-02-GS-001 Rev.0134pcsxx0.00xx0.000.0073Spiral Wound Gasket dia.3"- ANSI 150# refers to doc.no. 116639-11-PP-02-GS-001 Rev.0114pcsxx0.00xx0.000.0074Spiral Wound Gasket dia.2"- ANSI 150# refers to doc.no. 116639-11-PP-02-GS-001 Rev.0112pcsxx0.00xx0.000.0075Stud Bolt & Nut M24 x L. min. 135 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.0196pcsxx0.00xx0.000.0076Stud Bolt & Nut M24 x L. min. 125 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.0172pcsxx0.00xx0.000.0077Stud Bolt & Nut M20 x L. min. 120 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.01144pcsxx0.00xx0.000.0078Stud Bolt & Nut M20 x L. min. 110 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.0132pcsxx0.00xx0.000.0079Stud Bolt & Nut M16 x L. min. 90 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.01156pcsxx0.00xx0.000.0080Fit-up & welding pipe dia.12" A106 Gr.B Sch.408Ttk0.000.00x0.000.00x0.0081Fit-up & welding pipe dia.10" A106 Gr.B Sch.404Ttk0.000.00x0.000.00x0.0082Fit-up & welding pipe dia.8" A106 Gr.B Sch.4032Ttk0.000.00x0.000.00x0.0083Fit-up & welding pipe dia.6" A106 Gr.B Sch.40100Ttk0.000.00x0.000.00x0.0084Fit-up & welding pipe dia.4" A106 Gr.B Sch.404Ttk0.000.00x0.000.00x0.0085Fit-up & welding pipe dia.3" A106 Gr.B Sch.402Ttk0.000.00x0.000.00x0.0086Fit-up & welding pipe dia.6" A106 Gr.B Sch.80110Ttk0.000.00x0.000.00x0.0087Fit-up & welding pipe dia.4" A106 Gr.B Sch.8018Ttk0.000.00x0.000.00x0.0088Fit-up & welding pipe dia.3" A106 Gr.B Sch.80105Ttk0.000.00x0.000.00x0.0089Fit-up & welding pipe dia.2" A106 Gr.B Sch.8012Ttk0.000.00x0.000.00x0.0090Fit-up & welding flange dia.12" A105 ANSI 150# WN RF Neck Sch.408pcs0.000.00x0.000.00x0.0091Fit-up & welding flange dia.10" A105 ANSI 150# WN RF Neck Sch.406pcs0.000.00x0.000.00x0.0092Fit-up & welding flange dia.8" A105 ANSI 150# WN RF Neck Sch.408pcs0.000.00x0.000.00x0.0093Fit-up & welding flange dia.6" A105 ANSI 150# WN RF Neck Sch.4010pcs0.000.00x0.000.00x0.0094Fit-up & welding flange dia.4" A105 ANSI 150# WN RF Neck Sch.4024pcs0.000.00x0.000.00x0.0095Fit-up & welding flange dia.3" A105 ANSI 150# WN RF Neck Sch.402pcs0.000.00x0.000.00x0.0096Fit-up & welding flange dia.6" A105 ANSI 150# WN RF Neck Sch.8026pcs0.000.00x0.000.00x0.0097Fit-up & welding flange dia.4" A105 ANSI 150# WN RF Neck Sch.8010pcs0.000.00x0.000.00x0.0098Fit-up & welding flange dia.3" A105 ANSI 150# WN RF Neck Sch.8012pcs0.000.00x0.000.00x0.0099Fit-up & welding flange dia.2" A105 ANSI 150# WN RF Neck Sch.8012pcs0.000.00x0.000.00x0.00100Fit-up & welding elbow dia.12" A234 WPB (SML) Sch.40 BE8pcs0.000.00x0.000.00x0.00101Fit-up & welding elbow dia.10" A234 WPB (SML) Sch.40 BE4pcs0.000.00x0.000.00x0.00102Fit-up & welding elbow dia.8" A234 WPB (SML) Sch.40 BE12pcs0.000.00x0.000.00x0.00103Fit-up & welding elbow dia.6" A234 WPB (SML) Sch.40 BE14pcs0.000.00x0.000.00x0.00104Fit-up & welding elbow dia.4" A234 WPB (SML) Sch.40 BE2pcs0.000.00x0.000.00x0.00105Fit-up & welding elbow dia.6" A234 WPB (SML) Sch.80 BE6pcs0.000.00x0.000.00x0.00106Fit-up & welding elbow dia.4" A234 WPB (SML) Sch.80 BE16pcs0.000.00x0.000.00x0.00107Fit-up & welding elbow dia.3" A234 WPB (SML) Sch.80 BE20pcs0.000.00x0.000.00x0.00108Fit-up & welding elbow dia.2" A234 WPB (SML) Sch.80 BE8pcs0.000.00x0.000.00x0.00109Fit-up & welding straight tee dia.12" x 12" A234 WPB (SML) Sch.40 BE2pcs0.000.00x0.000.00x0.00110Fit-up & welding straight tee dia.10" x 10" A234 WPB (SML) Sch.40 BE2pcs0.000.00x0.000.00x0.00111Fit-up & welding straight tee dia.8" x 8" A234 WPB (SML) Sch.40 BE2pcs0.000.00x0.000.00x0.00112Fit-up & welding straight tee dia.6" x 6" A234 WPB (SML) Sch.40 BE2pcs0.000.00x0.000.00x0.00113Fit-up & welding straight tee dia.4" x 4" A234 WPB (SML) Sch.40 BE3pcs0.000.00x0.000.00x0.00114Fit-up & welding reducing tee dia.12" x 8" A234 WPB (SML) Sch.40 BE2pcs0.000.00x0.000.00x0.00115Fit-up & welding reducing tee dia.10" x 6" A234 WPB (SML) Sch.40 BE2pcs0.000.00x0.000.00x0.00116Fit-up & welding reducing tee dia.8" x 6" A234 WPB (SML) Sch.40 BE2pcs0.000.00x0.000.00x0.00117Fit-up & welding reducing tee dia.6" x 4" A234 WPB (SML) Sch.80 BE2pcs0.000.00x0.000.00x0.00118Fit-up & welding reducing tee dia.6" x 4" A234 WPB (SML) Sch.40 BE2pcs0.000.00x0.000.00x0.00119Fit-up & welding reducing tee dia.6" x 3" A234 WPB (SML) Sch.80 BE4pcs0.000.00x0.000.00x0.00120Fit-up & welding reducing tee dia.4" x 2" A234 WPB (SML) Sch.80 BE4pcs0.000.00x0.000.00x0.00121Fit-up & welding reducing tee dia.3" x 2" A234 WPB (SML) Sch.80 BE4pcs0.000.00x0.000.00x0.00122Fit-up & welding eccentric reducer dia.4" x 3" A234 WPB (SML) Sch.40 BE2pcs0.000.00x0.000.00x0.00123Fit-up & welding full coupling dia.'' A105 SW 3000 LB10pcs0.000.00x0.000.00x0.00124Fit-up & welding weldolet dia.'' A105 SW 3000 LB10pcs0.000.00x0.000.00x0.00125Fit-up & welding elbow dia.'' A105 SW 3000 LB8pcs0.000.00x0.000.00x0.00126Install pipe dia.12" Sch.40 on support/piping system/piping interface existing24m-run0.000.00x0.000.00x0.00127Install pipe dia.10" Sch.40 on support/piping system/piping interface existing12m-run0.000.00x0.000.00x0.00128Install pipe dia.8" Sch.40 on support/piping system/piping interface existing96m-run0.000.00x0.000.00x0.00129Install pipe dia.6" Sch.40 on support/piping system/piping interface existing300m-run0.000.00x0.000.00x0.00130Install pipe dia.4" Sch.40 on support/piping system/piping interface existing12m-run0.000.00x0.000.00x0.00131Install pipe dia.3" Sch.40 on support/piping system/piping interface existing6m-run0.000.00x0.000.00x0.00132Install pipe dia.6" Sch.80 on support/piping system/piping interface existing330m-run0.000.00x0.000.00x0.00133Install pipe dia.4" Sch.80 on support/piping system/piping interface existing36m-run0.000.00x0.000.00x0.00134Install pipe dia.3" Sch.80 on support/piping system/piping interface existing210m-run0.000.00x0.000.00x0.00135Install pipe dia.2" Sch.80 on support/piping system/piping interface existing36m-run0.000.00x0.000.00x0.00136Install Valves dia.12" - ANSI 150# on support/piping system/piping interface existing2pcs0.000.00x0.000.00x0.00137Install Valves dia.10" - ANSI 150# on support/piping system/piping interface existing2pcs0.000.00x0.000.00x0.00138Install Valves dia.8" - ANSI 150# on support/piping system/piping interface existing2pcs0.000.00x0.000.00x0.00139Install Valves dia.6" - ANSI 150# on support/piping system/piping interface existing2pcs0.000.00x0.000.00x0.00140Install Valves dia.4" - ANSI 150# on support/piping system/piping interface existing5pcs0.000.00x0.000.00x0.00141Install Valves dia.3" - ANSI 150# on support/piping system/piping interface existing4pcs0.000.00x0.000.00x0.00142Install Valves dia.2" - ANSI 150# on support/piping system/piping interface existing4pcs0.000.00x0.000.00x0.00143Install valves dia.'' - ANSI 150# on support/piping system/piping interface existing10pcs0.000.00x0.000.00x0.00144Install Y-Strainer dia.4" - ANSI 150# on support/piping system/piping interface existing2pcs0.000.00x0.000.00x0.00144Install Blind Flange dia.4" - ANSI 150# RF2pcs0.000.00x0.000.00x0.00JUMLAH II.C0.000.000.000.00D. Utilities Piping1Pipe dia.4" ASTM A53 Gr.B ERW Sch.40 BE x L.6000 mm2jtsxx0.00xx0.000.002Pipe dia.3" ASTM A53 Gr.B ERW Sch.40 BE x L.6000 mm2jtsxx0.00xx0.000.003Pipe dia.2" ASTM A53 Gr.B ERW Sch.40 BE x L.6000 mm20jtsxx0.00xx0.000.004Pipe dia.'' ASTM A106 Gr.B Sch.80 PE x L.6000 mm6jtsxx0.00xx0.000.005Flange dia.4" ASTM A105 ANSI 150# SO RF, ASME B.16.53pcsxx0.00xx0.000.006Flange dia.3" ASTM A105 ANSI 150# SO RF, ASME B.16.52pcsxx0.00xx0.000.007Flange dia.2" ASTM A105 ANSI 150# SO RF, ASME B16.56pcsxx0.00xx0.000.008Blind flange dia.2" ASTM A105 ANSI 150# RF, ASME B.16.52pcsxx0.00xx0.000.009Elbow dia.2" - 90 deg. ASTM A234 WPB Sch.40 BE, ASME B16.912pcsxx0.00xx0.000.0010Elbow dia.2" - 45 deg. ASTM A234 WPB Sch.40 BE, ASME B16.98pcsxx0.00xx0.000.0011Elbow dia.'' - 90 deg. ASTM A105 SW 3000 LB, ASME B16.1116pcsxx0.00xx0.000.0012Elbow dia.'' - 45 deg. ASTM A105 SW 3000 LB, ASME B16.118pcsxx0.00xx0.000.0013Straight tee dia.2" x 2" ASTM A234 WPB Sch.40 BE, ASME B16.96pcsxx0.00xx0.000.0014Straight tee dia.'' x '' ASTM A105 SW 3000 LB, ASME B16.1110pcsxx0.00xx0.000.0015Concentric reducer dia.3" x 2" ASTM A234 WPB Sch.40 BE, ASME B16.92pcsxx0.00xx0.000.0016Full coupling dia. '' ASTM A105 SW 3000 LB, ASME B16.1112pcsxx0.00xx0.000.0017Weldolet dia. '' ASTM A105 SW 3000 LB, ASME B16.118pcsxx0.00xx0.000.0018Nipple dia.'' ASTM A106 Gr.B Sch.40 x L.150 mm Plain One End (POE) x Thread One End (TOE)8pcsxx0.00xx0.000.0019Gate Valve dia.3"- ANSI 150# as per datasheet doc.no. 116639-11-PP-02-DS-003 Rev.012pcsxx0.00xx0.000.0020Gate Valve dia.2"- ANSI 150# as per datasheet doc.no. 116639-11-PP-02-DS-003 Rev.013pcsxx0.00xx0.000.0021Gate Valve dia.'' - CL.800 as per datasheet doc.no. 116639-11-PP-02-DS-003 Rev.018pcsxx0.00xx0.000.0022Spiral wound gasket dia.3"- ANSI 150# refers to doc.no. 116639-11-PP-02-GS-001 Rev.012pcsxx0.00xx0.000.0023Spiral wound gasket dia.2"- ANSI 150# refers to doc.no. 116639-11-PP-02-GS-001 Rev.026pcsxx0.00xx0.000.0024Stud Bolt & Nut M16 x L. min. 90 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.0140pcsxx0.00xx0.000.0025Fit-up & welding pipe dia.3" A53 Gr.B Sch.404Ttk0.000.00x0.000.00x0.0026Fit-up & welding pipe dia.2" A53 Gr.B Sch.4040Ttk0.000.00x0.000.00x0.0027Fit-up & welding flange dia.3" A105 ANSI 150# SO RF2pcs0.000.00x0.000.00x0.0028Fit-up & welding flange dia.2" A105 ANSI 150# SO RF6pcs0.000.00x0.000.00x0.0029Fit-up & welding elbow dia.2" A234 WPB Sch.40 BE20pcs0.000.00x0.000.00x0.0030Fit-up & welding elbow dia.'' A105 SW 3000 LB24pcs0.000.00x0.000.00x0.0031Fit-up & welding straight tee dia.2" x 2" A234 WPB Sch.40 BE6pcs0.000.00x0.000.00x0.0032Fit-up & welding straight tee dia.'' x '' ASTM A105 SW 3000 LB10pcs0.000.00x0.000.00x0.0033Fit-up & welding concentric reducer dia.3" x 2" A234 WPB Sch.40 BE2pcs0.000.00x0.000.00x0.0034Fit-up & welding elbow dia.'' A105 SW 3000 LB14pcs0.000.00x0.000.00x0.0035Fit-up & welding concentric reducer dia.3" x 2" A234 WPB Sch.40 BE2pcs0.000.00x0.000.00x0.0036Fit-up & welding full coupling dia.'' A105 SW 3000 LB12pcs0.000.00x0.000.00x0.0037Fit-up & welding weldolet dia.'' A105 SW 3000 LB8pcs0.000.00x0.000.00x0.0038Install pipe dia. 3" Sch.40 on support/piping system/piping interface existing12m-run0.000.00x0.000.00x0.0039Install pipe dia. 2" Sch.40 on support/piping system/piping interface existing120m-run0.000.00x0.000.00x0.0040Install pipe dia. '' Sch.80 on support/piping system/piping interface existing36m-run0.000.00x0.000.00x0.0041Install valves dia.3" - ANSI 150# on support/piping system/piping interface existing2pcs0.000.00x0.000.00x0.0042Install valves dia.2" - ANSI 150# on support/piping system/piping interface existing3pcs0.000.00x0.000.00x0.0043Install valves dia.'' - ANSI 150# on support/piping system/piping interface existing8pcs0.000.00x0.000.00x0.0044Install Blind Flanges dia.2" - ANSI 150# on piping system/piping interface existing2pcs0.000.00x0.000.00x0.00JUMLAH II.D0.000.000.000.00JUMLAH II (A+B+C+D)0.000.000.000.00IIIPaket Pekerjaan Hot Tapping1Dokumen teknis (hot tap procedure, WPS & PQR's, etc) including MIGAS Approval1Ls0.000.00x0.000.00x0.002Split tee 10" x 6" Class 300# mat'l Carbon Steel1pcsxx0.00xx0.000.003Ball Valve dia.6"- ANSI 300# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.011pcsxx0.00xx0.000.004Fit-up & welding split tee 10" x 6" Class 300#1pcs0.000.00x0.000.00x0.005Non Destructive Examination (NDE)1Ls0.000.00x0.000.00x0.006Hot tapping operation 10" x 6" class 300# including hot tap machine, hot tapping specialist, hot tapping operator, scafolding, others tools and any supporting required.1Ttk0.000.00x0.000.00x0.00JUMLAH III0.000.000.000.00IVNon Destructive Examination (NDE) Untuk Sistem Perpipaan1Radiograpy Test, Film 4" x 15"500sheet0.000.00x0.000.00x0.00Gamma Ray, including proses lab. RT personil terdiri dari RT Level II @ 1 orang, RT Level I @ 1 orang, helper @ 1 orang, report, transportasi & akomodasi personil.2Radiograpy Test, Film 4" x 10"1000sheet0.000.00x0.000.00x0.00Gamma Ray, including proses lab. RT personil terdiri dari RT Level II @ 1 orang, RT Level I @ 1 orang, helper @ 1 orang, report, transportasi & akomodasi personil.3Dye Penetran Test, including report,a. PT ASNT Level I @ 1 orang2HO0.00xx0.00xx0.00b. PT ASNT Level II @ 1 orang2HO0.00xx0.00xx0.00c. PT Chemical Set (Cleaner, Penetrant, Developer)6setx0.00xx0.00x0.00Jumlah IV0.000.000.000.00VPengecatan Sistem Perpipaan, termasuk material pengecatan.1Pipe dia.20", refers to doc.no. 116639-11-GN-00-GS-001 Standard Pengecatan, PS Group No.550m-run0.000.00x0.000.00x0.002Pipe dia.16", refers to doc.no. 116639-11-GN-00-GS-001 Standard Pengecatan, PS Group No.550m-run0.000.00x0.000.00x0.003Pipe dia.14", refers to doc.no. 116639-11-GN-00-GS-001 Standard Pengecatan, PS Group No.550m-run0.000.00x0.000.00x0.004Pipe dia.12", refers to doc.no. 116639-11-GN-00-GS-001 Standard Pengecatan, PS Group No.575m-run0.000.00x0.000.00x0.005Pipe dia.10", refers to doc.no. 116639-11-GN-00-GS-001 Standard Pengecatan, PS Group No.520m-run0.000.00x0.000.00x0.006Pipe dia.8", refers to doc.no. 116639-11-GN-00-GS-001 Standard Pengecatan, PS Group No.5120m-run0.000.00x0.000.00x0.007Pipe dia.6", refers to doc.no. 116639-11-GN-00-GS-001 Standard Pengecatan, PS Group No.5700m-run0.000.00x0.000.00x0.008Pipe dia.4", refers to doc.no. 116639-11-GN-00-GS-001 Standard Pengecatan, PS Group No.575m-run0.000.00x0.000.00x0.009Pipe dia.3", refers to doc.no. 116639-11-GN-00-GS-001 Standard Pengecatan, PS Group No.5250m-run0.000.00x0.000.00x0.0010Pipe dia.2", refers to doc.no. 116639-11-GN-00-GS-001 Standard Pengecatan, PS Group No.5175m-run0.000.00x0.000.00x0.0011Pipe dia.1", refers to doc.no. 116639-11-GN-00-GS-001 Standard Pengecatan, PS Group No.550m-run0.000.00x0.000.00x0.0012Pipe dia.'', refers to doc.no. 116639-11-GN-00-GS-001 Standard Pengecatan, PS Group No.550m-run0.000.00x0.000.00x0.00Jumlah V0.000.000.000.00VIHeavy Mobile Equipment untuk kegiatan konstruksi di lapangan.1Mobile crane capacity min.35 Ton including mobilisasi & demolisasi, certified crane operator & rigger, fuel (BBM) @ 1 unit240jam-alat0.000.00x0.000.00x0.002Mobile truck, including driver, fuel @ 1 unit240jam-alat0.000.00x0.000.00x0.00Jumlah VI0.000.000.000.00VIIHydrostatic test, flushing & purging untuk sistem perpipaan1Air (fresh water)25m3x0.00xx0.00x0.002Nitrogen (N2) Gas 99.999% @7 m350tubex0.00xx0.00x0.003Temporary gasket, blind plate dan consumables lainnya1Lsx0.00xx0.00x0.004Piping Supervisor @ 1 orang14hari-orang0.00xx0.000.00x0.005QA/QC Engineer @ 1 orang14hari-orang0.00xx0.000.00x0.006Pipe Fitter @ 2 orang28hari-orang0.00xx0.000.00x0.007Helper @ 2 orang28hari-orang0.00xx0.000.00x0.008Pressure regulator, tubing & accesories @ 2 set28hari-alatx0.00x0.000.00x0.009Alat kerja bongkar pasang valve & accesories @ 2 set28hari-alatx0.00x0.00xx0.0010Pressure chart recorder & pressure gauge @ 2 set28hari-alatx0.00x0.00xx0.00Jumlah VII0.000.000.000.00VIIISertifikasi Kelayakan Pengunaan Peralatan (SKPP)1Slope Tank/FWKO Tank @ 1 unit1Ls0.000.00x0.000.00x0.002Dry Air Receiver Drum Tag.No. 2-11-D31 @ 1 unit1Ls0.000.00x0.000.00x0.003Flare KO Drum (Closed Drain Vessel) Tag. No. 2-11-D26 @ 1 unit1Ls0.000.00x0.000.00x0.00Jumlah VIII0.000.000.000.00TOTAL (I + II + III + IV + V + VI + VII + VIII), Rp0.000.000.000.001.002.003.004.005.006.007.00

&L&7/&F/&A/&R&7&P of &N

BOQ Inst rev 1ESTIMASI BIAYA INSTRUMENTASIPEKERJAAN UP GRADING SP SUBANGNOURAIAN PEKERJAANVOLUMEHARGA SATUAN (Rp)JUMLAH HARGA (Rp)TOTAL HARGA (Rp)SATUANJASAMATERIALJASAMATERIALIPEKERJAAN ENGINEERINGAPENYUSUNAN PROSEDUR PENGELOLAAN PROYEK1.Penyusunan Prosedur Komunikasi dan Kontraktual1.00Ls2,937,500.00500,000.002,937,500.00500,000.003,437,500.002.Penyusunan Prosedur Persetujuan Dokumen Administrasi dan Teknis1.00Ls2,163,500.00500,000.002,163,500.00500,000.002,663,500.003.Penyusunan Project Control Chart (Prorata, S-Curve / Bar Chart)1.00Ls2,005,000.00500,000.002,005,000.00500,000.002,505,000.004.Penyediaan Progress Status Report1.00Ls9,008,000.002,000,000.009,008,000.002,000,000.0011,008,000.00Jumlah I.A16,114,000.003,500,000.0019,614,000.00BPERENCAAN / REKAYASA & RANCANGBANGUN1.Pelaksanaan survey rinci (pendataan, asesmen kondisi tanah, sarana existing dan lingkungan)1.00Ls13,176,000.002,000,000.0013,176,000.002,000,000.0015,176,000.002.Penyusunan Kalkulasi Teknis1.00Ls9,043,000.001,000,000.009,043,000.001,000,000.0010,043,000.003.Pembuatan Desain / Gambar Teknis1.00Ls6,391,000.001,000,000.006,391,000.001,000,000.007,391,000.004.Penyusunan Spesifikasi Peralatan dan Material1.00Ls4,004,000.00250,000.004,004,000.00250,000.004,254,000.005.Penyusunan Pelaksanaan / Pemasangan Konstruksi1.00Ls4,791,000.00500,000.004,791,000.00500,000.005,291,000.006.Penyusunan Spesifikasi Pengujian Teknis (Inspeksi) dan Test Report1.00Ls3,610,500.00250,000.003,610,500.00250,000.003,860,500.007.Pengelolaan Proyek1.00Ls8,640,000.003,000,000.008,640,000.003,000,000.0011,640,000.00Jumlah I.B49,655,500.008,000,000.0057,655,500.00JUMLAH - I65,769,500.0011,500,000.0077,269,500.00IIPEKERJAAN KONSTRUKSIAPERSIAPAN1.Mobilisasi & Demobilisasi1Ls4,458,000400,0004,458,000.00400,000.004,858,000.002.Sarana sementara kantor/gudang (36 m)1Ls8,070,00022,438,0008,070,000.0022,438,000.0030,508,000.003.Penyediaan kendaraan transportasi (mini bus), 1 unit1Ls6,000,00024,516,0006,000,000.0024,516,000.0030,516,000.00JUMLAH - II.118,528,000.0047,354,000.0065,882,000.00BPEKERJAAN MEKANIKAL1PEMBANGUNAN TRUNK LINE 6" SCH 40 SEPANJANG 1825 METERDARI SP MLD KE SP MLD BARUPekerjaan Sipila.Pekerjaan Galian & Urugan230.25M30,229.000.06,960,227.250.06,960,227.256.14M12,091.0048,600.0074,238.74298,404.00372,642.74230.25M10,154.000.02,337,958.500.02,337,958.50b.Pekerjaan Support6.00Unit32,380.00110,721.00194,280.00664,326.00858,606.0028.00Unit70,048.00213,367.001,961,344.005,974,276.007,935,620.0038.00Unit328,828.00123,920.0012,495,464.004,708,960.0017,204,424.00Pekerjaan Pemipaana.Pengeceran pipa1.00Jts1,709.00104.001,709.00104.001,813.0024,780.002,110.00153.00Jts17,759.001,083.002,717,127.00165,699.002,882,826.0014,644.003,500.003.00Jts26,728.001,630.0080,184.004,890.0085,074.00b.Membersihkan bagian dalam pipa1.00Jts732.0080.00732.0080.00812.006,907.002,998.00153.00Jts2,196.00238.00335,988.0036,414.00372,402.003.00Jts3,641.00267.0010,923.00801.0011,724.00c.Pengelasan Pipa (pek. proyek)1.00Jts23,068.0018,502.0023,068.0018,502.0041,570.00153.00Jts87,119.0058,422.0013,329,207.008,938,566.0022,267,773.003.00Jts130,678.0087,631.00392,034.00262,893.00654,927.00d.Menyetel/memasang Valve2.00Pcs64,923.0010,000.00129,846.0020,000.00149,846.004.00Pcs64,923.0010,000.00259,692.0040,000.00299,692.00e.Pengelasan Fitting Pipa26.00Pcs73,018.0087,631.001,898,468.002,278,406.004,176,874.002.00Pcs97,356.00116,841.00194,712.00233,682.00428,394.00f.Potong dan Bevel Pipa28.00ttk9,475.0023,543.00265,300.00659,204.00924,504.00g.Pekerjaan Crossing1.00Lks4,915,701.00522,544.004,915,701.00522,544.005,438,245.0010.00Pcs14,937.001,750.00149,370.0017,500.00166,870.008.00Pcs18,672.002,188.00149,376.0017,504.00166,880.00h.Pekerjaan Wrapping & Coating pipa 6"0.00M'6,180.0029,367.000.00.00.0i.Pekerjaan Lowering in Pipa 6" @ 12M0.00M'592.0084.000.00.00.0j.Pengecatan pipa1,518.00M'1,957.005,742.002,970,726.008,716,356.0011,687,082.00k.Pekerjaan Tie-in1.00Ls824,000.001,550,000.00824,000.001,550,000.002,374,000.00JUMLAH - II.B10.00.00.02BONGKAR & PINDAHKAN VESSEL & PIPING DI AREA SP MLD LAMAa.Pekerjaan Bongkar Pipa2Jts7,185.001,856.0014,370.003,712.0018,082.004Jts8,757.002,263.0035,028.009,052.0044,080.0010Jts11,676.003,016.00116,760.0030,160.00146,920.0010Jts18,682.004,826.00186,820.0048,260.00235,080.00b.Pekerjaan Bongkar Valve1Pcs5,266.00651.005,266.00651.005,917.003Pcs32,461.002,083.0097,383.006,249.00103,632.003Pcs36,520.502,735.25109,561.508,205.75117,767.257Pcs27,825.001,786.00194,775.0012,502.00207,277.006Pcs38,954.002,500.00233,724.0015,000.00248,724.003Pcs41,737.502,679.00125,212.508,037.00133,249.5013Pcs38,954.002,500.00506,402.0032,500.00538,902.0010Pcs58,431.003,750.00584,310.0037,500.00621,810.001Pcs48,692.007,500.0048,692.007,500.0056,192.004Pcs64,923.0010,000.00259,692.0040,000.00299,692.002Pcs64,923.0010,000.00129,846.0020,000.00149,846.00c.Pekerjaan Bongkar Fittings2Pcs12,168.7513,876.5024,337.5027,753.0052,090.506Pcs16,225.0018,502.0097,350.00111,012.00208,362.006Pcs16,225.0018,502.0097,350.00111,012.00208,362.0014Pcs22,466.0025,618.00314,524.00358,652.00673,176.0012Pcs22,466.0025,618.00269,592.00307,416.00577,008.006Pcs22,466.0025,618.00134,796.00153,708.00288,504.0030Pcs29,206.0033,303.00876,180.00999,090.001,875,270.0024Pcs29,206.0033,303.00700,944.00799,272.001,500,216.002Pcs48,679.0058,422.0097,358.00116,844.00214,202.008Pcs48,679.0058,422.00389,432.00467,376.00856,808.004Pcs48,679.0058,422.00194,716.00233,688.00428,404.004Pcs29,206.0033,303.00116,824.00133,212.00250,036.005Pcs29,206.0033,303.00146,030.00166,515.00312,545.003Pcs48,679.0058,422.00146,037.00175,266.00321,303.0013Pcs24,339.0027,751.00316,407.00360,763.00677,170.0010Pcs33,700.0038,426.00337,000.00384,260.00721,260.0018Pcs43,810.0049,954.00788,580.00899,172.001,687,752.0012Pcs43,810.0049,954.00525,720.00599,448.001,125,168.005Pcs32,452.0037,003.00162,260.00185,015.00347,275.0011Pcs44,934.0051,234.00494,274.00563,574.001,057,848.0020Pcs58,414.0066,605.001,168,280.001,332,100.002,500,380.002Pcs110,731.0091,725.00221,462.00183,450.00404,912.001Pcs73,465.0058,921.0073,465.0058,921.00132,386.002Pcs55,009.0044,120.00110,018.0088,240.00198,258.00d.Pekerjaan Bongkar Vessel (Scruber, Separator & Pig)1Lot7,825,560.00600,000.007,825,560.00600,000.008,425,560.00e.Pekerjaan Pemindahan Vessel (Scruber, Separator, Pig) & Piping1Lot2,935,000.0015,709,000.002,935,000.0015,709,000.0018,644,000.00f.Pekerjaan Pasang Vessel (Scruber, Separator & Pig)1Lot3,913,000.006,281,000.003,913,000.006,281,000.0010,194,000.00JUMLAH - II.B225,124,338.5031,685,087.7556,809,426.253PEKERJAAN PIPING SYSTEM DI DALAM AREA SP BARUa.Pengeceran pipa15Jts1,709.00104.0025,635.001,560.0027,195.003Jts3,548.00216.0010,644.00648.0011,292.0012Jts5,050.00308.0060,600.003,696.0064,296.0015Jts8,879.00541.00133,185.008,115.00141,300.00b.Membersihkan bagian dalam pipa15Jts732.0080.0010,980.001,200.0012,180.003Jts877.0096.002,631.00288.002,919.0012Jts961.00104.0011,532.001,248.0012,780.0015Jts1,097.00119.0016,455.001,785.0018,240.00c.Pengelasan pipa Sch 40 (proyek)15Jts23,068.0018,502.00346,020.00277,530.00623,550.003Jts31,941.0025,618.0095,823.0076,854.00172,677.0012Jts41,524.0033,303.00498,288.00399,636.00897,924.0015Jts69,207.0058,422.001,038,105.00876,330.001,914,435.00d.Menyetel / Pasang Valve1Pcs5,266.00651.005,266.00651.005,917.003Pcs32,461.002,083.0097,383.006,249.00103,632.003Pcs36,520.502,735.25109,561.508,205.75117,767.257Pcs27,825.001,786.00194,775.0012,502.00207,277.006Pcs38,954.002,500.00233,724.0015,000.00248,724.003Pcs41,737.502,679.00125,212.508,037.00133,249.5013Pcs38,954.002,500.00506,402.0032,500.00538,902.0010Pcs58,431.003,750.00584,310.0037,500.00621,810.001Pcs48,692.007,500.0048,692.007,500.0056,192.004Pcs64,923.0010,000.00259,692.0040,000.00299,692.002Pcs64,923.0010,000.00129,846.0020,000.00149,846.001Pcs64,923.0010,000.0064,923.0010,000.0074,923.001Pcs48,679.0058,522.0048,679.0058,522.00107,201.00e.Stel dan las fitting2Pcs12,168.7513,876.5024,337.5027,753.0052,090.5012Pcs16,225.0018,502.00194,700.00222,024.00416,724.0032Pcs22,466.0025,618.00718,912.00819,776.001,538,688.0063Pcs29,206.0033,303.001,839,978.002,098,089.003,938,067.0017Pcs48,679.0058,522.00827,543.00994,874.001,822,417.0013Pcs24,339.0027,751.00316,407.00360,763.00677,170.0010Pcs33,700.0038,426.00337,000.00384,260.00721,260.0030Pcs43,810.0049,954.001,314,300.001,498,620.002,812,920.005Pcs32,452.0037,003.00162,260.00185,015.00347,275.0011Pcs44,934.0051,234.00494,274.00563,574.001,057,848.0020Pcs58,414.0066,605.001,168,280.001,332,100.002,500,380.002Pcs110,731.0091,725.00221,462.00183,450.00404,912.001Pcs73,465.0058,921.0073,465.0058,921.00132,386.002Pcs55,009.0044,120.00110,018.0088,240.00198,258.00f.Potong & bevel pipa15Ttk2,611.008,214.0039,165.00123,210.00162,375.0030Ttk4,678.0013,144.00140,340.00394,320.00534,660.0045Ttk6,024.0017,353.00271,080.00780,885.001,051,965.0025Ttk9,475.0023,543.00236,875.00588,575.00825,450.00g.Pengecatan pipa ( 1x cat meni + 2 x cat Alumunium)90M'730.002,059.0065,700.00185,310.00251,010.0018M'1,012.003,031.0018,216.0054,558.0072,774.0072M'1,337.003,900.0096,264.00280,800.00377,064.0090M'1,957.005,742.00176,130.00516,780.00692,910.00h.Pasang Flare Stack (inc. Flame Arrestor)1Unit30,000,000.0050,000,000.0030,000,000.0050,000,000.0080,000,000.00JUMLAH - II.B343,505,070.5063,647,453.75107,152,524.254PEMBUATAN SUMUR BOR AIR TANAHa.Pengeboran Sumur1.00Ttk580,540.00245,000.00580,540.00245,000.00825,540.001.00Unit338,271.0012,500.00338,271.0012,500.00350,771.0010.00Jts28,979.0031,250.00289,790.00312,500.00602,290.0010.00M'173,424.00208,333.001,734,240.002,083,330.003,817,570.0010.00M'187,297.00225,000.001,872,970.002,250,000.004,122,970.0010.00M'202,281.00243,000.002,022,810.002,430,000.004,452,810.0010.00M'218,465.00262,440.002,184,650.002,624,400.004,809,050.0010.00M'235,940.00283,435.002,359,400.002,834,350.005,193,750.0010.00M'254,816.00306,110.002,548,160.003,061,100.005,609,260.0010.00M'275,201.00330,599.002,752,010.003,305,990.006,058,000.0010.00M'297,218.00357,047.002,972,180.003,570,470.006,542,650.0010.00M'240,746.00289,208.002,407,460.002,892,080.005,299,540.0010.00M'260,006.00312,344.002,600,060.003,123,440.005,723,500.0010.00M'280,807.00337,332.002,808,070.003,373,320.006,181,390.0010.00M'303,271.00364,319.003,032,710.003,643,190.006,675,900.0012.00Jts39,695.0041,367.00476,340.00496,404.00972,744.0010.00Jts20,058.0025,500.00200,580.00255,000.00455,580.001.00Unit237,866.0025,500.00237,866.0025,500.00263,366.008.00Jts9,715.552,537.5077,724.4020,300.0098,024.401.00Ls338,271.0012,500.00338,271.0012,500.00350,771.00b.Pengecoran beton kepala sumur8.00m8,919.0038,153.0071,352.00305,224.00376,576.001.20m330,229.00-36,274.800.036,274.802.00m225,564.0036,400.0051,128.0072,800.00123,928.000.40m312,091.0048,600.004,836.4019,440.0024,276.400.02m379,697.00315,580.001,593.946,311.607,905.540.30m3140,979.00446,450.0042,293.70133,935.00176,228.702.00m215,954.001,907.0031,908.003,814.0035,722.004.00m215,692.006,141.0062,768.0024,564.0087,332.0020.00Jts4,744.001,500.0094,880.0030,000.00124,880.00c.Pengetesan Debit Air / Sumur1.00Ls455,208.00255,000.00455,208.00255,000.00710,208.00d.Biaya Kompensasi1.00Smr8,950,000.00-8,950,000.000.08,950,000.001.00Unit250,000.00750,000.00250,000.00750,000.001,000,000.00JUMLAH - II.B441,886,345.2438,172,462.6080,058,807.845INSTALASI FIRE HYDRANT (INCLUDE POMPA/ENGINE)a.Pasang & stel Pompa Pemadam1.00Ls1,491,035.00125,000.001,491,035.00125,000.001,616,035.00b.Pengeceran pipa278.00Jts1,709.00104.00475,102.0028,912.00504,014.0038.00Jts5,050.00308.00191,900.0011,704.00203,604.001.00Jts8,879.00541.008,879.00541.009,420.00c.Membersihkan bagian dalam278.00Jts732.0080.00203,496.0022,240.00225,736.0038.00Jts1,922.00209.0073,036.007,942.0080,978.001.00Jts1,097.00119.001,097.00119.001,216.00d.Memasang, stel & las pipa278.00Jts23,068.0018,502.006,412,904.005,143,556.0011,556,460.0038.00Jts52,271.0033,303.001,986,298.001,265,514.003,251,812.001.00Jts69,207.0058,422.0069,207.0058,422.00127,629.00e.Pasang valve1.00Pcs18,260.001,172.0018,260.001,172.0019,432.0026.00Pcs24,347.001,563.00633,022.0040,638.00673,660.004.00Pcs38,954.002,500.00155,816.0010,000.00165,816.003.00Pcs38,954.002,500.00116,862.007,500.00124,362.00f.Stel & las fitting54.00Pcs16,225.0018,502.00876,150.00999,108.001,875,258.0035.00Pcs29,206.0033,303.001,022,210.001,165,605.002,187,815.002.00Pcs48,679.0058,422.0097,358.00116,844.00214,202.004.00Pcs29,206.0033,303.00116,824.00133,212.00250,036.002.00Pcs48,679.0058,422.0097,358.00116,844.00214,202.00106.00Pcs24,339.0027,751.002,579,934.002,941,606.005,521,540.0010.00Pcs43,810.0049,954.00438,100.00499,540.00937,640.0012.00Pcs32,452.0037,003.00389,424.00444,036.00833,460.0012.00Pcs58,414.0066,605.00700,968.00799,260.001,500,228.0013.00Pcs11,809.00720.00153,517.009,360.00162,877.003.00Pcs6,759.00412.0020,277.001,236.0021,513.00h.Potong & bevel pipa188.00Ttk2,611.008,214.00490,868.001,544,232.002,035,100.0090.00Ttk6,024.0017,353.00542,160.001,561,770.002,103,930.004.00Ttk9,475.0023,543.0037,900.0094,172.00132,072.00i.Coating & Wrapping12.00M'2,316.0013,872.0027,792.00166,464.00194,256.00432.00M'4,120.0021,737.001,779,840.009,390,384.0011,170,224.00j.Digging, Lowering & Back Filling :244.20M30,229.007,381,921.800.07,381,921.804.85M12,091.0048,600.0058,641.35235,710.00294,351.35239.35M10,154.002,430,359.900.02,430,359.9012.00M'114.0016.001,368.00192.001,560.00432.00M'337.0048.00145,584.0020,736.00166,320.00k.Pengecatan pipa ( 1x cat meni + 2 x cat Alumunium)1,656.00M'730.002,059.001,208,880.003,409,704.004,618,584.0024.00M'1,337.003,900.0032,088.0093,600.00125,688.006.00M'1,957.005,742.0011,742.0034,452.0046,194.00l.Pasang fire box & hydrant pillar5.00Unit185,771.0012,500.00928,855.0062,500.00991,355.00m.Pembuatan Support beton cor :19.00Unit72,440.00307,677.001,376,360.005,845,863.007,222,223.003.00Unit18,635.0067,357.0055,905.00202,071.00257,976.00JUMLAH - II.B534,839,299.0536,611,761.0071,451,060.056MODIFIKASI TRUNKLINE PIPA GAS 6"a.Mengecer pipa-$26Jts8,879.00541.00230,854.0014,066.00244,920.00b.Membersihkan bagian dalam pipa-26Jts1,097.00119.0028,522.003,094.0031,616.00c.Pengelasan pipa (pekerjaan proyek)-26Jts69,207.0058,422.001,799,382.001,518,972.003,318,354.00d.Menyetel / memasang Valve-3Pcs64,923.0010,000.00194,769.0030,000.00224,769.00-1Pcs64,923.0010,000.0064,923.0010,000.0074,923.00e.Las fitting :-10Pcs48,679.0058,422.00486,790.00584,220.001,071,010.00-7Pcs97,356.00116,841.00681,492.00817,887.001,499,379.00-2Pcs43,810.0049,954.0087,620.0099,908.00187,528.00f.Potong & bevel pipa-19Ttk9,475.0023,543.00180,025.00447,317.00627,342.00g.Pengecatan pipa ( 1x cat meni + 2 x cat Alumunium)-153M'1,957.005,742.00299,421.00878,526.001,177,947.00JUMLAH - II.B64,053,798.004,403,990.008,457,788.007INSTALASI MANIFOLD HEADERa.Mengecer pipa-$9Jts5,050.00308.0045,450.002,772.0048,222.00-$16Jts8,879.00541.00142,064.008,656.00150,720.00b.Membersihkan bagian dalam pipa-9Jts961.00104.008,649.00936.009,585.00-16Jts1,097.00119.0017,552.001,904.0019,456.00c.Pengelasan pipa (pekerjaan proyek)-9Jts41,524.0033,303.00373,716.00299,727.00673,443.00-16Jts69,207.0058,422.001,107,312.00934,752.002,042,064.00d.Menyetel / memasang Valve-18Pcs48,692.003,125.00876,456.0056,250.00932,706.00-6Pcs48,692.003,125.00292,152.0018,750.00310,902.00e.Las fitting :-60Pcs29,206.0033,303.001,752,360.001,998,180.003,750,540.00-12Pcs48,679.0058,422.00584,148.00701,064.001,285,212.00-18Pcs58,414.0066,605.001,051,452.001,198,890.002,250,342.00-18Pcs97,356.00116,841.001,752,408.002,103,138.003,855,546.00-12Pcs43,810.0049,954.00525,720.00599,448.001,125,168.00f.Potong & bevel pipa-78Ttk6,024.0017,353.00469,872.001,353,534.001,823,406.00-42Ttk9,475.0023,543.00397,950.00988,806.001,386,756.00g.Pengecatan pipa ( 1x cat meni + 2 x cat Alumunium)-51M'1,337.003,900.0068,187.00198,900.00267,087.00-93M'1,957.005,742.00182,001.00534,006.00716,007.00JUMLAH - II.B79,647,449.0010,999,713.0020,647,162.008PEMBUATAN 12 UNIT TANKI PENAMPUNG MINYAK @ 40 MLENGKAP DENGAN BORDES DAN TANGGA.PEMBUATAN 1 UNIT TANKI @ 40 Ma.Penyetelan / Pengerolan besi plat :438.00Kg155.39340.3468,060.82149,068.92217,129.741,940.00Kg242.52465.60470,488.80903,264.001,373,752.80688.00Kg296.62569.47204,074.56391,795.36595,869.92656.00Kg247.07186.42162,077.99122,291.52284,369.51b.Pekerjaan pengelasan sambung :15.49M'49,657.0070,437.00769,186.931,091,069.131,860,256.069.14M'77,911.0078,679.00712,106.54719,126.061,431,232.603.05M'123,878.00125,100.00377,827.90381,555.00759,382.9018.29M'58,584.0059,172.001,071,501.361,082,255.882,153,757.249.14M'93,149.0094,083.00851,381.86859,918.621,711,300.4814.96M'78,955.0097,427.001,181,166.801,457,507.922,638,674.72c.Pekerjaan las potong :15.24M'16,408.0015,618.00250,057.92238,018.32488,076.249.14M'12,306.0011,713.50112,476.84107,061.39219,538.23d.Pekerjaan konstruksi rangka, tangga dll.0.00Kg247.07186.420.00.00.054.00M'58,584.0059,172.003,163,536.003,195,288.006,358,824.0038.00M'16,408.0015,618.00623,504.00593,484.001,216,988.00e.Stel dan pasang :NOZZLE & ACCESSORIES1.00Pcs1,148,858.001,789,909.001,148,858.001,789,909.002,938,767.001.00Pcs653,208.60938,173.00653,208.60938,173.001,591,381.601.00Pcs409,665.30593,967.10409,665.30593,967.101,003,632.402.00Pcs300,974.30435,672.50601,948.60871,345.001,473,293.601.00Pcs225,730.73331,379.41225,730.73331,379.41557,110.141.00Pcs150,487.15220,919.55150,487.15220,919.55371,406.701.00Pcs224,600.00267,491.00224,600.00267,491.00492,091.001.00Pcs97,356.00116,841.0097,356.00116,841.00214,197.001.00Pcs24,347.001,563.0024,347.001,563.0025,910.001.00Pcs38,954.002,500.0038,954.002,500.0041,454.001.00Pcs49,224.0046,854.0049,224.0046,854.0096,078.001.00Pcs16,850.0019,213.0016,850.0019,213.0036,063.002.00Pcs43,810.0049,954.0087,620.0099,908.00187,528.002.00Pcs33,700.0038,426.0067,400.0076,852.00144,252.001.00Pcs24,339.0027,751.0024,339.0027,751.0052,090.00f.Pemasangan Tanki pada pondasinya-4.00Bh25,000.0035,000.00100,000.00140,000.00240,000.00-1.00Ls200,000.00400,000.00200,000.00400,000.00600,000.00g.Pengecatan-146.00M6,437.000.0939,802.000.0939,802.00-82.00M6,437.000.0527,834.000.0527,834.00BIAYA PEMBUATAN 1 UNIT TANKI @ 40 MJumlah0.00.00.0BIAYA PEMBUATAN 12 UNIT TANKI @ 40 MJUMLAH - II.B80.00.00.09PEMBANGUNAN JEMBATAN ANTAR TANKI & PIPING SYSTEM TANKIa.Pekerjaan Sipil1.3M30,229.000.090,687.000.090,687.003M10,154.000.030,462.000.030,462.002.39M'12,306.0011,713.50479,934.00456,826.50936,760.5040M'33,214.0046,867.001,328,560.001,874,680.003,203,240.003.14Unit18,635.0067,357.00260,890.00942,998.001,203,888.004.130M9,661.006,344.001,255,930.00824,720.002,080,650.00Jumlah II.B9a3,446,463.004,099,224.507,545,687.50b.Pekerjaan Pemipaan1.24Jts5,050.00308.00121,200.007,392.00128,592.0014Jts8,879.00541.00124,306.007,574.00131,880.002.24Jts961.00104.0023,064.002,496.0025,560.0014Jts1,097.00119.0015,358.001,666.0017,024.003.24Jts41,524.0033,303.00996,576.00799,272.001,795,848.0014Jts69,207.0058,422.00968,898.00817,908.001,786,806.004.96Pcs29,206.0033,303.002,803,776.003,197,088.006,000,864.0016Pcs48,679.0058,422.00778,864.00934,752.001,713,616.005.108Ttk6,024.0017,353.00650,592.001,874,124.002,524,716.0012Ttk9,475.0023,543.00113,700.00282,516.00396,216.006.24Pcs38,954.002,500.00934,896.0060,000.00994,896.001Pcs48,692.007,500.0048,692.007,500.0056,192.007.144M'1,337.003,900.00192,528.00561,600.00754,128.0084M'1,957.005,742.00164,388.00482,328.00646,716.00Jumlah II.B9b7,936,838.009,036,216.0016,973,054.00JUMLAH - II.B911,383,301.0013,135,440.5024,518,741.50JUMLAH - II.B0.00.00.0CPEKERJAAN ELEKTRIKAL1PEMINDAHAN DAN PEMASANGAN GENSET STANDFORDa.Bongkar Generator Stanford 31,3kVA/25kW/380V/3P/50Hz1.00Unit622,898.00622,898.000.0622,898.00b.Pasang Generator Stanford 31,3kVA/25kW/380V/3P/50Hz1.00Unit1,245,796.001,245,796.000.01,245,796.00c.Galian Kabel3.75M32,125.53120,470.740.0120,470.74d.Gelar Kabel NYFGbY 4x25 mm30.00M2,838.4385,152.900.085,152.90e.Urugan Pasir dengan Ukuran 0,2x0,4x150m150.00M12,850.214,000.001,927,531.50600,000.002,527,531.50f.Urugan Tanah3.75M12,850.2148,188.290.048,188.29g.Batu Ampar 10 Cm X 24 Cm62.50Pcs2,143.48133,967.500.0133,967.50Jumlah II.C14,184,004.93600,000.004,784,004.932PANEL GENSETa.Pasang dan instalasi Panel ( 60x50x25 ) IP30,RAL 7032,1.00Unit3,173,635.003,173,635.000.03,173,635.00Thk 1,5 mm c/w Accessoriesb.Pasang MCCB 60-80Amp/3Phs Compact NS 36kA1.00Unit260,694.00260,694.000.0260,694.00Jumlah II.C23,434,329.000.03,434,329.003PANEL PENERANGANa.Pasang & Instal Panel ( 60x40x25 ) IP30,RAL 70321.00Set591,824.00591,824.000.0591,824.00Thk 1,5mm, c/w Accesoriessb.Pasang MCCB 60-80Amp/3Phs Compact NS 36kA1.00Pcs260,694.00260,694.000.0260,694.00Jumlah II.C3852,518.000.0852,518.004INSTALASI CONTROL ROOMa.Pasang instalasi baru untuk lampu TL 2x40 Watt9.00titik116,770.501,050,934.500.01,050,934.50b.Rakit, pasng, dan sambung armature TL 2x40 Watt9.00titik82,867.00745,803.000.0745,803.00c.Pasang Instalasi baru TL 20W/220V+ Armature6.00titik116,770.50700,623.000.0700,623.00d.Rakit, pasang, dan sambung armature TL 20 Watt/220V6.00titik82,867.00497,202.000.0497,202.00e.Pasang instalasi Socket Contact Broco 6A/220V5.00titik77,487.00387,435.000.0387,435.00f.Pasang instalasi AC 1PK National2.00Set142,301.75284,603.500.0284,603.50Jumlah II.C43,666,601.000.03,666,601.005INSTALASI PENERANGAN RUMAH GENSET,FIRE PUMPa.Pasang Lampu TL GMS HG 2x36-40 Watt/220 Volt8.00titik116,770.50934,164.000.0934,164.00b.Rakit, pasng, dan sambung armature TL 2x40 Watt8.00titik116,770.50934,164.000.0934,164.00Jumlah II.C51,868,328.000.01,868,328.006INSTALASI PENERANGAN RUMAH POMPAa.Pasang Lampu Mercury Fixture Pendant 125Watt Expl Proof2.00Unit251,845.20503,690.400.0503,690.40Jumlah II.C6503,690.400.0503,690.407INSTALASI PENERANGAN JALANa.Pondasi Tiang Lampu Jalan 1:2:33.07M206,001.34328,450.00632,836.121,008,998.401,641,834.52b.Pasang stel besi beton142.85kg2,389.677,850.00341,359.581,121,356.801,462,716.38c.Pemasangan lampu dan mendirikan tiang lampu12.00Bh150,239.001,802,868.000.01,802,868.00d.Pemasangan armature lampu jalan12.00titik145,912.001,750,944.000.01,750,944.00e.Galian Kabel NYFGbY4x6mm SPLN215.70M32,125.536,929,476.820.06,929,476.82f.Gelar Kabel NYFGbY4x6mm SPLN719.00Mtr1,351.63971,821.970.0971,821.97g.Urugan Kabel dg pasir uk.0,2x0,4x580719.00Mtr12,850.214,000.009,239,300.992,876,000.0012,115,300.99h.Urugan Kabel179.75M12,850.212,309,825.250.02,309,825.25i.Batu Ampar 12x24cm2995.83Bh2,143.486,421,508.830.06,421,508.83Jumlah II.C730,399,941.565,006,355.2035,406,296.768INSTALASI LAMPU SOROTa.Pondasi Tiang Lampu Sorot 1:2:30.93M206,001.34328,450.00191,169.24304,801.60495,970.84b.Pasang stel besi beton54.56kg2,389.677,850.00130,380.40428,296.00558,676.40c.Mendirikan tiang lampu Sorot4.00Bh281,876.001,127,504.000.01,127,504.00d.Pemasangan armature lampu Sorot4.00titik209,871.00839,484.000.0839,484.00e.Galian Kabel NYFGbY4x6mm SPLN70.05M32,125.532,250,393.380.02,250,393.38f.Gelar Kabel NYFGbY4x6mm SPLN233.50Mtr1,351.63315,605.610.0315,605.61g.Urugan Kabel dg pasir uk.0,2x0,4x580233.50Mtr12,850.214,000.003,000,524.04934,000.003,934,524.04h.Urugan Kabel58.38M12,850.21750,131.010.0750,131.01i.Batu Ampar 12x24cm972.92Bh2,143.482,085,427.420.02,085,427.42Jumlah II.C810,690,619.101,667,097.6012,357,716.709PEMINDAHAN PENANGKAL PETIR UTAMAa.Bongkar instalasi penangkal Petir1.00Set822,730.00822,730.000.0822,730.00b.Pemasangan Penangkal Petir1.00Unit822,730.00822,730.000.0822,730.00Jumlah II.C91,645,460.000.01,645,460.0010GROUNDING PENAGKAL PETIR UTAMAa.Pemasangan Earth Steel Cooper Rood 5/8" @ 3 meter1.00titik35,363.1535,363.150.035,363.15b.Pembuatan bak kontrol 40x40x40 cm/bh1.00Unit89,876.08100,414.0089,876.08100,414.00190,290.08c.Pengukuran Grounding system1.00Unit144,010.00144,010.000.0144,010.00Jumlah II.C10269,249.23100,414.00369,663.2311PEMINDAHAN (BONGKAR/PASANG) ANTENA TELKOMa.Bongkar instalasi antena Telkom1.00Set822,730.00822,730.000.0822,730.00b.Pemasangan antena Telkom1.00Unit822,730.00822,730.000.0822,730.00c.Pasang kabel BC 50 mm50.00M2,027.45101,372.500.0101,372.50d.Pemasangan lampu indicator1.00Bh0.00.00.00.0e.Pemasangan penangkal petir convensional1.00Bh0.00.00.00.0Jumlah II.C111,746,832.500.01,746,832.5012GROUNDING ANTENA TELKOMa.Pemasangan Earth Steel Cooper Rood 5/8" @ 3 meter1.00titik35,363.1535,363.150.035,363.15b.Pembuatan bak kontrol 40x40x40 cm/bh1.00Unit89,876.08100,414.0089,876.08100,414.00190,290.08c.Pengukuran Grounding system1.00Unit144,010.00144,010.000.0144,010.00Jumlah II.C12269,249.23100,414.00369,663.2313GROUNDING SYSTEM GENSET, PANEL, TANGKI DAN POMPAa.Galian tanah2.40M32,152.5377,166.070.077,166.07b.Gelar kabel BC 50 mm80.00M2,027.45162,196.000.0162,196.00c.Timbun kabel dg pasir 20cm80.00M13,806.204,500.001,104,496.00360,000.001,464,496.00d.Pemasangan Earth Steel Cooper Rood 5/8" @ 3 meter4.00titik35,363.15141,452.600.0141,452.60e.Pembuatan bak kontrol 40x40x40 cm/bh4.00Unit89,876.08100,414.00359,504.32401,656.00761,160.32f.Pengukuran Grounding system4.00Unit144,010.00576,040.000.0576,040.00Jumlah II.C132,420,854.99761,656.003,182,510.9914CATHODIC PROTECTION TANKa.Pasang Aluminium Anode24.00Pcs124,515.172,988,364.000.02,988,364.00Jumlah II.C142,988,364.000.02,988,364.00JUMLAH - II.C64,940,041.948,235,936.8073,175,978.741Instrument c/w fitting, tubing & other accessories(as per hook-up document)a.Pressure Safety Valve1.00Unit0.000.000.000.000.00b.Level Glass for vessel2.00Unit0.000.000.000.000.00c.Level Transmitter for vessel (float/displacer type)2.00Unit0.000.000.000.000.00d.Level Indicator For Tank (float type)1.00Unit0.000.000.000.000.00e.Level Transmitter for Tank (float Type)1.00Unit0.000.000.000.000.00f.Pressure Indicator3.00Unit0.000.000.000.000.00g.Pressure Transmitter3.00Unit0.000.000.000.000.00h.Temperature Indicator3.00Unit0.000.000.000.000.00i.Temperature Transmitter3.00Unit0.000.000.000.000.00j.Breather Valve1.00Unit0.000.000.000.000.00k.Foam Chamber2.00Unit0.000.000.000.000.00l.Flame Detector2.00Unit0.000.000.000.000.00m.Gas Detector2.00Unit0.000.000.000.000.000.000.000.000.000.002Junction Box c/w terminal block, cable gland, support, name plate,bounding & grounding, and other accessoriesa.Analog junction Box (12 analog signal)3.00Unit0.000.000.000.000.00b.Analog junction Box (24 analog signal)1.00Unit0.000.000.000.000.00c.Digital Junction box (36 digital signal)1.00Unit0.000.000.000.000.000.000.000.000.000.003Air Instrument Connection c/w male/female connector double ferrule,Union connector, union tee, tube plug, dll. ASTM A182, 316SS.a.3/4" OD, 0,049'WT, Tubing SMLS fully annalead, ASTM A269, 316SS20.00m'0.000.000.000.000.00b.1/2" OD, 0,049'WT, Tubing SMLS fully annalead, ASTM A269, 316SS60.00m'0.000.000.000.000.000.000.000.000.000.004Instrument cable (as per cable specification)c/w cable marker, cable lug, cable ties, and other accessories.a.Instrument Cable 1 PR x 1,5 mm2, Armoure,500.00m'0.000.000.000.000.00b.Instrument Cable 2 PR x 1,5 mm2, Armoure,200.00m'0.000.000.000.000.00c.Instrument Cable 12 PR x 1,5 mm2, Armoure,1,500.00m'0.000.000.000.000.00d.Grounding Cable, 10 mm2100.00m'0.000.000.000.000.000.000.000.000.000.005Cable Ladder/Tray, supporta.Perforated cable tray, steel hotdip galvanized finished, ASTM A123,c/w reducer, riser, tee, splice plate, cover plate, clamp cover,grounding, bolt and nut, dll- ukuran 100 (W) x 100 (D)25.00m'0.000.000.000.000.00- ukuran 100 (W) x 50 (D)50.00m'0.000.000.000.000.00b.Perforated cable ladder, steel hotdip galvanized finished, ASTM A123,c/w reducer, riser, tee, splice plate, cover plate, clamp cover,grounding, bolt and nut, dll- ukuran 300 (W) x 150 (D)50.00m'0.000.000.000.000.00- ukuran 150 (W) x 150 (D)700.00m'0.000.000.000.000.00c.Conduit, rigid steel hotdip, galvanized finished c/w bushing & Locknut,sadle/clamp,dsb- ukuran 2" @10.00pcs0.000.000.000.000.00- ukuran 1"10.00pcs0.000.000.000.000.00d.Instrument stancion7.00pcs0.000.000.000.000.000.000.000.000.000.006Pemprograman HMI dan DCS1.00Ls0.000.000.000.000.000.000.000.000.000.007Sertifikasi peralatan1.00Ls0.000.000.000.000.000.000.000.000.000.00TOTAL BIAYA PEKERJAAN0.000.000.00

&L/&F/&A/&R&10&P of &NPas. Valve 2"-150# + 50%50% = faktor ASA 600# (ref. analisa th. 2006)Pas. Valve 2"-150# + 50%50% = faktor ASA 600# (ref. analisa th. 2006)Pas. Valve 3"-150# + 50%50% = faktor ASA 600# (ref. analisa th. 2006)Pas. Valve 3"-150# + 50%50% = faktor ASA 600# (ref. analisa th. 2006)Pas. Valve 4"-150# + 50%50% = faktor ASA 600# (ref. analisa th. 2006)Pas. Valve 4"-150# + 50%50% = faktor ASA 600# (ref. analisa th. 2006)75% dari flange 2"Pas. Valve 2"-150# + 50%50% = faktor ASA 600# (ref. analisa th. 2006)Pas. Valve 2"-150# + 50%50% = faktor ASA 600# (ref. analisa th. 2006)Pas. Valve 3"-150# + 50%50% = faktor ASA 600# (ref. analisa th. 2006)Pas. Valve 3"-150# + 50%50% = faktor ASA 600# (ref. analisa th. 2006)Pas. Valve 4"-150# + 50%50% = faktor ASA 600# (ref. analisa th. 2006)Pas. Valve 4"-150# + 50%50% = faktor ASA 600# (ref. analisa th. 2006)1 jts = 6 meteranalisa per ton dibagi kg1,59 x upah las plat dasar.LAS plat dasar dgn over lap tebal 4mmsupport type B di fire hydrantsupport type B di fire hydrant

BoQ ElectBILL OF QUANTITYPEKERJAAN ELECTRICAL "PEMBANGUNAN SP SUBANG"Rev 1NOURAIAN PEKERJAANVOLUMEHARGA SATUAN (Rp)JUMLAH HARGA (Rp)TOTAL HARGA (Rp)FAKTOR ESKALASI =25%(tanggal 23 Agustus 2013)SATUANUPAHBAHAN/ALATMATERIALUPAHBAHAN/ALATMATERIALFAKTOR TAMBAHAN =125%1PANEL DISTRIBUSI UTAMA &PANEL PENERANGANa.Panel ( 80x60x30 )cm, IP42,RAL 70351.00UnitXX1,948,000.000.000.001948000.001948000.00Thk 1,5mm, c/w Accesoriessb.Pasang dan Instalasi Panel ( 60x40x25 )cm, IP42,RAL 70351.00Unit0.00XX0.000.000.000.00Thk 1,5mm, c/w Accesoriessc.Indicator Lamp for Phase3.00UnitXX52,500.000.000.00157500.00157500.00d.Fuse 4A + Holder3.00UnitXX0.000.000.000.000.00e.Volt Meter1.00UnitXX230,000.000.000.00230000.00230000.00f.Ampere Meter1.00UnitXX360,000.000.000.00360000.00360000.00g.Copper Busbar1.00LotXX0.000.000.000.000.00h.MCCB 100Amp, 3 Pole, 380V1.00UnitXX989,500.000.000.00989500.00989500.00i.Starter Motor 20 KW, star/delta2.00Unit0.00X2,500,000.000.000.005000000.005000000.00j.Starter Motor 5 KW, DOL2.00Unit0.00X850,000.000.000.001700000.001700000.00k.MCB 16 Amp 1 Phs, 220V, 10 KA6.00UnitXX141,500.000.000.00849000.00849000.00l.MCB 6 Amp 1 Phs, 220V, 10 KA4.00UnitXX141,500.000.000.00566000.00566000.00m.Local Control Station, 2 Push Button, explosion proof4.00Set0.00X536,000.000.000.002144000.002144000.00n.Selector switch 2 posisi2.00UnitXX96,500.00193000.00193000.00o.Consumable kit (control cable, terminal block, cable lug, wire duct,1.00LotXX0.000.000.000.000.00junction box, LOTO accessories, etc)0.000.0014137000.0014137000.002INSTALASI PENERANGAN SHELTER FIRE PUMPa.Lampu TL 2 x36 Watt/220V Explotion Proof, Class 1 Div.2 + Saklar2.00unitXX0.000.000.000.000.00b.Pasang Lampu TL 2 x36 Watt/220V, Class 1 Div.22.00titik0.00XX0.000.000.000.00c.Conduit Pipe Galvanized 3/4" @ 6m2.00BtgXX0.000.000.000.000.00d."TEE" Bahan Metal1.00unitXX0.000.000.000.000.000.000.000.000.003INSTALASI PENERANGAN SHELTER CLOSED DRAIN PUMPa.Lampu TL 2 x36 Watt/220V Explotion Proof, Class 1 Div.2 + Saklar2.00unitXX0.000.000.000.000.00b.Pasang Lampu TL 2 x36 Watt/220V, Class 1 Div.22.00titik0.00XX0.000.000.000.00c.Conduit Pipe Galvanized 3/4" @ 6m2.00BtgXX0.000.000.000.000.00d."TEE" Bahan Metal1.00unitXX0.000.000.000.000.000.000.000.000.004INSTALASI LAMPU SOROTa.Lampu Sorot Explotion Proof 400Watt, class 1 div 24.00UnitXX0.000.000.000.000.00b.Tiang Lampu Sorot 11 Mtr4.00UnitXX0.000.000.000.000.00c.Pondasi Tiang Lampu Sorot 1:2:33.71M0.000.00X0.000.000.000.00d.Pasang stel besi beton54.56kg0.000.00X0.000.000.000.00e.Mendirikan tiang lampu Sorot4.00Unit0.00XX0.000.000.000.00f.Pemasangan armature lampu Sorot4.00titik0.00XX0.000.000.000.00g.MCB 4Amp /220V4.00UnitXX0.000.000.000.000.000.000.000.000.005INSTALASI PENGKABELANa.Kabel NYFGbY 3x4mm2250.00MtrXX0.000.000.000.000.00Gelar Kabel NYFGbY 3x4mm2250.00Mtr0.00XX0.000.000.000.00b.Kabel NYFGbY 4x10mm2200.00MtrXX0.000.000.000.000.00Gelar Kabel NYFGbY 4x10mm2200.00Mtr0.00XX0.000.000.000.00c.Kabel NYFGbY 4x4mm2350.00MtrXX0.000.000.000.000.00Gelar Kabel NYFGbY 4x4mm2350.00Mtr0.00XX0.000.000.000.00d.Galian Kabel75.00M0.00XX0.000.000.000.00Urugan Pasir dengan Ukuran 0,1x0,5x(panjang kabel)m12.50M0.000.00X0.000.000.000.00Urugan Tanah62.50M0.00XX0.000.000.000.00Batu Ampar 10 Cm X 24 Cm750.00Unit0.00XX0.000.000.000.00e.Kabel NYY 2x2,5mm2100.00Mtr0.00X0.000.000.000.000.00f.Galvanized Pipe (Crossing jalan) 6" @6M2.00BtgXX0.000.000.000.000.000.000.000.000.006PEMASANGAN PENANGKAL PETIR UTAMAa.Air Terminal / preventer2.00UnitXX0.000.000.000.000.00b.Pemasangan Lightning Preventer2.00Unit0.00XX0.000.000.000.00c.Ligthning Strike Counter2.00UnitXX0.000.000.000.000.00d.Termination Kit Upper/Lower2.00SetXX0.000.000.000.000.00e.Tiang Penangkal Petir (Mounting Mast) 25 Meter,2.00UnitXX0.000.000.000.000.00f.Wire rope2.00SetXX0.000.000.000.000.00g.Pondasi penangkal petir 1:2:316.00M0.000.00X0.000.000.000.00h.Pasang stel besi beton215.60kg0.000.00X0.000.000.000.00i.Pemasangan Tiang Penangkal Petir2.00Unit0.00XX0.000.000.000.000.000.000.000.007GROUNDING PENANGKAL PETIR UTAMAa.Grounding Rod dia 5/8" @3mtr6.00BtgXX0.000.000.000.000.00b.Rod Clamp2.00UnitXX0.000.000.000.000.00c.Rod Coupling4.00UnitXX0.000.000.000.000.00d.BC Cable 50 mm220.00Mtr0.00X0.000.000.000.000.00e.Pemasangan Grounding Rod 5/8" @ 3 meter2.00titikXX0.000.000.000.000.00f.Pembuatan bak kontrol 40x40x40 cm/bh2.00Unit0.000.00X0.000.000.000.00g.Pengukuran Grounding system2.00Unit0.000.00X0.000.000.000.000.000.000.000.008GROUNDING SYSTEM PERALATAN DAN BONDING SYSTEMa.BC Cable 95 mm2200.00MtrXX0.000.000.000.000.00b.BC Cable 50 mm2100.00MtrXX0.000.000.000.000.00c.Gelar kabel BC 50 mm2100.00Mtr0.00XX0.000.000.000.00d.Galian tanah60.00M0.00XX0.000.000.000.00e.Gelar kabel BC 95 mm2200.00M0.00XX0.000.000.000.00fTimbun kabel BC 95 mm2 dg tanah60.00M0.000.00X0.000.000.000.00g.Grounding Rod dia 5/8" @3mtr12.00BtgXX0.000.000.000.000.00h.Rod Clamp4.00UnitXX0.000.000.000.000.00i.Rod Coupling8.00UnitXX0.000.000.000.000.00j.Pemasangan Earth Steel Cooper Rod 5/8" @ 3 meter4.00titik0.00XX0.000.000.000.00k.Pembuatan bak kontrol 40x40x40 cm/bh4.00Unit0.000.00X0.000.000.000.00l.Conduit Pipe Galvanized 3/4" @ 6m6.00JtsXX0.000.000.000.000.00m.Conduit Clamp 3/4"8.00UnitXX0.000.000.000.000.00n.Pengukuran Grounding system4.00Unit0.000.00X0.000.000.000.000.000.000.000.009CATHODIC PROTECTION TANKIa.Pemasangan Cathodic Protection tanki1.00Lot0.000.000.000.000.000.000.000.000.000.000.000.000.0014137000.0014137000.000.000.001570.781570.78

&L/&F/&A/&R&10&P of &N

BoQ SipilB I L L O F Q U A N T I T YPEKERJAAN SIPIL - UPGRADING SP SUBANGKabupaten SubangNOURAIAN PEKERJAANVOLUMESATHARGA SATUANJUMLAH HARGAUPAHBAHANUPAHBAHANUPAH + BAHANIPekerjaan Persiapan1Mobilisasi & demobilisasi alat berat2.00unitX2Pasang bouwplank dari kayu borneo10.00m'3Pekerjaan sondir (cone penetration test) berikut mob demob. Setup alat & pelaporan1.00lsXJUMLAHIIPekerjaan Bongkaran1Bongkar pasangan lantai0.64m2X2Bongkar tembok atau pasangan bata0.30m3X3Bongkar pintu jendela (kusen, daun , ventilasi, aksesoris, dst)1.00setX4Bongkar pintu (kusen, daun , ventilasi, aksesoris, dst)1.00setX5Bongkar jendela (kusen, daun , ventilasi, aksesoris, dst)1.00setX6Bongkar closet / wastafel / urinoir berikut aksesoris1.00setX7Bongkar pipa saluran air bersih / kotor1.00m'X8Bongkar plafond berikut rangka, listrik, dan aksesoris0.64m2X9Bongkar atap / kanopi (berikut kuda-kuda, rangka, lisplank, talang, aksesories, dst), volume dihitung sebagai luas datar10.00m2X10Bongkar pasangan batu kali0.40m3X11Bongkar / bobok beton bertulang0.15m3X12Bongkar / bobok beton tak bertulang0.15m3X13Bongkar besi-besi konstruksi untuk dipakai kembali9.00kgX14Bongkar pagar berikut rangka10.00m'XJUMLAHIIIPekerjaan Galian & Urugan1Galian material0.13m3X2Urugan & perataan material ex-galian0.13m3X3Urugan pasir (s/d kondisi padat)0.13m34Urugan sirtu (s/d kondisi padat)0.13m35Urugan base coarse (s/d kondisi padat)0.13m36Urugan split 2/3 cm (hitam) (s/d kondisi padat)0.13m37Mendatangkan tanah dari luar gembur s/d lokasi pekerjaan40,000.00m3XJUMLAHIVPekerjaan Pasangan1Pasangan bata merah tebal 1/2 bata, 1Pc : 4Ps2.00m22Pasangan bata merah tebal 1/2 bata, 1Pc : 6Ps2.00m23Pasangan batu kali, 1Pc : 4Ps0.40m34Pasangan batu kali, 1Pc : 6Ps0.40m35Plesteran spesi 1Pc : 4Ps tebal 15 mm berikut aci4.00m26Plesteran spesi 1Pc : 6Ps tebal 15 mm berikut aci4.00m27Acian4.00m28Siaran spesi 1:41.50m29Pasang lantai/ step nosing keramik semua ukuran, warna, tekstur, & corak merk Roman (termasuk apabila di variasi)12.00m210Pasang dinding keramik semua ukuran, warna, tekstur, & corak merk Roman (termasuk apabila di variasi)10.00m211Pasang plint keramik tinggi 10 cm merk Roman semua ukuran, warna, tekstur, & corak (termasuk apabila di variasi)2.00m'JUMLAHVPekerjaan Pintu dan Jendela1Pembuatan & pasang pintu besi baja termasuk las & cat, lengkap berikut kusen (Kanal "C" 150.50.20.2,3), daun pintu (besi plat tb. 1,2 mm dua muka, rangka Kanal "C" 60.30.10.2,3), engsel besi, kunci / kunci tanam, grandel, dan handle / holder1.20m22Pasang pintu allumunium untuk kamar mandi lengkap berikut kusen, daun pintu, engsel, kunci silinder, dan kunci selot1.00bh3Pembuatan dan pasang kusen / daun untuk pintu / jendela / ventilasi alumunium warna berikut skonengan dan tali air, yi. :a.Stel, pasang, dan sambung profil alumunium 4"5.00m'b.Stel, pasang, dan sambung profil alumunium "T"3.60m'c.Stel, pasang, dan sambung list alumunium lebar 10 cm0.10m'4Pasang pelapis daun pintu dari teak wood tebal 4 mm double1.60m25Buat daun pintu rangka kayu kamper, dilapis teakwood dua muka1.60m26Pasang kaca bening tb. 5 mm berikut list karet0.72m27Pasang kunci merk ses lengkap1.00bh8Pasang engsel kuningan2.00bh9Pasang hak untuk jendela dan ventilasi1.00bh10Pasang grendel untuk jendela dan ventilasi1.00bh11Pasang door closer merk new star1.00bh12Pasang door stoper1.00bh13Pasang vertical blinds0.72m2JUMLAHVIPekerjaan Plafond1Pembuatan & pasang rangka langit - langit dari besi stall uk. min. 40 x 40 x 1 mm, sambungan konstruksi las, uk. grid maks. 60 x 60 cm, berikut penggantung0.64m22Pasang langit - langit gypsum board tb. 9 mm berikut merapihkan sambungan/ nad0.64m23Pasang langit - langit GRC tb. 4 mm berikut merapihkan sambungan/ nad0.64m24Pasang list plafond gypsum lebar 10 cm0.50m'JUMLAHVIIPekerjaan Pengecatan1Pengecatan kayu dengan politur 2 x cat sampai rata1.60m22Pengecatan permukaan dinding/plafond lapisan baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) sampai rata2.00m23Pengecatan permukaan dengan Meni Kansai Paint / Zincromate sampai rata0.40m24Pengecatan permukaan dengan F-Talit ( 2 x cat ) sampai rata0.40m25Pengecatan permukaan dengan cat alumunium Kansai Paint ( 2 x cat ) sampai rata0.40m26Waterproofing dengan aquaproof0.40m2JUMLAHVIIIPekerjaan Atap1Stel pasang kuda-kuda & rangka atap baja ringan Zincolume lengkap, volume dihitung sebagai luas bidang datar1.00m2X2Pasang atap zincolume tb. 0.5 mm seluruh warna, tekstur permukaan, profil, & model800.00m23Pasang bubungan zincolume tb. 0.5 mm seluruh warna, tekstur permukaan, profil, & model40.00m'4Pasang talang seng plat BJLS 30 lebar 90 cm berikut dudukan papan kayu kruing tb. 2 cm dan cat meni40.00m'JUMLAHIXPekerjaan Sanitair1Memasang closet duduk merk toto CW 420 / S 516 JPT lengkap1.00bh2Memasang closet jongkok merk Toto type CE-71.00bh3Memasang urinoir merk toto type U-57 lengkap1.00bh4Memasang wastafel merk Toto type LW 230 lengkap (shipon, flexible, keran, tempat sabun cair, planchete stainless steel, cermin uk. 60x60 cm, dst.)1.00bh5Pasang shower spray untuk closet merk toto type TX 403 S PIV lengkap atau setara1.00bh6Memasang kran air merk San'ei type Y 20 C1.00bh7Memasang beltraf merk sansun1.00bh8Buat septictank dari pasangan bata + plesteran lengkap dengan penyekat dan tutup atas dari cor beton bertulang serta pembuangan udara dari pipa galvanis 1,5" ujung T1.00bh9Buat rembesan septictank dari batu kali dan ijuk lengkap dengan inlet pipa PVC 4"1.00bhJUMLAHXPekerjaan Pipa PVC(berikut sambungan & sumbat apabila diperlukan)1Memasang pipa PVC tipe AW 3/4"4.00m'2Memasang pipa PVC tipe AW 1"4.00m'3Memasang pipa PVC tipe AW 2"4.00m'4Memasang pipa PVC tipe AW 3"4.00m'5Memasang pipa PVC tipe AW 4"4.00m'JUMLAHXIPekerjaan Buis Beton(berikut sambungan apabila diperlukan)1Memasang & menyetel buis beton dia. 30 cm1.00m'2Memasang & menyetel buis beton dia. 80 cm1.00m'JUMLAHXIIPekerjaan Perkuatan Lapisan Tanah1Pasang gedeg bambu30.00m22Pengadaan & instalasi Geotextile Non Woven 650 gr/m2 (warna putih)30.00m23Pengadaan & instalasi geogrid uk. 35 x 35 mm 360 gr/m2 (termasuk overlap min. 30 cm di klem plastik dan angkur pemberat)30.00m2JUMLAHXIIIPekerjaan Perkerasan1Pekerjaan berm berikut galian parit drainase (manual)150.00m2X2Ampar sirtu, padat (menggunakan A2B All In)10,000.00m33Ampar base coarse, padat (menggunakan A2B All In)100.00m34Ampar split 2/3 cm (hitam), padat (menggunakan A2B All In)1,500.00m35Ampar steenslaag 3/5 cm (hitam), padat (menggunakan A2B All In)1,000.00m36Ampar steenslaag 5/7 cm (hitam), padat (menggunakan A2B All In)1,000.00m37Ampar batu 15/20 cm (hitam), padat (menggunakan A2B All in)100.00m38Penetrasi aspal tebal 4 cm, padat (alat berat All In)400.00m29Sheet aspal tebal 4 cm, padat (alat berat All In)400.00m210Kiicir aspal cair40.00m2JUMLAHXIVPekerjaan Pancang1Pengadaan tiang pancang spun pile 40 cm @ 8 m' bottom (K.600)30.00btgX2Pengadaan tiang pancang spun pile 40 cm @ 8 m' middle (K.600)30.00btgX3Pengadaan tiang pancang mini pile segitiga uk. 28 cm @ 6 m' (K450, Tulangan 3D13 U-39, Spiral 6)1.00btgX4Pancang spun pile / mini pile480.00m'X5Pancang dolken / bambu / pipa4.00m'XJUMLAHXVPekerjaan Kayu1Pengadaan dolken 12 cm4.00m'X2Pengadaan dolken 5 s/d 10 cm4.00m'X3Pengadaan bambu 10 cm4.00m'X4Pasang penggalang & perancah dolken4.00m'XJUMLAHXVIPekerjaan Pembesian1Pembesian dengan besi beton polos atau besi beton ulir termasuk kawat beton75,000.00kg2Stel dan pasang konstruksi besi round bar (shear conector, handle, dudukan bekisting, dst.)0.89kg3Stel dan pasang konstruksi besi plat polos / bordes8.11kg4Stel dan pasang konstruksi besi grating plate8.11kg5Stel dan pasang konstruksi besi canal9.37kg6Stel dan pasang konstruksi besi siku4.43kg7Stel dan pasang konstruksi besi WF / H beam9.33kg8Stel & pasang wiremesh 6 mm1.00m29Stel dan pasang angkur atau dynabold1.00bh10Stel dan pasang spansproef1.00bh11Pasang angkur mur baud 3/4" berikut lubang1.00bh12Pasang angkur mur baud 5/8" berikut lubang1.00bh13Pengadaan, stel, & pasang multiplate pipe48.00kg14Membersihkan besi dari karat menggunakan sikat baja dan ampelas besi0.40m2JUMLAHXVIIPekerjaan Las1Las potong0.20m'2Las sambung0.40m'JUMLAHXVIIIPekerjaan Beton1Pasang bekisting dari multyplek tb 12 mm (rangka dari kayu borneo ukuran 5/7 cm dan dilabur dengan oli bekas)150.00m22Bongkar bekisting dan siram beton150.00m2X3Gelar dan pasang plastik putih0.06m24Cor beton ready mix K 225 termasuk concrete vibrator (concrete pump apabila diperlukan)520.00m35Cor beton ready mix K 350 termasuk concrete vibrator (concrete pump apabila diperlukan)75.00m36Cor beton 1Pc : 2Ps : 3Sp50.00m37Cor beton 1Pc : 3Ps : 5Sp40.00m38Memotong beton dan mengisi celah beton dengan aspal cair.9.00m'9Membuat alur permukaan beton0.06m2X10Test kubus beton1.00bhXJUMLAHXIXPekerjaan Pagar1Pasang kawat duri, pemasangan harus kencang100.00m'2Pasang pagar panel beton berikut tiang45.00m2X3Pengadaan kolom panel beton keadaan utuh (ukuran 20 x 18,5 cm).30.00m'X4Pengadaan pagar panel beton keadaan utuh ( tebal min. 8 cm).45.00m2X5Pasang kawat harmonica gas BWG12 3 mm dan penjepit dari besi beton 8 mm, berikut las, pemasangan harus kencang.45.00m2JUMLAHXXPekerjaan Lain - Lain1Pasang drum ex oli untuk penahan tanah2.04m22Pasang bronjong dari kawat galvanis 4 mm dan batu belah disusun padat dan rapih, berikut pompa air0.50m33Memotong rumput dan alang-alang5.00m2X4Menebang pohon3.00btgX5Pasang karung plastik / goni diisi tanah dan dijahit dengan tali (tanah setempat), berikut pompa air0.50m3JUMLAHXXIPerapihan Bekas Kerja1Bongkar direksi keet1.00lsX2Administrasi, Perijinan, Laporan Monitoring Proyek, Dokumentasi, Perapihan Bekas Kerja, dan Laporan Penyelesaian Pekerjaan6.00lsXJUMLAHT O T A LRp.P E M B U L A T A NRp.0.00.0Terbilang :(harga tidak termasuk PPN 10 %)