Top Banner
KEGIATAN : PEMBANGUNAN SMAN 1 SUMATERA BARAT DI PADANG PANJANG PEKERJAAN : PEMBANGUNAN GAPURA PINTU GERBANG LOKASI : KOTA PADANG PANJANG T. ANGGARAN : 2013 1 GAPURA UTAMA - 2 GAPURA KEDUA - JUMLAH - PPn 10 % - JUMLAH TOTAL - DIBULATKAN - TERBILANG : ……………………………………………………………………………. Padang, 2013 Dibuat Oleh, Penawar, PT / CV. ………………………. NAMA JABATAN REKAPITULASI TOTAL RENCANA ANGGARAN BIAYA NO. URAIAN PEKERJAAN JUMLAH HARGA (Rp.) PDF created with pdfFactory Pro trial version www.pdffactory.com
31

Boq Gapura

Feb 14, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Boq Gapura

KEGIATAN : PEMBANGUNAN SMAN 1 SUMATERA BARAT DI PADANG PANJANGPEKERJAAN : PEMBANGUNAN GAPURA PINTU GERBANGLOKASI : KOTA PADANG PANJANGT. ANGGARAN : 2013

1 GAPURA UTAMA -

2 GAPURA KEDUA -

JUMLAH -

PPn 10 % -

JUMLAH TOTAL -

DIBULATKAN -

TERBILANG : …………………………………………………………………………….

Padang, 2013Dibuat Oleh,

Penawar,PT / CV. ……………………….

NAMA

JABATAN

REKAPITULASI TOTALRENCANA ANGGARAN BIAYA

NO. URAIAN PEKERJAANJUMLAH HARGA

(Rp.)

PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 2: Boq Gapura

KEGIATAN : PEMBANGUNAN SMAN 1 SUMATERA BARAT DI PADANG PANJANGPEKERJAAN : PEMBANGUNAN GAPURA PINTU GERBANGLOKASI : KOTA PADANG PANJANGT. ANGGARAN : 2013

JUMLAH HARGA(Rp.)

1 GAPURA UTAMAI PEKERJAAN PENDAHULUAN - II PEKERJAAN PONDASI - III PEKERJAAN PEMBETONAN - IV PEKERJAAN DINDING - V PEKERJAAN PLAFOND - VI PEKERJAAN LANTAI DAN KERAMIK - VII PEKERJAAN PINTU DAN JENDELA - VIII PEKERJAAN KM/WC - IX PEKERJAAN LUAR BANGUNAN - X PEKERJAAN INSTALASI LISTRIK - XI PEKERJAAN FINISHING -

TOTAL JUMLAH I s/d XI -

REKAPITULASIRENCANA ANGGARAN BIAYA

NO. URAIAN PEKERJAAN

PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 3: Boq Gapura

KEGIATAN : PEMBANGUNAN SMAN 1 SUMATERA BARAT DI PADANG PANJANGPEKERJAAN : PEMBANGUNAN GAPURA PINTU GERBANGLOKASI : KOTA PADANG PANJANGT. ANGGARAN : 2013

HARGA SATUAN JUMLAH HARGA(Rp.) (Rp.)

1 GAPURA UTAMA

I PEKERJAAN PENDAHULUAN1 Pek. Pasang Plank Proyek Ls 1.00 - - 2 Pek. Pembersihan Lapangan M2 43.28 - - 3 Pek. Pasang Bouplank M1 36.50 - - 4 Job Mix Formula ( JMF ) Dan Laporan Ls 1.00 - -

- II PEKERJAAN PONDASI

1 Pek. Galian Tanah M3 16.07 - - 2 Pek. Urugan Pasir, t = 5 Cm M3 0.70 - - 3 Pek. Aanstampang Batu Kali M3 2.80 - - 4 Pek. Pasang Pondasi Batu Kali 1 : 4 M3 5.17 - - 5 Pek. Lantai Kerja, t = 10 Cm ( K-100 ) M3 0.25 - - 6 Pek. Pasang Pondasi Plat, P1 ( K-250 ) M3 0.54 - - 7 Pek. Pasang Pondasi Plat, P2 ( K-250 ) M3 0.32 - - 8 Pek. Pasang Pondasi Plat, P3 ( K-250 ) M3 0.09 - - 9 Pek. Stek Besi Ø 10 mm Pengikat Sloof Kg 7.67 - -

10 Pek. Urugan Kembali M3 4.02 - - -

III PEKERJAAN PEMBETONAN1 Pek. Sloof 15/20 ( K-175 ) M3 0.47 - - 2 Pek. Sloof 15/20 ( K-250 ) M3 0.06 - - 3 Pek. Sloof 15/25 ( K-250 ) M3 0.08 - - 4 Pek. Kolom Kp, 13/13 ( K-175 ) M3 0.22 - - 5 Pek. Kolom K1 ( K-175 ) M3 0.82 - - 6 Pek. Kolom K2 ( K-175 ) M3 0.16 - - 7 Pek. Kolom K3 ( K-250 ) M3 0.13 - - 8 Pek. Kolom K4 ( K-250 ) s/d Elev 2.30 M3 0.29 - - 9 Pek. Kolom K4 ( K-250 ) s/d Elev 4.20 M3 0.07 - -

10 Pek. Kolom K5 ( K-250 ) M3 0.43 - - 11 Pek. Kolom K6 ( K-250 ) s/d Elev 4.20 M3 0.53 - - 12 Pek. Kolom K6 ( K-250 ) s/d Elev 4.75 M3 0.02 - - 13 Pek. Stek Besi Ø 10 mm Pada Kolom Kg 46.40 - - 14 Pek. Balok Late 13/13 ( K-175 ) M3 0.16 - - 15 Pek. Ring Balok 13/20 ( K-175 ) M3 0.70 - - 16 Pek. Ring Balok 15/25 ( K-250 ) M3 0.12 - - 17 Pek. Plat Dag Pos , t = 10 Cm ( K-175 ) M3 2.24 - - 18 Pek. Plat Beton Tempat Huruf Hias, t = 12 Cm ( K-250 ) M3 0.20 - -

-

RENCANA ANGGARAN BIAYA (RAB)

NO. URAIAN PEKERJAAN SAT VOLUME

JUMLAH I

JUMLAH II

JUMLAH III

PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 4: Boq Gapura

HARGA SATUAN JUMLAH HARGA(Rp.) (Rp.)

NO. URAIAN PEKERJAAN SAT VOLUME

IV PEKERJAAN DINDING 1 Pek. Pasang Bata 1 : 2 M2 5.83 - - 2 Pek. Pasang Bata 1 : 4 M2 35.46 - - 3 Pek. Stek Besi Ø 10 mm Pengikat Bata Kg 26.20 - - 4 Pek. Kusen Pintu Alumunium M1 10.00 - - 5 Pek. Kusen Jendela Alumunium M1 30.10 - - 6 Pek. Pasang Besi Hollow M2 5.37 - - 7 Pek. Plesteran Bata 1 : 2 M2 11.65 - - 8 Pek. Plesteran Bata 1 : 4 M2 49.16 - - 9 Pek. Plesteran Sisir 2 x 5 Cm M1 222.86 - -

10 Pek. Profil Beton M1 45.46 - - 11 Pek. Acian M2 60.81 - - 12 Pek. Afwerking Beton M2 58.75 - -

- V PEKERJAAN PLAFOND

1 Pek. Pasang Rangka Plafond M2 8.35 - - 2 Pek. Pasang Plafond Kalsiboard, t = 3,5 mm M2 8.35 - - 3 Pek. Pasang List Profil ( Gypsum 5x10 cm ) M1 20.80 - -

- VI PEKERJAAN LANTAI DAN KERAMIK

1 Pek. Urugan Tanah M3 1.83 - - 2 Pek. Urugan Pasir M3 0.41 - - 3 Pek. Coran Lantai ( K-100 ) M3 0.58 - - 4 Pek. Pasang Keramik Lantai 40 x 40 Cm M2 6.84 - - 5 Pek. Pasang Bon-bon Keramik M1 1.60 - -

- VII PEKERJAAN PINTU DAN JENDELA

1 Pek. Pintu Alumunium Type P1 + Acc Unit 1.00 - - 2 Pek. Pintu Alumunium Type P2 + Acc Unit 1.00 - - 3 Pek. Jendela Alumunium Type J1 + Acc Unit 2.00 - - 4 Pek. Pasang Kaca Mati, t = 5 mm M2 2.71 - -

- VIII PEKERJAAN KM/WC

1 Pek. Intalasi Air Bersih ( PVC Ø 3/4" ) M1 5.50 - - 2 Pek. Intalasi Air Kotor/Cair ( PVC Ø 2" ) M1 3.00 - - 3 Pek. Intalasi Air Kotor/Padat ( PVC Ø 4" ) M1 2.00 - - 4 Pek. Pasang Kran Air Bh 1.00 - - 5 Pek. Pasang Closed Jongkok Bh 1.00 - - 6 Pek. Pasang Keramik Dinding 20 x 25 cm M2 6.15 - - 7 Pek. Pasang Keramik Lantai 20 x 20 cm ( Unpolis ) M2 1.21 - - 8 Pas. Pasang Listelo 10 x 20 M1 4.10 - - 9 Pek. Pasang Bon-Bon Keramik M1 1.40 - -

10 Pek. Pasang Floor Drain Bh 1.00 - - 10 Pek. Penyambungan Air Bersih Dari Pipa PDAM Ls 1.00 - - 11 Pek. Sumur Resapan Unit 1.00 - - 12 Pek. Septictank, Kapasitas 15 Orang + Resapan Unit 1.00 - -

-

JUMLAH VII

JUMLAH VIII

JUMLAH IV

JUMLAH V

JUMLAH VI

PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 5: Boq Gapura

HARGA SATUAN JUMLAH HARGA(Rp.) (Rp.)

NO. URAIAN PEKERJAAN SAT VOLUME

IX PEKERJAAN LUAR BANGUNANa. Pekerjaan Rabat Beton

1 Pek. Galian Tanah M3 0.75 - - 2 Pek. Lantai Kerja ( K-100 ) M3 0.19 - - 3 Pek. Pasang Bata 1 : 4 M2 10.71 - - 4 Pek. Urugan Tanah M3 1.43 - - 5 Pek. Urugan Pasir M3 0.31 - - 6 Pek. Coran Lantai, t = 7 cm ( K-100 ) M3 0.70 - - 7 Pek. Plesteran Bata 1 : 4 M2 6.96 - - 8 Pek. Acian M2 16.92 - -

b. Pekerjaan Pelengkap1 Pek. Pasang Huruf Hias ( Stainless steel ) Unit 1.00 - - 2 Pek. Pasang Logo Unit 2.00 - - 3 Pek. Pasang Tempat Logo Unit 1.00 - - 4 Pek. Pasang Gerbang Hollow ( Lengkap ) Unit 1.00 - -

- X PEKERJAAN INSTALASI LISTRIK

1 Pek. Instalasi Titik Lampu Titik 3.00 - - 2 Pek. Instalasi Stop Kontak Titik 1.00 - - 3 Pek. Pasang Lampu Sorot ( 25 Watt ) Bh 1.00 - - 4 Pek. Pasang Lampu XL Tornado( 20 Watt ) Bh 1.00 - - 5 Pek. Pasang Lampu XL Tornado ( 18 Watt ) Bh 1.00 - - 6 Pek. Pasang Stop Kontak Bh 1.00 - - 7 Pek. Panel 1 MCB Bh 1.00 - - 8 Pek. Penyambungan Daya Dari Gedung Kelas Ls 1.00 - -

- XI PEKERJAAN FINISHING

1 Pek. Mencat Plafond dgn Cat Tembok M2 8.35 - - 2 Pek. Mencat Dinding dgn Cat Tembok (Eksterior) M2 88.62 - - 3 Pek. Mencat Dinding dgn Cat Tembok (Interior) M2 37.37 - -

- -

JUMLAH IX

JUMLAH X

JUMLAH XITOTAL JUMLAH I s/d XI

PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 6: Boq Gapura

KEGIATAN : PEMBANGUNAN SMAN 1 SUMATERA BARAT DI PADANG PANJANGPEKERJAAN : PEMBANGUNAN GAPURA PINTU GERBANGLOKASI : KOTA PADANG PANJANGT. ANGGARAN : 2013

JUMLAH HARGA(Rp.)

2 GAPURA KEDUAI PEKERJAAN PENDAHULUAN - II PEKERJAAN PONDASI - III PEKERJAAN PEMBETONAN - IV PEKERJAAN DINDING - V PEKERJAAN LUAR BANGUNAN - VI PEKERJAAN INSTALASI LISTRIK - VII PEKERJAAN FINISHING -

TOTAL JUMLAH I s/d XI -

REKAPITULASIRENCANA ANGGARAN BIAYA

NO. URAIAN PEKERJAAN

PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 7: Boq Gapura

KEGIATAN : PEMBANGUNAN SMAN 1 SUMATERA BARAT DI PADANG PANJANGPEKERJAAN : PEMBANGUNAN GAPURA PINTU GERBANGLOKASI : KOTA PADANG PANJANGT. ANGGARAN : 2013

HARGA SATUAN JUMLAH HARGA(Rp.) (Rp.)

2 GAPURA KEDUA

I PEKERJAAN PENDAHULUAN1 Pek. Pembersihan Lapangan M2 25.60 - - 2 Pek. Pasang Bouplank M1 28.80 - -

- II PEKERJAAN PONDASI

1 Pek. Galian Tanah M3 5.56 - - 2 Pek. Lantai Kerja, t = 10 Cm ( K-100 ) M3 0.51 - - 3 Pek. Pasang Pondasi Plat, P1 ( K-250 ) M3 1.09 - - 4 Pek. Pasang Pondasi Plat, P2 ( K-250 ) M3 0.64 - - 5 Pek. Pasang Pondasi Plat, P3 ( K-250 ) M3 0.19 - - 6 Pek. Urugan Kembali M3 1.39 - -

- III PEKERJAAN PEMBETONAN

1 Pek. Sloof 15/20 ( K-250 ) M3 0.11 - - 2 Pek. Sloof 15/25 ( K-250 ) M3 0.15 - - 3 Pek. Kolom K3 ( K-250 ) M3 0.25 - - 4 Pek. Kolom K4 ( K-250 ) s/d Elev 2.30 M3 0.58 - - 5 Pek. Kolom K4 ( K-250 ) s/d Elev 4.20 M3 0.15 - - 6 Pek. Kolom K5 ( K-250 ) M3 0.86 - - 7 Pek. Kolom K6 ( K-250 ) s/d Elev 4.20 M3 1.06 - - 8 Pek. Kolom K6 ( K-250 ) s/d Elev 4.75 M3 0.03 - - 9 Pek. Kolom K7 ( K-250 ) M3 0.14 - -

10 Pek. Stek Besi Ø 10 mm Pada Kolom Kg 37.25 - - 11 Pek. Ring Balok 15/25 ( K-250 ) M3 0.24 - - 12 Pek. Plat Beton Tempat Huruf Hias, t = 12 Cm ( K-250 ) M3 0.20 - - 13 Pek. Plat Beton Profil, t = 10 Cm ( K-250 ) M3 0.01 - -

- IV PEKERJAAN DINDING

1 Pek. Pasang Bata 1 : 4 M2 1.04 - - 2 Pek. Pasang Besi Hollow M2 10.73 - - 3 Pek. Plesteran Bata 1 : 4 M2 2.07 - - 4 Pek. Plesteran Sisir 2 x 5 Cm M1 61.43 - - 5 Pek. Pasang Batu Alam Lempeng M2 2.23 - - 6 Pek. Profil Beton M1 30.40 - - 7 Pek. Acian M2 2.07 - - 8 Pek. Afwerking Beton M2 67.08 - -

-

JUMLAH II

JUMLAH III

JUMLAH IV

RENCANA ANGGARAN BIAYA (RAB)

NO. URAIAN PEKERJAAN SAT VOLUME

JUMLAH I

PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 8: Boq Gapura

HARGA SATUAN JUMLAH HARGA(Rp.) (Rp.)

NO. URAIAN PEKERJAAN SAT VOLUME

V PEKERJAAN LUAR BANGUNANa. Pekerjaan Rabat Beton

1 Pek. Galian Tanah M3 0.53 - - 2 Pek. Lantai Kerja ( K-100 ) M3 0.13 - - 3 Pek. Pasang Bata 1 : 4 M2 7.65 - - 4 Pek. Urugan Tanah M3 1.02 - - 5 Pek. Urugan Pasir M3 0.22 - - 6 Pek. Coran Lantai, t = 7 cm ( K-100 ) M3 0.50 - - 7 Pek. Plesteran Bata 1 : 4 M2 4.98 - - 8 Pek. Acian M2 12.10 - -

b. Pekerjaan Pelengkap1 Pek. Pasang Huruf Hias ( Stainless steel ) Unit 1.00 - - 2 Pek. Pasang Logo Unit 2.00 - - 3 Pek. Pasang Tempat Logo Unit 1.00 - - 4 Pek. Pasang Gerbang Hollow ( Lengkap ) Unit 1.00 - -

- VI PEKERJAAN INSTALASI LISTRIK

1 Pek. Instalasi Titik Lampu Titik 2.00 - - 2 Pek. Pasang Lampu Sorot ( 25 Watt ) Bh 2.00 - - 3 Pek. Penyambungan Daya Dari Gedung Administrasi Ls 1.00 - -

- VII PEKERJAAN FINISHING

1 Pek. Mencat Dinding dgn Cat Tembok (Eksterior) M2 62.78 - - - -

JUMLAH V

JUMLAH VI

JUMLAH VIITOTAL JUMLAH I s/d VII

PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 9: Boq Gapura

KEGIATAN : PEMBANGUNAN SMAN 1 SUMATERA BARAT DI PADANG PANJANGPEKERJAAN : PEMBANGUNAN GAPURA PINTU GERBANGLOKASI : KOTA PADANG PANJANGT. ANGGARAN : 2013

HARGA SATUANPEKERJAAN

( Rp. )

1 1 M2 Membersihan Lapangan Dan Perataan - 2 1 M1 Pemasangan Bowplank -

1 1 M3 Galian Tanah Biasa - 2 1 M3 Galian Tanah Biasa Dengan Kedalaman 1 s/d 2 m - 3 1 M3 Urugan Kembali - 4 1 M3 Urugan Pasir - 5 1 M3 Urugan Tanah -

1 1 M3 Pasang Pondasi Batu Kali 1 Pc : 4 Ps - 2 1 M3 Pasang Pondasi Batu Kosong -

1 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 2 Ps - 2 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 4 Ps -

1 1 M2 Plesteran 1 Pc : 2 Ps, Tebal 15 mm - 2 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 15 mm - 3 1 M2 Pekerjaan Acian - 4 1 M2 Pekerjaan Afwerking Beton -

1 1 M2 Pasang Rangka Langit-langit (60 x 60) cm Kayu Kls II -

1 1 M3 Pekerjaan Lantai Kerja Beton fc' = 7,4 MPa (K 100), SLUMP (3-6) CM, W/C = 0,87 - 2 1 M3 Pekerjaan Beton fc' = 7,4 MPa (K 100), SLUMP (12 + 2) CM, W/C = 0,87 - 3 1 M3 Pekerjaan Beton fc' = 14,5 MPa (K 175), SLUMP (12 + 2) CM, W/C = 0,66 - 4 1 M3 Pekerjaan Beton fc' = 21,7 MPa (K 250), SLUMP (12 + 2) CM, W/C = 0,56 - 5 1 Kg Pembesian Dengan Besi Polos - 6 1 M2 Pasang Bekisting Pondasi - 7 1 M2 Pasang Bekisting Untuk Sloof - 8 1 M2 Pasang Bekisting Untuk Kolom - 9 1 M2 Pasang Bekisting Untuk Balok - 10 1 M2 Pasang Bekisting Untuk Plat Lantai -

1 1 M3 Pekerjaan Pondasi Plat P1 ( K-250 ) - 2 1 M3 Pekerjaan Pondasi Plat P2 ( K-250 ) - 3 1 M3 Pekerjaan Pondasi Plat P3 ( K-250 ) - 4 1 M3 Pekerjaan Sloof 0.15 x 0.20 ( K-175 ) - 5 1 M3 Pekerjaan Sloof 0.15 x 0.20 ( K-250 ) - 6 1 M3 Pekerjaan Sloof 0.15 x 0.25 ( K-250 ) -

HARGA SATUAN

KELOMPOK I , SNI DT-91 -0006-2007

KELOMPOK PEKERJAAN TANAH, SNI 2835-2008

KELOMPOK PONDASI, SNI 2836 - 2008

KELOMPOK III SNI 6897 - 2008

KELOMPOK PLESTERAN, SNI 2837 - 2008

KELOMPOK KAYU, SNI 2434 - 2008

DAFTAR HARGA SATUAN PEKERJAAN

NO. URAIAN KET

KELOMPOK BETON MERUJUK SNI 2394 - 2008

NO. URAIAN KET

TABEL PEKERJAAN BETON BERTULANG

PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 10: Boq Gapura

PEKERJAAN( Rp. )

7 1 M3 Pekerjaan Kolom Kp / K1 ( 0.13 x 0.13 ) ( K-175 ) - 8 1 M3 Pekerjaan Kolom K1 Gapura ( K-175 ) - 9 1 M3 Pekerjaan Kolom K2 Gapura ( K-175 ) - 10 1 M3 Pekerjaan Kolom K3 Gapura ( K-250 ) - 11 1 M3 Pekerjaan Kolom K4 Gapura ( K-250 ) s/d elev 2.30 - 12 1 M3 Pekerjaan Kolom K4 Gapura ( K-250 ) s/d elev 4.20 - 13 1 M3 Pekerjaan Kolom K5 Gapura ( K-250 ) - 14 1 M3 Pekerjaan Kolom K6 Gapura ( K-250 ) s/d Elev 4.20 - 15 1 M3 Pekerjaan Kolom K6 Gapura ( K-250 ) s/d Elev 4.75 - 16 1 M3 Pekerjaan Kolom K7 Gapura ( K-250 ) - 17 1 M3 Pekerjaan Ring Balok Gapura 0.15 x 0.25 ( K-250 ) - 18 1 M3 Pekerjaan Ring Balok / Balok Late 0.13 x 0.2 ( K-175 ) - 19 1 M3 Pekerjaan Balok Late 0.13 x 0.13 ( K-175 ) - 20 1 M3 Pekerjaan Plat Beton , t = 12 Cm ( K-175 ) - 21 1 M3 Pekerjaan Plat Beton , t = 12 Cm ( K-250 ) - 22 1 M3 Pekerjaan Plat Beton , t = 10 Cm ( K-175 ) - 23 1 M3 Pekerjaan Plat Beton , t = 10 Cm ( K-250 ) - 24 1 M3 Pekerjaan Plat Beton , t = 15 Cm ( K-175 ) -

1 1 M2 Plafond Kalsiboard t = 3,5 mm - 2 1 M List Profil Plafond ( Gypsum 5 x 10 Cm ) -

1 1 Bh Pasang Kloset Jongkok Porselen - 2 1 M1 Pasang Pipa PVC dia. 3/4" - 3 1 M1 Pasang Pipa PVC dia. 2" - 4 1 M1 Pasang Pipa PVC dia. 4" - 5 1 Bh Pas. Kran Air 1/2" - 6 1 Bh Pas. Floor Drain -

1 1 M1 Pasang Kusen Pintu Alumunium - 2 1 M1 Pasang Kusen Jendela Alumunium - 3 1 M1 Pasang Frame Pintu Alumunium - 4 1 M1 Pasang Frame Jendela Alumunium - 5 1 M2 Pasang Daun Pintu Alumunium - 6 1 Unit Pintu Alumunium Type P1 - 7 1 Unit Pintu Alumunium Type P2 - 8 1 Unit Jendela Alumunium Type J1 -

1 1 Bh Pasang Kunci Selot Tanam - 2 1 Bh Pasang Kunci Silinder - 3 1 Bh Pasang Engsel Pintu Alumunium - 4 1 Bh Pasang Engsel Jendela Alumunium - 5 1 Bh Pasang Grendel Tanam Pintu Alumunium - 6 1 Bh Pasang Kunci Jendela ( Rambuncis ) - 7 1 M2 Pasang Kaca Bening, tbl 5 mm - 8 1 M2 Pasang Kaca Bening, tbl 8 mm -

1 1 M1 Pasang Listello 10 x 20 cm - 2 1 M2 Pasang Lantai Keramik 20 x 20 cm - 3 1 M2 Pasang Lantai Keramik 40 x 40 cm - 4 1 M2 Pasang Dinding Keramik 20 x 25 cm - 5 1 M2 Pasang Batu Alam Lempeng -

KELOMPOK LANTAI DAN DINDING ( MERUJUK PADA SNI - 7395 - 2008 )

NO. URAIAN KET

KELOMPOK X ( MERUJUK PADA SK SNI S -05 - 1989 F )

KELOMPOK PEKERJAAN LANGIT LANGIT , SNI 2839 - 2008

KELOMPOK IX ( MERUJUK PADA SNI 7393 - 2008 )

KELOMPOK VIII ( MERUJUK PADA SK SNI -S 06 - 1989 F )

PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 11: Boq Gapura

HARGA SATUANPEKERJAAN

( Rp. )

1 1 M2 Pengecatan Tembok Baru Yang Tidak Terlindungi Dari Panas Dan Hujan - 2 1 M2 Pengecatan Tembok Baru (1 plamir, 1 cat dasar, 3 cat penutup) - 3 1 M2 Pengecatan Plafond Baru (1 cat dasar, 2 cat penutup) - 4 1 M2 Pengecatan Ulang Plafond (1 cat penutup) -

Padang, 2013Dibuat Oleh,

Penawar,PT / CV. ……………………….

NAMAJABATAN

KELOMPOK XII ( MERUJUK PADA SNI 03-2408-1991 )

NO. URAIAN KET

PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 12: Boq Gapura

KEGIATAN : PEMBANGUNAN SMAN 1 SUMATERA BARAT DI PADANG PANJANGPEKERJAAN : PEMBANGUNAN GAPURA PINTU GERBANGLOKASI : KOTA PADANG PANJANGT. ANGGARAN : 2013

HRG . SATUAN UPAH JUMLAHRp. Rp. Rp.

1 1 M2 Membersihan Lapangan Dan Perataan Upah :

0.100 Oh Pekerja - - 0.050 Oh Mandor - - -

Jumlah - Keuntungan dan Over head 10% - Total -

2 1 M1 Pemasangan Bowplank Upah :

0.100 Oh Tukang kayu - - 0.010 Oh Kepala tukang - - 0.100 Oh Pekerja - - 0.005 Oh Mandor - - -

Bahan :0.007 M3 Kayu papan - - 0.012 M3 Kayu 5 x 7 cm - - 0.020 Kg Besi paku biasa - - -

Jumlah - Keuntungan dan Over head 10% - Total -

KELOMPOK PEKERJAAN TANAH, SNI 2835-2008HRG . SATUAN UPAH JUMLAH

Rp. Rp. Rp.

1 1 M3 Galian Tanah Biasa Upah :

0.750 Oh Pekerja - - 0.025 Oh Mandor - - -

Jumlah - Keuntungan dan Over head 10% - Total -

2 1 M3 Galian Tanah Biasa Dengan Kedalaman 1 s/d 2 m Upah :

0.900 Oh Pekerja - - 0.045 Oh Mandor - - -

Jumlah - Keuntungan dan Over head 10% - Total -

3 1 M3 Urugan Kembali Upah :

0.250 Oh Pekerja - - 0.008 Oh Mandor - - -

Jumlah - Keuntungan dan Over head 10% - Total -

NO.

NO.

KET

URAIAN

URAIAN

KET

DAFTAR ANALISA BIAYA KONSTRUKSI (ABK)

KELOMPOK I , SNI DT-91 -0006-2007

PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 13: Boq Gapura

HRG . SATUAN UPAH JUMLAHRp. Rp. Rp.

4 1 M3 Urugan Pasir Upah :

0.300 Oh Pekerja - - 0.010 Oh Mandor - - -

Bahan :1.200 M3 Pasir Urug - - -

Jumlah - Keuntungan dan Over head 10% - Total -

5 1 M3 Urugan Tanah Upah :

0.300 Oh Pekerja - - 0.010 Oh Mandor - - -

Bahan :1.200 M3 Tanah Urug - - -

Jumlah - Keuntungan dan Over head 10% - Total -

HRG . SATUAN SUB JUMLAH JUMLAHRp. Rp. Rp.

1 1 M3 Pasang Pondasi Batu Kali 1 Pc : 4 Ps Upah :

1.500 Oh Pekerja - - 0.750 Oh Tukang batu - - 0.075 Oh Kepala tukang - - 0.075 Oh Mandor - - -

1.200 M3 Batu belah 15/20 - - 163.000 Kg Semen portland ( 50 Kg) - -

0.520 M3 Pasir pasangan - - - Jumlah - Keuntungan dan Over head 10% - Total -

2 1 M3 Pasang Pondasi Batu Kosong Upah :

0.780 Oh Pekerja - - 0.390 Oh Tukang batu - - 0.039 Oh Kepala tukang - - 0.039 Oh Mandor - - -

Bahan :1.200 M3 Batu belah 15/20 - - 0.432 M3 Pasir Urug - - -

Jumlah - Keuntungan dan Over head 10% - Total -

KELOMPOK III SNI 6897 - 2008

KET

KET

KELOMPOK PONDASI, SNI 2836 - 2008

URAIANNO.

NO. URAIAN

PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 14: Boq Gapura

HRG . SATUAN SUB JUMLAH JUMLAHRp. Rp. Rp.

1 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 2 Ps Upah :

0.300 Oh Pekerja - - 0.100 Oh Tukang batu - - 0.010 Oh Kepala tukang - - 0.015 Oh Mandor - - -

Bahan :70.000 Bh Batu bata - - 18.950 Kg Semen portland ( 50 Kg) - -

0.038 M3 Pasir pasangan - - - Jumlah - Keuntungan dan Over head 10% - Total -

2 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 4 Ps Upah :

0.300 Oh Pekerja - - 0.100 Oh Tukang batu - - 0.010 Oh Kepala tukang - - 0.015 Oh Mandor - - -

Bahan :70.000 Bh Batu bata - - 11.500 Kg Semen portland ( 50 Kg) - -

0.043 M3 Pasir pasangan - - - Jumlah - Keuntungan dan Over head 10% - Total -

KELOMPOK PLESTERAN, SNI 2837 - 2008HRG . SATUAN SUB JUMLAH JUMLAH

Rp. Rp. Rp.

1 1 M2 Plesteran 1 Pc : 2 Ps, Tebal 15 mm Upah :

0.300 Oh Pekerja - - 0.150 Oh Tukang batu - - 0.015 Oh Kepala tukang - - 0.015 Oh Mandor - - -

Bahan :10.224 Kg Semen portland ( 50 Kg) - -

0.020 M3 Pasir pasangan - - - Jumlah - Keuntungan dan Over head 10% - Total -

2 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 15 mm Upah :

0.300 Oh Pekerja - - 0.150 Oh Tukang batu - - 0.015 Oh Kepala tukang - - 0.010 Oh Mandor - - -

Bahan :6.240 Kg Semen portland ( 50 Kg) - - 0.024 M3 Pasir pasangan - - -

Jumlah - Keuntungan dan Over head 10% - Total -

HRG . SATUAN SUB JUMLAH JUMLAHRp. Rp. Rp.

URAIANNO.

KET URAIANNO.

NO. URAIAN

KET

KET

PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 15: Boq Gapura

3 1 M2 Pekerjaan Acian Upah :

0.200 Oh Pekerja - - 0.100 Oh Tukang batu - - 0.010 Oh Kepala tukang - - 0.010 Oh Mandor - - -

Bahan :3.250 Kg Semen portland ( 50 Kg) - - -

Jumlah - Keuntungan dan Over head 10% - Total -

4 1 M2 Pekerjaan Afwerking Beton Upah :

0.200 Oh Pekerja - - 0.100 Oh Tukang batu - - 0.010 Oh Kepala tukang - - 0.010 Oh Mandor - - -

Bahan :3.250 Kg Semen portland ( 50 Kg) - - -

Jumlah - Keuntungan dan Over head 10% - Total -

KELOMPOK KAYU, SNI 2434 - 2008HRG . SATUAN SUB JUMLAH JUMLAH

Rp. Rp. Rp.

1 1 M2 Pasang Rangka Langit-langit (60 x 60) cm Kayu Kls II Upah :

0.200 Oh Pekerja - - 0.300 Oh Tukang kayu - - 0.030 Oh Kepala tukang - - 0.010 Oh Mandor - - -

Bahan :0.016 M3 Kayu 5 x 7 cm - - 0.250 Kg Besi paku biasa - - -

Jumlah - Keuntungan dan Over head 10% - Total -

KELOMPOK BETON MERUJUK SNI 2394 - 2008HRG . SATUAN SUB JUMLAH JUMLAH

Rp. Rp. Rp.

1 1 M3 Pekerjaan Lantai Kerja Beton fc' = 7,4 MPa (K 100), SLUMP (3-6) CM, W/C = 0,87 Upah :

1.200 Oh Pekerja - - 0.200 Oh Tukang batu - - 0.020 Oh Kepala tukang - - 0.060 Oh Mandor - - -

Bahan :230.000 Kg Semen portland ( 50 Kg) - -

0.630 M3 Pasir beton - - 0.760 M 3 Split 1-2 - -

200.000 Ltr Air - - - Jumlah - Keuntungan dan Over head 10% - Total -

HRG . SATUAN SUB JUMLAH JUMLAHRp. Rp. Rp.

KET

NO. URAIAN KET

NO. URAIAN KET

NO. URAIAN

PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 16: Boq Gapura

2 1 M3 Pekerjaan Beton fc' = 7,4 MPa (K 100), SLUMP (12 + 2) CM, W/C = 0,87 Upah :

1.650 Oh Pekerja - - 0.275 Oh Tukang batu - - 0.028 Oh Kepala tukang - - 0.083 Oh Mandor - - -

Bahan :247.000 Kg Semen portland ( 50 Kg) - -

0.620 M3 Pasir beton - - 0.740 M 3 Split 1-2 - -

215.000 Ltr Air - - - Jumlah - Keuntungan dan Over head 10% - Total -

3 1 M3 Pekerjaan Beton fc' = 14,5 MPa (K 175), SLUMP (12 + 2) CM, W/C = 0,66 Upah :

1.650 Oh Pekerja - - 0.275 Oh Tukang batu - - 0.028 Oh Kepala tukang - - 0.083 Oh Mandor - - -

Bahan :326.000 Kg Semen portland ( 50 Kg) - -

0.540 M3 Pasir beton - - 0.760 M 3 Split 1-2 - -

215.000 Ltr Air - - - Jumlah - Keuntungan dan Over head 10% - Total -

4 1 M3 Pekerjaan Beton fc' = 21,7 MPa (K 250), SLUMP (12 + 2) CM, W/C = 0,56 Upah :

1.650 Oh Pekerja - - 0.275 Oh Tukang batu - - 0.028 Oh Kepala tukang - - 0.083 Oh Mandor - - -

Bahan :384.000 Kg Semen portland ( 50 Kg) - -

0.490 M3 Pasir beton - - 0.760 M 3 Split 1-2 - -

215.000 Ltr Air - - - Jumlah - Keuntungan dan Over head 10% - Total -

5 1 Kg Pembesian Dengan Besi Polos Upah :

0.0070 Oh Pekerja - - 0.0070 Oh Tukang besi - - 0.0007 Oh Kepala tukang - - 0.0004 Oh Mandor - - -

Bahan :1.0500 Kg Besi beton polos - - 0.0150 Kg Kawat Beton - - -

Jumlah - Keuntungan dan Over head 10% - Total -

HRG . SATUAN SUB JUMLAH JUMLAHRp. Rp. Rp.

6 1 M2 Pasang Bekisting Pondasi

NO. URAIAN KET

PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 17: Boq Gapura

Upah :0.520 Oh Pekerja - - 0.260 Oh Tukang kayu - - 0.026 Oh Kepala tukang - - 0.026 Oh Mandor - - -

Bahan :0.040 M3 Papan bikesting - - 0.300 Kg Paku Biasa - - 0.100 Lt Minyak bekisting - - -

Jumlah - Keuntungan dan Over head 10% - Total - dua kali pakai -

7 1 M2 Pasang Bekisting Untuk Sloof Upah :

0.520 Oh Pekerja - - 0.260 Oh Tukang kayu - - 0.026 Oh Kepala tukang - - 0.026 Oh Mandor - - -

Bahan :0.045 M3 Kayu terentang/Perancah - - 0.300 Kg Paku Biasa - - 0.100 Lt Minyak bekisting - - -

Jumlah - Keuntungan dan Over head 10% - Total - dua kali pakai -

8 1 M2 Pasang Bekisting Untuk Kolom Upah :

0.660 Oh Pekerja - - 0.330 Oh Tukang kayu - - 0.033 Oh Kepala tukang - - 0.033 Oh Mandor - - -

Bahan :0.040 M3 Kayu terentang/Perancah - - 0.400 Kg Paku Biasa - - 0.200 Lt Minyak bekisting - - 0.015 M3 Balok Kayu - - 0.350 Lbr Plywood 9 mm - - 2.000 Btg Dolken kayu dia. 8 - 10 - - -

Jumlah - Keuntungan dan Over head 10% - Total - dua kali pakai -

HRG . SATUAN SUB JUMLAH JUMLAHRp. Rp. Rp.

9 1 M2 Pasang Bekisting Untuk Balok Upah :

NO. URAIAN KET

PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 18: Boq Gapura

0.660 Oh Pekerja - - 0.330 Oh Tukang kayu - - 0.033 Oh Kepala tukang - - 0.033 Oh Mandor - - -

Bahan :0.040 M3 Kayu terentang/Perancah - - 0.400 Kg Paku Biasa - - 0.200 Lt Minyak bekisting - - 0.018 M3 Balok Kayu - - 0.350 Lbr Plywood 9 mm - - 2.000 Btg Dolken kayu dia. 8 - 10 - - -

Jumlah - Keuntungan dan Over head 10% - Total - dua kali pakai -

10 1 M2 Pasang Bekisting Untuk Plat Lantai Upah :

0.660 Oh Pekerja - - 0.330 Oh Tukang kayu - - 0.033 Oh Kepala tukang - - 0.033 Oh Mandor - - -

Bahan :0.040 M3 Kayu terentang/Perancah - - 0.400 Kg Paku Biasa - - 0.200 Lt Minyak bekisting - - 0.015 M3 Balok Kayu - - 0.350 Lbr Plywood 9 mm - - 6.000 Btg Dolken kayu dia. 8 - 10 - - -

Jumlah - Keuntungan dan Over head 10% - Total - dua kali pakai -

HRG . SATUAN SUB JUMLAH JUMLAHRp. Rp. Rp.

1 1 M3 Pekerjaan Pondasi Plat P1 ( K-250 )1.000 M 3 Beton K-250 - - 5.926 M 2 Bikesting Pondasi - -

131.359 K g Penulangan Besi Polos - - - Jumlah -

2 1 M3 Pekerjaan Pondasi Plat P2 ( K-250 )1.000 M 3 Beton K-250 - - 8.692 M 2 Bikesting Pondasi - -

133.081 K g Penulangan Besi Polos - - - Jumlah -

3 1 M3 Pekerjaan Pondasi Plat P3 ( K-250 )1.000 M 3 Beton K-250 - -

12.698 M 2 Bikesting Pondasi - - 151.248 K g Penulangan Besi Polos - - -

Jumlah -

HRG . SATUAN SUB JUMLAH JUMLAHRp. Rp. Rp.

4 1 M3 Pekerjaan Sloof 0.15 x 0.20 ( K-175 )1.000 M 3 Beton K-175 - -

13.333 M 2 Bikesting Sloof - -

NO. URAIAN KET

KET URAIAN

TABEL PEKERJAAN BETON BERTULANG

NO.

PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 19: Boq Gapura

192.019 K g Penulangan Besi Polos - - - Jumlah -

5 1 M3 Pekerjaan Sloof 0.15 x 0.20 ( K-250 )1.000 M 3 Beton K-250 - -

13.333 M 2 Bikesting Sloof - - 192.019 K g Penulangan Besi Polos - - -

Jumlah -

6 1 M3 Pekerjaan Sloof 0.15 x 0.25 ( K-250 )1.000 M 3 Beton K-250 - -

13.333 M 2 Bikesting Sloof - - 256.727 K g Penulangan Besi Polos - - -

Jumlah -

7 1 M3 Pekerjaan Kolom Kp / K1 ( 0.13 x 0.13 ) ( K-175 )1.000 M 3 Beton K-175 - -

15.385 M 2 Bikesting Kolom - - 243.040 K g Penulangan Besi Polos - - -

Jumlah -

8 1 M3 Pekerjaan Kolom K1 Gapura ( K-175 )1.000 M 3 Beton K-175 - -

19.048 M 2 Bikesting Kolom - - 190.591 K g Penulangan Besi Polos - - -

Jumlah -

9 1 M3 Pekerjaan Kolom K2 Gapura ( K-175 )1.000 M 3 Beton K-175 - -

13.333 M 2 Bikesting Kolom - - 162.033 K g Penulangan Besi Polos - - -

Jumlah -

10 1 M3 Pekerjaan Kolom K3 Gapura ( K-250 )1.000 M 3 Beton K-250 - -

23.333 M 2 Bikesting Kolom - - 192.019 K g Penulangan Besi Polos - - -

Jumlah -

11 1 M3 Pekerjaan Kolom K4 Gapura ( K-250 ) s/d elev 2.301.000 M 3 Beton K-250 - -

19.697 M 2 Bikesting Kolom - - 166.911 K g Penulangan Besi Polos - - -

Jumlah -

12 1 M3 Pekerjaan Kolom K4 Gapura ( K-250 ) s/d elev 4.201.000 M 3 Beton K-250 - -

21.765 M 2 Bikesting Kolom - - 173.142 K g Penulangan Besi Polos - - -

Jumlah -

13 1 M3 Pekerjaan Kolom K5 Gapura ( K-250 )1.000 M 3 Beton K-250 - -

16.513 M 2 Bikesting Kolom - - 221.055 K g Penulangan Besi Polos - - -

Jumlah -

HRG . SATUAN SUB JUMLAH JUMLAHRp. Rp. Rp.

14 1 M3 Pekerjaan Kolom K6 Gapura ( K-250 ) s/d Elev 4.201.000 M 3 Beton K-250 - -

17.833 M 2 Bikesting Kolom - - 255.642 K g Penulangan Besi Polos - - -

NO. URAIAN KET

PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 20: Boq Gapura

Jumlah -

15 1 M3 Pekerjaan Kolom K6 Gapura ( K-250 ) s/d Elev 4.751.000 M 3 Beton K-250 - -

23.333 M 2 Bikesting Kolom - - 384.696 K g Penulangan Besi Polos - - -

Jumlah -

16 1 M3 Pekerjaan Kolom K7 Gapura ( K-250 ) 1.000 M 3 Beton K-250 - -

30.000 M 2 Bikesting Kolom - - 272.246 K g Penulangan Besi Polos - - -

Jumlah -

17 1 M3 Pekerjaan Ring Balok Gapura 0.15 x 0.25 ( K-250 )1.000 M 3 Beton K-250 - -

13.333 M 2 Bikesting Balok - - 162.033 K g Penulangan Besi Polos - - -

Jumlah -

18 1 M3 Pekerjaan Ring Balok / Balok Late 0.13 x 0.2 ( K-175 )1.000 M 3 Beton K-175 - -

15.385 M 2 Bikesting Balok - - 195.004 K g Penulangan Besi Polos - - -

Jumlah -

19 1 M3 Pekerjaan Balok Late 0.13 x 0.13 ( K-175 )1.000 M 3 Beton K-175 - -

15.385 M 2 Bikesting Balok - - 267.320 K g Penulangan Besi Polos - - -

Jumlah -

20 1 M3 Pekerjaan Plat Beton , t = 12 Cm ( K-175 )1.000 M 3 Beton K-175 - - 8.333 M 2 Bikesting Plat Lantai - -

180.840 K g Penulangan Besi Polos - - - Jumlah -

21 1 M3 Pekerjaan Plat Beton , t = 12 Cm ( K-250 )1.000 M 3 Beton K-250 - -

19.667 M 2 Bikesting Plat Lantai - - 161.112 K g Penulangan Besi Polos - - -

Jumlah -

22 1 M3 Pekerjaan Plat Beton , t = 10 Cm ( K-175 )1.000 M 3 Beton K-175 - -

13.000 M 2 Bikesting Plat Lantai - - 189.882 K g Penulangan Besi Polos - - -

Jumlah -

23 1 M3 Pekerjaan Plat Beton , t = 10 Cm ( K-250 )1.000 M 3 Beton K-250 - -

13.000 M 2 Bikesting Plat Lantai - - 94.941 K g Penulangan Besi Polos - - -

Jumlah -

HRG . SATUAN SUB JUMLAH JUMLAHRp. Rp. Rp.

24 1 M3 Pekerjaan Plat Beton , t = 15 Cm ( K-175 )1.000 M 3 Beton K-175 - -

10.667 M 2 Bikesting Plat Lantai - - 148.618 K g Penulangan Besi Polos - - -

Jumlah -

NO. URAIAN KET

PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 21: Boq Gapura

KELOMPOK PEKERJAAN LANGIT LANGIT , SNI 2839 - 2008HRG . SATUAN SUB JUMLAH JUMLAH

Rp. Rp. Rp.

1 1 M2 Plafond Kalsiboard t = 3,5 mmUpah :

0.100 Oh Pekerja - - 0.100 Oh Tukang kayu - - 0.010 Oh Kepala tukang - - 0.005 Oh Mandor - - -

Bahan :0.375 Lbr Kalsiboard t = 3,5 mm - - 0.030 Kg Paku Grc - - 4.000 M Kain Kas - - 0.150 Kg Tepung Coumpund - - -

Jumlah - Keuntungan dan Over head 10% - Total -

2 1 M List Profil Plafond ( Gypsum 5 x 10 Cm )Upah :

0.060 Oh Pekerja - - 0.060 Oh Tukang kayu - - 0.006 Oh Kepala tukang - - 0.003 Oh Mandor - - -

Bahan :1.050 M List Gypsum - - 0.150 Kg Tepung Gypsum - - -

Jumlah - Keuntungan dan Over head 10% - Total -

KELOMPOK VIII ( MERUJUK PADA SK SNI -S 06 - 1989 F ) HRG . SATUAN SUB JUMLAH JUMLAH

Rp. Rp. Rp.

1 1 Bh Pasang Kloset Jongkok PorselenUpah :

1.000 Oh Pekerja - - 1.500 Oh Tukang batu - - 1.500 Oh Kepala tukang - - 0.160 Oh Mandor - - -

Bahan :1.000 Bh Kloset jongkok porselen (AST) - - 6.000 Kg Semen portland ( 50 Kg) - - 0.010 M3 Pasir pasangan - - -

Jumlah - Keuntungan dan Over head 10% - Total -

HRG . SATUAN SUB JUMLAH JUMLAHRp. Rp. Rp.

2 1 M1 Pasang Pipa PVC dia. 3/4"Upah :

0.036 Oh Pekerja - - 0.060 Oh Tukang pipa - - 0.006 Oh Kepala tukang - - 0.002 Oh Mandor - - -

URAIAN

KET URAIANNO.

NO. KET

NO. URAIAN KET

PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 22: Boq Gapura

Bahan :1.200 M1 Pipa PVC - - 1.000 Ls Perlengkapan - - -

Jumlah - Keuntungan dan Over head 10% - Total -

3 1 M1 Pasang Pipa PVC dia. 2"Upah :

0.081 Oh Pekerja - - 0.135 Oh Tukang pipa - - 0.014 Oh Kepala tukang - - 0.004 Oh Mandor - - -

Bahan :1.200 M1 Pipa PVC - - 1.000 Ls Perlengkapan - - -

Jumlah - Keuntungan dan Over head 10% - Total -

4 1 M1 Pasang Pipa PVC dia. 4"Upah :

0.081 Oh Pekerja - - 0.135 Oh Tukang pipa - - 0.014 Oh Kepala tukang - - 0.004 Oh Mandor - - -

Bahan :1.200 M1 Pipa PVC - - 1.000 Ls Perlengkapan - - -

Jumlah - Keuntungan dan Over head 10% - Total -

5 1 Bh Pas. Kran Air 1/2"Upah :

0.010 Oh Pekerja - - 0.100 Oh Tukang pipa - - 0.010 Oh Kepala tukang - - 0.005 Oh Mandor - - -

Bahan :1.000 Bh Kran air 1/2" - - 0.025 Bh Seal tape - - -

Jumlah - Keuntungan dan Over head 10% - Total -

6 1 Bh Pas. Floor DrainUpah :

0.010 Oh Pekerja - - 0.100 Oh Tukang pipa - - 0.010 Oh Kepala tukang - - 0.005 Oh Mandor - - -

Bahan :1.000 Bh Floor Drain - - -

Jumlah - Keuntungan dan Over head 10% - Total -

KELOMPOK IX ( MERUJUK PADA SNI 7393 - 2008 )HRG . SATUAN SUB JUMLAH JUMLAH

Rp. Rp. Rp.

1 1 M1 Pasang Kusen Pintu AlumuniumUpah :

0.0430 Oh Pekerja - - 0.0430 Oh Tukang besi - - 0.0043 Oh Kepala tukang - - 0.0021 Oh Mandor - - -

NO. KET URAIAN

PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 23: Boq Gapura

Bahan :1.1000 M1 Profil alumunium 4" - - 2.0000 bh Skrup fixer - - 0.0600 Tube Sealant - - -

Jumlah - Keuntungan dan Over head 10% - Total -

2 1 M1 Pasang Kusen Jendela AlumuniumUpah :

0.0430 Oh Pekerja - - 0.0430 Oh Tukang besi - - 0.0043 Oh Kepala tukang - - 0.0021 Oh Mandor - - -

Bahan :1.1000 M1 Profil alumunium 3" - - 2.0000 bh Skrup fixer - - 0.0600 Tube Sealant - - -

Jumlah - Keuntungan dan Over head 10% - Total -

3 1 M1 Pasang Frame Pintu AlumuniumUpah :

0.0430 Oh Pekerja - - 0.0430 Oh Tukang besi - - 0.0043 Oh Kepala tukang - - 0.0021 Oh Mandor - - -

Bahan :1.1000 M1 Frame pintu alumunium - - 2.0000 bh Skrup fixer - - 0.0600 Tube Sealant - - -

Jumlah - Keuntungan dan Over head 10% - Total -

4 1 M1 Pasang Frame Jendela AlumuniumUpah :

0.0430 Oh Pekerja - - 0.0430 Oh Tukang besi - - 0.0043 Oh Kepala tukang - - 0.0021 Oh Mandor - - -

Bahan :1.1000 M1 Frame jendela alumunium - - 2.0000 bh Skrup fixer - - 0.0600 Tube Sealant - - -

Jumlah - Keuntungan dan Over head 10% - Total -

HRG . SATUAN SUB JUMLAH JUMLAHRp. Rp. Rp.

5 1 M2 Pasang Daun Pintu AlumuniumUpah :

0.0850 Oh Pekerja - - 0.0850 Oh Tukang besi - - 0.0085 Oh Kepala tukang - - 0.0042 Oh Mandor - - -

Bahan :14.6000 M1 Aluminium strip l 8 cm - - -

NO. URAIAN KET

PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 24: Boq Gapura

Jumlah - Keuntungan dan Over head 10% - Total -

6 1 Unit Pintu Alumunium Type P15.700 M1 Frame pintu alumunium - - 0.854 M2 Kaca polos, tebal 8 mm - - 1.000 bh Kunci Selot tanam - - 3.000 bh Engsel pintu aluminium - - 2.000 bh Grendel tanam pintu aluminium - -

Jumlah -

7 1 Unit Pintu Alumunium Type P25.300 M1 Frame pintu alumunium - - 0.832 M2 Daun pintu alumunium - - 3.000 bh Engsel pintu aluminium - - 1.000 bh Grendel tanam pintu aluminium - -

Jumlah - 8 1 Unit Jendela Alumunium Type J1

3.800 M1 Frame jendela alumunium - - 0.322 M2 Kaca polos, tebal 5 mm - - 0.136 M2 Kaca polos, tebal 5 mm - - 2.000 bh Kunci jendela ( Rambuncis ) - - 2.000 bh Engsel jendela top hank - -

Jumlah -

KELOMPOK X ( MERUJUK PADA SK SNI S -05 - 1989 F )HRG . SATUAN SUB JUMLAH JUMLAH

Rp. Rp. Rp.1 1 Bh Pasang Kunci Selot Tanam

Upah :0.005 Oh Pekerja - - 0.500 Oh Tukang kayu - - 0.005 Oh Kepala tukang - - 0.003 Oh Mandor - - -

Bahan :1.000 Bh Kunci Selot Tanam - - -

Jumlah - Keuntungan dan Over head 10% - Total -

2 1 Bh Pasang Kunci Silinder Upah :

0.005 Oh Pekerja - - 0.500 Oh Tukang kayu - - 0.005 Oh Kepala tukang - - 0.003 Oh Mandor - - -

Bahan :1.000 Bh Kunci Silinder - - -

Jumlah - Keuntungan dan Over head 10% - Total -

HRG . SATUAN SUB JUMLAH JUMLAHRp. Rp. Rp.

3 1 Bh Pasang Engsel Pintu Alumunium Upah :

0.015 Oh Pekerja - - 0.150 Oh Tukang kayu - - 0.015 Oh Kepala tukang - - 0.001 Oh Mandor - - -

Bahan :1.000 Bh Engsel pintu alumunium - - -

URAIAN

NO. URAIAN KET

NO. KET

PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 25: Boq Gapura

Jumlah - Keuntungan dan Over head 10% - Total -

4 1 Bh Pasang Engsel Jendela Alumunium Upah :

0.015 Oh Pekerja - - 0.150 Oh Tukang kayu - - 0.015 Oh Kepala tukang - - 0.008 Oh Mandor - - -

Bahan :1.000 Bh Engsel Jendela top hank - - -

Jumlah - Keuntungan dan Over head 10% - Total -

5 1 Bh Pasang Grendel Tanam Pintu Alumunium Upah :

0.015 Oh Pekerja - - 0.150 Oh Tukang kayu - - 0.015 Oh Kepala tukang - - 0.001 Oh Mandor - - -

Bahan :1.000 Bh Grendel Tanam type sendok - - -

Jumlah - Keuntungan dan Over head 10% - Total -

6 1 Bh Pasang Kunci Jendela ( Rambuncis ) Upah :

0.015 Oh Pekerja - - 0.150 Oh Tukang kayu - - 0.015 Oh Kepala tukang - - 0.001 Oh Mandor - - -

Bahan :1.000 Bh Grendel Jendela ( rambuncis ) - - -

Jumlah - Keuntungan dan Over head 10% - Total -

7 1 M2 Pasang Kaca Bening, tbl 5 mm Upah :

0.0150 Oh Pekerja - - 0.1500 Oh Tukang kayu - - 0.0150 Oh Kepala tukang - - 0.0008 Oh Mandor - - -

Bahan :1.1000 M2 Kaca tbl 5 mm - - -

Jumlah - Keuntungan dan Over head 10% - Total -

HRG . SATUAN SUB JUMLAH JUMLAHRp. Rp. Rp.

8 1 M2 Pasang Kaca Bening, tbl 8 mm Upah :

0.0210 Oh Pekerja - - 0.0210 Oh Tukang kayu - - 0.0200 Oh Kepala tukang - - 0.0100 Oh Mandor - - -

Bahan :1.1000 M2 Kaca tbl 8 mm - - -

Jumlah - Keuntungan dan Over head 10% -

NO. URAIAN KET

PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 26: Boq Gapura

Total -

KELOMPOK LANTAI DAN DINDING ( MERUJUK PADA SNI - 7395 - 2008 )HRG . SATUAN SUB JUMLAH JUMLAH

Rp. Rp. Rp.

1 1 M1 Pasang Listello 10 x 20 cm Upah :

0.090 Oh Pekerja - - 0.090 Oh Tukang batu - - 0.009 Oh Kepala tukang - - 0.005 Oh Mandor - - -

Bahan :5.300 Bh Border Keramik 10 x 20 - - 1.140 Kg Semen portland ( 50 Kg) - - 0.003 M3 Pasir pasangan - - 0.025 Kg Semen warna - - -

Jumlah - Keuntungan dan Over head 10% - Total -

2 1 M2 Pasang Lantai Keramik 20 x 20 cm Upah :

0.700 Oh Pekerja - - 0.350 Oh Tukang batu - - 0.035 Oh Kepala tukang - - 0.030 Oh Mandor - - -

Bahan :26.500 Bh Ubin Keramik 20 x 20 - - 10.400 Kg Semen portland ( 50 Kg) - -

0.045 M3 Pasir pasangan - - 1.620 Kg Semen warna - - -

Jumlah - Keuntungan dan Over head 10% - Total -

3 1 M2 Pasang Lantai Keramik 40 x 40 cm Upah :

0.700 Oh Pekerja - - 0.350 Oh Tukang batu - - 0.035 Oh Kepala tukang - - 0.030 Oh Mandor - - -

Bahan :6.250 Bh Ubin Keramik 40 x 40 - -

10.000 Kg Semen portland ( 50 Kg) - - 0.045 M3 Pasir pasangan - - 1.500 Kg Semen warna - - -

Jumlah - Keuntungan dan Over head 10% - Total -

HRG . SATUAN SUB JUMLAH JUMLAHRp. Rp. Rp.

4 1 M2 Pasang Dinding Keramik 20 x 25 cm Upah :

0.900 Oh Pekerja - - 0.450 Oh Tukang batu - - 0.045 Oh Kepala tukang - - 0.045 Oh Mandor - - -

Bahan :25.000 Bh Ubin Keramik 20 x 25 - -

9.300 Kg Semen portland ( 50 Kg) - - 0.180 M3 Pasir pasangan - - 0.194 Kg Semen warna - - -

URAIANNO. KET

NO. URAIAN KET

PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 27: Boq Gapura

Jumlah - Keuntungan dan Over head 10% - Total -

5 1 M2 Pasang Batu Alam Lempeng Upah :

0.700 Oh Pekerja - - 0.350 Oh Tukang batu - - 0.035 Oh Kepala tukang - - 0.035 Oh Mandor - - -

Bahan :1.100 M2 Batu Alam Lempeng - -

11.750 Kg Semen portland ( 50 Kg) - - 0.035 M3 Pasir pasangan - - -

Jumlah - Keuntungan dan Over head 10% - Total -

KELOMPOK XII ( MERUJUK PADA SNI 03-2408-1991 )HRG . SATUAN SUB JUMLAH JUMLAH

Rp. Rp. Rp.

1 1 M2 Pengecatan Tembok Baru Yang Tidak Terlindungi Dari Panas Dan Hujan Upah :

0.020 Oh Pekerja - - 0.063 Oh Tukang cat - - 0.006 Oh Kepala tukang - - 0.003 Oh Mandor - - -

Bahan :0.100 Kg Cat alkali resisting primer - - 0.360 Kg Cat weather shield setara ICI DULUX - - -

Jumlah - Keuntungan dan Over head 10% - Total -

2 1 M2 Pengecatan Tembok Baru (1 plamir, 1 cat dasar, 3 cat penutup) Upah :

0.020 Oh Pekerja - - 0.063 Oh Tukang cat - - 0.006 Oh Kepala tukang - - 0.003 Oh Mandor - - -

Bahan :0.100 Kg Plamir - - 0.100 Kg Cat alkali resisting primer - - 0.360 Kg Cat Interior setara ICI DULUX - - -

Jumlah - Keuntungan dan Over head 10% - Total -

HRG . SATUAN SUB JUMLAH JUMLAHRp. Rp. Rp.

3 1 M2 Pengecatan Plafond Baru (1 cat dasar, 2 cat penutup) Upah :

0.028 Oh Pekerja - - 0.042 Oh Tukang cat - - 0.004 Oh Kepala tukang - - 0.003 Oh Mandor - - -

Bahan :0.100 Kg Cat dasar - - 0.260 Kg Cat Interior setara ICI DULUX - - -

Jumlah - Keuntungan dan Over head 10% - Total -

URAIAN KETNO.

NO. URAIAN KET

PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 28: Boq Gapura

4 1 M2 Pengecatan Ulang Plafond (1 cat penutup) Upah :

0.021 Oh Pekerja - - 0.032 Oh Tukang cat - - 0.003 Oh Kepala tukang - - 0.002 Oh Mandor - - -

Bahan :0.195 Kg Cat Interior setara ICI DULUX - - -

Jumlah - Keuntungan dan Over head 10% - Total -

Padang, 2013Dibuat Oleh,

Penawar,PT / CV. ……………………….

NAMAJABATAN

PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 29: Boq Gapura

KEGIATAN : PEMBANGUNAN SMAN 1 SUMATERA BARAT DI PADANG PANJANGPEKERJAAN : PEMBANGUNAN GAPURA PINTU GERBANGLOKASI : KOTA PADANG PANJANGT. ANGGARAN : 2013

I UPAH1 Mandor Hari Rp. - 2 Kepala Tukang Hari Rp. - 3 Tukang Kayu Hari Rp. - 4 Tukang Batu Hari Rp. - 5 Tukang Besi Hari Rp. - 6 Tukang Cat Hari Rp. - 7 Pekerja Hari Rp. -

II BAHANPasir/ Batu

1 Pasir pasangan/ Beton/ Lepoh M3 Rp. - 2 Pasir Urug M3 Rp. - 3 Tanah urug M3 Rp. - 4 Split 1-2 M3 Rp. - 5 Batu kali M3 Rp. - 6 Semen padang (50 Kg) Zak Rp. - 7 Semen Putih Kg Rp. - 8 Tepung Upa Kg Rp. - 9 Tepung Gypsum Kg Rp. - 10 Tepung Coumpond Kg Rp. - 11 Batu bata Bh Rp. -

Kayu1 Kayu Kelas II (papan) M3 Rp. - 2 Kayu klas II Balok M3 Rp. - 3 Kayu Perancah / Bekisting Klas IV M3 Rp. - 4 Dolken Btg Rp. - 5 Kalsiboard t = 3,5 mm Hli Rp. - 6 Multiplek 9 mm Lbr Rp. - 7 List Gypsum 5 x 10 Cm M1 Rp. - 8 Kain Kas M1 Rp. - 9 Minyak Bekisting Ltr Rp. -

DAFTAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH

NO JENIS BAHAN BANGUNAN DAN UPAH SAT HARGA SATUAN

PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 30: Boq Gapura

Besi1 Besi Beton Polos Kg Rp. - 2 Besi Paku Kg Rp. - 3 Skrup GRC Kg Rp. - 4 Skrup Fixer Bh Rp. - 5 Kawat Beton Kg Rp. - 6 Sealant Tube Rp. -

Cat/ Kaca1 Cat Tembok setara ICI DULUX Kg Rp. - 2 Cat weather shield setara ICI DULUX Kg Rp. - 3 Cat alkali resisting primer Kg Rp. - 4 Plamur Tembok RJ Kg Rp. - 5 Kaca bening 5 mm M2 Rp. - 6 Kaca bening 8 mm M2 Rp. -

Pintu/ Jendela dan Alat Penggantung/ Pengunci1 Kunci Selot Tanam Bh Rp. - 2 Kunci Silinder Bh Rp. - 3 Engsel pintu alumunium Bh Rp. - 4 Engsel jendela Tophank (engsel atas + hak angin) Bh Rp. - 5 Grendel tanam pintu alumunium Bh Rp. - 6 Grendel Jendela Alumunium Bh Rp. - 7 Alumunium Strip I 8 Cm M1 Rp. - 8 Kuzen Pintu Aluminium 4" x 1 3/4 " M1 Rp. - 9 Kuzen Jendela alum 3" x 1 3/4 " M1 Rp. - 10 Frame Pintu Aluminium M1 Rp. - 11 Frame jendela Aluminium M1 Rp. -

Penutup Lantai/ Dinding1 Keramik 40 x 40 cm Setara Masterina M2 Rp. - 2 Keramik 40 x 40 cm Setara Masterina Bh Rp. - 3 Keramik 20 x 20 cm Setara Masterina M2 Rp. - 4 Keramik 20 x 25 cm Setara Masterina M2 Rp. - 5 Listello 10 x 20 Cm Bh Rp. - 6 Batu alam lempeng M2 Rp. - 7 Bon-bon Keramik M1 Rp. -

Sanitary1 Kloset Jongkok Setara American Standard Bh Rp. - 2 PVC Putih 4" AW M1 Rp. - 3 PVC Putih 2" AW M1 Rp. - 4 PVC Putih 3/4" AW M1 Rp. - 5 Kran Air 1/2" Bh Rp. -

JENIS BAHAN BANGUNAN DAN UPAH SAT HARGA SATUANNO

PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 31: Boq Gapura

6 Seal tape Bh Rp. - 7 Floor drain (stainless) Bh Rp. -

Padang, 2013Dibuat Oleh,

Penawar,PT / CV. ……………………….

NAMAJABATAN

NO JENIS BAHAN BANGUNAN DAN UPAH SAT HARGA SATUAN

PDF created with pdfFactory Pro trial version www.pdffactory.com