STOK GUDANG PER 21 OKT 2013 Uraian SATUAN Gudang Bangka Gudang Tanjung Pandan Trafo Dist 20 kV 3P 50 kVA D3 SPLN 2007 54 54 - - Trafo Dist 20 kV 3P 100 kVA D3 SPLN 2007 77 77 3 3 Trafo Dist 20 kV 3P 160 kVA D3 SPLN 2007 2 2 - - Trafo Dist 20 kV 3P 200 kVA D3 SPLN 2007 2 2 - - Trafo Dist 20 kV 3P 250 kVA D3 SPLN 2007 - - - - Kubikel IC LBS Motorize 24 kV 14 14 2 2 Kubikel CB OG 24 kV + Metering 16 16 2 2 Konduktor AAAC 70 mm2 - - - - Konduktor AAAC 150 mm2 84,558 84,558 - - Konduktor AAAC 240 mm2 274,794 274,794 138,092 138,092 Konduktor AAAC-s 150 mm2 1,724 1,724 - - Konduktor AAAC-s 240 mm2 - - - - Isolator 20 kV; Pin Post; Porcelin 7,768 7,768 2,627 2,627 Isolator 20 kV; Pin Post; Polimer - - - - Isolator Suspension 20 kV; Porcelin - - - - Isolator Suspension 20 kV; Comp Strain Clam; Porcelin 1,433 1,433 648 648 Isolator Suspension 20 kV; Polimer - - - - Kabel Tanah 3 x 50 mm2 340 340 - - Kabel Tanah 3 x 70 mm2 - - - - Kabel Tanah 3 x 150 mm2 492 492 263 263 Kabel Tanah 3 x 185 mm2 200 200 - - Kabel Tanah 3 x 240 mm2 7,326 7,326 2,865 2,865 Kabel Tanah 1 x 150 mm2 675 675 - - Kabel Tanah 1 x 300 mm2 - - - - Kabel Tanah 1 x 300 mm2; 11,6/20 kV 94 94 220 220 Kabel XPLE 2 x 10 mm2 407,245 407,245 120,527 120,527 Kabel XPLE 2 x 16 mm2 - - - - Kabel XPLE 4 x 10 mm2 3,969 3,969 - - Kabel XPLE 4 x 16 mm2 21,351 21,351 394 394 Kabel XPLE 4 x 25 mm2 - - - - Kabel LVTC 3 x 35 + 25 mm2 - - - - Kabel LVTC 3 x 50 + 35 mm2 - - - - Kabel LVTC 3 x 70 + 50 mm2 58,755 58,755 41,951 41,951 Kabel NYY 1 x 70 mm2 - - - - Kabel NYY 1 x 95 mm2 - - - - Kabel NYY 1 x 120 mm2 - - - - Kabel NYY 1 x 150 mm2 - - - - LA; 20 -24 kV; 10 kA Porcelin - - - - LA; 20 -24 kV; 5 kA Porcelin - - - - LA; 20 -24 kV; 10 kA Polimer 784 784 - - LA; 20 -24 kV; 5 kA Polimer - - - - Fuse Cut Out 24 kV polimer 666 666 - - Fuse Cut Out 24 kV porcelin - - - - Guy Wire 22 mm2 meter - - 45,000 45,000 MTR;kWH Prabayar 1 Ph;5-60A;1 - - - - MTR; KWH Prabayar 1 Ph Combo MCB 2 A - - 204 204 MTR; KWH Prabayar 1 Ph Combo MCB 4 A - - 6,847 6,847 MTR; KWH Prabayar 1 Ph Combo MCB 6 A - - 2,531 2,531 MTR; KWH Prabayar 1 Ph Combo MCB 10 A 2,438 2,438 432 432 MTR; KWH Prabayar 1 Ph Combo MCB 16 A 277 277 - - MTR; KWH Prabayar 1 Ph Combo MCB 20 A - - - - MTR; KWH Prabayar 1 Ph Combo MCB 25 A - - - - MTR;kWH E COM;;1P;230V;5-40A-4A;1;ST;2W 1,823 1,823 - - MTR;kWH Elektronik 1P;230V;5-20A 10 10 - - MTR;kWH Elektronik Combo 1P; 230V; 5-40A MCB 2A 1,743 1,743 - - MTR;kWH Elektronik Combo 1P;230V;5-40A MCB 6A 1,081 1,081 - - MTR;kWH Elektronik Combo 1P;230V;5-40A MCB 16A 7 7 - - MTR;KWH Elektronik 3P; 57,7/100V; Class 0,5 2 2 - - MTR;kWH E;;3P;57.7/100V;5-10A;0.5;;4W 10 10 - - MTR;kWH E;MD;3P;220/380V;5-10A;1;;4W - - - - MTR;kWH Mekanik 3P;220/380V; 5A; 2; DT; 4W 12 12 - - MTR;kWH Elektronik 3P;220/380V; 5A; Class 0.5 - - - - MTR;kWH Elektronik 3P; 230/400V;5-80A;Class 1; - - 3 3 MTR;kWH Elektronik 3P;220/380V;5-100A; Class 1 - - - - MTR;kWH Prabayar 1 Ph;5-60A;2 - - - - MTR;kWH E;;3P;57.7/240V;5-10A;0.5;;4W - - - - Stok Gudang Rencana Pakai Akhir Tahun Sisa Akhir Tahun Stok Gudang Rencana Pakai Akhir Tahun Sisa Akhir Tahun
138

Babel - Lkai 2014 v14

Oct 22, 2015

Download

Documents

Nasil Oir
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Babel - Lkai 2014 v14

STOK GUDANG PER 21 OKT 2013 RENCANA PEMAKAIAN 2014

Uraian SATUAN

Gudang Bangka Gudang Tanjung Pandan

Total

AREA BANGKA

Trafo Dist 20 kV 3P 50 kVA D3 SPLN 2007 54 54 - - 54 54 Trafo Dist 20 kV 3P 100 kVA D3 SPLN 2007 77 77 3 3 80 77 Trafo Dist 20 kV 3P 160 kVA D3 SPLN 2007 2 2 - - 2 2 Trafo Dist 20 kV 3P 200 kVA D3 SPLN 2007 2 2 - - 2 2 Trafo Dist 20 kV 3P 250 kVA D3 SPLN 2007 - - - - - Kubikel IC LBS Motorize 24 kV 14 14 2 2 16 14 Kubikel CB OG 24 kV + Metering 16 16 2 2 18 16 Konduktor AAAC 70 mm2 - - - - - Konduktor AAAC 150 mm2 84,558 84,558 - - 84,558 84,558 Konduktor AAAC 240 mm2 274,794 274,794 138,092 138,092 412,886 259,648 Konduktor AAAC-s 150 mm2 1,724 1,724 - - 1,724 Konduktor AAAC-s 240 mm2 - - - - - Isolator 20 kV; Pin Post; Porcelin 7,768 7,768 2,627 2,627 10,395 6,853 Isolator 20 kV; Pin Post; Polimer - - - - - Isolator Suspension 20 kV; Porcelin - - - - - Isolator Suspension 20 kV; Comp Strain Clam; Porcelin 1,433 1,433 648 648 2,081 1,433 12 Isolator Suspension 20 kV; Polimer - - - - - Kabel Tanah 3 x 50 mm2 340 340 - - 340 Kabel Tanah 3 x 70 mm2 - - - - - Kabel Tanah 3 x 150 mm2 492 492 263 263 755 Kabel Tanah 3 x 185 mm2 200 200 - - 200 Kabel Tanah 3 x 240 mm2 7,326 7,326 2,865 2,865 10,191 6,873 Kabel Tanah 1 x 150 mm2 675 675 - - 675 Kabel Tanah 1 x 300 mm2 - - - - - Kabel Tanah 1 x 300 mm2; 11,6/20 kV 94 94 220 220 314 Kabel XPLE 2 x 10 mm2 407,245 407,245 120,527 120,527 527,772 407,245 Kabel XPLE 2 x 16 mm2 - - - - - Kabel XPLE 4 x 10 mm2 3,969 3,969 - - 3,969 Kabel XPLE 4 x 16 mm2 21,351 21,351 394 394 21,745 15,000 Kabel XPLE 4 x 25 mm2 - - - - - Kabel LVTC 3 x 35 + 25 mm2 - - - - - Kabel LVTC 3 x 50 + 35 mm2 - - - - - Kabel LVTC 3 x 70 + 50 mm2 58,755 58,755 41,951 41,951 100,706 58,755 27,951 Kabel NYY 1 x 70 mm2 - - - - - Kabel NYY 1 x 95 mm2 - - - - - Kabel NYY 1 x 120 mm2 - - - - - Kabel NYY 1 x 150 mm2 - - - - - LA; 20 -24 kV; 10 kA Porcelin - - - - - LA; 20 -24 kV; 5 kA Porcelin - - - - - LA; 20 -24 kV; 10 kA Polimer 784 784 - - 784 519 LA; 20 -24 kV; 5 kA Polimer - - - - - Fuse Cut Out 24 kV polimer 666 666 - - 666 315 Fuse Cut Out 24 kV porcelin - - - - - Guy Wire 22 mm2 meter - - 45,000 45,000 45,000 MTR;kWH Prabayar 1 Ph;5-60A;1 - - - - - MTR; KWH Prabayar 1 Ph Combo MCB 2 A - - 204 204 204 MTR; KWH Prabayar 1 Ph Combo MCB 4 A - - 6,847 6,847 6,847 MTR; KWH Prabayar 1 Ph Combo MCB 6 A - - 2,531 2,531 2,531 MTR; KWH Prabayar 1 Ph Combo MCB 10 A 2,438 2,438 432 432 2,870 MTR; KWH Prabayar 1 Ph Combo MCB 16 A 277 277 - - 277 MTR; KWH Prabayar 1 Ph Combo MCB 20 A - - - - - MTR; KWH Prabayar 1 Ph Combo MCB 25 A - - - - - MTR;kWH E COM;;1P;230V;5-40A-4A;1;ST;2W 1,823 1,823 - - 1,823 MTR;kWH Elektronik 1P;230V;5-20A 10 10 - - 10 MTR;kWH Elektronik Combo 1P; 230V; 5-40A MCB 2A 1,743 1,743 - - 1,743 MTR;kWH Elektronik Combo 1P;230V;5-40A MCB 6A 1,081 1,081 - - 1,081 MTR;kWH Elektronik Combo 1P;230V;5-40A MCB 16A 7 7 - - 7 MTR;KWH Elektronik 3P; 57,7/100V; Class 0,5 2 2 - - 2 MTR;kWH E;;3P;57.7/100V;5-10A;0.5;;4W 10 10 - - 10 MTR;kWH E;MD;3P;220/380V;5-10A;1;;4W - - - - - MTR;kWH Mekanik 3P;220/380V; 5A; 2; DT; 4W 12 12 - - 12 MTR;kWH Elektronik 3P;220/380V; 5A; Class 0.5 - - - - - MTR;kWH Elektronik 3P; 230/400V;5-80A;Class 1; - - 3 3 3 MTR;kWH Elektronik 3P;220/380V;5-100A; Class 1 - - - - - MTR;kWH Prabayar 1 Ph;5-60A;2 - - - - - MTR;kWH E;;3P;57.7/240V;5-10A;0.5;;4W - - - - -

Stok Gudang

Rencana Pakai Akhir Tahun

Sisa Akhir Tahun

Stok Gudang

Rencana Pakai Akhir Tahun

Sisa Akhir Tahun

dari Gudang Bangka

dari Gudang

TJP

Page 2: Babel - Lkai 2014 v14

MTR;kWH E;;1P;230V;5-40A;1;;2W - - 9 9 9 LV PANEL 2 JURUSAN 52 52 1 1 53 52 LV PANEL 3 JURUSAN 108 108 - 108 108

Page 3: Babel - Lkai 2014 v14

RENCANA PEMAKAIAN 2014AREA BANGKA UL TJ. PANDAN

SISA STOKTotal Total

54 - - 77 3 3 - 2 - - 2 - - - - - 14 2 2 - 16 2 2 - - - - 84,558 - - 259,648 15,146 138,092 153,238 - - 1,724 1,724 - - - - 6,853 55 2,627 2,682 860 - - - - - - 1,445 636 636 - - - - - - 340 - - - - - 755 - - 200 6,873 115 2,865 2,980 338 - - 675 - - - - - 314 407,245 120,527 120,527 - - - - - - 3,969 15,000 - 6,745 - - - - - - - - - 86,706 14,000 14,000 - - - - - - - - - - - - - - - - - - - 519 - 265 - - - 315 - 351 - - - - 45,000 45,000 - 5.31 238,950 - - - - - 204 - - 6,847 - - 2,531 - - 2,870 - - 277 - - - - - - - - 1,823 - - 10 - - 1,743 - - 1,081 - - 7 - - 2 - - 10 - - - - - 12 - - - - - 3 - - - - - - - - -

HARGA SATUAN

(xRp.1000)

NILAI STOK GD DIPAKAI (Rp.1000)

dari Gudang Bangka

dari Gudang

TJP

Page 4: Babel - Lkai 2014 v14

- - 9 52 - 1 108 - -

Page 5: Babel - Lkai 2014 v14

Pengadaan Trafo 200 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon PangkalpinangJasa + Material Pelengkap untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Pemasaran Rayon Pangkalpinang, BGK

Pengadaan Trafo 50 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon SungailiatPengadaan Trafo 100 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon SungailiatPengadaan Trafo 160 kVA untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat, BGKPengadaan Trafo 200 kVA untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat, BGKJasa + Material Pelengkap untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat, BGK

Pengadaan Trafo 50 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon KobaPengadaan Trafo 100 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon KobaJasa + Material Pelengkap untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Koba, BGK

Pengadaan Trafo 50 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon MentokPengadaan Trafo 100 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon MentokPengadaan Trafo 160 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon MentokJasa + Material Pelengkap untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Mentok, BGK

Page 6: Babel - Lkai 2014 v14

Pengadaan Trafo 200 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon PangkalpinangJasa + Material Pelengkap untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Pemasaran Rayon Pangkalpinang, BGK

Pengadaan Trafo 50 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon SungailiatPengadaan Trafo 100 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon SungailiatPengadaan Trafo 160 kVA untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat, BGKPengadaan Trafo 200 kVA untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat, BGKJasa + Material Pelengkap untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat, BGK

Pengadaan Trafo 50 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon KobaPengadaan Trafo 100 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon KobaJasa + Material Pelengkap untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Koba, BGK

Pengadaan Trafo 50 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon MentokPengadaan Trafo 100 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon MentokPengadaan Trafo 160 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon MentokJasa + Material Pelengkap untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Mentok, BGK

Page 7: Babel - Lkai 2014 v14

6 570,000 - 2,866,572

- - - - - - 2 140,000 - 2 190,000 -

858,236

- - - - - -

864,680

- - - - - - 2 140,000 -

1,417,391

Page 8: Babel - Lkai 2014 v14

URAIAN KEGIATAN UNITDISBURSE 2014 (xRp. 1000)

TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV Rp 7,850,854 Rp 54,989,611 Rp 74,784,494 Rp 86,841,141

1 Jasa + Material Pelengkap Pembangunan SUTM 240 mm2 15 lokasi AREA Rp 6,941,862

Jasa u/ penarikan SUTM 240 mm2 SL 5 Merawang - GI Sungailiat, BGK Rp 225,000

Jasa u/ penarikan SKTM 3x240 mm2 u/ Penarikan SL 5 Merawang - GI Sungailiat, BGK Rp 78,750

Rp 1,030,496

Rp 88,114

Jasa + Material untuk Pembangunan Express Feeder Jelitik (SUTM & SKTM) Sungailiat, BGK Rp 490,254

Rp 240,644

Rp 128,740

Rp 34,252

Jasa + Material Pelengkap untuk Pekerjaan Underbuild dan Uprating Belinyu, BGK Rp 1,767,082

Rp 245,918

Rp 36,938

Rp 57,414

Rp 436,988

Rp 286,988

Rp 175,918

Rp 356,952

Rp 386,222

Rp 175,612

Rp 104,420

Rp 165,312

Rp 302,866

Rp 15,810

Rp 111,172

2 Jasa + Material Pembangunan SKTM 240 mm2 3 Lokasi AREA Rp 1,561,950

3 Jasa + Material Pelengkap SUTM,SUTR dan Gardu Sisip 6 lokasi AREA Rp 2,523,695 Rp 5,047,390

4 Jasa perluasan SUTR dan penyambungan pelanggan lokasi : AREA Rp 1,748,848 Rp 2,623,271 Rp 2,623,271

5 Pengadaan Material dan Jasa Pembangunan GSW AREA Rp 1,004,734

JUMLAH AREA Rp - Rp 11,257,393 Rp 5,146,966 Rp 7,670,661

1 Jasa + Material Pelengkap SUTM dan SKTM 240 mm2 lokasi : UL TJP Rp 3,433,666

2 Jasa + Material Pelengkap Gardu Sisip 100 KVA lokasi : UL TJP Rp 975,000 Rp 1,950,000

3 Jasa Perluasan SUTR dan penyambungan pelanggan lokasi : UL TJP Rp 507,527 Rp 761,291 Rp 761,291

4 Pengadaan Material dan Jasa Pembangunan GSW : UL TJP Rp 3,397,771

5 Jasa + Material Pelengkap Rekonektor lokasi : UL TJP Rp 650,000 Rp 650,000 Rp 650,000

UL TANJUNG PANDAN Rp - Rp 4,591,194 Rp 5,784,062 Rp 3,361,291

1 Paket SKTM 240 mm2 JPROC Rp 3,067,500

2 Paket SUTM 240 mm2 JPROC Rp 82,120

3 Paket SUTM 150 mm2 JPROC Rp 1,712,026

4 Paket AAACS JPROC Rp 197,280

5 Paket Panel TM JPROC Rp 7,900,300

6 Paket Trafo JPROC Rp 6,720,000

7 Paket Isolator JPROC Rp 215,786

8 Paket LVTC 3x70 mm2 JPROC Rp 5,412,240 Rp 5,412,240

9 Paket LVTC 2x10 mm2 JPROC Rp 2,178,140

10 Paket kWhmeter JPROC Rp 4,309,200 Rp 4,309,200 Rp 4,309,200

JUMLAH PANITIA JPROC FUNGSI DISTRIBUSI Rp - Rp 31,794,592 Rp 9,721,440 Rp 4,309,200

1 Repowering Ms. Mirrlees PLTD Mentok, BGK KANWIL Rp 14,500,000

2 Pengadaan & Pemasangan Gearpump mesin Mirless Merawang, BGK KANWIL Rp 4,500,000

3 Reverse Engineering PLTU Air Anyir KANWIL Rp 6,559,258

4 Studi Amdal PLTU Sewa 2x30MW KANWIL Rp 600,000

5 Pengadaan mobil Cable Fault Locator u/ Mendeteksi Gangguan SKTM, BGK KANWIL Rp 2,500,000

6 Pengadaan Power Quality Meter, BGK KANWIL Rp 320,000

7 Peralatan kerja & K3 GI FTP 1 KANWIL Rp 2,070,364

NOSKKI

Jasa + Material Pelengkap Pembangunan SUTM Express Penyulang GI Kampak - Simpang SPBU Pangkalan Baru, BGK

Jasa + Material Pelengkap penarikan SUTM 240 mm2 OG GH Payung untuk Pembangunan Penyulang Rayon Toboali, BGK

Jasa + Material Pelengkap penarikan SUTM 240 mm2 Penyulang Toboali-Kantor Bupati untuk Pembangunan Penyulang Rayon Toboali, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 OG GH Payung untuk Pembangunan Penyulang Rayon Toboali, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 Penyulang Toboali-Kantor Bupati untuk Pembangunan Penyulang Rayon Toboali, BGK

Jasa + Material Pelengkap penarikan SUTM 240 mm2 penyulang Mentok-4 untuk Pembangunan Penyulang Rayon Mentok, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 OG Underbuild Jebus untuk Pembangunan Penyulang Rayon Mentok, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 OG penyulang Mentok-4 untuk Pembangunan Penyulang Rayon Mentok, BGK

Jasa + Material Pelengkap Pembangunan SUTM OG GI Kampak-Perkuatan PP-3 dan PP5 untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SUTM 240 mm2 Underbuild Ketapang untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SUTM 240 mm2 Penyulang OG GI Kampak untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 Penyulang OG GI Kampak untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SUTM 240 mm2 Penyulang OG GI Air Anyir untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 Penyulang OG GI Air Anyir untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SUTM 150 mm2 Simp. Gubernur untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 Simp. Gubernur untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SUTM 150 mm2 Underbuild Jebus untuk Pembangunan Penyulang Rayon Mentok, BGK

Jasa + Material Pelengkap Uprating SUTM 35 mm2 ke 240 mm2 P024 untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap Uprating SUTM 35 mm2 ke 240 mm2 untuk Pembangunan Penyulang Rayon Toboali, BGK

Page 9: Babel - Lkai 2014 v14

JUMLAH PPBJ I Rp - Rp 600,000 Rp 21,390,364 Rp 9,059,258

1 Jasa Konsultasi Pembangunan SCADA Titik Kontrol KANWIL Rp 674,490

2 Pembangunan SCADA Sistem kelistrikan Bangka Belitung (Master Station) KANWIL Rp 6,014,580 Rp 6,014,580

3 Perbaikan titik kontrol SCADA KANWIL Rp 8,262,064 Rp 8,262,064

4 Pengadaan CT / PT Indoor u/ Metering Outfit Lengkap Pelanggan TM, BGK KANWIL Rp 1,900,000

5 Jasa Instalasi dan License AMR BGK & TJP KANWIL Rp 588,500

6 Paket Prasarana SCADA KANWIL Rp 7,984,587

7 Paket Meter Elektronik AMR KANWIL Rp 7,153,200

8 Paket Tower dan Radio KANWIL Rp 2,692,500

JUMLAH PPBJ II Rp - Rp 3,162,990 Rp 21,429,844 Rp 24,953,731

1 Pembangunan Kabel laut 20kV Tanjung Pandan - Selat nasik KANWIL Rp 31,587,500

2 Pengadaan dan Pemasangan MV Panel dan SKTM GH Merawang, BGK KANWIL Rp 8,362,068

3 Paket Jasa AVR KANWIL Rp 633,692

4 Paket Tiang beton KANWIL Rp 2,949,750 Rp 2,949,750 Rp 5,899,500

JUMLAH PPBJ III Rp - Rp 3,583,442 Rp 11,311,818 Rp 37,487,000

TOTAL MURNI Rp 216,615,246 ANGGARAN INVESTASI TAHUN 2014 Rp 224,466,100

KETERANGANSKKI TERBITPAIPANITIA PENGADAAN BARANG & JASA I, II & IIIPROSES PEKERJAANPOINVOICE

Page 10: Babel - Lkai 2014 v14

1 Pembangunan Kabel laut 20kV Tanjung Pandan - Selat nasik 1 lot Rp 31,587,500 PPBJ III

2 1 lot Rp 6,432,360 PPBJ III

3 Paket Jasa AVR 1 lot Rp 533,609 PPBJ III

1 lot Rp 200,000

1 lot Rp 333,609

4 Paket Tiang beton 2622 btg Rp 11,799,000 PPBJ III

1200 batang Rp 5,400,000

1402 batang Rp 6,309,000

20 batang Rp 90,000

JUMLAH PPBJ III Rp 50,352,469

TOTAL MURNI Rp 216,615,246 ANGGARAN INVESTASI TAHUN 2014 Rp 226,500,000

Pengadaan dan Pemasangan MV Panel dan SKTM GH Merawang, BGK

Jasa + Material Pendukung untuk Pemasangan Trafo AVR 10MVA untuk Perbaikan Tegangan di Belinyu, BGKPembangunan GH AVR Belinyu untuk Pembangunan AVR untuk Perbaikan Tegangan di Belinyu, BGK

Pengadaan Tiang Beton 9 m 200 daN Perluasan SUTR Manggar, Kelapa Kampit, Membalong &Tanjung Pandan, TJP

Pengadaan Tiang Beton 9m - 200 daN Pangkalpinang,Sungailiat,Koba,Mentok & Toboali u/ Perluasan SUTR ,BGK

Pengadaan Tiang Beton 7m - 200 daN Pangkalpinang,Sungailiat,Koba,Mentok & Toboali u/ Perluasan SUTR,BGK

Page 11: Babel - Lkai 2014 v14
Page 12: Babel - Lkai 2014 v14

PROGRAM KEGIATAN ANGGARAN INVESTASI TAHUN 2014WILAYAH : BANGKA BELITUNG

No PRK SCORE

7.11 PRK.2014.WBE.7.1 10.2

8.12 PRK.2014.WBE.8.1 10.2

29.13 PRK.2014.WBE.29.1 10.8

8.34 PRK.2014.WBE.8.3 10.2

28.15 PRK.2014.WBE.28.1 10.8

9.36 PRK.2014.WBE.9.3 10.2

10.17 PRK.2014.WBE.10.1 10.2

10.58 PRK.2014.WBE.10.5 10.2

10.69 PRK.2014.WBE.10.6 10.2

10.810 PRK.2014.WBE.10.8 10.2

11.111 PRK.2014.WBE.11.1 10.2

10.312 PRK.2014.WBE.10.3 10.2

9.113 PRK.2014.WBE.9.1 10.2

8.214 PRK.2014.WBE.8.2 10.2

8.415 PRK.2014.WBE.8.4 10.2

Page 13: Babel - Lkai 2014 v14

9.216 PRK.2014.WBE.9.2 10.2

9.417 PRK.2014.WBE.9.4 10.2

10.418 PRK.2014.WBE.10.4 10.2

10.719 PRK.2014.WBE.10.7 10.2

10.920 PRK.2014.WBE.10.9 10.2

11.221 PRK.2014.WBE.11.2 10.2

12.122 PRK.2014.WBE.12.1 10.2

12.323 PRK.2014.WBE.12.3 10.2

13.1 24 PRK.2014.WBE.13.1 10.2

10.225 PRK.2014.WBE.10.2 10.2

8.526 PRK.2014.WBE.8.5 10.2

20.527 PRK.2014.WBE.20.5 10.7

21.528 PRK.2014.WBE.21.5 10.7

22.329 PRK.2014.WBE.22.3 10.7

23.430 PRK.2014.WBE.23.4 10.7

24.831 PRK.2014.WBE.24.8 10.7

24.632 PRK.2014.WBE.24.6 10.7

24.733 PRK.2014.WBE.24.7 10.7

25.3 34 PRK.2014.WBE.25.3 10.734.8 35 PRK.2014.WBE.34.8 10.934.10 36 PRK.2014.WBE.34.10 10.934.6 37 PRK.2014.WBE.34.6 10.9

33.438 PRK.2014.WBE.33.4 10.9

Page 14: Babel - Lkai 2014 v14

32.139 PRK.2014.WBE.32.1 10.9

JUMLAH AREA

38.4 1 PRK.2014.WBE.38.4 10.9

14.1 2 PRK.2014.WBE.14.1 10.2

14.2 3 PRK.2014.WBE.14.2 10.2

45.3 4 PRK.2014.WBE.45.3 10.9

27.2 5 PRK.2014.WBE.27.2 10.7

39.2

6 PRK.2014.WBE.39.2 10.9

40.3 7 PRK.2014.WBE.40.3 10.9

26.3 8 PRK.2014.WBE.26.3 10.743.3 9 PRK.2014.WBE.43.3 10.943.5 10 PRK.2014.WBE.43.5 10.944.5 11 PRK.2014.WBE.44.5 10.9

43.1 12 PRK.2014.WBE.43.1 10.9

37.1 13 PRK.2014.WBE.37.1 10.937.2 14 PRK.2014.WBE.37.2 10.937.3 15 PRK.2014.WBE.37.3 10.9

37.4 16 PRK.2014.WBE.37.4 10.9

37.5 17 PRK.2014.WBE.37.5 10.9

37.6 18 PRK.2014.WBE.37.6 10.9

37.7 19 PRK.2014.WBE.37.7 10.9

37.8 20 PRK.2014.WBE.37.8 10.9

37.9 21 PRK.2014.WBE.37.9 10.9

Page 15: Babel - Lkai 2014 v14

37.10 22 PRK.2014.WBE.37.10 10.9

37.11 23 PRK.2014.WBE.37.11 10.9

37.12 24 PRK.2014.WBE.37.12 10.9

37.13 25 PRK.2014.WBE.37.13 10.9

37.14 26 PRK.2014.WBE.37.14 10.9

37.15 27 PRK.2014.WBE.37.15 10.9

41.1 28 PRK.2014.WBE.41.1 10.941.2 29 PRK.2014.WBE.41.2 10.9

JUMLAH UL TJP

PANITIA JPROC FUNGSI DISTRIBUSI

12.21 PRK.2014.WBE.12.2 10.2

45.1 2 PRK.2014.WBE.45.1 10.9

20.13 PRK.2014.WBE.20.1 10.7

22.14 PRK.2014.WBE.22.1 10.7

24.1 5 PRK.2014.WBE.24.1 10.7

21.1 6 PRK.2014.WBE.21.1 10.7

23.1 7 PRK.2014.WBE.23.1 10.7

38.1 8 PRK.2014.WBE.38.1 10.9

45.2 9 PRK.2014.WBE.45.2 10.9

31.1 10 PRK.2014.WBE.31.1 10.9

34.1 11 PRK.2014.WBE.34.1 10.9

44.1 12 PRK.2014.WBE.44.1 10.9

12.4 13 PRK.2014.WBE.12.4 10.2

34.3 14 PRK.2014.WBE.34.3 10.9

Page 16: Babel - Lkai 2014 v14

44.3 15 PRK.2014.WBE.44.3 10.9

34.2 16 PRK.2014.WBE.34.2 10.9

44.2 17 PRK.2014.WBE.44.2 10.9

31.2 18 PRK.2014.WBE.31.2 10.9

20.4 19 PRK.2014.WBE.20.4 10.7

21.4 20 PRK.2014.WBE.21.4 10.7

24.5 21 PRK.2014.WBE.24.5 10.7

20.3 22 PRK.2014.WBE.20.3 10.7

21.3 23 PRK.2014.WBE.21.3 10.7

23.3 24 PRK.2014.WBE.23.3 10.7

24.4 25 PRK.2014.WBE.24.4 10.7

27.1 26 PRK.2014.WBE.27.1 10.7

24.3 27 PRK.2014.WBE.24.3 10.7

20.2 28 PRK.2014.WBE.20.2 10.7

21.2 29 PRK.2014.WBE.21.2 10.7

22.2 30 PRK.2014.WBE.22.2 10.7

23.2 31 PRK.2014.WBE.23.2 10.7

24.2 32 PRK.2014.WBE.24.2 10.7

38.333 PRK.2014.WBE.38.3 10.9

38.234 PRK.2014.WBE.38.2 10.9

Page 17: Babel - Lkai 2014 v14

33.135 PRK.2014.WBE.33.1 10.9

39.1

36 PRK.2014.WBE.39.1 10.9

40.137 PRK.2014.WBE.40.1 10.9

25.138 PRK.2014.WBE.25.1 10.7

26.139 PRK.2014.WBE.26.1 10.7

25.240 PRK.2014.WBE.25.2 10.7

26.241 PRK.2014.WBE.26.2 10.7

JUMLAH PANITIA JPROC FUNGSI DISTRIBUSI

PANITIA PENGADAAN BARANG DAN JASA I46.1 1 PRK.2014.WBE.46.1 10.10

47.12 PRK.2014.WBE.47.1 10.10

18.1 3 PRK.2014.WBE.18.1 10.4

19.1 4 PRK.2014.WBE.19.1 10.4

35.15 PRK.2014.WBE.35.1 10.9

35.2 6 PRK.2014.WBE.35.2 10.9

30.17 PRK.2014.WBE.30.1 10.8

30.2 8 PRK.2014.WBE.30.2 10.8

JUMLAH PPBJ I

PANITIA PENGADAAN BARANG DAN JASA II48.2 1 PRK.2014.WBE.48.2 10.13

48.52 PRK.2014.WBE.48.5 10.13

48.1 3 PRK.2014.WBE.48.1 10.13

34.5 4 PRK.2014.WBE.34.5 10.9

42.1 5 PRK.2014.WBE.42.1 10.9

Page 18: Babel - Lkai 2014 v14

48.3 6 PRK.2014.WBE.48.3 10.13

48.4 7 PRK.2014.WBE.48.4 10.13

34.48 PRK.2014.WBE.34.4 10.9

44.49 PRK.2014.WBE.44.4 10.9

34.910 PRK.2014.WBE.34.9 10.9

43.411 PRK.2014.WBE.43.4 10.9

34.712 PRK.2014.WBE.34.7 10.9

43.213 PRK.2014.WBE.43.2 10.9

15.2

14 PRK.2014.WBE.15.2 10.2

15.115 PRK.2014.WBE.15.1 10.2

16.116 PRK.2014.WBE.16.1 10.2

JUMLAH PPBJ II

PANITIA PENGADAAN BARANG DAN JASA III17.1 1 PRK.2014.WBE.17.1 10.4

36.12 PRK.2014.WBE.36.1 10.9

31.43 PRK.2014.WBE.31.4 10.9

31.34 PRK.2014.WBE.31.3 10.9

40.25 PRK.2014.WBE.40.2 10.9

33.26 PRK.2014.WBE.33.2 10.9

33.37 PRK.2014.WBE.33.3 10.9

Page 19: Babel - Lkai 2014 v14

JUMLAH PPBJ III

TOTAL MURNI

Page 20: Babel - Lkai 2014 v14

PROGRAM KEGIATAN ANGGARAN INVESTASI TAHUN 2014WILAYAH : BANGKA BELITUNG

URAIAN KEGIATAN VOLUME SATUAN

Jasa + Material Pelengkap Pembangunan SUTM 240 mm2 lokasi :

1 lot

1.26 kms

1 lot

4.54 kms

1 lot

7.70 kms

1 lot

2 kms

3.4 kms

7.8 kms

Jasa u/ penarikan SUTM 240 mm2 SL 5 Merawang - GI Sungailiat, BGK 7.5 kms

Jasa + Material Pelengkap Pembangunan SUTM 150 mm2 lokasi :

2 kms

8.02 kms

Jasa + Material Pembangunan SKTM 240 mm2 Lokasi :

0.27 km

0.08 km

Jasa + Material Pelengkap Pembangunan SUTM Express Penyulang GI Kampak - Simpang SPBU Pangkalan Baru, BGK

Jasa + Material Pelengkap penarikan SUTM 240 mm2 OG GH Payung untuk Pembangunan Penyulang Rayon Toboali, BGK

Jasa + Material untuk Pembangunan Express Feeder Jelitik (SUTM & SKTM) Sungailiat, BGK

Jasa + Material Pelengkap penarikan SUTM 240 mm2 Penyulang Toboali-Kantor Bupati untuk Pembangunan Penyulang Rayon Toboali, BGK

Jasa + Material Pelengkap untuk Pekerjaan Underbuild dan Uprating 240 mm2 Belinyu, BGK

Jasa + Material Pelengkap penarikan SUTM 240 mm2 penyulang Mentok-4 untuk Pembangunan Penyulang Rayon Mentok, BGK

Jasa + Material Pelengkap Pembangunan SUTM 240 mm2 OG GI Kampak-Perkuatan PP-3 dan PP5 untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SUTM 240 mm2 Underbuild Ketapang untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SUTM 240 mm2 Penyulang OG GI Kampak untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SUTM 240 mm2 Penyulang OG GI Air Anyir untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SUTM 150 mm2 Simp. Gubernur untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SUTM 150 mm2 Underbuild Jebus untuk Pembangunan Penyulang Rayon Mentok, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 OG GH Payung untuk Pembangunan Penyulang Rayon Toboali, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 Penyulang Toboali-Kantor Bupati untuk Pembangunan Penyulang Rayon Toboali, BGK

Page 21: Babel - Lkai 2014 v14

0.08 km

0.27 km

1.5 km

2.1 km

1.1 km

525 meter

1,343 meter

8,180 meter

Jasa + Material Pelengkap untuk Penarikan SKTM Bandara, BGK 1 lotJasa + Material Pelengkap Uprating SUTM 240 mm2 lokasi :

1 lot

3.50 kms

Jasa + Material Pelengkap SUTM,SUTR dan Gardu Sisip lokasi :

1 lot

1 lot

1 lot

1 lot

1 lot

Pengadaan LV Panel lokasi :

3 set

8 set

Jasa perluasan SUTR dan penyambungan pelanggan lokasi :

Jasa Penyambungan pelanggan 1 fasa Bangka 32,936 setJasa Penyambungan pelanggan 3 fasa Langsung, BGK 500 SetJasa Penyambungan pelanggan 3 fasa Tak Langsung, BGK 131 SetJasa Penyambungan Konsumen TM dan Material Pelengkap, BGK 20 set

107.4 km

Jasa + Material Pelengkap penarikan SKTM 240 mm2 OG PLTD Jebus untuk Pembangunan Penyulang Rayon Mentok, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 penyulang Mentok-4 untuk Pembangunan Penyulang Rayon Mentok, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 Simp. Gubernur untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 Penyulang OG GI Kampak untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 Penyulang OG GI Air Anyir untuk Penyulang Rayon Pangkalpinang, BGK

Jasa u/ penarikan SKTM 3x240 mm2 u/ Penarikan SL 5 Merawang - GI Sungailiat, BGK

Jasa u/ penarikan SKTM 3x240 mm2 u/ Penarikan SKTM BTC - GH Theresia, BGK

Jasa u/ penarikan SKTM 3x240 mm2 u/ Penarikan SL 6 Merawang - GI Sungailiat, BGK

Jasa + Material Pelengkap Uprating SUTM 35 mm2 ke 240 mm2 P024 untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap Uprating SUTM 35 mm2 ke 240 mm2 untuk Pembangunan Penyulang Rayon Toboali, BGK

Jasa + Material Pelengkap untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Pemasaran Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat, BGK

Jasa + Material Pelengkap untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Koba, BGK

Jasa + Material Pelengkap untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Mentok, BGK

Jasa + Material Pelengkap untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali, BGK

Pengadaan LV Panel 2 jurusan 250 A untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali, BGK

Pengadaan LV Panel 3 jurusan 400 A untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali, BGK

Jasa Penarikan SUTR Pangkalpinang,Sungailiat,Koba,Mentok & Toboali u/ Perluasan,BGK

Page 22: Babel - Lkai 2014 v14

Jasa + Material Pelengkap Pembangunan GSW

1 lot

JUMLAH AREA

Jasa + Material Pelengkap SUTM dan SKTM 240 mm2 lokasi :

1 lot

45 kms

2.98 km

Jasa + Material Pelengkap u/ Rehabilitasi Jaringan, TJP 10 kms

Jasa + Material Pelengkap Gardu Sisip 100 KVA lokasi :

Jasa Pembangunan Gardu Sisip 100 kVA dan material pelengkap, TJP 65.0 set

Jasa Perluasan SUTR dan penyambungan pelanggan lokasi :

1 lot

1 lot

Jasa + Material Pelengkap u/ Sambungan 1 Phasa, TJP 4,000 setJasa + Material Pelengkap u/ Sambungan 3 Phasa, TJP 400 setJasa Penyambungan pelanggan 3 fasa Tak Langsung, TJP 40 setJasa + Material Pelengkap u/ Sambungan TM, TJP 8 set

Pengadaan MCB 3 Phasa 240/400 V 20 A u/ Sambungan 3 Phasa, TJP 400 buah

Jasa + Material Pelengkap Pembangunan GSW : 17.4 km 8.9 km 12.1 km

11,900 meter

18.5 km

10,000 meter

Jasa & Material Pelengkap Pembangunan GSW Penyulang Aceh 10 km 10 km

10,000 meter

10 km

Jasa + Material Pelengkap Pembangunan GSW (Ground Steel Wire) Mentok dari PLTD Mentok - Gardu M35 untuk Pembangunan GSW (Ground Steel Wire) Mentok, BGK

Jasa + Material Pelengkap Penarikan SUTM PLTU Jangkang - Kelapa Kampit untuk Perbaikan Tegangan, TJP

Jasa + Material Pelengkap untuk Penarikan SUTM AAAC 240 mm2 Tanjung Pandan untuk Back Up Evakuasi Daya PLTU Suge, TJP

Jasa + Material Pelengkap untuk Pembangunan SKTM 240 mm2 Back Up Evakuasi Daya PLTU Suge, TJP

Jasa + Material Pelengkap Pembangunan Jaringan SUTR Tanjung Pandan Kelapa Kampit,Tanjung Kelumpang, Tanjung Binga, Sijuk, Membalong & Gantung untuk Perbaikan Tegangan, TJP

Jasa + Material Pelengkap Perluasan SUTR Manggar, Kelapa Kampit, Membalong &Tanjung Pandan, TJP

Jasa & Material Pelengkap Pembangunan GSW Penyulang Bengkulu 17,4 km Jasa & Material Pelengkap Pembangunan GSW Penyulang Marakas 8,9 km Jasa & Material Pelengkap Pembangunan GSW Penyulang Metro 12,1 km Pengadaan Galvanized Steel wire 22mm untuk GSW Penyulang Jakarta 18,5 km Jasa & Material Pelengkap Pembangunan GSW Penyulang Jakarta 18,5 km Pengadaan Galvanized Steel wire 22mm untuk GSW Penyulang Aceh 10 km

Pengadaan Galvanized Steel wire 22mm untuk GSW Penyulang Bangka 10 km

Jasa & Material Pelengkap Pembangunan GSW Penyulang Bangka 10 km

Page 23: Babel - Lkai 2014 v14

10,000 meter

10 km

10,000 meter

10 km

10,000 meter

Jasa & Material Pelengkap Pembangunan GSW Penyulang Riau 10 km 10 km

Jasa + Material Pelengkap Rekonektor lokasi :Rekonektor Gardu, JTR, SR dan APP Manggar, TJP 13 garduRekonektor Gardu, JTR, SR dan APP Tanjung Pandan, TJP 26 gardu

JUMLAH UL TJP

PANITIA JPROC FUNGSI DISTRIBUSIPaket SKTM 240 mm2

8,180 meter

Paket SUTM 240 mm2Pengadaan A3C 240 mm2 u/ Rehabilitasi Jaringan, TJP 4,106 meter

Paket SUTM 150 mm2

25,054 meter

8,349 meter

4,150 meter

4,369 meter

19,247 meter

24,432 meter

Paket AAACS

Pengadaan A3CS 150 mm2 u/ Rehabilitasi Jaringan, TJP 6,576 meter

Paket Panel TM

2 unit

Pengadaan Panel Incoming LBS u/ konsumen TM, BGK 7 unit

Pengadaan Panel Incoming LBS u/ Sambungan TM, TJP 8 unit

1 buah

Pengadaan Panel Outgoing Panel CB Motorized u/ konsumen TM, BGK 5 unit

Pengadaan Galvanized Steel wire 22mm untuk GSW Penyulang Andalas 10 km Jasa & Material Pelengkap Pembangunan GSW Penyulang Andalas 10 km Pengadaan Galvanized Steel wire 22mm untuk GSW Penyulang Medan 10 km Jasa & Material Pelengkap Pembangunan GSW Penyulang Medan 10 km Pengadaan Galvanized Steel wire 22mm untuk GSW Penyulang Riau 10 km

Pengadaan SKTM 3x240 mm2 u/ Penarikan Penarikan SL 6 Merawang - GI Sungailiat, BGK

Pengadaan AAAC 150mm2 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Pangkalpinang

Pengadaan AAAC 150mm2 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Koba

Pengadaan AAAC 150mm2 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali

Pengadaan AAAC 150mm2 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat

Pengadaan AAAC 150mm2 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Mentok

Pengadaan AAAC 150 mm² Penarikan SUTM PLTU Jangkang - Kelapa Kampit untuk Perbaikan Tegangan, TJP

Pengadaan Kubikel incoming untuk Pembangunan AVR untuk Perbaikan Tegangan di Belinyu, BGK

Pengadaan Kubikel Out Going u/Penarikan SKTM SL 6 Merawang - GI Sungailiat, BGK

Page 24: Babel - Lkai 2014 v14

Pengadaan Panel Outgoing Panel CB Motorized u/ Sambungan TM, TJP 8 unit

Pengadaan Panel Metering Panel u/ konsumen TM, BGK 20 unit

Pengadaan Panel Metering Panel u/ Sambungan TM, TJP 8 unit

2 unit

Paket Trafo

6 buah

2 unit

2 unit

10 buah

2 unit

2 unit

11 unit

Pengadaan Trafo 100 kVA u/ Gardu Sisipan, TJP 62 unit

1 unit

Paket Isolator

25 set

24 set

57 set

90 set

24 set

105 set

497 buah

Pengadaan Kubikel Coupling untuk Pembangunan AVR untuk Perbaikan Tegangan di Belinyu, BGK

Pengadaan Trafo 200 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Pangkalpinang

Pengadaan Trafo 200 kVA untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat, BGK

Pengadaan Trafo 200 kVA untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali, BGK

Pengadaan Trafo 160 kVA untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Pangkalpinang, BGK

Pengadaan Trafo 160 kVA untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat, BGK

Pengadaan Trafo 160 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Mentok

Pengadaan Trafo 100 kVA untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali, BGK

Pengadaan Trafo 50 kVA untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali, BGK

Pengadaan Isolator tarik 20 kV + strain clamp 150-240 mm² untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Pangkalpinang

Pengadaan Isolator tarik 20 kV + strain clamp 150-240 mm² untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat

Pengadaan Isolator tarik 20 kV + strain clamp 150-240 mm² untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Koba

Pengadaan Isolator tarik 20 kV + strain clamp 150-240 mm² untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Mentok

Pengadaan Isolator tarik 20 kV + strain clamp 150-240 mm² untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali

Pengadaan Isolator tarik 20 kV + strain clamp 150-240 mm² Penarikan SUTM PLTU Jangkang - Kelapa Kampit untuk Perbaikan Tegangan, TJP

Pengadaan Isolator Tumpu 20 kV Penarikan SUTM PLTU Jangkang - Kelapa Kampit untuk Perbaikan Tegangan, TJP

Page 25: Babel - Lkai 2014 v14

Paket LVTC 3x70 mm2

87,957 meter

129,712 meter

41,600 meter

Paket LVTC 2x10 mm2

416,155 meter

Pengadaan Material LVTC 2 x 10 mm2 u/ Sambungan 1 Phasa, TJP 19,473 meter

Paket kWhmeter

32,936 buah

4,000 buah

JUMLAH PANITIA JPROC FUNGSI DISTRIBUSI

PANITIA PENGADAAN BARANG DAN JASA IRepowering Ms. Mirrlees PLTD Mentok, BGK 1 unit

Pengadaan & Pemasangan Gearpump mesin Mirless Merawang, BGK 1 lot

Reverse Engineering PLTU Air Anyir 1 lot

Studi Amdal PLTU Sewa 2x30MW 1 lot

1 unit

Pengadaan Power Quality Meter, BGK 1 set

Peralatan kerja & K3 GI FTP 1

Pengadaan Peralatan Kerja GI FTP 1 untuk Area Bangka dan UL TJP 3 set

Pengadaan Peralatan K3 GI FTP 1 untuk Area Bangka dan UL TJP 3 set

JUMLAH PPBJ I

PANITIA PENGADAAN BARANG DAN JASA IIJasa Konsultasi Pembangunan SCADA Titik Kontrol 1 lot

1 lot

Perbaikan titik kontrol SCADA 1 lot

Pengadaan CT / PT Indoor u/ Pelanggan TM, BGK & TJP 20 unit

Jasa Instalasi dan License AMR BGK & TJP 3,000 titik

Paket Prasarana SCADA

Pengadaan LVTC 3 x 70 + 50 mm2 Pangkalpinang,Sungailiat,Koba,Mentok & Toboali u/ Perluasan,BGK

Pengadaan LVTC 3 x 70 + 50 mm² Pembangunan Jaringan SUTR Tanjung Pandan,Kelapa Kampit,Tanjung Kelumpang, Tanjung Binga, Sijuk, Membalong & Gantung untuk Perbaikan Tegangan, TJP

Pengadaan LVTC 3 x 70 + 50 mm2 Perluasan SUTR Manggar, Kelapa Kampit, Membalong &Tanjung Pandan, TJP

Pengadaan Material LVTC 2 x 10 mm2, untuk Penyambungan 1 phasa, BGK

Pengadaan kWh Meter 1 Phasa Prabayar 5/40 A 230/400 V, untuk penyambungan 1 phasa, BGK

Pengadaan kWh Meter 1 Phasa Prabayar 5/40 A 230/400 V u/ Sambungan 1 Phasa, TJP

Pengadaan mobil Cable Fault Locator u/ Mendeteksi Gangguan SKTM, BGK

Pembangunan SCADA Sistem kelistrikan Bangka Belitung (Master Station)

Page 26: Babel - Lkai 2014 v14

Pembangunan Prasarana SCADA, BGK 1 lot

Pembangunan Prasarana SCADA, TJP 1 lot

Paket Meter Elektronik AMR

20 unit

8 buah

131 buah

40 bh

500 buah

400 buah

Paket Tower dan Radio

2 unit

1 unit

1 unit

JUMLAH PPBJ II

PANITIA PENGADAAN BARANG DAN JASA IIIPembangunan Kabel laut 20kV Tanjung Pandan - Selat nasik 1 lot

Pengadaan dan Pemasangan MV Panel dan SKTM GH Merawang, BGK 1 lot

Paket Jasa AVR

1 lot

1 lot

Paket Tiang beton

1,200 batang

1,402 batang

20 batang

Pengadaan kWh Meter Elektronik + Smart Panel Box u/ Sambungan TM, BGK

Pengadaan kWh Meter Elektronik + Smart Panel Box u/ Sambungan TM, TJP

Pengadaan kWh Meter 3 Phasa Tak langsung + Box AMR Combo lengkap (Modem+CT), BGK

Pengadaan kWh Meter 3 Phasa Tak langsung + Box AMR Combo lengkap (Modem+CT), TJP

Pengadaan kWh Meter Elektronik 3 Phasa langsung + Smart Panel Boks Phasa 5/100 A 230/400 V, BGK

Pengadaan kWh Meter Elektronik 3 Phasa langsung + Smart Panel Boks Phasa 5/100 A 230/400 V, TJP

Pengadaan Tower Antenna 30 mtr dan Celwave Omnidirectional Antena SDB + Penghantar + Arde u/ Peralatan KomunikasiLokasi : GI Dukong & Kantor Jaga Sijuk, TJP

Pengadaan Tower Antenna 50 mtr self support u/ Peralatan KomunikasiLokasi : Kantor Jaga Simpang Pesak, TJP

Pengadaan Repeater GR 500 VHF 45 Watt serta Access u/ Radio LinkLokasi : Kantor Jaga Simpang Pesak, TJP

Jasa + Material Pendukung untuk Pemasangan Trafo AVR 10MVA untuk Perbaikan Tegangan di Belinyu, BGKPembangunan GH AVR Belinyu untuk Pembangunan AVR untuk Perbaikan Tegangan di Belinyu, BGK

Pengadaan Tiang Beton 9 m 200 daN Perluasan SUTR Manggar, Kelapa Kampit, Membalong &Tanjung Pandan, TJP

Pengadaan Tiang Beton 9m - 200 daN Pangkalpinang,Sungailiat,Koba,Mentok & Toboali u/ Perluasan SUTR ,BGK

Pengadaan Tiang Beton 7m - 200 daN Pangkalpinang,Sungailiat,Koba,Mentok & Toboali u/ Perluasan SUTR,BGK

Page 27: Babel - Lkai 2014 v14

JUMLAH PPBJ III

TOTAL MURNI

Page 28: Babel - Lkai 2014 v14

PROGRAM KEGIATAN ANGGARAN INVESTASI TAHUN 2014WILAYAH : BANGKA BELITUNG

TRIWULAN 1 TRIWULAN 2

JAN FEB MAR APR

Rp 22,091,643 Rp 91,965,357

607,993 607,993 607,993 607,993

51,987 41,260 51,987 51,987

289,250 289,250 289,250 289,250

141,980 31,273 141,980 141,980

1,042,578 1,042,578 1,042,578 1,042,578

145,092 18,852 145,092 145,092

257,823 257,823 257,823 257,823

169,323 84,661 169,323 169,323

103,792 30,527 103,792 103,792

227,871 29,214 227,871 227,871

225,000 30,000 225,000 225,000

61,608 30,804 61,608 61,608

178,691 22,288 178,691 178,691

75,957 281,321 75,957 75,957

20,209 252,609 20,209 20,209

ANGGARAN INVESTASI 2014

(x Rp. 1000)

HARGA SATUAN

(x Rp. 1000)

JUMLAH HARGA

(x Rp. 1000)

Page 29: Babel - Lkai 2014 v14

21,793 272,418 21,793 21,793

33,874 125,460 33,874 33,874

97,534 65,023 97,534 97,534

210,602 100,287 210,602 210,602

103,611 94,192 103,611 103,611

78,750 150 78,750 78,750

201,450 150 201,450 201,450

1,227,000 150 1,227,000 1,227,000

1,252,585 1,252,585 1,252,585 1,252,585

9,328 9,328 9,328 9,328

65,591 18,740 65,591 65,591

1,843,228 1,843,228 1,843,228 1,843,228

540,913 540,913 540,913 540,913

541,201 541,201 541,201 541,201

985,645 985,645 985,645 985,645

507,152 507,152 507,152 507,152

24,602 8,201 24,602 24,602

58,111 7,264 58,111 58,111

5,928,480 180 5,928,480 1,778,544 1,778,544 150,000 300 150,000 150,000 39,300 300 39,300 39,300 56,000 2,800 56,000 56,000

821,610 7,650 821,610

Page 30: Babel - Lkai 2014 v14

911,989 911,989 911,989 JUMLAH AREA

258,000 258,000 258,000 258,000

1,330,469 29,566 1,330,469 1,330,469

249,568 83,748 249,568 249,568

300,000 30,000 300,000 300,000

2,925,000 45,000 2,925,000 877,500

785,709 785,709 785,709

306,000 306,000 306,000 720,000 180 720,000 720,000 120,000 300 120,000 120,000 12,000 300 12,000 12,000 22,400 2,800 22,400 22,400

64,000 160 64,000

107,835 6,197 107,835 107,835 60,488 6,796 60,488 60,488 145,753 12,046 145,753 145,753

63,189 5 63,189 63,189

108,558 5,868 108,558 108,558

53,100 5 53,100 53,100

321,900 32,190 321,900

53,100 5 53,100 53,100

321,900 32,190 321,900

Page 31: Babel - Lkai 2014 v14

53,100 5 53,100 53,100

321,900 32,190 321,900

53,100 5 53,100 53,100

321,900 32,190 321,900

53,100 5 53,100 53,100

321,900 32,190 321,900

650,000 50,000 650,000 1,300,000 50,000 1,300,000

JUMLAH UL TJP

PANITIA JPROC FUNGSI DISTRIBUSI

3,067,500 375 3,067,500

82,120 20 82,120

501,086 20 501,086

166,980 20 166,980

83,000 20 83,000

87,380 20 87,380

384,940 20 384,940

488,640 20 488,640

197,280 30 197,280

640,000 320,000 640,000

388,500 55,500 388,500

444,000 55,500 444,000

300,000 300,000 300,000

1,375,000 275,000 1,375,000

Page 32: Babel - Lkai 2014 v14

2,200,000 275,000 2,200,000

1,702,000 85,100 1,702,000

680,800 85,100 680,800

170,000 85,000 170,000

570,000 95,000 570,000

190,000 95,000 190,000

190,000 95,000 190,000

700,000 70,000 700,000

140,000 70,000 140,000

140,000 70,000 140,000

715,000 65,000 715,000

4,030,000 65,000 4,030,000

45,000 45,000 45,000

7,500 300 7,500

7,200 300 7,200

17,100 300 17,100

27,000 300 27,000

7,200 300 7,200

31,500 300 31,500

118,286 238 118,286

Page 33: Babel - Lkai 2014 v14

3,672,205 42 3,672,205

5,415,476 42 5,415,476

1,736,800 42 1,736,800

2,080,775 5 2,080,775

97,365 5 97,365

11,527,600 350 11,527,600

1,400,000 350 1,400,000

JUMLAH PANITIA JPROC FUNGSI DISTRIBUSI

PANITIA PENGADAAN BARANG DAN JASA I 14,500,000 14,500,000 14,500,000 7,250,000

4,500,000 4,500,000 4,500,000

17,134,889 17,134,889 17,134,889 1,713,489

505,224 505,224 505,224 505,224

2,500,000 2,500,000 2,500,000

320,000 320,000 320,000

626,094 208,698 626,094 626,094

1,256,442 418,814 1,256,442 1,256,442

JUMLAH PPBJ I

PANITIA PENGADAAN BARANG DAN JASA II 674,490 674,490 674,490 674,490

24,058,321 24,058,321 24,058,321

16,524,127 16,524,127 16,524,127

1,900,000 95,000 1,900,000

588,500 196 588,500 588,500

Page 34: Babel - Lkai 2014 v14

12,718,491 12,718,491 12,718,491

3,250,683 3,250,683 3,250,683

153,000 7,650 153,000

61,200 7,650 61,200

1,179,000 9,000 1,179,000

360,000 9,000 360,000

3,000,000 6,000 3,000,000

2,400,000 6,000 2,400,000

1,400,000 700,000 1,400,000

1,000,000 1,000,000 1,000,000

292,500 292,500 292,500

JUMLAH PPBJ II

PANITIA PENGADAAN BARANG DAN JASA III 33,250,000 33,250,000 33,250,000

6,432,360 6,432,360 6,432,360

200,000 200,000 200,000

333,609 333,609 333,609

5,400,000 4,500 5,400,000

6,309,000 4,500 6,309,000

90,000 4,500 90,000

Page 35: Babel - Lkai 2014 v14

JUMLAH PPBJ III

TOTAL MURNI

Page 36: Babel - Lkai 2014 v14

PROGRAM KEGIATAN ANGGARAN INVESTASI TAHUN 2014WILAYAH : BANGKA BELITUNG

TRIWULAN 2 TRIWULAN 3 TRIWULAN 4

MEI JUN JUL AGT SEP OKT NOV

Rp 91,965,357 Rp 27,453,237 Rp 76,270,150

Page 37: Babel - Lkai 2014 v14

1,185,696 1,185,696

821,610

Page 38: Babel - Lkai 2014 v14

911,989

877,500 585,000 585,000

785,709

306,000

64,000

321,900

321,900

Page 39: Babel - Lkai 2014 v14

321,900

321,900

321,900

650,000 390,000 390,000 520,000

PANITIA JPROC FUNGSI DISTRIBUSI

3,067,500

82,120

501,086

166,980

83,000

87,380

384,940

488,640

197,280

640,000

388,500

444,000

300,000

1,375,000

Page 40: Babel - Lkai 2014 v14

2,200,000

1,702,000

680,800

170,000

570,000

190,000

190,000

700,000

140,000

140,000

715,000

4,030,000

45,000

7,500

7,200

17,100

27,000

7,200

31,500

118,286

Page 41: Babel - Lkai 2014 v14

3,672,205

5,415,476

1,736,800

2,080,775

97,365

11,527,600

1,400,000

PANITIA PENGADAAN BARANG DAN JASA I 7,250,000

4,500,000

3,426,978 5,140,467 4,283,722

2,500,000

320,000

PANITIA PENGADAAN BARANG DAN JASA II

3,608,748

6,609,651 5,442,154

1,900,000

Page 42: Babel - Lkai 2014 v14

1,907,774 4,451,472

487,602 1,137,739

153,000

61,200

1,179,000

360,000

3,000,000

2,400,000

1,400,000

1,000,000

292,500

PANITIA PENGADAAN BARANG DAN JASA III 19,950,000 11,637,500

6,432,360

200,000

333,609

5,400,000

6,309,000

90,000

Page 43: Babel - Lkai 2014 v14
Page 44: Babel - Lkai 2014 v14

PROGRAM KEGIATAN ANGGARAN INVESTASI TAHUN 2014WILAYAH : BANGKA BELITUNG

TRIWULAN 4

KETERANGANDES

Rp 76,270,150

Rp 3,262,688 SKKI 1

607,993

51,987

289,250

141,980

1,042,578

145,092

257,823

169,323

103,792

227,871

225,000

Rp 240,299 SKKI 2

61,608

178,691

Rp 3,323,365 SKKI 3

75,957

20,209

DISBURSE AKI 2014(Rp. 1000)

Page 45: Babel - Lkai 2014 v14

21,793

33,874

97,534

210,602

103,611

78,750

201,450

1,227,000

1,252,585 Rp 74,919 SKKI 4

9,328

65,591

Rp 4,418,139 SKKI 5

1,843,228

540,913

541,201

985,645

507,152

Rp 82,713 SKKI 6

24,602

58,111

Rp 6,995,390 SKKI 7

5,928,480 150,000 39,300 56,000

821,610

Page 46: Babel - Lkai 2014 v14

Rp 911,989 SKKI 8

911,989

Rp 19,309,502

Rp 2,138,037 SKKI 1

258,000

1,330,469

249,568

300,000

Rp 2,925,000 SKKI 2

2,925,000

Rp 2,030,109 SKKI 3

785,709

306,000

720,000 120,000 12,000 22,400

64,000

Rp 2,360,823 SKKI 4

107,835 60,488 145,753

63,189

108,558

53,100

321,900

53,100

321,900

Page 47: Babel - Lkai 2014 v14

53,100

321,900

53,100

321,900

53,100

321,900

Rp 1,950,000 SKKI 5

650,000 1,300,000

Rp 11,403,968

PANITIA JPROC FUNGSI DISTRIBUSI Rp 3,067,500 PENGADAAN 1

3,067,500

Rp 82,120 PENGADAAN 2

82,120

Rp 1,712,026 PENGADAAN 3

501,086

166,980

83,000

87,380

384,940

488,640

Rp 197,280 PENGADAAN 4

197,280

Rp 7,900,300 PENGADAAN 5

640,000

388,500

444,000

300,000

1,375,000

Page 48: Babel - Lkai 2014 v14

2,200,000

1,702,000

680,800

170,000

Rp 6,720,000 PENGADAAN 6

570,000

190,000

190,000

700,000

140,000

140,000

715,000

4,030,000

45,000

Rp 215,786 PENGADAAN 7

7,500

7,200

17,100

27,000

7,200

31,500

118,286

Page 49: Babel - Lkai 2014 v14

Rp 10,824,481 PENGADAAN 8

3,672,205

5,415,476

1,736,800

Rp 2,178,140 PENGADAAN 9

2,080,775

97,365

Rp 12,927,600 PENGADAAN 10

11,527,600

1,400,000

Rp 45,825,233 PANITIA PENGADAAN BARANG DAN JASA I

14,500,000 Rp 14,500,000 PEKERJAAN 1

4,500,000 Rp 4,500,000 PEKERJAAN 2

2,570,233 17,134,889 Rp 17,134,889 PEKERJAAN 3

505,224 Rp 505,224 PEKERJAAN 4

2,500,000 Rp 2,500,000 PEKERJAAN 5

320,000 Rp 320,000 PEKERJAAN 6

Rp 1,882,536 PEKERJAAN 7

626,094

1,256,442

Rp 41,342,649 PANITIA PENGADAAN BARANG DAN JASA II

674,490 Rp 674,490 PEKERJAAN 1

8,420,412 12,029,161 Rp 12,029,161 PEKERJAAN 2

4,472,322 16,524,127 Rp 16,524,127 PEKERJAAN 3

1,900,000 Rp 1,900,000 PEKERJAAN 4

588,500 Rp 588,500 PEKERJAAN 5

Rp 7,984,587 PEKERJAAN 6

Page 50: Babel - Lkai 2014 v14

6,359,246

1,625,341

Rp 7,153,200 PEKERJAAN 7

153,000

61,200

1,179,000

360,000

3,000,000

2,400,000

Rp 2,692,500 PEKERJAAN 8

1,400,000

1,000,000

292,500

Rp 49,546,565 PANITIA PENGADAAN BARANG DAN JASA III

31,587,500 Rp 31,587,500 PEKERJAAN 1

6,432,360 Rp 6,432,360 PEKERJAAN 2

Rp 533,609 PEKERJAAN 3

200,000

333,609

Rp 11,799,000 PEKERJAAN 4

5,400,000

6,309,000

90,000

Page 51: Babel - Lkai 2014 v14

Rp 50,352,469

Rp 217,780,386 LUNCURAN

Kantor Wilayah Rp 187,066,916 Area Bangka Rp 19,309,502 UL Tanjung Pandan Rp 11,403,968 Panitia JProc Rp 45,825,233 Panitia 1,2&3 Rp 141,241,683

Rp 187,066,916

Rp 217,780,386,290 Rp 8,719,613,710

Page 52: Babel - Lkai 2014 v14

LUNCURAN 8,719,614

Rp 226,500,000

Page 53: Babel - Lkai 2014 v14

PT PLN (PERSERO) WILAYAH BANGKA BELITUNGLEMBAR KERJA ANGGARAN INVESTASI TAHUN 2014 143,304 171

KODE PRK UNIT : WBE3 4 5 6 7 8 9 10

SCORE URAIAN KEGIATANVOLUME MATERIAL

SATUAN KEBUTUHAN PENGADAAN

10.1 Kegiatan yang sudah kontrak

1 10.1 Pembangunan AVR untuk Perbaikan Tegangan di Belinyu, BGK1 10.1 Pengadaan Trafo AVR 10 MVA untuk Perbaikan Tegangan di Belinyu, BGK unit 1 1

2 10.1 Pembangunan SCADA dan GSW, BGK1 10.1 Sisa Jasa Konsultasi Engineering Proyek Kabel Laut 150 kV Bangka-Sumatera lot - 2 10.1 Jasa Konsultasi Pembangunan SCADA Master Station lot -

3 10.1

1 10.1 lot -

4 10.1 Pengadaan Peralatan PDKB1 10.1 Pengadaan Peralatan PDKB set 1 1

5 10.1 Upgrade Sistem PDPJ1 10.1 Jasa Upgrade Sistem PDPJ lot -

6 10.1 Pembangunan PLTS1 10.1 Pembangunan PLTS 40 kWp di Pulau Sumedang lot - 2 10.1 Pembangunan PLTS Pulau Pongok 125 kWp lot - 3 10.1 Pembangunan PLTS Pulau Celagen 80 kWp lot - 4 10.1 Pembangunan PLTS Pulau Buku Limau 80 kWp lot -

49 10.1 Pembangunan GSW Area Bangka1 10.1 Pemasangan GSW lokasi Desa Bikang - Desa Bencah Toboali km -

2 10.1 Pemasangan GSW lokasi Desa Karang Panjang, Desa Rebo, Pemali dan Desa Tutut Sungailiat km -

3 10.1 Pemasangan GSW lokasi PLTD - Desa Bikang km - 4 10.1 Pemasangan GSW lokasi Simpang Sunghin - Desa Puding km -

10.2

7

10.2 meter 742 742 -

10.2 bh 1,009 1,009 -

10.2 set 267 267 -

10.2 batang 24 24 -

10.2 batang 3 3 -

10.2 bh 6 6 -

10.2 meter 30 30 -

10.2 meter 38,851 38,851 -

1 10.2 kms

8 10.2 Pembangunan Penyulang Rayon Toboali, BGK10.2 Pengadaan Konduktor AAAC 240 mm² untuk Pembangunan Penyulang Rayon Toboali meter 28,460 28,460 - 10.2 Pengadaan Tiang Beton 12 m 200 daN untuk Pembangunan Penyulang Rayon Toboali batang 15 15 - 10.2 Pengadaan Isolator Tumpu 20 kV (keramik) untuk Pembangunan Penyulang Rayon Toboali bh 401 401 -

10.2 set 63 63 -

10.2 Pengadaan Kabel NA2XSEBY 3x240 mm2 untuk Pembangunan Penyulang Rayon Toboali meter 347 347 -

1 10.2 kms

2 10.2 km

3 10.2 kms

4 10.2 km

5 10.2 kms

9 Pembangunan Penyulang Rayon Mentok, BGK10.2 Pengadaan AAAC 150 mm2 untuk Penyulang Rayon Mentok, BGK meter 24,774 24,774 - 10.2 Pengadaan AAAC 240 mm2 untuk Penyulang Rayon Mentok, BGK meter 23,430 23,430 -

Pengadaan Tiang Beton 12 m 200 daN untuk Penyulang Rayon Mentok batang 20 20 - Pengadaan Isolator Tumpu untuk Penyulang Rayon Mentok buah 552 552 -

10.2 set 131 131 -

Pengadaan Kabel NA2XSEBY 3x240 mm2 untuk Penyulang Rayon Mentok meter 350 350 -

1 10.2 kms

2 10.2 km

No.UrutPRK

No.Urut

RUPTL STOKGUDANG

Pemasangan APP Lengkap (kWh Meter + Box + CT + Modem + Instalasinya) untuk Meterisasi Gardu Program Revenue Assurance (REVAS) BGK&TJPJasa + Material Pelengkap Pemasangan APP Lengkap (kWh Meter + Box + CT + Modem + Instalasinya) untuk Meterisasi Gardu Program Revenue Assurance (REVAS) BGK&TJP

Kegiatan terkait PLTU FTP 1 yang ada progresnya, termasuk perluasan fasilitas batubara dan evakuasi daya

Pembangunan SUTM Express Penyulang GI Kampak - Simpang SPBU Pangkalan Baru, BGK Pengadaan Kabel NA2XSEBY 3x240 mm2 untuk Pembangunan SUTM Express Penyulang GI Kampak - Simpang SPBU Pangkalan Baru

Pengadaan Isolator Tumpu untuk Pembangunan SUTM Express Penyulang GI Kampak - Simpang SPBU Pangkalan Baru

Pengadaan Isolator tarik 20 kV + strain clamp 150-240 mm² untuk Pembangunan SUTM Express Penyulang GI Kampak - Simpang SPBU Pangkalan Baru

Pengadaan Tiang Beton 12 m 200 daN untuk Pembangunan SUTM Express Penyulang GI Kampak - Simpang SPBU Pangkalan Baru

Pengadaan Tiang Beton 9 m 200 daN untuk Pembangunan SUTM Express Penyulang GI Kampak - Simpang SPBU Pangkalan Baru

Pengadaan Ligthing Arrester 24 kV, 10 kA (Polimer) untuk Pembangunan SUTM Express Penyulang GI Kampak - Simpang SPBU Pangkalan Baru

Pengadaan AAAC 70 mm2 untuk Pembangunan SUTM Express Penyulang GI Kampak - Simpang SPBU Pangkalan Baru, BGK (menggunakan stok gudang A3C 150mm)

Pengadaan AAAC 150 mm2 untuk Pembangunan SUTM Express Penyulang GI Kampak - Simpang SPBU Pangkalan Baru, BGK

Jasa + Material Pelengkap Pembangunan SUTM Express Penyulang GI Kampak - Simpang SPBU Pangkalan Baru, BGK

Pengadaan Isolator tarik 20 KV + Strain Clamp 150-240 mm² untuk Pembangunan Penyulang Rayon Toboali, BGK

Jasa + Material Pelengkap penarikan SUTM 240 mm2 OG GH Payung untuk Pembangunan Penyulang Rayon Toboali, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 OG GH Payung untuk Pembangunan Penyulang Rayon Toboali, BGK

Jasa + Material Pelengkap penarikan SUTM 240 mm2 Penyulang Toboali-Kantor Bupati untuk Pembangunan Penyulang Rayon Toboali, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 Penyulang Toboali-Kantor Bupati untuk Pembangunan Penyulang Rayon Toboali, BGK

Jasa + Material Pelengkap Uprating SUTM 35 mm2 ke 240 mm2 untuk Pembangunan Penyulang Rayon Toboali, BGK

Pengadaan Isolator tarik 20 KV + Strain Clamp 150-240 mm² untuk Pembangunan Penyulang Rayon Mentok, BGK

Jasa + Material Pelengkap penarikan SUTM 150 mm2 Underbuild Jebus untuk Pembangunan Penyulang Rayon Mentok, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 OG Underbuild Jebus untuk Pembangunan Penyulang Rayon Mentok, BGK

Page 54: Babel - Lkai 2014 v14

3 10.2 kms

4 10.2 km

10 Pembangunan Penyulang Rayon Pangkalpinang, BGK10.2 Pengadaan AAAC 150 mm2 untuk Penyulang Rayon Pangkalpinang, BGK meter 6,026 6,026 - 10.2 Pengadaan AAAC 240 mm2 untuk Penyulang Rayon Pangkalpinang, BGK meter 71,915 71,915 - 10.2 Pengadaan Isolator Tumpu untuk Penyulang Rayon Pangkalpinang, BGK buah 1,312 1,312 -

10.2 Pengadaan Isolator tarik 20 kV + strain clamp 150-240 mm² untuk Penyulang Rayon Pangkalpinang, BGK set 198 198 -

10.2 Pengadaan Kabel NA2XSEBY 3x240 mm2 untuk Penyulang Rayon Pangkalpinang, BGK meter 2,624 2,624 -

1 10.2 kms

2 10.2 kms

3 10.2 kms

4 10.2 km

5 10.2 kms

6 10.2 kms

7 10.2 km

8 10.2 kms

9 10.2 km

11 Pembangunan SUTM OG GH dan PLTD Area Bangka10.2 Pengadaan A3C 240 mm2 u/ penarikan SUTM SL 5 Merawang - GI Sungailiat, BGK meter 23,342 23,342 - 10.2 Pengadaan Isolator Tumpu u/ penarikan SUTM SL 5 Merawang - GI Sungailiat, BGK buah 475 475 - 10.2 Pengadaan Isolator Tarik u/ penarikan SUTM SL 5 Merawang - GI Sungailiat, BGK set 93 93 -

1 10.2 Jasa u/ penarikan SUTM 240 mm2 SL 5 Merawang - GI Sungailiat, BGK kms - 10.2 Pengadaan SKTM 3x240 mm2 u/ Penarikan SL 5 Merawang - GI Sungailiat, BGK meter 525 525 -

2 10.2 Jasa u/ penarikan SKTM 3x240 mm2 u/ Penarikan SL 5 Merawang - GI Sungailiat, BGK meter - 10.2 Pengadaan Kubikel Out Going u/Penarikan SUTM SL 5 Merawang - GI Sungailiat, BGK buah 1 1 -

12 Pembangunan SKTM Area Bangka10.2 Pengadaan SKTM 3x240 mm2 u/ Penarikan SKTM BTC - GH Theresia, BGK meter 1,343 1,343 -

1 10.2 Jasa u/ penarikan SKTM 3x240 mm2 u/ Penarikan SKTM BTC - GH Theresia, BGK - 10.2 Pengadaan Kubikel Incoming u/Penarikan SKTM BTC - GH Theresia, BGK buah 1 1 -

2 10.2 Pengadaan SKTM 3x240 mm2 u/ Penarikan Penarikan SL 6 Merawang - GI Sungailiat, BGK meter - 3 10.2 Jasa u/ penarikan SKTM 3x240 mm2 u/ Penarikan SL 6 Merawang - GI Sungailiat, BGK meter - 4 10.2 Pengadaan Kubikel Out Going u/Penarikan SKTM SL 6 Merawang - GI Sungailiat, BGK buah - 13 Penarikan SKTM Bandara Depati Amir, BGK

10.2 Pengadaan Kabel NA2XSEBY 3x240 mm2 untuk Penarikan SKTM Bandara Depati Amir, BGK meter 890 890 - 1 10.2 Jasa + Material Pelengkap untuk Penarikan SKTM Bandara, BGK meter -

14

10.2 Pengadaan AAAC 240 mm2 untuk Pembangunan SUTM dan SKTM 20 KV untuk Back Up Evakuasi Daya PLTU Suge meter 135,744 135,744 -

10.2 unit 2 2 -

10.2 unit 2 2 -

10.2 meter 2,980 2,980 -

10.2 Pengadaan Isolator Tumpu untuk Pembangunan SUTM dan SKTM 20 KV untuk Back Up Evakuasi Daya PLTU Suge buah 2,682 2,682 -

10.2 set 636 636 -

10.2 batang 416 416 -

10.2 batang 30 30 -

1 10.2 kms

2 10.2 Jasa + Material Pelengkap untuk Pembangunan SKTM 240 mm2 Back Up Evakuasi Daya PLTU Suge, TJP kms

15 Peralatan Radio Komunikasi UL TJP

1 10.2 unit

2 10.2 unit

16 Radio Repeater Link UL TJP

1 10.2 unit

10.4 PLTU-PLTM-PLTA-PLTP-PLTGB-PLTG gas/Trans/GI yang menurunkan BBM

17 Pembangunan Kabel laut 20kV Tanjung Pandan - Selat nasik1 10.4 Pembangunan Kabel laut 20kV Tanjung Pandan - Selat nasik lot

18 Reverse Engineering PLTU Air Anyir1 10.4 Reverse Engineering PLTU Air Anyir lot

19 Studi Amdal dan UKL UPL PLTU SEWA1 10.4 Studi Amdal PLTU Sewa 2x30MW lot -

10.7 Penyambungan Pelanggan untuk menuju minimum RE 60% per provinsi

Jasa + Material Pelengkap penarikan SUTM 240 mm2 penyulang Mentok-4 untuk Pembangunan Penyulang Rayon Mentok, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 OG penyulang Mentok-4 untuk Pembangunan Penyulang Rayon Mentok, BGK

Jasa + Material Pelengkap Pembangunan SUTM OG GI Kampak-Perkuatan PP-3 dan PP5 untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap Uprating SUTM 35 mm2 ke 240 mm2 P024 untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SUTM 150 mm2 Simp. Gubernur untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 Simp. Gubernur untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SUTM 240 mm2 Underbuild Ketapang untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SUTM 240 mm2 Penyulang OG GI Kampak untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 Penyulang OG GI Kampak untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SUTM 240 mm2 Penyulang OG GI Air Anyir untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 Penyulang OG GI Air Anyir untuk Penyulang Rayon Pangkalpinang, BGK

Penarikan SUTM dan Pembangunan SKTM 20 KV untuk Back Up Evakuasi Daya PLTU Suge, TJP

Pengadaan LBS Incoming 630 A 16 KA Motorized untuk Pembangunan SUTM dan SKTM 20 KV untuk Back Up Evakuasi Daya PLTU Suge

Pengadaan Outgoing CB 630 A, 16 KA, Withdrawable type untuk Pembangunan SUTM dan SKTM 20 KV untuk Back Up Evakuasi Daya PLTU Suge

Pengadaan Kabel NA2XSEBY 3x240 mm2 untuk Pembangunan SUTM dan SKTM 20 KV untuk Back Up Evakuasi Daya PLTU Suge

Pengadaan Isolator tarik 20 kV + strain clamp 150-240 mm² untuk Pembangunan SUTM dan SKTM 20 KV untuk Back Up Evakuasi Daya PLTU Suge

Pengadaan Tiang Beton 14 m 350 daN untuk Pembangunan SUTM dan SKTM 20 KV untuk Back Up Evakuasi Daya PLTU Suge

Pengadaan Tiang Beton 9 m 200 daN untuk Pembangunan SUTM dan SKTM 20 KV untuk Back Up Evakuasi Daya PLTU Suge

Jasa + Material Pelengkap untuk Penarikan SUTM AAAC 240 mm2 Tanjung Pandan untuk Back Up Evakuasi Daya PLTU Suge, TJP

Pengadaan Tower Antenna 50 mtr self support u/ Peralatan KomunikasiLokasi : Kantor Jaga Simpang Pesak, TJP

Pengadaan Tower Antenna 30 mtr dan Celwave Omnidirectional Antena SDB + Penghantar + Arde u/ Peralatan KomunikasiLokasi : GI Dukong & Kantor Jaga Sijuk, TJP

Pengadaan Repeater GR 500 VHF 45 Watt serta Access u/ Radio LinkLokasi : Kantor Jaga Simpang Pesak, TJP

Page 55: Babel - Lkai 2014 v14

20 10.7

1 10.7 meter 39,931 14,877 25,054

10.7 buah 723 723 -

2 10.7 set 234 209 25

10.7 batang 232 232 -

10.7 meter 19,140 19,140 -

10.7 batang 394 394 -

10.7 buah 5 5 -

10.7 buah 41 41 -

3 10.7 buah 12 2 10

4 10.7 buah 8 2 6

10.7 buah 198 198 -

10.7 set 198 198 -

10.7 set 5 5 -

10.7 set 61 61 -

5 10.7 kms

21 10.7 Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat, BGK

1 10.7 Pengadaan AAAC 150mm2 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat meter 4,369 - 4,369

10.7 Pengadaan Isolator Tumpu untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat buah 82 82 -

2 10.7 set 24 - 24

10.7 batang 32 32 -

10.7 meter 8,734 8,734 -

10.7 batang 202 202 -

10.7 unit 2 2 -

10.7 unit 15 15 -

3 10.7 unit 2 - 2

4 10.7 unit 2 - 2

buah 63 63 -

set 63 63 -

set 2 2 -

set 19 19 -

5 10.7 kms

22 10.7 Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Koba, BGK

1 10.7 Pengadaan AAAC 150mm2 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Koba meter 8,349 - 8,349

10.7 Pengadaan Isolator Tumpu untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Koba buah 135 135 -

2 10.7 set 57 - 57

10.7 batang 33 33 -

10.7 Pengadaan LVTC 3 x 70 + 50 mm² untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Koba meter 17,768 17,768 -

10.7 batang 270 270 -

10.7 unit 10 10 -

10.7 unit 8 8 -

10.7 buah 54 54 -

10.7 set 54 54 -

10.7 set 10 10 -

10.7 set 8 8 -

3 10.7 kms

23 10.7 Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Mentok, BGK

Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Pangkalpinang, BGKPengadaan AAAC 150mm2 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Pangkalpinang

Pengadaan Isolator Tumpu untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Pangkalpinang

Pengadaan Isolator tarik 20 kV + strain clamp 150-240 mm² untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Pangkalpinang

Pengadaan Tiang Beton 12 m 200 daN untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Pangkalpinang

Pengadaan LVTC 3 x 70 + 50 mm² untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Pangkalpinang

Pengadaan Tiang Beton 9 m 200 daN untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Pangkalpinang

Pengadaan Trafo 50 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Pangkalpinang

Pengadaan Trafo 100 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Pangkalpinang

Pengadaan Trafo 160 kVA untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Pangkalpinang, BGK

Pengadaan Trafo 200 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Pangkalpinang

Pengadaan Ligthing Arrester 24 kV, 10 kA (Polimer) untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Pangkalpinang

Pengadaan Cut Out 24 kV + Fuse link 2 A untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Pangkalpinang

Pengadaan LV Panel 2 jurusan 250 A untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Pangkalpinang

Pengadaan LV Panel 3 jurusan 400 A untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Pangkalpinang

Jasa + Material Pelengkap untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Pemasaran Rayon Pangkalpinang, BGK

Pengadaan Isolator tarik 20 kV + strain clamp 150-240 mm² untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat

Pengadaan Tiang Beton 12 m 200 daN untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat

Pengadaan LVTC 3 x 70 + 50 mm² untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat

Pengadaan Tiang Beton 9 m 200 daN untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat

Pengadaan Trafo 50 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat

Pengadaan Trafo 100 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat

Pengadaan Trafo 160 kVA untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat, BGK

Pengadaan Trafo 200 kVA untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat, BGK

Pengadaan Ligthing Arrester 24 kV, 10 kA (Polimer) untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat

Pengadaan Cut Out 24 kV + Fuse link 2 A untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat

Pengadaan LV Panel 2 jurusan 250 A untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat

Pengadaan LV Panel 3 jurusan 400 A untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat

Jasa + Material Pelengkap untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat, BGK

Pengadaan Isolator tarik 20 kV + strain clamp 150-240 mm² untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Koba

Pengadaan Tiang Beton 12 m 200 daN untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Koba

Pengadaan Tiang Beton 9 m 200 daN untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Koba

Pengadaan Trafo 50 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Koba

Pengadaan Trafo 100 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Koba

Pengadaan Ligthing Arrester 24 kV, 10 kA (Polimer) untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Koba

Pengadaan Cut Out 24 kV + Fuse link 2 A untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Koba

Pengadaan LV Panel 2 jurusan 250 A untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Koba

Pengadaan LV Panel 3 jurusan 400 A untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Koba

Jasa + Material Pelengkap untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Koba, BGK

Page 56: Babel - Lkai 2014 v14

1 10.7 Pengadaan AAAC 150mm2 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Mentok meter 19,247 - 19,247

10.7 Pengadaan Isolator Tumpu untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Mentok buah 400 400 -

2 10.7 set 90 - 90

10.7 batang 130 130 -

10.7 meter 4,787 4,787 -

10.7 batang 73 73 -

10.7 unit 32 32 -

10.7 unit 13 13 -

3 10.7 unit 2 - 2

10.7 buah 141 141 -

10.7 set 141 141 -

10.7 set 32 32 -

10.7 set 15 15 -

4 10.7 kms

24 10.7 Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali, BGK

1 10.7 Pengadaan AAAC 150mm2 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali meter 4,150 - 4,150

10.7 Pengadaan Isolator Tumpu untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali buah 83 83 -

2 10.7 set 24 - 24

10.7 batang 30 30 -

10.7 meter 16,829 16,829 -

10.7 batang 104 104 -

3 10.7 unit 6 5 1

4 10.7 unit 11 - 11

5 10.7 unit 2 2

10.7 buah 57 57 -

10.7 set 57 57 -

6 10.7 set 6 3 3

7 10.7 set 13 5 8

8 10.7 kms

25 Penyambungan Pelanggan 1 phasa Area Bangka 1 10.7 Pengadaan Material LVTC 2 x 10 mm2, untuk Penyambungan 1 phasa, BGK meter 823,400 407,245 416,155 2 10.7 Pengadaan kWh Meter 1 Phasa Prabayar 5/40 A 230/400 V, untuk penyambungan 1 phasa, BGK buah 32,936 32,936 3 10.7 Jasa Penyambungan pelanggan 1 fasa Bangka set 32,936 32,936

Pengadaan Isolator tarik 20 kV + strain clamp 150-240 mm² untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Mentok

Pengadaan Tiang Beton 12 m 200 daN untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Mentok

Pengadaan LVTC 3 x 70 + 50 mm² untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Mentok

Pengadaan Tiang Beton 9 m 200 daN untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Mentok

Pengadaan Trafo 50 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Mentok

Pengadaan Trafo 100 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Mentok

Pengadaan Trafo 160 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Mentok

Pengadaan Ligthing Arrester 24 kV, 10 kA (Polimer) untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Mentok

Pengadaan Cut Out 24 kV + Fuse link 2 A untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Mentok

Pengadaan LV Panel 2 jurusan 250 A untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Mentok

Pengadaan LV Panel 3 jurusan 400 A untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Mentok

Jasa + Material Pelengkap untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Mentok, BGK

Pengadaan Isolator tarik 20 kV + strain clamp 150-240 mm² untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali

Pengadaan Tiang Beton 12 m 200 daN untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali

Pengadaan LVTC 3 x 70 + 50 mm² untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali, BGK

Pengadaan Tiang Beton 9 m 200 daN untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali

Pengadaan Trafo 50 kVA untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali, BGK

Pengadaan Trafo 100 kVA untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali, BGK

Pengadaan Trafo 200 kVA untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali, BGK

Pengadaan Ligthing Arrester 24 kV, 10 kA (Polimer) untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali

Pengadaan Cut Out 24 kV + Fuse link 2 A untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali

Pengadaan LV Panel 2 jurusan 250 A untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali, BGK

Pengadaan LV Panel 3 jurusan 400 A untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali, BGK

Jasa + Material Pelengkap untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali, BGK

Page 57: Babel - Lkai 2014 v14

26 Sambungan Listrik 1 Phasa UL TJP1 10.7 Pengadaan Material LVTC 2 x 10 mm2 u/ Sambungan 1 Phasa, TJP meter 140,000 120,527 19,473 2 10.7 Pengadaan kWh Meter 1 Phasa Prabayar 5/40 A 230/400 V u/ Sambungan 1 Phasa, TJP buah 4,000 4,000 3 10.7 Jasa + Material Pelengkap u/ Sambungan 1 Phasa, TJP plg 4,000 4,000

27 Pembangunan Gardu Sisip untuk Pemasaran UL TJP1 10.7 Pengadaan Trafo 100 kVA u/ Gardu Sisipan, TJP unit 65 3 62 2 10.7 Jasa Pembangunan Gardu Sisip 100 kVA dan material pelengkap, TJP set

10.8 Mengatasi overload pada Trafo, transmisi dan GI

28 Pekerjaan Underbuild dan Uprating Belinyu, BGKPengadaan Konduktor AAAC 240 mm² untuk Pekerjaan Underbuild dan Uprating Belinyu meter 101,850 101,850 -

Pengadaan Kabel NA2XSEBY 3x240 mm2 untuk Pekerjaan Underbuild dan Uprating Belinyu meter 323 323 -

Pengadaan Isolator Tumpu 20 kV (keramik) untuk Pekerjaan Underbuild dan Uprating Belinyu buah 1,468 1,468 -

10.8 set 433 433 -

1 10.8 Jasa + Material Pelengkap untuk Pekerjaan Underbuild dan Uprating Belinyu, BGK kms29 Pembangunan Express Feeder Jelitik (SUTM & SKTM) Sungailiat, BGK

10.8 Pengadaan AAAC 240 mm² untuk Pembangunan Express Feeder Jelitik (SUTM & SKTM) Sungailiat, BGK meter 10,651 10,651 -

meter 471 471 -

Pengadaan Isolator Tumpu untuk Pembangunan Express Feeder Jelitik (SUTM & SKTM) Sungailiat buah 213 213 -

10.8 set 51 51 -

1 10.8 Jasa + Material untuk Pembangunan Express Feeder Jelitik (SUTM & SKTM) Sungailiat, BGK kms30 Pengadaan Peralatan Kerja Area Bangka dan UL TJP

1 10.8 Pengadaan Peralatan K3 GI FTP 1 untuk Area Bangka dan UL TJP set 3 3 2 10.8 Pengadaan Peralatan Kerja GI FTP 1 untuk Area Bangka dan UL TJP set 3 3

10.9 Perkuatan distribusi untuk penyambungan pelanggan

31 Pembangunan AVR untuk Perbaikan Tegangan di Belinyu, BGK

1 10.9 Pengadaan Kubikel incoming untuk Pembangunan AVR untuk Perbaikan Tegangan di Belinyu, BGK unit 2 - 2

2 10.9 Pengadaan Kubikel Coupling untuk Pembangunan AVR untuk Perbaikan Tegangan di Belinyu, BGK unit 2 - 2

3 10.9 Pembangunan GH AVR Belinyu untuk Pembangunan AVR untuk Perbaikan Tegangan di Belinyu, BGK lot

4 10.9 lot

32 Pembangunan GSW (Ground Steel Wire) Mentok, BGK

1 10.9 km

33 Pembangunan JTR untuk perbaikan susut Area Bangka

1 10.9 Pengadaan LVTC 3 x 70 + 50 mm2 Pangkalpinang,Sungailiat,Koba,Mentok & Toboali u/ Perluasan,BGK meter 107,405 19,448 87,957

2 10.9 batang 1,402 1,402

3 10.9 batang 20 20

4 10.9 Jasa Penarikan SUTR Pangkalpinang,Sungailiat,Koba,Mentok & Toboali u/ Perluasan,BGK km

34 Penyambungan Pelanggan 3 phasa Area Bangka 1 10.9 Pengadaan Panel Incoming LBS u/ konsumen TM, BGK unit 20 13 7 2 10.9 Pengadaan Panel Metering Panel u/ konsumen TM, BGK unit 20 - 20 3 10.9 Pengadaan Panel Outgoing Panel CB Motorized u/ konsumen TM, BGK unit 20 15 5 4 10.9 Pengadaan kWh Meter Elektronik + Smart Panel Box, BGK unit 20 - 20 5 10.9 Pengadaan CT / PT Indoor u/ Metering Outfit Lengkap Pelanggan TM, BGK unit 20 - 20 6 10.9 Jasa Penyambungan Konsumen TM dan Material Pelengkap, BGK set

10.9 Pengadaan Material LVTC 4 x 16 mm2, BGK meter 15,000 15,000 -

7 10.9 Pengadaan kWh Meter Elektronik 3 Phasa langsung + Smart Panel Boks Phasa 5/100 A 230/400 V, BGK buah 500 500

8 10.9 Jasa Penyambungan pelanggan 3 fasa Langsung, BGK set 9 10.9 Pengadaan kWh Meter 3 Phasa Tak langsung + Box AMR Combo lengkap (Modem+CT), BGK buah 131 131 10 10.9 Jasa Penyambungan pelanggan 3 fasa Tak Langsung, BGK set

Pengadaan Isolator tarik 20 KV + Strain Clamp 150-240 mm² untuk Pekerjaan Underbuild dan Uprating Belinyu, BGK

Pengadaan Kabel NA2XSEBY 3x240 mm2 untuk Pembangunan Express Feeder Jelitik (SUTM & SKTM) Sungailiat

Pengadaan Isolator tarik 20 kV + strain clamp 150-240 mm² untuk Pembangunan Express Feeder Jelitik (SUTM & SKTM) Sungailiat, BGK

Jasa + Material Pendukung untuk Pemasangan Trafo AVR 10MVA untuk Perbaikan Tegangan di Belinyu, BGK

Pengadaan Material dan Jasa Pembangunan GSW (Ground Steel Wire) Mentok dari PLTD Mentok - Gardu M35 untuk Pembangunan GSW (Ground Steel Wire) Mentok, BGK

Pengadaan Tiang Beton 9m - 200 daN Pangkalpinang,Sungailiat,Koba,Mentok & Toboali u/ Perluasan SUTR ,BGK

Pengadaan Tiang Beton 7m - 200 daN Pangkalpinang,Sungailiat,Koba,Mentok & Toboali u/ Perluasan SUTR,BGK

Page 58: Babel - Lkai 2014 v14

35 Pengadaan Peralatan Kerja Area Bangka 1 10.9 Pengadaan mobil Cable Fault Locator u/ Mendeteksi Gangguan SKTM, BGK unit 1 1 2 10.9 Pengadaan Power Quality Meter, BGK set 1 136 Rekonfigurasi Outgoing PLTD Merawang (SKTM dan GH Merawang)

1 10.9 Pengadaan dan Pemasangan MV Panel dan SKTM GH Merawang, BGK lot- kubikel incoming

37 Pembangunan GSW (Ground Stell Wire) UL. Tanjung Pandan, TJP10.9 Pembangunan GSW (Ground Steel Wire) Penyulang Bengkulu 17,4 km10.9 Pengadaan Galvanized Steel wire 22mm untuk GSW Penyulang Bengkulu 17,4 km meter 17,400 17,400 -

1 10.9 Jasa & Material Pelengkap Pembangunan GSW Penyulang Bengkulu 17,4 km km10.9 Pembangunan GSW (Ground Steel Wire) Penyulang Marakas 8,9 km - 10.9 Pengadaan Galvanized Steel wire 22mm untuk GSW Penyulang Marakas 8,9 km meter 8,900 8,900 -

2 10.9 Jasa & Material Pelengkap Pembangunan GSW Penyulang Marakas 8,9 km km - 10.9 Pembangunan GSW (Ground Steel Wire) Penyulang Metro 12,1 km - 10.9 Pengadaan Galvanized Steel wire 22mm untuk GSW Penyulang Metro 12,1 km meter 12,100 12,100 -

3 10.9 Jasa & Material Pelengkap Pembangunan GSW Penyulang Metro 12,1 km km - 10.9 Pembangunan GSW (Ground Steel Wire) Penyulang Jakarta 18,5 km -

4 10.9 Pengadaan Galvanized Steel wire 22mm untuk GSW Penyulang Jakarta 18,5 km meter 18,500 6,600 11,900 5 10.9 Jasa & Material Pelengkap Pembangunan GSW Penyulang Jakarta 18,5 km km -

10.9 Pembangunan GSW (Ground Steel Wire) Penyulang Aceh 10 km - 6 10.9 Pengadaan Galvanized Steel wire 22mm untuk GSW Penyulang Aceh 10 km meter 10,000 10,000 7 10.9 Jasa & Material Pelengkap Pembangunan GSW Penyulang Aceh 10 km km -

10.9 Pembangunan GSW (Ground Steel Wire) Penyulang Bangka 10 km - 8 10.9 Pengadaan Galvanized Steel wire 22mm untuk GSW Penyulang Bangka 10 km meter 10,000 10,000 9 10.9 Jasa & Material Pelengkap Pembangunan GSW Penyulang Bangka 10 km km -

10.9 Pembangunan GSW (Ground Steel Wire) Penyulang Andalas 10 km - 10 10.9 Pengadaan Galvanized Steel wire 22mm untuk GSW Penyulang Andalas 10 km meter 10,000 10,000 11 10.9 Jasa & Material Pelengkap Pembangunan GSW Penyulang Andalas 10 km km -

10.9 Pembangunan GSW (Ground Steel Wire) Penyulang Medan 10 km - 12 10.9 Pengadaan Galvanized Steel wire 22mm untuk GSW Penyulang Medan 10 km meter 10,000 10,000 13 10.9 Jasa & Material Pelengkap Pembangunan GSW Penyulang Medan 10 km km -

10.9 Pembangunan GSW (Ground Steel Wire) Penyulang Riau 10 km - 14 10.9 Pengadaan Galvanized Steel wire 22mm untuk GSW Penyulang Riau 10 km meter 10,000 10,000 15 10.9 Jasa & Material Pelengkap Pembangunan GSW Penyulang Riau 10 km km -

38 Penarikan SUTM untuk Perbaikan Tegangan, TJP

1 10.9 meter 24,432 24,432

2 10.9 buah 497 497

3 10.9 set 105 105

4 10.9 kms

39 Pemberatan Jaringan SUTR untuk Perbaikan Tegangan, TJP

1 10.9 meter 129,712 129,712

2 10.9 kms

40 Pembangunan Jaringan SUTR untuk Perbaikan Susut, TJP

1 10.9 meter 41,600 41,600

2 10.9 batang 1,200 1,200

3 10.9 Jasa + Material Pelengkap Perluasan SUTR Manggar, Kelapa Kampit, Membalong &Tanjung Pandan, TJP kms

41 Rekonektor Gardu, JTR, SR dan APP UL TJP1 10.9 Rekonektor Gardu, JTR, SR dan APP Manggar, TJP gardu2 10.9 Rekonektor Gardu, JTR, SR dan APP Tanjung Pandan, TJP gardu

42 Pemasangan AMR Area Bangka & UL TJP1 10.9 Jasa Instalasi dan License AMR BGK & TJP titik

43 Sambungan Listrik 3 Phasa UL TJP10.9 Pengadaan LVTC 3 x 70 + 50 mm2 u/ Sambungan 3 Phasa, TJP meter 14,000 14,000 -

1 10.9 Pengadaan MCB 3 Pole 240/400 V 20 A s/d 300 A u/ Sambungan 3 Phasa, TJP buah 400 - 400

2 10.9 Pengadaan kWh Meter Elektronik 3 Phasa langsung + Smart Panel Boks Phasa 5/100 A 230/400 V, TJP buah 400 - 400

3 10.9 Jasa + Material Pelengkap u/ Sambungan 3 Phasa Langsung, TJP set -

4 10.9 Pengadaan kWh Meter 3 Phasa Tak langsung + Box AMR Combo lengkap (Modem+CT), TJP bh 40 - 40

5 10.9 Jasa Penyambungan pelanggan 3 fasa Tak Langsung, TJP set - 44 Sambungan Listrik Konsumen TM, TJP

1 10.9 Pengadaan Panel Incoming LBS u/ Sambungan TM, TJP unit 8 - 8 2 10.9 Pengadaan Panel Metering Panel u/ Sambungan TM, TJP unit 8 - 8 3 10.9 Pengadaan Panel Outgoing Panel CB Motorized u/ Sambungan TM, TJP unit 8 - 8 4 10.9 Pengadaan kWh Meter Elektronik + Smart Panel Box u/ Sambungan TM, TJP buah 8 - 8 5 10.9 Jasa + Material Pelengkap u/ Sambungan TM, TJP set 8 8

45 Rehabilitasi Konduktor JTM Tua diatas 30 Tahun UL TJP1 10.9 Pengadaan A3C 240 mm2 u/ Rehabilitasi Jaringan, TJP meter 21,600 17,494 4,106 2 10.9 Pengadaan A3CS 150 mm2 u/ Rehabilitasi Jaringan, TJP meter 8,300 1,724 6,576 3 10.9 Jasa + Material Pelengkap u/ Rehabilitasi Jaringan, TJP kms

10.10 Memenuhi pembangkit peaking

46 Repowering Ms. Mirrlees PLTD Mentok, BGK1 10.10 Repowering Ms. Mirrlees PLTD Mentok, BGK unit

Pengadaan AAAC 150 mm² Penarikan SUTM PLTU Jangkang - Kelapa Kampit untuk Perbaikan Tegangan, TJP

Pengadaan Isolator Tumpu 20 kV Penarikan SUTM PLTU Jangkang - Kelapa Kampit untuk Perbaikan Tegangan, TJP

Pengadaan Isolator tarik 20 kV + strain clamp 150-240 mm² Penarikan SUTM PLTU Jangkang - Kelapa Kampit untuk Perbaikan Tegangan, TJP

Jasa + Material Pelengkap Penarikan SUTM PLTU Jangkang - Kelapa Kampit untuk Perbaikan Tegangan, TJP

Pengadaan LVTC 3 x 70 + 50 mm² Pembangunan Jaringan SUTR Tanjung Pandan,Kelapa Kampit,Tanjung Kelumpang, Tanjung Binga, Sijuk, Membalong & Gantung untuk Perbaikan Tegangan, TJP

Jasa + Material Pelengkap Pembangunan Jaringan SUTR Tanjung Pandan Kelapa Kampit,Tanjung Kelumpang, Tanjung Binga, Sijuk, Membalong & Gantung untuk Perbaikan Tegangan, TJP

Pengadaan LVTC 3 x 70 + 50 mm2 Perluasan SUTR Manggar, Kelapa Kampit, Membalong &Tanjung Pandan, TJP

Pengadaan Tiang Beton 9 m 200 daN Perluasan SUTR Manggar, Kelapa Kampit, Membalong &Tanjung Pandan, TJP

Page 59: Babel - Lkai 2014 v14

47 Pengadaan & Pemasangan Gearpump mesin Mirless Merawang, BGK1 10.10 Pengadaan & Pemasangan Gearpump mesin Mirless Merawang, BGK lot

10.13 SCADA Transmisi48 Pengembangan SCADA

1 10.13 Perbaikan titik kontrol SCADA lot2 10.13 Jasa Konsultasi Pembangunan SCADA Titik Kontrol lot3 10.13 Pembangunan Prasarana SCADA, BGK lot4 10.13 Pembangunan Prasarana SCADA, TJP lot5 10.13 Pembangunan SCADA Sistem kelistrikan Bangka Belitung (Master Station) lot

TOTAL

5 10.13 Pembangunan Kabel laut 20kV Tanjung Pandan - Selat nasik

Basket 2 - Peningkatan Mutu & Keandalan (SAIDI-SAIFI)

Basket 4 - Rehab Instalasi & Jaringan DistribusiBasket 5 - Perluasan Jaringan untuk Perluasan Pelayanan

Page 60: Babel - Lkai 2014 v14

28,884,754 19,000,000 1,103,400 4,102,942 6,968,259 8,589,823 63,971,537

- - 282,604 (538,242) (824,211) 1,103,400 4,102,942 6,685,655 9,128,065 64,795,748

11 12 13 14 15 16 17 18 19

JANUARI FEBRUARI MARET APRIL MEI

9,884,754 1,103,400 3,428,452 3,319,003 - 1,932,205 1,166,000

1 unit 1,166,000 1,166,000 1,166,000 764,314

1 lot 426,862 426,862 426,862 1 lot 337,452 337,452 337,452

1,103,400

1 lot 1,103,400 1,103,400 1,103,400

1,925,000 1 set 1,925,000 1,925,000 1,925,000

2,033,900 1 lot 2,033,900 2,033,900 1,932,205

2,176,127 1 lot 1,727,000 1,727,000 1,727,000 1 lot 141,735 141,735 141,735 1 lot 163,300 163,300 163,300 1 lot 144,092 144,092 144,092

716,013

21.37 km 13,141 280,777 280,777

19.44 km 6,678 129,812 129,812

1.06 km 149,860 158,852 158,852 24.91 km 5,884 146,572 146,572

14,229,748 - - - - 5,455,790

835,705

- meter 375 -

- bh 238 -

- set 300 -

- batang 6,750 -

- batang 4,500 -

- bh 836 -

- meter 20 -

- meter 20 -

12.95 kms 64,533 835,705 835,705

420,154 30 - 6,750 - 238 -

- set 300 -

375

1.26 kms 49,923 62,903

0.27 km 367,393 99,196

4.54 kms 37,658 170,966

0.08 km 362,913 29,033

3.21 kms 18,086 58,056

470,287 - meter 20 - - meter 30 -

6,750 - 238 -

set 300 -

375 -

8.02 kms 29,471 236,357

0.08 km 393,063 31,445

VOLUMEPENGADAAN

HARGASATUAN

TOTALANGGARAN

TOTALANGGARAN

Page 61: Babel - Lkai 2014 v14

7.7 kms 19,405 149,416

0.27 km 196,552 53,069

1,541,388 meter 20 - meter 30 - buah 238 -

set 300 -

meter 375 -

6.67 kms 45,859 305,879

0.39 kms 24,023 9,369

2 kms 48,004 96,392

1.5 kms 54,107 81,161

5.5 kms 36,184 199,012

3.5 kms 34,553 121,005

2.1 km 143,438 306,526

7.9 kms 33,904 266,591

1.1 km 141,321 155,453

303,750 - meter 30 - - buah 238 - - buah 300 - 7.5 kms 30,000 225,000 - meter 375 - 525 meter 150 78,750 - buah 300,000 -

4,795,950 - meter 375 - 1,343 meter 150 201,450

buah 150,000 - 8,180 meter 375 3,067,500 3,067,500 8,180 meter 150 1,227,000 1 buah 300,000 300,000 300,000

1,252,585 - meter 375 - 890 meter 1,407 1,252,585 1,252,585

1,917,429

30 -

320,000 -

300,000 -

375 -

238 -

300 -

10,603 -

4,500 -

45.2 kms 34,874 1,577,985

2.98 kms 113,907 339,444

2,400,000

1 unit 1,000,000 1,000,000

2 unit 700,000 1,400,000

292,500

1 unit 292,500 292,500

45,811,901 - - 770,968 1,289,565 596,499 33,250,000

1 lot 33,250,000 33,250,000 12,056,677

1 lot 12,056,677 12,056,677 265,744 1,289,565 596,499 505,224

1 lot 505,224 505,224 505,224 39,557,993 - - 664,848 - 23,197,839

Page 62: Babel - Lkai 2014 v14

4,645,158

25,054 meter 20 501,086 501,086

- buah 238 -

25 set 300 7,500 7,500

- batang 6,750 -

- meter 42 -

- batang 4,500 -

- buah 45,000 -

- buah 65,000 -

10 buah 70,000 700,000 700,000

6 buah 95,000 570,000 570,000

- buah 975 -

- set 1,100 -

- set 7,810 -

- set 7,810 -

1 lot 2,866,572 2,866,572

1,282,816

4,369 meter 20 87,380 87,380

- buah 238 -

24 set 300 7,200 7,200

- batang 6,750 -

- meter 42 -

- batang 4,500 -

- unit 45,000 -

- unit 65,000 -

2 unit 70,000 140,000 140,000

2 unit 95,000 190,000 190,000

- buah 975 -

- set 1,100 -

- set 7,810 -

- set 7,810 -

1 lot 858,236 858,236

1,048,760

8,349 meter 20 166,980 166,980

- buah 238 -

57 set 300 17,100 17,100

- batang 6,750 -

- meter 42 -

- batang 4,500 -

- unit 45,000 -

- unit 65,000 -

- buah 975 -

- set 1,100 -

- set 7,810 -

- set 7,810 -

1 lot 864,680 864,680

1,969,331

Page 63: Babel - Lkai 2014 v14

19,247 meter 20 384,940 384,940

- buah 238 -

90 set 300 27,000 27,000

- batang 6,750 -

- meter 42 -

- batang 4,500 -

- unit 45,000 -

- unit 65,000 -

2 unit 70,000 140,000 140,000

- buah 975 -

- set 1,100 -

- set 7,810 -

- set 7,810 -

1 lot 1,417,391 1,417,391

1,902,708

4,150 meter 20 83,000 83,000

- buah 238 -

24 set 300 7,200 7,200

- batang 6,750 -

- meter 42 -

- batang 4,500 -

1 unit 45,000 45,000 45,000

11 unit 65,000 715,000 715,000

2 unit 95,000 190,000 190,000

- unit 975 -

- unit 1,100 -

3 set 8,201 24,602 24,602

8 set 7,264 58,111 58,111

1 lot 779,795 779,795

19,536,855 416,155 meter 5 2,080,775 2,080,775 32,936 buah 350 11,527,600 11,527,600 32,936 set 180 5,928,480 592,848

Page 64: Babel - Lkai 2014 v14

2,217,365 19,473 meter 5 97,365 97,365 4,000 buah 350 1,400,000 1,400,000 4,000 plg 180 720,000 72,000

6,955,000 62 unit 65,000 4,030,000 4,030,000

65 set 45,000 2,925,000 3,479,256 - - 1,882,536 - -

1,227,822

- meter 30 -

- meter 375 -

- buah 238 -

- set 300 -

33.95 kms 36,166 1,227,822 368,898

- meter 30 -

- meter 375

- buah 238

- set 300 -

3.55 kms 103,915 368,898 1,882,536

3 set 208,698 626,094 626,094 3 set 418,814 1,256,442 1,256,442

58,997,984 - - 48,300 588,500 29,113,416 1,343,609

2 unit 320,000 640,000 640,000

2 unit 85,000 170,000 170,000

1 lot 333,609 333,609 333,609

1 lot 200,000 200,000

911,989

74.7 km 12,209 911,989

10,892,815

87,957 meter 41.75 3,672,205 3,672,205

1,402 batang 4,500 6,309,000

20 batang 4,500 90,000

107.4 km 7,650 821,610

9,942,800 7 unit 55,500 388,500 388,500 20 unit 85,100 1,702,000 1,702,000 5 unit 275,000 1,375,000 1,375,000 20 unit 7,650 153,000 153,000 20 unit 95,000 1,900,000 1,900,000 20 set 2,800 56,000 11,200 - meter 12 -

500 buah 6,000 3,000,000 3,000,000

500 Set 300 150,000 15,000 131 buah 9,000 1,179,000 1,179,000 131 Set 300 39,300 6,000

Page 65: Babel - Lkai 2014 v14

2,820,000 1 unit 2,500,000 2,500,000 1 set 320,000 320,000 320,000

6,432,360 1 lot 6,432,360 6,432,360

485,823

- meter 5 - 17.4 km 6,197 107,835

- meter 5 - 8.9 km 6,796 60,488

- meter 5 - 12.1 km 12,046 145,753

11,900 meter 5 63,189 18.5 km 5,868 108,558

10,000 meter 5 53,100 10 km 32,190 321,900

10,000 meter 5 53,100 10 km 32,190 321,900

10,000 meter 5 53,100 10 km 32,190 321,900

10,000 meter 5 53,100 10 km 32,190 321,900

10,000 meter 5 53,100 10 km 32,190 321,900

943,733

24,432 meter 20 488,640 488,640

497 buah 238 118,286 118,286

105 set 300 31,500 31,500

8.2 kms 37,233 305,307

6,201,185

129,712 meter 42 5,415,476 5,415,476

43.24 kms 18,171 785,709

7,666,370

41,600 meter 42 1,736,800 1,736,800

1,200 batang 4,500 5,400,000

13.87 kms 38,181 529,570

1,950,000 13 gardu 50,000 650,000 26 gardu 50,000 1,300,000

588,500 3,000 titik 196 588,500 588,500

2,956,000 - meter 25 - - 400 buah 160 64,000 64,000

400 buah 6,000 2,400,000 2,400,000

400 set 300 120,000 9,000

40 bh 9,000 360,000 360,000

40 set 300 12,000 1,500 3,408,400

8 unit 55,500 444,000 444,000 8 unit 85,100 680,800 680,800 8 unit 275,000 2,200,000 2,200,000 8 buah 7,650 61,200 61,200 8 set 2,800 22,400 5,600

579,400 4,106 meter 20 82,120 82,120 6,576 meter 30 197,280 197,280 10 kms 30,000 300,000

19,000,000 - - - 7,250,000 4,500,000 14,500,000

1 unit 14,500,000 14,500,000 7,250,000

Page 66: Babel - Lkai 2014 v14

4,500,000 1 lot 4,500,000 4,500,000 4,500,000

57,226,112 - 674,490 - - - 57,226,112

1 lot 16,524,127 16,524,127 1 lot 674,490 674,490 674,490 1 lot 12,718,491 12,718,491 1 lot 3,250,683 3,250,683 1 lot 24,058,321 24,058,321

248,187,748 246,312,748 1,103,400 4,102,942 6,685,655 9,128,065 64,795,748

823,400

2 KABEL 33,250,000 33,250,000 1 KABEL 24,361,000

Pangkalpinang, Desember 2013

GENERAL MANAGER

I.B. ARI WARDANA

KIT 33,738,028 TRS 59,872,962 DIS 154,576,757

248,187,747 -

Basket 1 - Perbaikan Tegangan 9,654,527 9,654,527 Basket 2 - Peningkatan Mutu & Keandalan (SAIDI-SAIFI) 151,650,572 129,962,824

Basket 3 - Perbaikan Susut Jaringan 25,722,805 25,722,805 Basket 4 - Rehab Instalasi & Jaringan Distribusi 2,613,300 2,613,300

Basket 5 - Perluasan Jaringan untuk Perluasan Pelayanan 58,546,544 58,546,544 248,187,747 226,500,000

10.1 9,884,754 10.2 14,229,748 - - 10.4 45,811,901 10.7 39,557,993 10.8 3,479,256 10.9 58,997,984

10.10 19,000,000 10.13 57,226,112

248,187,748

Page 67: Babel - Lkai 2014 v14

23,832,294 13,719,398 14,094,709 12,708,797 32,185,594 29,035,931 16,187,316 2,265,435 2,933,485 (47,307) (1,649,226) (223,570) (1,374,355) (824,613) 21,566,860 10,785,913 14,142,016 14,358,023 32,409,164 30,410,286 17,011,929

20 21 22 23 24 25 26

JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER

- - - - 101,695 - -

101,695

5,500,370 2,046,588 1,227,000 - - - -

62,903

99,196

170,966

29,033

58,056

236,357

31,445

Page 68: Babel - Lkai 2014 v14

149,416

53,069

305,879

9,369

96,392

81,161

199,012

121,005

306,526

266,591

155,453

225,000

78,750

201,450

1,227,000

1,577,985

339,444

1,000,000

1,400,000

292,500

589,236 (6,538,483) - 6,789,693 19,950,000 17,295,577 3,394,846

19,950,000 11,637,500

589,236 (6,538,483) 6,789,693 5,658,077 3,394,846

1,329,696 6,786,674 2,925,000 1,994,544 - 1,994,544 664,848

Page 69: Babel - Lkai 2014 v14

2,866,572

858,236

864,680

Page 70: Babel - Lkai 2014 v14

1,417,391

779,795

1,185,696 1,778,544 1,778,544 592,848

Page 71: Babel - Lkai 2014 v14

144,000 216,000 216,000 72,000

2,925,000 368,898 1,227,822 - - - - -

1,227,822

368,898

6,528,660 7,263,312 9,990,016 3,178,410 2,139,070 88,800 59,500

200,000

911,989

6,309,000

90,000

821,610

11,200 11,200 11,200 11,200

36,000 45,000 36,000 18,000

15,000 12,000 3,000 3,300

Page 72: Babel - Lkai 2014 v14

2,500,000

6,432,360

107,835

60,488

145,753

63,189 108,558

53,100 321,900

53,100 321,900

53,100 321,900

53,100 321,900

53,100 321,900

305,307

785,709

5,400,000

529,570

650,000 1,300,000

24,000 30,000 30,000 27,000

4,500 3,000 3,000 -

5,600 5,600 5,600

300,000 7,250,000 - - - - - -

7,250,000

Page 73: Babel - Lkai 2014 v14

- - - 2,395,376 10,218,399 11,031,365 12,892,734

6,609,651 5,442,154 4,472,322

1,907,774 4,451,472 487,602 1,137,739

3,608,748 8,420,412

21,566,860 10,785,913 14,142,016 14,358,023 32,409,164 30,410,286 17,011,929

7,299,984

19,950,000 11,637,500

Page 74: Babel - Lkai 2014 v14

27

DISBURSE

9,884,754 - 1,166,000 - 426,862 337,452

-

1,103,400

- 1,925,000 - 2,033,900 - 1,727,000 141,735 163,300 144,092

280,777

129,812

158,852 146,572

14,229,748

-

-

-

-

-

-

-

-

-

835,705

- - - -

-

-

62,903

99,196

170,966

29,033

58,056

- - - - -

-

-

236,357

31,445

Page 75: Babel - Lkai 2014 v14

149,416

53,069

- - - -

-

-

305,879

9,369

96,392

81,161

199,012

121,005

306,526

266,591

155,453

- - - - 225,000 - 78,750 - - - 201,450 - 3,067,500 1,227,000 300,000 - - 1,252,585

-

-

-

-

-

-

-

-

-

1,577,985

339,444

-

1,000,000

1,400,000

-

292,500

44,137,901 - 31,587,500 - 12,045,177 - 505,224 39,557,993

Page 76: Babel - Lkai 2014 v14

-

501,086

-

7,500

-

-

-

-

-

700,000

570,000

-

-

-

-

2,866,572

-

87,380

-

7,200

-

-

-

-

-

140,000

190,000

-

-

-

-

858,236

-

166,980

-

17,100

-

-

-

-

-

-

-

-

-

864,680

-

Page 77: Babel - Lkai 2014 v14

384,940

-

27,000

-

-

-

-

-

140,000

-

-

-

-

1,417,391

-

83,000

-

7,200

-

-

-

45,000

715,000

190,000

-

-

24,602

58,111

779,795

- 2,080,775 11,527,600 5,928,480

Page 78: Babel - Lkai 2014 v14

- 97,365 1,400,000 720,000 - 4,030,000 2,925,000 3,479,256 -

-

-

-

-

1,227,822 -

-

-

-

-

368,898 - 626,094 1,256,442 58,997,984 -

640,000

170,000

333,609

200,000

-

911,989

-

3,672,205

6,309,000

90,000

821,610

- 388,500 1,702,000 1,375,000 153,000 1,900,000 56,000 -

3,000,000

150,000 1,179,000 39,300

Page 79: Babel - Lkai 2014 v14

- 2,500,000 320,000 - 6,432,360

-

- 107,835

- 60,488

- 145,753

63,189 108,558

53,100 321,900

53,100 321,900

53,100 321,900

53,100 321,900

53,100 321,900 -

488,640

118,286

31,500

305,307

-

5,415,476

785,709

-

1,736,800

5,400,000

529,570

- 650,000 1,300,000 - 588,500 - - 64,000

2,400,000

120,000

360,000

12,000 - 444,000 680,800 2,200,000 61,200 22,400 - 82,120 197,280 300,000 19,000,000 -

14,500,000

Page 80: Babel - Lkai 2014 v14

- 4,500,000 37,212,365 - 16,524,127 674,490 6,359,246 1,625,341 12,029,161 - 226,500,000

226,500,000

31,587,500

9,884,754 14,229,748

Page 81: Babel - Lkai 2014 v14

hal. 81 / 103

PROGRAM KEGIATAN ANGGARAN INVESTASI TAHUN 2014WILAYAH : BANGKA BELITUNG

No PRK SCORE URAIAN KEGIATAN VOLUME SATUAN

10.1 KEGIATAN YANG SUDAH KONTRAK 9,884,754 9,884,754 9,884,754 Basket 1 - Perbaikan Tegangan

1 PRK.2014.WBE.1.1 10.1 Pengadaan Trafo AVR 10 MVA untuk Perbaikan Tegangan di Belinyu, BGK 1 unit 1,166,000 1,166,000 1,166,000 1,166,000 Basket 2 - Peningkatan Mutu & Keandalan (SAIDI-SAIFI)

2 PRK.2014.WBE.2.1 10.1 Sisa Jasa Konsultasi Engineering Proyek Kabel Laut 150 kV Bangka-Sumatera 1 lot 426,862 426,862 426,862 426,862

3 PRK.2014.WBE.2.2 10.1 Jasa Konsultasi Pembangunan SCADA Master Station 1 lot 337,452 337,452 337,452 337,452 4 PRK.2014.WBE.49.1 10.1 Pemasangan GSW lokasi Desa Bikang - Desa Bencah Toboali 21 km 280,777 13,141 280,777 280,777

5 PRK.2014.WBE.49.2 10.1 19 km 129,812 6,678 129,812 129,812

6 PRK.2014.WBE.49.3 10.1 Pemasangan GSW lokasi PLTD - Desa Bikang 1 km 158,852 149,860 158,852 158,852 7 PRK.2014.WBE.49.4 10.1 Pemasangan GSW lokasi Simpang Sunghin - Desa Puding 25 km 146,572 5,884 146,572 146,572

Basket 3 - Perbaikan Susut Jaringan

8 PRK.2014.WBE.3.1 10.1 1 lot 1,103,400 1,103,400 1,103,400 1,103,400

9 PRK.2014.WBE.4.1 10.1 Pengadaan Peralatan PDKB 1 set 1,925,000 1,925,000 1,925,000 1,925,000 Basket 4 - Rehab Instalasi & Jaringan Distribusi

10 PRK.2014.WBE.5.1 10.1 Jasa Upgrade Sistem PDPJ 1 lot 2,033,900 2,033,900 2,033,900 2,033,900 Basket 5 - Perluasan Jaringan untuk Perluasan Pelayanan

11 PRK.2014.WBE.6.1 10.1 Pembangunan PLTS 40 kWp di Pulau Sumedang 1 lot 1,727,000 1,727,000 1,727,000 1,727,000 12 PRK.2014.WBE.6.2 10.1 Pembangunan PLTS Pulau Pongok 125 kWp 1 lot 141,735 141,735 141,735 141,735 13 PRK.2014.WBE.6.3 10.1 Pembangunan PLTS Pulau Celagen 80 kWp 1 lot 163,300 163,300 163,300 163,300 14 PRK.2014.WBE.6.4 10.1 Pembangunan PLTS Pulau Buku Limau 80 kWp 1 lot 144,092 144,092 144,092 144,092

10.2 14,229,748 14,229,748 14,229,748

Basket 2 - Peningkatan Mutu & Keandalan (SAIDI-SAIFI)

1 PRK.2014.WBE.7.1 10.2 12.95 kms 835,705 64,533 835,705 835,705

2 PRK.2014.WBE.8.1 10.2 1.26 kms 62,903 49,923 62,903 62,903

3 PRK.2014.WBE.8.2 10.2 0.27 km 99,196 367,393 99,196 99,196

ANGGARAN INVESTASI 2014

(x Rp. 1000)HARGA SATUAN

(x Rp. 1000)JUMLAH HARGA

(x Rp. 1000)DISBURSE AKI

2014(Rp. 1000)

Pemasangan GSW lokasi Desa Karang Panjang, Desa Rebo, Pemali dan Desa Tutut Sungailiat

Jasa + Material Pelengkap Pemasangan APP Lengkap (kWh Meter + Box + CT + Modem + Instalasinya) untuk Meterisasi Gardu Program Revenue Assurance (REVAS) BGK&TJP

KEGIATAN TERKAIT PLTU FTP 1 YANG ADA PROGRESNYA, TERMASUK PERLUASAN FASILITAS BATUBARA DAN EVAKUASI DAYA

Jasa + Material Pelengkap Pembangunan SUTM Express Penyulang GI Kampak - Simpang SPBU Pangkalan Baru, BGK

Jasa + Material Pelengkap penarikan SUTM 240 mm2 OG GH Payung untuk Pembangunan Penyulang Rayon Toboali, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 OG GH Payung untuk Pembangunan Penyulang Rayon Toboali, BGK

Page 82: Babel - Lkai 2014 v14

hal. 82 / 103

PROGRAM KEGIATAN ANGGARAN INVESTASI TAHUN 2014WILAYAH : BANGKA BELITUNG

No PRK SCORE URAIAN KEGIATAN VOLUME SATUANANGGARAN

INVESTASI 2014(x Rp. 1000)

HARGA SATUAN(x Rp. 1000)

JUMLAH HARGA(x Rp. 1000)

DISBURSE AKI 2014

(Rp. 1000)

4 PRK.2014.WBE.8.3 10.2 4.54 kms 170,966 37,658 170,966 170,966

5 PRK.2014.WBE.8.4 10.2 0.08 km 29,033 362,913 29,033 29,033

6 PRK.2014.WBE.8.5 10.2 3.21 kms 58,056 18,086 58,056 58,056

7 PRK.2014.WBE.9.1 10.2 8.02 kms 236,357 29,471 236,357 236,357

8 PRK.2014.WBE.9.2 10.2 0.08 km 31,445 393,063 31,445 31,445

9 PRK.2014.WBE.9.3 10.2 7.70 kms 149,416 19,405 149,416 149,416

10 PRK.2014.WBE.9.4 10.2 0.27 km 53,069 196,552 53,069 53,069

11 PRK.2014.WBE.10.1 10.2 7 kms 305,879 45,859 305,879 305,879

12 PRK.2014.WBE.10.2 10.2 0 kms 9,369 24,023 9,369 9,369

13 PRK.2014.WBE.10.3 10.2 2.01 kms 96,392 48,004 96,392 96,392

14 PRK.2014.WBE.10.4 10.2 1.50 kms 81,161 54,107 81,161 81,161

15 PRK.2014.WBE.10.5 10.2 5.50 kms 199,012 36,184 199,012 199,012

16 PRK.2014.WBE.10.6 10.2 3.50 kms 121,005 34,553 121,005 121,005

17 PRK.2014.WBE.10.7 10.2 2.14 km 306,526 143,438 306,526 306,526

18 PRK.2014.WBE.10.8 10.2 7.86 kms 266,591 33,904 266,591 266,591

19 PRK.2014.WBE.10.9 10.2 1.10 km 155,453 141,321 155,453 155,453

20 PRK.2014.WBE.11.1 10.2 Jasa u/ penarikan SUTM 240 mm2 SL 5 Merawang - GI Sungailiat, BGK 7.50 kms 225,000 30,000 225,000 225,000

Jasa + Material Pelengkap penarikan SUTM 240 mm2 Penyulang Toboali-Kantor Bupati untuk Pembangunan Penyulang Rayon Toboali, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 Penyulang Toboali-Kantor Bupati untuk Pembangunan Penyulang Rayon Toboali, BGK

Jasa + Material Pelengkap Uprating SUTM 35 mm2 ke 240 mm2 untuk Pembangunan Penyulang Rayon Toboali, BGK

Jasa + Material Pelengkap penarikan SUTM 150 mm2 Underbuild Jebus untuk Pembangunan Penyulang Rayon Mentok, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 OG Underbuild Jebus untuk Pembangunan Penyulang Rayon Mentok, BGK

Jasa + Material Pelengkap penarikan SUTM 240 mm2 penyulang Mentok-4 untuk Pembangunan Penyulang Rayon Mentok, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 OG penyulang Mentok-4 untuk Pembangunan Penyulang Rayon Mentok, BGK

Jasa + Material Pelengkap Pembangunan SUTM OG GI Kampak-Perkuatan PP-3 dan PP5 untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap Uprating SUTM 35 mm2 ke 240 mm2 P024 untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SUTM 150 mm2 Simp. Gubernur untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 Simp. Gubernur untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SUTM 240 mm2 Underbuild Ketapang untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SUTM 240 mm2 Penyulang OG GI Kampak untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 Penyulang OG GI Kampak untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SUTM 240 mm2 Penyulang OG GI Air Anyir untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 Penyulang OG GI Air Anyir untuk Penyulang Rayon Pangkalpinang, BGK

Page 83: Babel - Lkai 2014 v14

hal. 83 / 103

PROGRAM KEGIATAN ANGGARAN INVESTASI TAHUN 2014WILAYAH : BANGKA BELITUNG

No PRK SCORE URAIAN KEGIATAN VOLUME SATUANANGGARAN

INVESTASI 2014(x Rp. 1000)

HARGA SATUAN(x Rp. 1000)

JUMLAH HARGA(x Rp. 1000)

DISBURSE AKI 2014

(Rp. 1000)

21 PRK.2014.WBE.11.2 10.2 525 meter 78,750 150 78,750 78,750

22 PRK.2014.WBE.12.1 10.2 Jasa u/ penarikan SKTM 3x240 mm2 u/ Penarikan SKTM BTC - GH Theresia, BGK 1,343 meter 201,450 150 201,450 201,450

23 PRK.2014.WBE.12.2 10.2 8,180 meter 3,067,500 375 3,067,500 3,067,500

24 PRK.2014.WBE.12.3 10.2 8,180 meter 1,227,000 150 1,227,000 1,227,000

25 PRK.2014.WBE.12.4 10.2 1 buah 300,000 300,000 300,000 300,000

26 PRK.2014.WBE.13.1 10.2 Jasa + Material Pelengkap untuk Penarikan SKTM Bandara, BGK 890 meter 1,252,585 1,407 1,252,585 1,252,585

27 PRK.2014.WBE.14.1 10.2 45.25 kms 1,577,985 34,874 1,577,985 1,577,985

28 PRK.2014.WBE.14.2 10.2 2.98 kms 339,444 113,907 339,444 339,444

29 PRK.2014.WBE.15.1 10.2 1 unit 1,000,000 1,000,000 1,000,000 1,000,000

30 PRK.2014.WBE.15.2 10.2 2 unit 1,400,000 700,000 1,400,000 1,400,000

31 PRK.2014.WBE.16.1 10.2 1 unit 292,500 292,500 292,500 292,500

10.4 PLTU-PLTM-PLTA-PLTP-PLTGB-PLTG gas/Trans/GI yang MENURUNKAN BBM 45,811,901 45,811,901 44,137,901

Basket 2 - Peningkatan Mutu & Keandalan (SAIDI-SAIFI)1 PRK.2014.WBE.17.1 10.4 Pembangunan Kabel laut 20kV Tanjung Pandan - Selat nasik 1 lot 33,250,000 33,250,000 33,250,000 31,587,500 2 PRK.2014.WBE.18.1 10.4 Reverse Engineering PLTU Air Anyir 1 lot 12,056,677 12,056,677 12,056,677 12,045,177

Basket 5 - Perluasan Jaringan untuk Perluasan Pelayanan3 PRK.2014.WBE.19.1 10.4 Studi Amdal PLTU Sewa 2x30MW 1 lot 505,224 505,224 505,224 505,224

10.7 PENYAMBUNGAN PELANGGAN UNTUK MENUJU MINIMUM RE 60% per PROVINSI 39,557,993 39,557,993 39,557,993

Basket 5 - Perluasan Jaringan untuk Perluasan Pelayanan

1 PRK.2014.WBE.20.1 10.7 25,054 meter 501,086 20 501,086 501,086

Jasa u/ penarikan SKTM 3x240 mm2 u/ Penarikan SL 5 Merawang - GI Sungailiat, BGK

Pengadaan SKTM 3x240 mm2 u/ Penarikan Penarikan SL 6 Merawang - GI Sungailiat, BGK

Jasa u/ penarikan SKTM 3x240 mm2 u/ Penarikan SL 6 Merawang - GI Sungailiat, BGK

Pengadaan Kubikel Out Going u/Penarikan SKTM SL 6 Merawang - GI Sungailiat, BGK

Jasa + Material Pelengkap untuk Penarikan SUTM AAAC 240 mm2 Tanjung Pandan untuk Back Up Evakuasi Daya PLTU Suge, TJP

Jasa + Material Pelengkap untuk Pembangunan SKTM 240 mm2 Back Up Evakuasi Daya PLTU Suge, TJP

Pengadaan Tower Antenna 50 mtr self support u/ Peralatan KomunikasiLokasi : Kantor Jaga Simpang Pesak, TJP

Pengadaan Tower Antenna 30 mtr dan Celwave Omnidirectional Antena SDB + Penghantar + Arde u/ Peralatan KomunikasiLokasi : GI Dukong & Kantor Jaga Sijuk, TJP

Pengadaan Repeater GR 500 VHF 45 Watt serta Access u/ Radio LinkLokasi : Kantor Jaga Simpang Pesak, TJP

Pengadaan AAAC 150mm2 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Pangkalpinang

Page 84: Babel - Lkai 2014 v14

hal. 84 / 103

PROGRAM KEGIATAN ANGGARAN INVESTASI TAHUN 2014WILAYAH : BANGKA BELITUNG

No PRK SCORE URAIAN KEGIATAN VOLUME SATUANANGGARAN

INVESTASI 2014(x Rp. 1000)

HARGA SATUAN(x Rp. 1000)

JUMLAH HARGA(x Rp. 1000)

DISBURSE AKI 2014

(Rp. 1000)

2 PRK.2014.WBE.20.2 10.7 25 set 7,500 300 7,500 7,500

3 PRK.2014.WBE.20.3 10.7 10 buah 700,000 70,000 700,000 700,000

4 PRK.2014.WBE.20.4 10.7 6 buah 570,000 95,000 570,000 570,000

5 PRK.2014.WBE.20.5 10.7 1 lot 2,866,572 2,866,572 2,866,572 2,866,572

6 PRK.2014.WBE.21.1 10.7 4,369 meter 87,380 20 87,380 87,380

7 PRK.2014.WBE.21.2 10.7 24 set 7,200 300 7,200 7,200

8 PRK.2014.WBE.21.3 10.7 2 unit 140,000 70,000 140,000 140,000

9 PRK.2014.WBE.21.4 10.7 2 unit 190,000 95,000 190,000 190,000

10 PRK.2014.WBE.21.5 10.7 1 lot 858,236 858,236 858,236 858,236

11 PRK.2014.WBE.22.1 10.7 8,349 meter 166,980 20 166,980 166,980

12 PRK.2014.WBE.22.2 10.7 57 set 17,100 300 17,100 17,100

13 PRK.2014.WBE.22.3 10.7 1 lot 864,680 864,680 864,680 864,680

14 PRK.2014.WBE.23.1 10.7 19,247 meter 384,940 20 384,940 384,940

15 PRK.2014.WBE.23.2 10.7 90 set 27,000 300 27,000 27,000

16 PRK.2014.WBE.23.3 10.7 2 unit 140,000 70,000 140,000 140,000

Pengadaan Isolator tarik 20 kV + strain clamp 150-240 mm² untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Pangkalpinang

Pengadaan Trafo 160 kVA untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Pangkalpinang, BGK

Pengadaan Trafo 200 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Pangkalpinang

Jasa + Material Pelengkap untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Pemasaran Rayon Pangkalpinang, BGK

Pengadaan AAAC 150mm2 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat

Pengadaan Isolator tarik 20 kV + strain clamp 150-240 mm² untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat

Pengadaan Trafo 160 kVA untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat, BGK

Pengadaan Trafo 200 kVA untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat, BGK

Jasa + Material Pelengkap untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat, BGK

Pengadaan AAAC 150mm2 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Koba

Pengadaan Isolator tarik 20 kV + strain clamp 150-240 mm² untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Koba

Jasa + Material Pelengkap untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Koba, BGK

Pengadaan AAAC 150mm2 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Mentok

Pengadaan Isolator tarik 20 kV + strain clamp 150-240 mm² untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Mentok

Pengadaan Trafo 160 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Mentok

Page 85: Babel - Lkai 2014 v14

hal. 85 / 103

PROGRAM KEGIATAN ANGGARAN INVESTASI TAHUN 2014WILAYAH : BANGKA BELITUNG

No PRK SCORE URAIAN KEGIATAN VOLUME SATUANANGGARAN

INVESTASI 2014(x Rp. 1000)

HARGA SATUAN(x Rp. 1000)

JUMLAH HARGA(x Rp. 1000)

DISBURSE AKI 2014

(Rp. 1000)

17 PRK.2014.WBE.23.4 10.7 1 lot 1,417,391 1,417,391 1,417,391 1,417,391

18 PRK.2014.WBE.24.1 10.7 4,150 meter 83,000 20 83,000 83,000

19 PRK.2014.WBE.24.2 10.7 24 set 7,200 300 7,200 7,200

20 PRK.2014.WBE.24.3 10.7 1 unit 45,000 45,000 45,000 45,000

21 PRK.2014.WBE.24.4 10.7 11 unit 715,000 65,000 715,000 715,000

22 PRK.2014.WBE.24.5 10.7 2 unit 190,000 95,000 190,000 190,000

23 PRK.2014.WBE.24.6 10.7 3 set 24,602 8,201 24,602 24,602

24 PRK.2014.WBE.24.7 10.7 8 set 58,111 7,264 58,111 58,111

25 PRK.2014.WBE.24.8 10.7 1 lot 779,795 779,795 779,795 779,795

26 PRK.2014.WBE.25.1 10.7 Pengadaan Material LVTC 2 x 10 mm2, untuk Penyambungan 1 phasa, BGK 416,155 meter 2,080,775 5 2,080,775 2,080,775

27 PRK.2014.WBE.25.2 10.7 32,936 buah 11,527,600 350 11,527,600 11,527,600

28 PRK.2014.WBE.25.3 10.7 Jasa Penyambungan pelanggan 1 fasa Bangka 32,936 set 5,928,480 180 5,928,480 5,928,480 29 PRK.2014.WBE.26.1 10.7 Pengadaan Material LVTC 2 x 10 mm2 u/ Sambungan 1 Phasa, TJP 19,473 meter 97,365 5 97,365 97,365

30 PRK.2014.WBE.26.2 10.7 4,000 buah 1,400,000 350 1,400,000 1,400,000

31 PRK.2014.WBE.26.3 10.7 Jasa + Material Pelengkap u/ Sambungan 1 Phasa, TJP 4,000 plg 720,000 180 720,000 720,000 32 PRK.2014.WBE.27.1 10.7 Pengadaan Trafo 100 kVA u/ Gardu Sisipan, TJP 62 unit 4,030,000 65,000 4,030,000 4,030,000 33 PRK.2014.WBE.27.2 10.7 Jasa Pembangunan Gardu Sisip 100 kVA dan material pelengkap, TJP 65 set 2,925,000 45,000 2,925,000 2,925,000

10.8 MENGATASI OVERLOAD PADA TRAFO, TRANSMISI DAN GI 3,479,256 3,479,256 3,479,256 Basket 3 - Perbaikan Susut Jaringan

1 PRK.2014.WBE.28.1 10.8 Jasa + Material Pelengkap untuk Pekerjaan Underbuild dan Uprating Belinyu, BGK 34 kms 1,227,822 36,166 1,227,822 1,227,822

Jasa + Material Pelengkap untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Mentok, BGK

Pengadaan AAAC 150mm2 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali

Pengadaan Isolator tarik 20 kV + strain clamp 150-240 mm² untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali

Pengadaan Trafo 50 kVA untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali, BGK

Pengadaan Trafo 100 kVA untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali, BGK

Pengadaan Trafo 200 kVA untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali, BGK

Pengadaan LV Panel 2 jurusan 250 A untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali, BGK

Pengadaan LV Panel 3 jurusan 400 A untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali, BGK

Jasa + Material Pelengkap untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali, BGK

Pengadaan kWh Meter 1 Phasa Prabayar 5/40 A 230/400 V, untuk penyambungan 1 phasa, BGK

Pengadaan kWh Meter 1 Phasa Prabayar 5/40 A 230/400 V u/ Sambungan 1 Phasa, TJP

Page 86: Babel - Lkai 2014 v14

hal. 86 / 103

PROGRAM KEGIATAN ANGGARAN INVESTASI TAHUN 2014WILAYAH : BANGKA BELITUNG

No PRK SCORE URAIAN KEGIATAN VOLUME SATUANANGGARAN

INVESTASI 2014(x Rp. 1000)

HARGA SATUAN(x Rp. 1000)

JUMLAH HARGA(x Rp. 1000)

DISBURSE AKI 2014

(Rp. 1000)

2 PRK.2014.WBE.29.1 10.8 4 kms 368,898 103,915 368,898 368,898

Basket 2 - Peningkatan Mutu & Keandalan (SAIDI-SAIFI)3 PRK.2014.WBE.30.1 10.8 Pengadaan Peralatan K3 GI FTP 1 untuk Area Bangka dan UL TJP 3 set 626,094 208,698 626,094 626,094 4 PRK.2014.WBE.30.2 10.8 Pengadaan Peralatan Kerja GI FTP 1 untuk Area Bangka dan UL TJP 3 set 1,256,442 418,814 1,256,442 1,256,442

10.9 PERKUATAN DISTRIBUSI UNTUK PENYAMBUNGAN PELANGGAN 58,997,984 58,997,984 58,997,984 Basket 1 - Perbaikan Tegangan

1 PRK.2014.WBE.31.1 10.9 2 unit 640,000 320,000 640,000 640,000

2 PRK.2014.WBE.31.2 10.9 2 unit 170,000 85,000 170,000 170,000

3 PRK.2014.WBE.31.3 10.9 1 lot 333,609 333,609 333,609 333,609

4 PRK.2014.WBE.31.4 10.9 1 lot 200,000 200,000 200,000 200,000

Basket 2 - Peningkatan Mutu & Keandalan (SAIDI-SAIFI)

5 PRK.2014.WBE.32.1 10.9 75 km 911,989 12,209 911,989 911,989

Basket 3 - Perbaikan Susut Jaringan

6 PRK.2014.WBE.33.1 10.9 87,957 meter 3,672,205 42 3,672,205 3,672,205

7 PRK.2014.WBE.33.2 10.9 1,402 batang 6,309,000 4,500 6,309,000 6,309,000

8 PRK.2014.WBE.33.3 10.9 20 batang 90,000 4,500 90,000 90,000

9 PRK.2014.WBE.33.4 10.9 107 km 821,610 7,650 821,610 821,610

Basket 5 - Perluasan Jaringan untuk Perluasan Pelayanan10 PRK.2014.WBE.34.1 10.9 Pengadaan Panel Incoming LBS u/ konsumen TM, BGK 7 unit 388,500 55,500 388,500 388,500 11 PRK.2014.WBE.34.2 10.9 Pengadaan Panel Metering Panel u/ konsumen TM, BGK 20 unit 1,702,000 85,100 1,702,000 1,702,000 12 PRK.2014.WBE.34.3 10.9 Pengadaan Panel Outgoing Panel CB Motorized u/ konsumen TM, BGK 5 unit 1,375,000 275,000 1,375,000 1,375,000 13 PRK.2014.WBE.34.4 10.9 Pengadaan kWh Meter Elektronik + Smart Panel Box, BGK 20 unit 153,000 7,650 153,000 153,000 14 PRK.2014.WBE.34.5 10.9 Pengadaan CT / PT Indoor u/ Metering Outfit Lengkap Pelanggan TM, BGK 20 unit 1,900,000 95,000 1,900,000 1,900,000

Jasa + Material untuk Pembangunan Express Feeder Jelitik (SUTM & SKTM) Sungailiat, BGK

Pengadaan Kubikel incoming untuk Pembangunan AVR untuk Perbaikan Tegangan di Belinyu, BGK

Pengadaan Kubikel Coupling untuk Pembangunan AVR untuk Perbaikan Tegangan di Belinyu, BGK

Pembangunan GH AVR Belinyu untuk Pembangunan AVR untuk Perbaikan Tegangan di Belinyu, BGK

Jasa + Material Pendukung untuk Pemasangan Trafo AVR 10MVA untuk Perbaikan Tegangan di Belinyu, BGK

Pengadaan Material dan Jasa Pembangunan GSW (Ground Steel Wire) Mentok dari PLTD Mentok - Gardu M35 untuk Pembangunan GSW (Ground Steel Wire) Mentok, BGK

Pengadaan LVTC 3 x 70 + 50 mm2 Pangkalpinang,Sungailiat,Koba,Mentok & Toboali u/ Perluasan,BGK

Pengadaan Tiang Beton 9m - 200 daN Pangkalpinang,Sungailiat,Koba,Mentok & Toboali u/ Perluasan SUTR ,BGK

Pengadaan Tiang Beton 7m - 200 daN Pangkalpinang,Sungailiat,Koba,Mentok & Toboali u/ Perluasan SUTR,BGK

Jasa Penarikan SUTR Pangkalpinang,Sungailiat,Koba,Mentok & Toboali u/ Perluasan,BGK

Page 87: Babel - Lkai 2014 v14

hal. 87 / 103

PROGRAM KEGIATAN ANGGARAN INVESTASI TAHUN 2014WILAYAH : BANGKA BELITUNG

No PRK SCORE URAIAN KEGIATAN VOLUME SATUANANGGARAN

INVESTASI 2014(x Rp. 1000)

HARGA SATUAN(x Rp. 1000)

JUMLAH HARGA(x Rp. 1000)

DISBURSE AKI 2014

(Rp. 1000)

15 PRK.2014.WBE.34.6 10.9 Jasa Penyambungan Konsumen TM dan Material Pelengkap, BGK 20 set 56,000 2,800 56,000 56,000

16 PRK.2014.WBE.34.7 10.9 500 buah 3,000,000 6,000 3,000,000 3,000,000

17 PRK.2014.WBE.34.8 10.9 Jasa Penyambungan pelanggan 3 fasa Langsung, BGK 500 Set 150,000 300 150,000 150,000

18 PRK.2014.WBE.34.9 10.9 131 buah 1,179,000 9,000 1,179,000 1,179,000

19 PRK.2014.WBE.34.10 10.9 Jasa Penyambungan pelanggan 3 fasa Tak Langsung, BGK 131 Set 39,300 300 39,300 39,300 Basket 2 - Peningkatan Mutu & Keandalan (SAIDI-SAIFI)

20 PRK.2014.WBE.35.1 10.9 Pengadaan mobil Cable Fault Locator u/ Mendeteksi Gangguan SKTM, BGK 1 unit 2,500,000 2,500,000 2,500,000 2,500,000 21 PRK.2014.WBE.35.2 10.9 Pengadaan Power Quality Meter, BGK 1 set 320,000 320,000 320,000 320,000 22 PRK.2014.WBE.36.1 10.9 Pengadaan dan Pemasangan MV Panel dan SKTM GH Merawang, BGK 1 lot 6,432,360 6,432,360 6,432,360 6,432,360

23 PRK.2014.WBE.37.1 10.9 Jasa & Material Pelengkap Pembangunan GSW Penyulang Bengkulu 17,4 km 17 km 107,835 6,197 107,835 107,835

24 PRK.2014.WBE.37.2 10.9 Jasa & Material Pelengkap Pembangunan GSW Penyulang Marakas 8,9 km 9 km 60,488 6,796 60,488 60,488 25 PRK.2014.WBE.37.3 10.9 Jasa & Material Pelengkap Pembangunan GSW Penyulang Metro 12,1 km 12 km 145,753 12,046 145,753 145,753

26 PRK.2014.WBE.37.4 10.9 Pengadaan Galvanized Steel wire 22mm untuk GSW Penyulang Jakarta 18,5 km 11,900 meter 63,189 5 63,189 63,189

27 PRK.2014.WBE.37.5 10.9 Jasa & Material Pelengkap Pembangunan GSW Penyulang Jakarta 18,5 km 19 km 108,558 5,868 108,558 108,558

28 PRK.2014.WBE.37.6 10.9 Pengadaan Galvanized Steel wire 22mm untuk GSW Penyulang Aceh 10 km 10,000 meter 53,100 5 53,100 53,100

29 PRK.2014.WBE.37.7 10.9 Jasa & Material Pelengkap Pembangunan GSW Penyulang Aceh 10 km 10 km 321,900 32,190 321,900 321,900

30 PRK.2014.WBE.37.8 10.9 Pengadaan Galvanized Steel wire 22mm untuk GSW Penyulang Bangka 10 km 10,000 meter 53,100 5 53,100 53,100

31 PRK.2014.WBE.37.9 10.9 Jasa & Material Pelengkap Pembangunan GSW Penyulang Bangka 10 km 10 km 321,900 32,190 321,900 321,900

32 PRK.2014.WBE.37.10 10.9 Pengadaan Galvanized Steel wire 22mm untuk GSW Penyulang Andalas 10 km 10,000 meter 53,100 5 53,100 53,100

33 PRK.2014.WBE.37.11 10.9 Jasa & Material Pelengkap Pembangunan GSW Penyulang Andalas 10 km 10 km 321,900 32,190 321,900 321,900

34 PRK.2014.WBE.37.12 10.9 Pengadaan Galvanized Steel wire 22mm untuk GSW Penyulang Medan 10 km 10,000 meter 53,100 5 53,100 53,100

35 PRK.2014.WBE.37.13 10.9 Jasa & Material Pelengkap Pembangunan GSW Penyulang Medan 10 km 10 km 321,900 32,190 321,900 321,900

36 PRK.2014.WBE.37.14 10.9 Pengadaan Galvanized Steel wire 22mm untuk GSW Penyulang Riau 10 km 10,000 meter 53,100 5 53,100 53,100

37 PRK.2014.WBE.37.15 10.9 Jasa & Material Pelengkap Pembangunan GSW Penyulang Riau 10 km 10 km 321,900 32,190 321,900 321,900 Basket 1 - Perbaikan Tegangan

Pengadaan kWh Meter Elektronik 3 Phasa langsung + Smart Panel Boks Phasa 5/100 A 230/400 V, BGK

Pengadaan kWh Meter 3 Phasa Tak langsung + Box AMR Combo lengkap (Modem+CT), BGK

Page 88: Babel - Lkai 2014 v14

hal. 88 / 103

PROGRAM KEGIATAN ANGGARAN INVESTASI TAHUN 2014WILAYAH : BANGKA BELITUNG

No PRK SCORE URAIAN KEGIATAN VOLUME SATUANANGGARAN

INVESTASI 2014(x Rp. 1000)

HARGA SATUAN(x Rp. 1000)

JUMLAH HARGA(x Rp. 1000)

DISBURSE AKI 2014

(Rp. 1000)

38 PRK.2014.WBE.38.1 10.9 24,432 meter 488,640 20 488,640 488,640

39 PRK.2014.WBE.38.2 10.9 497 buah 118,286 238 118,286 118,286

40 PRK.2014.WBE.38.3 10.9 105 set 31,500 300 31,500 31,500

41 PRK.2014.WBE.38.4 10.9 8 kms 305,307 37,233 305,307 305,307

42 PRK.2014.WBE.39.1 10.9 129,712 meter 5,415,476 42 5,415,476 5,415,476

43 PRK.2014.WBE.39.2 10.9 43 kms 785,709 18,171 785,709 785,709

Basket 3 - Perbaikan Susut Jaringan

44 PRK.2014.WBE.40.1 10.9 41,600 meter 1,736,800 42 1,736,800 1,736,800

45 PRK.2014.WBE.40.2 10.9 1,200 batang 5,400,000 4,500 5,400,000 5,400,000

46 PRK.2014.WBE.40.3 10.9 14 kms 529,570 38,181 529,570 529,570

47 PRK.2014.WBE.41.1 10.9 Rekonektor Gardu, JTR, SR dan APP Manggar, TJP 13 gardu 650,000 50,000 650,000 650,000 48 PRK.2014.WBE.41.2 10.9 Rekonektor Gardu, JTR, SR dan APP Tanjung Pandan, TJP 26 gardu 1,300,000 50,000 1,300,000 1,300,000 49 PRK.2014.WBE.42.1 10.9 Jasa Instalasi dan License AMR BGK & TJP 3,000 titik 588,500 196 588,500 588,500

Basket 5 - Perluasan Jaringan untuk Perluasan Pelayanan

50 PRK.2014.WBE.43.1 10.9 Pengadaan MCB 3 Pole 240/400 V 20 A s/d 300 A u/ Sambungan 3 Phasa, TJP 400 buah 64,000 160 64,000 64,000

51 PRK.2014.WBE.43.2 10.9 400 buah 2,400,000 6,000 2,400,000 2,400,000

52 PRK.2014.WBE.43.3 10.9 Jasa + Material Pelengkap u/ Sambungan 3 Phasa Langsung, TJP 400 set 120,000 300 120,000 120,000

53 PRK.2014.WBE.43.4 10.9 40 bh 360,000 9,000 360,000 360,000

54 PRK.2014.WBE.43.5 10.9 Jasa Penyambungan pelanggan 3 fasa Tak Langsung, TJP 40 set 12,000 300 12,000 12,000 55 PRK.2014.WBE.44.1 10.9 Pengadaan Panel Incoming LBS u/ Sambungan TM, TJP 8 unit 444,000 55,500 444,000 444,000

Pengadaan AAAC 150 mm² Penarikan SUTM PLTU Jangkang - Kelapa Kampit untuk Perbaikan Tegangan, TJP

Pengadaan Isolator Tumpu 20 kV Penarikan SUTM PLTU Jangkang - Kelapa Kampit untuk Perbaikan Tegangan, TJP

Pengadaan Isolator tarik 20 kV + strain clamp 150-240 mm² Penarikan SUTM PLTU Jangkang - Kelapa Kampit untuk Perbaikan Tegangan, TJP

Jasa + Material Pelengkap Penarikan SUTM PLTU Jangkang - Kelapa Kampit untuk Perbaikan Tegangan, TJP

Pengadaan LVTC 3 x 70 + 50 mm² Pembangunan Jaringan SUTR Tanjung Pandan,Kelapa Kampit,Tanjung Kelumpang, Tanjung Binga, Sijuk, Membalong & Gantung untuk Perbaikan Tegangan, TJP

Jasa + Material Pelengkap Pembangunan Jaringan SUTR Tanjung Pandan Kelapa Kampit,Tanjung Kelumpang, Tanjung Binga, Sijuk, Membalong & Gantung untuk Perbaikan Tegangan, TJP

Pengadaan LVTC 3 x 70 + 50 mm2 Perluasan SUTR Manggar, Kelapa Kampit, Membalong &Tanjung Pandan, TJP

Pengadaan Tiang Beton 9 m 200 daN Perluasan SUTR Manggar, Kelapa Kampit, Membalong &Tanjung Pandan, TJP

Jasa + Material Pelengkap Perluasan SUTR Manggar, Kelapa Kampit, Membalong &Tanjung Pandan, TJP

Pengadaan kWh Meter Elektronik 3 Phasa langsung + Smart Panel Boks Phasa 5/100 A 230/400 V, TJP

Pengadaan kWh Meter 3 Phasa Tak langsung + Box AMR Combo lengkap (Modem+CT), TJP

Page 89: Babel - Lkai 2014 v14

hal. 89 / 103

PROGRAM KEGIATAN ANGGARAN INVESTASI TAHUN 2014WILAYAH : BANGKA BELITUNG

No PRK SCORE URAIAN KEGIATAN VOLUME SATUANANGGARAN

INVESTASI 2014(x Rp. 1000)

HARGA SATUAN(x Rp. 1000)

JUMLAH HARGA(x Rp. 1000)

DISBURSE AKI 2014

(Rp. 1000)

56 PRK.2014.WBE.44.2 10.9 Pengadaan Panel Metering Panel u/ Sambungan TM, TJP 8 unit 680,800 85,100 680,800 680,800 57 PRK.2014.WBE.44.3 10.9 Pengadaan Panel Outgoing Panel CB Motorized u/ Sambungan TM, TJP 8 unit 2,200,000 275,000 2,200,000 2,200,000

58 PRK.2014.WBE.44.4 10.9 Pengadaan kWh Meter Elektronik + Smart Panel Box u/ Sambungan TM, TJP 8 buah 61,200 7,650 61,200 61,200

59 PRK.2014.WBE.44.5 10.9 Jasa + Material Pelengkap u/ Sambungan TM, TJP 8 set 22,400 2,800 22,400 22,400 Basket 4 - Rehab Instalasi & Jaringan Distribusi

60 PRK.2014.WBE.45.1 10.9 Pengadaan A3C 240 mm2 u/ Rehabilitasi Jaringan, TJP 4,106 meter 82,120 20 82,120 82,120 61 PRK.2014.WBE.45.2 10.9 Pengadaan A3CS 150 mm2 u/ Rehabilitasi Jaringan, TJP 6,576 meter 197,280 30 197,280 197,280 62 PRK.2014.WBE.45.3 10.9 Jasa + Material Pelengkap u/ Rehabilitasi Jaringan, TJP 10 kms 300,000 30,000 300,000 300,000

10.10 MEMENUHI PEMBANGKIT PEAKING 19,000,000 19,000,000 19,000,000 Basket 2 - Peningkatan Mutu & Keandalan (SAIDI-SAIFI)

1 PRK.2014.WBE.46.1 10.10 Repowering Ms. Mirrlees PLTD Mentok, BGK 1 unit 14,500,000 14,500,000 14,500,000 14,500,000 2 PRK.2014.WBE.47.1 10.10 Pengadaan & Pemasangan Gearpump mesin Mirless Merawang, BGK 1 lot 4,500,000 4,500,000 4,500,000 4,500,000

10.13 SCADA TRANSMISI 57,226,112 57,226,112 37,212,365 Basket 2 - Peningkatan Mutu & Keandalan (SAIDI-SAIFI)

1 PRK.2014.WBE.48.1 10.13 Perbaikan titik kontrol SCADA 1 lot 16,524,127 16,524,127 16,524,127 16,524,127 2 PRK.2014.WBE.48.2 10.13 Jasa Konsultasi Pembangunan SCADA Titik Kontrol 1 lot 674,490 674,490 674,490 674,490 3 PRK.2014.WBE.48.3 10.13 Pembangunan Prasarana SCADA, BGK 1 lot 12,718,491 12,718,491 12,718,491 6,359,246 4 PRK.2014.WBE.48.4 10.13 Pembangunan Prasarana SCADA, TJP 1 lot 3,250,683 3,250,683 3,250,683 1,625,341 5 PRK.2014.WBE.48.5 10.13 Pembangunan SCADA Sistem kelistrikan Bangka Belitung (Master Station) 1 lot 24,058,321 24,058,321 24,058,321 12,029,161

T O T A L 248,187,748 248,187,748 226,500,000

Pangkalpinang, Desember 2013Mengetahui,

GENERAL MANAGER

I.B. ARI WARDANA

Page 90: Babel - Lkai 2014 v14

hal. 90 / 103

PT PLN (PERSERO)PT PLN (PERSERO)WILAYAH BANGKA BELITUNG

LEMBAR KERJA ANGGARAN INVESTASI (LKAI) TAHUN 2014KODE PRK UNIT : WBE dalam ribuan Rp

No. PRK SCORE URAIAN KEGIATANANGGARAN 2014

RENCANA ANGGARAN KAS INVESTASI2014 2015 2016

Vol Sat Harga Satuan Total Rupiah Valas Rupiah Valas Rupiah Valas

1 2 3 4 5 6 7 8=(5-6-7) 9 10 11 12 13 14 15

10.1 KEGIATAN YANG SUDAH KONTRAK 9,884,754 9,884,754 9,884,754 - APLNBasket 1 - Perbaikan Tegangan APLN

PRK.2014.WBE.1.1 10.1 Pengadaan Trafo AVR 10 MVA untuk Perbaikan Tegangan di Belinyu, BGK 1,166,000 1 unit 1,166,000 1,166,000 1,166,000 APLN

Basket 2 - Peningkatan Mutu & Keandalan (SAIDI-SAIFI) APLN

PRK.2014.WBE.2.1 10.1 Sisa Jasa Konsultasi Engineering Proyek Kabel Laut 150 kV Bangka-Sumatera 426,862 1 lot 426,862 426,862 426,862 APLN

PRK.2014.WBE.2.2 10.1 Jasa Konsultasi Pembangunan SCADA Master Station 337,452 1 lot 337,452 337,452 337,452 APLNPRK.2014.WBE.49.1 10.1 Pemasangan GSW lokasi Desa Bikang - Desa Bencah Toboali 280,777 21 km 13,141 280,777 280,777 APLN

PRK.2014.WBE.49.2 10.1 129,812 19 km 6,678 129,812 129,812 APLN

PRK.2014.WBE.49.3 10.1 Pemasangan GSW lokasi PLTD - Desa Bikang 158,852 1 km 149,860 158,852 158,852 APLNPRK.2014.WBE.49.4 10.1 Pemasangan GSW lokasi Simpang Sunghin - Desa Puding 146,572 25 km 5,884 146,572 146,572 APLN

Basket 3 - Perbaikan Susut Jaringan APLN

PRK.2014.WBE.3.1 10.1 1,103,400 1 lot 1,103,400 1,103,400 1,103,400 APLN

PRK.2014.WBE.4.1 10.1 Pengadaan Peralatan PDKB 1,925,000 1 set 1,925,000 1,925,000 1,925,000 APLNBasket 4 - Rehab Instalasi & Jaringan Distribusi APLN

PRK.2014.WBE.5.1 10.1 Jasa Upgrade Sistem PDPJ 2,033,900 1 lot 2,033,900 2,033,900 2,033,900 APLNBasket 5 - Perluasan Jaringan untuk Perluasan Pelayanan APLN

PRK.2014.WBE.6.1 10.1 Pembangunan PLTS 40 kWp di Pulau Sumedang 1,727,000 1 lot 1,727,000 1,727,000 1,727,000 APLNPRK.2014.WBE.6.2 10.1 Pembangunan PLTS Pulau Pongok 125 kWp 141,735 1 lot 141,735 141,735 141,735 APLNPRK.2014.WBE.6.3 10.1 Pembangunan PLTS Pulau Celagen 80 kWp 163,300 1 lot 163,300 163,300 163,300 APLNPRK.2014.WBE.6.4 10.1 Pembangunan PLTS Pulau Buku Limau 80 kWp 144,092 1 lot 144,092 144,092 144,092 APLN

10.2 14,229,748 14,229,748 14,229,748 - APLN

Basket 2 - Peningkatan Mutu & Keandalan (SAIDI-SAIFI) APLN

PRK.2014.WBE.7.1 10.2 835,705 13 kms 64,533 835,705 835,705 APLN

PRK.2014.WBE.8.1 10.2 62,903 1.26 kms 49,923 62,903 62,903 APLN

PRK.2014.WBE.8.2 10.2 99,196 0.27 km 367,393 99,196 99,196 APLN

PRK.2014.WBE.8.3 10.2 170,966 4.54 kms 37,658 170,966 170,966 APLN

PRK.2014.WBE.8.4 10.2 29,033 0.08 km 362,913 29,033 29,033 APLN

PRK.2014.WBE.8.5 10.2 58,056 3.21 kms 18,086 58,056 58,056 APLN

PRK.2014.WBE.9.1 10.2 236,357 8.02 kms 29,471 236,357 236,357 APLN

PRK.2014.WBE.9.2 10.2 31,445 0.08 km 393,063 31,445 31,445 APLN

PRK.2014.WBE.9.3 10.2 149,416 7.70 kms 19,405 149,416 149,416 APLN

PRK.2014.WBE.9.4 10.2 53,069 0.27 km 196,552 53,069 53,069 APLN

PRK.2014.WBE.10.1 10.2 305,879 7 kms 45,859 305,879 305,879 APLN

No. RUPTL

TOTAL NILAI /ANGGARAN

REALISASI PEMBAYARAN

S/D 2013

PREDIKSI REALISASI

PEMBAYARAN 2013

SUMBER DANA

Pemasangan GSW lokasi Desa Karang Panjang, Desa Rebo, Pemali dan Desa Tutut Sungailiat

Jasa + Material Pelengkap Pemasangan APP Lengkap (kWh Meter + Box + CT + Modem + Instalasinya) untuk Meterisasi Gardu Program Revenue Assurance (REVAS) BGK&TJP

KEGIATAN TERKAIT PLTU FTP 1 YANG ADA PROGRESNYA, TERMASUK PERLUASAN FASILITAS BATUBARA DAN EVAKUASI DAYA

Jasa + Material Pelengkap Pembangunan SUTM Express Penyulang GI Kampak - Simpang SPBU Pangkalan Baru, BGK

Jasa + Material Pelengkap penarikan SUTM 240 mm2 OG GH Payung untuk Pembangunan Penyulang Rayon Toboali, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 OG GH Payung untuk Pembangunan Penyulang Rayon Toboali, BGK

Jasa + Material Pelengkap penarikan SUTM 240 mm2 Penyulang Toboali-Kantor Bupati untuk Pembangunan Penyulang Rayon Toboali, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 Penyulang Toboali-Kantor Bupati untuk Pembangunan Penyulang Rayon Toboali, BGK

Jasa + Material Pelengkap Uprating SUTM 35 mm2 ke 240 mm2 untuk Pembangunan Penyulang Rayon Toboali, BGK

Jasa + Material Pelengkap penarikan SUTM 150 mm2 Underbuild Jebus untuk Pembangunan Penyulang Rayon Mentok, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 OG Underbuild Jebus untuk Pembangunan Penyulang Rayon Mentok, BGK

Jasa + Material Pelengkap penarikan SUTM 240 mm2 penyulang Mentok-4 untuk Pembangunan Penyulang Rayon Mentok, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 OG penyulang Mentok-4 untuk Pembangunan Penyulang Rayon Mentok, BGK

Jasa + Material Pelengkap Pembangunan SUTM OG GI Kampak-Perkuatan PP-3 dan PP5 untuk Penyulang Rayon Pangkalpinang, BGK

Lampiran 4.1Surat no : 1468/520/DIRUT/2013Tanggal : 10 Oktober 2013

Page 91: Babel - Lkai 2014 v14

hal. 91 / 103

PT PLN (PERSERO)PT PLN (PERSERO)WILAYAH BANGKA BELITUNG

LEMBAR KERJA ANGGARAN INVESTASI (LKAI) TAHUN 2014KODE PRK UNIT : WBE dalam ribuan Rp

No. PRK SCORE URAIAN KEGIATANANGGARAN 2014

RENCANA ANGGARAN KAS INVESTASI2014 2015 2016

Vol Sat Harga Satuan Total Rupiah Valas Rupiah Valas Rupiah Valas

1 2 3 4 5 6 7 8=(5-6-7) 9 10 11 12 13 14 15

No. RUPTL

TOTAL NILAI /ANGGARAN

REALISASI PEMBAYARAN

S/D 2013

PREDIKSI REALISASI

PEMBAYARAN 2013

SUMBER DANA

Lampiran 4.1Surat no : 1468/520/DIRUT/2013Tanggal : 10 Oktober 2013

PRK.2014.WBE.10.2 10.2 9,369 0 kms 24,023 9,369 9,369 APLN

PRK.2014.WBE.10.3 10.2 96,392 2 kms 48,004 96,392 96,392 APLN

PRK.2014.WBE.10.4 10.2 81,161 1.5 kms 54,107 81,161 81,161 APLN

PRK.2014.WBE.10.5 10.2 199,012 6 kms 36,184 199,012 199,012 APLN

PRK.2014.WBE.10.6 10.2 121,005 3.5 kms 34,553 121,005 121,005 APLN

PRK.2014.WBE.10.7 10.2 306,526 2.1 km 143,438 306,526 306,526 APLN

PRK.2014.WBE.10.8 10.2 266,591 7.9 kms 33,904 266,591 266,591 APLN

PRK.2014.WBE.10.9 10.2 155,453 1.1 km 141,321 155,453 155,453 APLN

PRK.2014.WBE.11.1 10.2 Jasa u/ penarikan SUTM 240 mm2 SL 5 Merawang - GI Sungailiat, BGK 225,000 7.5 kms 30,000 225,000 225,000 APLN

PRK.2014.WBE.11.2 10.2 78,750 525 meter 150 78,750 78,750 APLN

PRK.2014.WBE.12.1 10.2 201,450 1,343 meter 150 201,450 201,450 APLN

PRK.2014.WBE.12.2 10.2 3,067,500 8,180 meter 375 3,067,500 3,067,500 APLN

PRK.2014.WBE.12.3 10.2 1,227,000 8,180 meter 150 1,227,000 1,227,000 APLN

PRK.2014.WBE.12.4 10.2 300,000 1 buah 300,000 300,000 300,000 APLN

PRK.2014.WBE.13.1 10.2 Jasa + Material Pelengkap untuk Penarikan SKTM Bandara, BGK 1,252,585 890 meter 1,407 1,252,585 1,252,585 APLN

PRK.2014.WBE.14.1 10.2 1,577,985 45 kms 34,874 1,577,985 1,577,985 APLN

PRK.2014.WBE.14.2 10.2 339,444 2.98 kms 113,907 339,444 339,444 APLN

PRK.2014.WBE.15.1 10.2 1,000,000 1 unit 1,000,000 1,000,000 1,000,000 APLN

PRK.2014.WBE.15.2 10.2 1,400,000 2 unit 700,000 1,400,000 1,400,000 APLN

PRK.2014.WBE.16.1 10.2 292,500 1 unit 292,500 292,500 292,500 APLN

10.4 PLTU-PLTM-PLTA-PLTP-PLTGB-PLTG gas/Trans/GI yang MENURUNKAN BBM 45,811,901 45,811,901 44,149,401 1,662,500 APLN

Basket 2 - Peningkatan Mutu & Keandalan (SAIDI-SAIFI)PRK.2014.WBE.17.1 10.4 Pembangunan Kabel laut 20kV Tanjung Pandan - Selat nasik 33,250,000 1 lot 33,250,000 33,250,000 31,587,500 1,662,500 APLNPRK.2014.WBE.18.1 10.4 Reverse Engineering PLTU Air Anyir 12,056,677 1 lot 12,056,677 12,056,677 12,056,677 APLN

Basket 5 - Perluasan Jaringan untuk Perluasan PelayananPRK.2014.WBE.19.1 10.4 Studi Amdal PLTU Sewa 2x30MW 505,224 1 lot 505,224 505,224 505,224 APLN

10.7 39,557,993 39,557,993 39,557,993 - APLN

Basket 5 - Perluasan Jaringan untuk Perluasan Pelayanan - - - APLN

PRK.2014.WBE.20.1 10.7 501,086 25,054 meter 20 501,086 501,086 APLN

Jasa + Material Pelengkap Uprating SUTM 35 mm2 ke 240 mm2 P024 untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SUTM 150 mm2 Simp. Gubernur untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 Simp. Gubernur untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SUTM 240 mm2 Underbuild Ketapang untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SUTM 240 mm2 Penyulang OG GI Kampak untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 Penyulang OG GI Kampak untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SUTM 240 mm2 Penyulang OG GI Air Anyir untuk Penyulang Rayon Pangkalpinang, BGK

Jasa + Material Pelengkap penarikan SKTM 240 mm2 Penyulang OG GI Air Anyir untuk Penyulang Rayon Pangkalpinang, BGK

Jasa u/ penarikan SKTM 3x240 mm2 u/ Penarikan SL 5 Merawang - GI Sungailiat, BGK

Jasa u/ penarikan SKTM 3x240 mm2 u/ Penarikan SKTM BTC - GH Theresia, BGK

Pengadaan SKTM 3x240 mm2 u/ Penarikan Penarikan SL 6 Merawang - GI Sungailiat, BGK

Jasa u/ penarikan SKTM 3x240 mm2 u/ Penarikan SL 6 Merawang - GI Sungailiat, BGK

Pengadaan Kubikel Out Going u/Penarikan SKTM SL 6 Merawang - GI Sungailiat, BGK

Jasa + Material Pelengkap untuk Penarikan SUTM AAAC 240 mm2 Tanjung Pandan untuk Back Up Evakuasi Daya PLTU Suge, TJP

Jasa + Material Pelengkap untuk Pembangunan SKTM 240 mm2 Back Up Evakuasi Daya PLTU Suge, TJP

Pengadaan Tower Antenna 50 mtr self support u/ Peralatan KomunikasiLokasi : Kantor Jaga Simpang Pesak, TJP

Pengadaan Tower Antenna 30 mtr dan Celwave Omnidirectional Antena SDB + Penghantar + Arde u/ Peralatan KomunikasiLokasi : GI Dukong & Kantor Jaga Sijuk, TJP

Pengadaan Repeater GR 500 VHF 45 Watt serta Access u/ Radio LinkLokasi : Kantor Jaga Simpang Pesak, TJP

PENYAMBUNGAN PELANGGAN UNTUK MENUJU MINIMUM RE 60% per PROVINSI

Pengadaan AAAC 150mm2 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Pangkalpinang

Page 92: Babel - Lkai 2014 v14

hal. 92 / 103

PT PLN (PERSERO)PT PLN (PERSERO)WILAYAH BANGKA BELITUNG

LEMBAR KERJA ANGGARAN INVESTASI (LKAI) TAHUN 2014KODE PRK UNIT : WBE dalam ribuan Rp

No. PRK SCORE URAIAN KEGIATANANGGARAN 2014

RENCANA ANGGARAN KAS INVESTASI2014 2015 2016

Vol Sat Harga Satuan Total Rupiah Valas Rupiah Valas Rupiah Valas

1 2 3 4 5 6 7 8=(5-6-7) 9 10 11 12 13 14 15

No. RUPTL

TOTAL NILAI /ANGGARAN

REALISASI PEMBAYARAN

S/D 2013

PREDIKSI REALISASI

PEMBAYARAN 2013

SUMBER DANA

Lampiran 4.1Surat no : 1468/520/DIRUT/2013Tanggal : 10 Oktober 2013

PRK.2014.WBE.20.2 10.7 7,500 25 set 300 7,500 7,500 APLN

PRK.2014.WBE.20.3 10.7 700,000 10 buah 70,000 700,000 700,000 APLN

PRK.2014.WBE.20.4 10.7 570,000 6 buah 95,000 570,000 570,000 APLN

PRK.2014.WBE.20.5 10.7 2,866,572 1 lot 2,866,572 2,866,572 2,866,572 APLN

PRK.2014.WBE.21.1 10.7 87,380 4,369 meter 20 87,380 87,380 APLN

PRK.2014.WBE.21.2 10.7 7,200 24 set 300 7,200 7,200 APLN

PRK.2014.WBE.21.3 10.7 140,000 2 unit 70,000 140,000 140,000 APLN

PRK.2014.WBE.21.4 10.7 190,000 2 unit 95,000 190,000 190,000 APLN

PRK.2014.WBE.21.5 10.7 858,236 1 lot 858,236 858,236 858,236 APLN

PRK.2014.WBE.22.1 10.7 166,980 8,349 meter 20 166,980 166,980 APLN

PRK.2014.WBE.22.2 10.7 17,100 57 set 300 17,100 17,100 APLN

PRK.2014.WBE.22.3 10.7 864,680 1 lot 864,680 864,680 864,680 APLN

PRK.2014.WBE.23.1 10.7 384,940 19,247 meter 20 384,940 384,940 APLN

PRK.2014.WBE.23.2 10.7 27,000 90 set 300 27,000 27,000 APLN

PRK.2014.WBE.23.3 10.7 140,000 2 unit 70,000 140,000 140,000 APLN

PRK.2014.WBE.23.4 10.7 1,417,391 1 lot 1,417,391 1,417,391 1,417,391 APLN

PRK.2014.WBE.24.1 10.7 83,000 4,150 meter 20 83,000 83,000 APLN

PRK.2014.WBE.24.2 10.7 7,200 24 set 300 7,200 7,200 APLN

PRK.2014.WBE.24.3 10.7 45,000 1 unit 45,000 45,000 45,000 APLN

PRK.2014.WBE.24.4 10.7 715,000 11 unit 65,000 715,000 715,000 APLN

PRK.2014.WBE.24.5 10.7 190,000 2 unit 95,000 190,000 190,000 APLN

PRK.2014.WBE.24.6 10.7 24,602 3 set 8,201 24,602 24,602 APLN

PRK.2014.WBE.24.7 10.7 58,111 8 set 7,264 58,111 58,111 APLN

Pengadaan Isolator tarik 20 kV + strain clamp 150-240 mm² untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Pangkalpinang

Pengadaan Trafo 160 kVA untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Pangkalpinang, BGK

Pengadaan Trafo 200 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Pangkalpinang

Jasa + Material Pelengkap untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Pemasaran Rayon Pangkalpinang, BGK

Pengadaan AAAC 150mm2 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat

Pengadaan Isolator tarik 20 kV + strain clamp 150-240 mm² untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat

Pengadaan Trafo 160 kVA untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat, BGK

Pengadaan Trafo 200 kVA untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat, BGK

Jasa + Material Pelengkap untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Sungailiat, BGK

Pengadaan AAAC 150mm2 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Koba

Pengadaan Isolator tarik 20 kV + strain clamp 150-240 mm² untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Koba

Jasa + Material Pelengkap untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Koba, BGK

Pengadaan AAAC 150mm2 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Mentok

Pengadaan Isolator tarik 20 kV + strain clamp 150-240 mm² untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Mentok

Pengadaan Trafo 160 kVA 3 Phasa /20 kV-B2, YznY5 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Mentok

Jasa + Material Pelengkap untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Mentok, BGK

Pengadaan AAAC 150mm2 untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali

Pengadaan Isolator tarik 20 kV + strain clamp 150-240 mm² untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali

Pengadaan Trafo 50 kVA untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali, BGK

Pengadaan Trafo 100 kVA untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali, BGK

Pengadaan Trafo 200 kVA untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali, BGK

Pengadaan LV Panel 2 jurusan 250 A untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali, BGK

Pengadaan LV Panel 3 jurusan 400 A untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali, BGK

Page 93: Babel - Lkai 2014 v14

hal. 93 / 103

PT PLN (PERSERO)PT PLN (PERSERO)WILAYAH BANGKA BELITUNG

LEMBAR KERJA ANGGARAN INVESTASI (LKAI) TAHUN 2014KODE PRK UNIT : WBE dalam ribuan Rp

No. PRK SCORE URAIAN KEGIATANANGGARAN 2014

RENCANA ANGGARAN KAS INVESTASI2014 2015 2016

Vol Sat Harga Satuan Total Rupiah Valas Rupiah Valas Rupiah Valas

1 2 3 4 5 6 7 8=(5-6-7) 9 10 11 12 13 14 15

No. RUPTL

TOTAL NILAI /ANGGARAN

REALISASI PEMBAYARAN

S/D 2013

PREDIKSI REALISASI

PEMBAYARAN 2013

SUMBER DANA

Lampiran 4.1Surat no : 1468/520/DIRUT/2013Tanggal : 10 Oktober 2013

PRK.2014.WBE.24.8 10.7 779,795 1 lot 779,795 779,795 779,795 APLN

PRK.2014.WBE.25.1 10.7 Pengadaan Material LVTC 2 x 10 mm2, untuk Penyambungan 1 phasa, BGK 2,080,775 416,155 meter 5 2,080,775 2,080,775 APLN

PRK.2014.WBE.25.2 10.7 11,527,600 32,936 buah 350 11,527,600 11,527,600 APLN

PRK.2014.WBE.25.3 10.7 Jasa Penyambungan pelanggan 1 fasa Bangka 5,928,480 32,936 set 180 5,928,480 5,928,480 APLNPRK.2014.WBE.26.1 10.7 Pengadaan Material LVTC 2 x 10 mm2 u/ Sambungan 1 Phasa, TJP 97,365 19,473 meter 5 97,365 97,365 APLN

PRK.2014.WBE.26.2 10.7 1,400,000 4,000 buah 350 1,400,000 1,400,000 APLN

PRK.2014.WBE.26.3 10.7 Jasa + Material Pelengkap u/ Sambungan 1 Phasa, TJP 720,000 4,000 plg 180 720,000 720,000 APLNPRK.2014.WBE.27.1 10.7 Pengadaan Trafo 100 kVA u/ Gardu Sisipan, TJP 4,030,000 62 unit 65,000 4,030,000 4,030,000 APLNPRK.2014.WBE.27.2 10.7 Jasa Pembangunan Gardu Sisip 100 kVA dan material pelengkap, TJP 2,925,000 65 set 45,000 2,925,000 2,925,000 APLN

10.8 MENGATASI OVERLOAD PADA TRAFO, TRANSMISI DAN GI 3,479,256 3,479,256 3,479,256 - APLNBasket 3 - Perbaikan Susut Jaringan APLN

PRK.2014.WBE.28.1 10.8 1,227,822 34 kms 36,166 1,227,822 1,227,822 APLN

PRK.2014.WBE.29.1 10.8 368,898 4 kms 103,915 368,898 368,898 APLN

Basket 2 - Peningkatan Mutu & Keandalan (SAIDI-SAIFI) APLNPRK.2014.WBE.30.1 10.8 Pengadaan Peralatan K3 GI FTP 1 untuk Area Bangka dan UL TJP 626,094 3 set 208,698 626,094 626,094 APLNPRK.2014.WBE.30.2 10.8 Pengadaan Peralatan Kerja GI FTP 1 untuk Area Bangka dan UL TJP 1,256,442 3 set 418,814 1,256,442 1,256,442 APLN

10.9 PERKUATAN DISTRIBUSI UNTUK PENYAMBUNGAN PELANGGAN 58,997,984 58,997,984 58,997,984 - APLNBasket 1 - Perbaikan Tegangan APLN

PRK.2014.WBE.31.1 10.9 640,000 2 unit 320,000 640,000 640,000 APLN

PRK.2014.WBE.31.2 10.9 170,000 2 unit 85,000 170,000 170,000 APLN

PRK.2014.WBE.31.3 10.9 333,609 1 lot 333,609 333,609 333,609 APLN

PRK.2014.WBE.31.4 10.9 200,000 1 lot 200,000 200,000 200,000 APLN

Basket 2 - Peningkatan Mutu & Keandalan (SAIDI-SAIFI) APLN

PRK.2014.WBE.32.1 10.9 911,989 75 km 12,209 911,989 911,989 APLN

Basket 3 - Perbaikan Susut Jaringan APLN

PRK.2014.WBE.33.1 10.9 3,672,205 87,957 meter 42 3,672,205 3,672,205 APLN

PRK.2014.WBE.33.2 10.9 6,309,000 1,402 batang 4,500 6,309,000 6,309,000 APLN

PRK.2014.WBE.33.3 10.9 90,000 20 batang 4,500 90,000 90,000 APLN

PRK.2014.WBE.33.4 10.9 821,610 107 km 7,650 821,610 821,610 APLN

Basket 5 - Perluasan Jaringan untuk Perluasan Pelayanan APLNPRK.2014.WBE.34.1 10.9 Pengadaan Panel Incoming LBS u/ konsumen TM, BGK 388,500 7 unit 55,500 388,500 388,500 APLNPRK.2014.WBE.34.2 10.9 Pengadaan Panel Metering Panel u/ konsumen TM, BGK 1,702,000 20 unit 85,100 1,702,000 1,702,000 APLNPRK.2014.WBE.34.3 10.9 Pengadaan Panel Outgoing Panel CB Motorized u/ konsumen TM, BGK 1,375,000 5 unit 275,000 1,375,000 1,375,000 APLNPRK.2014.WBE.34.4 10.9 Pengadaan kWh Meter Elektronik + Smart Panel Box, BGK 153,000 20 unit 7,650 153,000 153,000 APLN

Jasa + Material Pelengkap untuk Pembangunan SUTM, SUTR, Gardu Sisip dan Gardu Pemasaran Rayon Toboali, BGK

Pengadaan kWh Meter 1 Phasa Prabayar 5/40 A 230/400 V, untuk penyambungan 1 phasa, BGK

Pengadaan kWh Meter 1 Phasa Prabayar 5/40 A 230/400 V u/ Sambungan 1 Phasa, TJP

Jasa + Material Pelengkap untuk Pekerjaan Underbuild dan Uprating Belinyu, BGK

Jasa + Material untuk Pembangunan Express Feeder Jelitik (SUTM & SKTM) Sungailiat, BGK

Pengadaan Kubikel incoming untuk Pembangunan AVR untuk Perbaikan Tegangan di Belinyu, BGK

Pengadaan Kubikel Coupling untuk Pembangunan AVR untuk Perbaikan Tegangan di Belinyu, BGK

Pembangunan GH AVR Belinyu untuk Pembangunan AVR untuk Perbaikan Tegangan di Belinyu, BGK

Jasa + Material Pendukung untuk Pemasangan Trafo AVR 10MVA untuk Perbaikan Tegangan di Belinyu, BGK

Pengadaan Material dan Jasa Pembangunan GSW (Ground Steel Wire) Mentok dari PLTD Mentok - Gardu M35 untuk Pembangunan GSW (Ground Steel Wire) Mentok, BGK

Pengadaan LVTC 3 x 70 + 50 mm2 Pangkalpinang,Sungailiat,Koba,Mentok & Toboali u/ Perluasan,BGK

Pengadaan Tiang Beton 9m - 200 daN Pangkalpinang,Sungailiat,Koba,Mentok & Toboali u/ Perluasan SUTR ,BGK

Pengadaan Tiang Beton 7m - 200 daN Pangkalpinang,Sungailiat,Koba,Mentok & Toboali u/ Perluasan SUTR,BGK

Jasa Penarikan SUTR Pangkalpinang,Sungailiat,Koba,Mentok & Toboali u/ Perluasan,BGK

Page 94: Babel - Lkai 2014 v14

hal. 94 / 103

PT PLN (PERSERO)PT PLN (PERSERO)WILAYAH BANGKA BELITUNG

LEMBAR KERJA ANGGARAN INVESTASI (LKAI) TAHUN 2014KODE PRK UNIT : WBE dalam ribuan Rp

No. PRK SCORE URAIAN KEGIATANANGGARAN 2014

RENCANA ANGGARAN KAS INVESTASI2014 2015 2016

Vol Sat Harga Satuan Total Rupiah Valas Rupiah Valas Rupiah Valas

1 2 3 4 5 6 7 8=(5-6-7) 9 10 11 12 13 14 15

No. RUPTL

TOTAL NILAI /ANGGARAN

REALISASI PEMBAYARAN

S/D 2013

PREDIKSI REALISASI

PEMBAYARAN 2013

SUMBER DANA

Lampiran 4.1Surat no : 1468/520/DIRUT/2013Tanggal : 10 Oktober 2013

PRK.2014.WBE.34.5 10.9 Pengadaan CT / PT Indoor u/ Metering Outfit Lengkap Pelanggan TM, BGK 1,900,000 20 unit 95,000 1,900,000 1,900,000 APLN

PRK.2014.WBE.34.6 10.9 Jasa Penyambungan Konsumen TM dan Material Pelengkap, BGK 56,000 20 set 2,800 56,000 56,000 APLN

PRK.2014.WBE.34.7 10.9 3,000,000 500 buah 6,000 3,000,000 3,000,000 APLN

PRK.2014.WBE.34.8 10.9 Jasa Penyambungan pelanggan 3 fasa Langsung, BGK 150,000 500 Set 300 150,000 150,000 APLN

PRK.2014.WBE.34.9 10.9 1,179,000 131 buah 9,000 1,179,000 1,179,000 APLN

PRK.2014.WBE.34.10 10.9 Jasa Penyambungan pelanggan 3 fasa Tak Langsung, BGK 39,300 131 Set 300 39,300 39,300 APLNBasket 2 - Peningkatan Mutu & Keandalan (SAIDI-SAIFI) APLN

PRK.2014.WBE.35.1 10.9 Pengadaan mobil Cable Fault Locator u/ Mendeteksi Gangguan SKTM, BGK 2,500,000 1 unit 2,500,000 2,500,000 2,500,000 APLN

PRK.2014.WBE.35.2 10.9 Pengadaan Power Quality Meter, BGK 320,000 1 set 320,000 320,000 320,000 APLNPRK.2014.WBE.36.1 10.9 Pengadaan dan Pemasangan MV Panel dan SKTM GH Merawang, BGK 6,432,360 1 lot 6,432,360 6,432,360 6,432,360 APLN

PRK.2014.WBE.37.1 10.9 Jasa & Material Pelengkap Pembangunan GSW Penyulang Bengkulu 17,4 km 107,835 17 km 6,197 107,835 107,835 APLN

PRK.2014.WBE.37.2 10.9 Jasa & Material Pelengkap Pembangunan GSW Penyulang Marakas 8,9 km 60,488 9 km 6,796 60,488 60,488 APLN

PRK.2014.WBE.37.3 10.9 Jasa & Material Pelengkap Pembangunan GSW Penyulang Metro 12,1 km 145,753 12 km 12,046 145,753 145,753 APLN

PRK.2014.WBE.37.4 10.9 63,189 11,900 meter 5 63,189 63,189 APLN

PRK.2014.WBE.37.5 10.9 Jasa & Material Pelengkap Pembangunan GSW Penyulang Jakarta 18,5 km 108,558 19 km 5,868 108,558 108,558 APLN

PRK.2014.WBE.37.6 10.9 Pengadaan Galvanized Steel wire 22mm untuk GSW Penyulang Aceh 10 km 53,100 10,000 meter 5 53,100 53,100 APLN

PRK.2014.WBE.37.7 10.9 Jasa & Material Pelengkap Pembangunan GSW Penyulang Aceh 10 km 321,900 10 km 32,190 321,900 321,900 APLN

PRK.2014.WBE.37.8 10.9 53,100 10,000 meter 5 53,100 53,100 APLN

PRK.2014.WBE.37.9 10.9 Jasa & Material Pelengkap Pembangunan GSW Penyulang Bangka 10 km 321,900 10 km 32,190 321,900 321,900 APLN

PRK.2014.WBE.37.10 10.9 53,100 10,000 meter 5 53,100 53,100 APLN

PRK.2014.WBE.37.11 10.9 Jasa & Material Pelengkap Pembangunan GSW Penyulang Andalas 10 km 321,900 10 km 32,190 321,900 321,900 APLN

PRK.2014.WBE.37.12 10.9 53,100 10,000 meter 5 53,100 53,100 APLN

PRK.2014.WBE.37.13 10.9 Jasa & Material Pelengkap Pembangunan GSW Penyulang Medan 10 km 321,900 10 km 32,190 321,900 321,900 APLN

PRK.2014.WBE.37.14 10.9 Pengadaan Galvanized Steel wire 22mm untuk GSW Penyulang Riau 10 km 53,100 10,000 meter 5 53,100 53,100 APLN

PRK.2014.WBE.37.15 10.9 Jasa & Material Pelengkap Pembangunan GSW Penyulang Riau 10 km 321,900 10 km 32,190 321,900 321,900 APLN

Basket 1 - Perbaikan Tegangan

PRK.2014.WBE.38.1 10.9 488,640 24,432 meter 20 488,640 488,640 APLN

PRK.2014.WBE.38.2 10.9 118,286 497 buah 238 118,286 118,286 APLN

PRK.2014.WBE.38.3 10.9 31,500 105 set 300 31,500 31,500 APLN

Pengadaan kWh Meter Elektronik 3 Phasa langsung + Smart Panel Boks Phasa 5/100 A 230/400 V, BGK

Pengadaan kWh Meter 3 Phasa Tak langsung + Box AMR Combo lengkap (Modem+CT), BGK

Pengadaan Galvanized Steel wire 22mm untuk GSW Penyulang Jakarta 18,5 km

Pengadaan Galvanized Steel wire 22mm untuk GSW Penyulang Bangka 10 km

Pengadaan Galvanized Steel wire 22mm untuk GSW Penyulang Andalas 10 km

Pengadaan Galvanized Steel wire 22mm untuk GSW Penyulang Medan 10 km

Pengadaan AAAC 150 mm² Penarikan SUTM PLTU Jangkang - Kelapa Kampit untuk Perbaikan Tegangan, TJP

Pengadaan Isolator Tumpu 20 kV Penarikan SUTM PLTU Jangkang - Kelapa Kampit untuk Perbaikan Tegangan, TJP

Pengadaan Isolator tarik 20 kV + strain clamp 150-240 mm² Penarikan SUTM PLTU Jangkang - Kelapa Kampit untuk Perbaikan Tegangan, TJP

Page 95: Babel - Lkai 2014 v14

hal. 95 / 103

PT PLN (PERSERO)PT PLN (PERSERO)WILAYAH BANGKA BELITUNG

LEMBAR KERJA ANGGARAN INVESTASI (LKAI) TAHUN 2014KODE PRK UNIT : WBE dalam ribuan Rp

No. PRK SCORE URAIAN KEGIATANANGGARAN 2014

RENCANA ANGGARAN KAS INVESTASI2014 2015 2016

Vol Sat Harga Satuan Total Rupiah Valas Rupiah Valas Rupiah Valas

1 2 3 4 5 6 7 8=(5-6-7) 9 10 11 12 13 14 15

No. RUPTL

TOTAL NILAI /ANGGARAN

REALISASI PEMBAYARAN

S/D 2013

PREDIKSI REALISASI

PEMBAYARAN 2013

SUMBER DANA

Lampiran 4.1Surat no : 1468/520/DIRUT/2013Tanggal : 10 Oktober 2013

PRK.2014.WBE.38.4 10.9 305,307 8 kms 37,233 305,307 305,307 APLN

PRK.2014.WBE.39.1 10.9 5,415,476 129,712 meter 42 5,415,476 5,415,476 APLN

PRK.2014.WBE.39.2 10.9 785,709 43 kms 18,171 785,709 785,709 APLN

Basket 3 - Perbaikan Susut Jaringan - - - APLN

PRK.2014.WBE.40.1 10.9 1,736,800 41,600 meter 42 1,736,800 1,736,800 APLN

PRK.2014.WBE.40.2 10.9 5,400,000 1,200 batang 4,500 5,400,000 5,400,000 APLN

PRK.2014.WBE.40.3 10.9 529,570 14 kms 38,181 529,570 529,570 APLN

PRK.2014.WBE.41.1 10.9 Rekonektor Gardu, JTR, SR dan APP Manggar, TJP 650,000 13 gardu 50,000 650,000 650,000 APLNPRK.2014.WBE.41.2 10.9 Rekonektor Gardu, JTR, SR dan APP Tanjung Pandan, TJP 1,300,000 26 gardu 50,000 1,300,000 1,300,000 APLNPRK.2014.WBE.42.1 10.9 Jasa Instalasi dan License AMR BGK & TJP 588,500 3,000 titik 196 588,500 588,500 APLN

Basket 5 - Perluasan Jaringan untuk Perluasan Pelayanan APLN

PRK.2014.WBE.43.1 10.9 64,000 400 buah 160 64,000 64,000 APLN

PRK.2014.WBE.43.2 10.9 2,400,000 400 buah 6,000 2,400,000 2,400,000 APLN

PRK.2014.WBE.43.3 10.9 Jasa + Material Pelengkap u/ Sambungan 3 Phasa Langsung, TJP 120,000 400 set 300 120,000 120,000 APLN

PRK.2014.WBE.43.4 10.9 360,000 40 bh 9,000 360,000 360,000 APLN

PRK.2014.WBE.43.5 10.9 Jasa Penyambungan pelanggan 3 fasa Tak Langsung, TJP 12,000 40 set 300 12,000 12,000 APLNPRK.2014.WBE.44.1 10.9 Pengadaan Panel Incoming LBS u/ Sambungan TM, TJP 444,000 8 unit 55,500 444,000 444,000 APLNPRK.2014.WBE.44.2 10.9 Pengadaan Panel Metering Panel u/ Sambungan TM, TJP 680,800 8 unit 85,100 680,800 680,800 APLN

PRK.2014.WBE.44.3 10.9 Pengadaan Panel Outgoing Panel CB Motorized u/ Sambungan TM, TJP 2,200,000 8 unit 275,000 2,200,000 2,200,000 APLN

PRK.2014.WBE.44.4 10.9 Pengadaan kWh Meter Elektronik + Smart Panel Box u/ Sambungan TM, TJP 61,200 8 buah 7,650 61,200 61,200 APLN

PRK.2014.WBE.44.5 10.9 Jasa + Material Pelengkap u/ Sambungan TM, TJP 22,400 8 set 2,800 22,400 22,400 APLNBasket 4 - Rehab Instalasi & Jaringan Distribusi APLN

PRK.2014.WBE.45.1 10.9 Pengadaan A3C 240 mm2 u/ Rehabilitasi Jaringan, TJP 82,120 4,106 meter 20 82,120 82,120 APLNPRK.2014.WBE.45.2 10.9 Pengadaan A3CS 150 mm2 u/ Rehabilitasi Jaringan, TJP 197,280 6,576 meter 30 197,280 197,280 APLNPRK.2014.WBE.45.3 10.9 Jasa + Material Pelengkap u/ Rehabilitasi Jaringan, TJP 300,000 10 kms 30,000 300,000 300,000 APLN

10.10 MEMENUHI PEMBANGKIT PEAKING 19,000,000 19,000,000 19,000,000 APLNBasket 2 - Peningkatan Mutu & Keandalan (SAIDI-SAIFI) APLN

PRK.2014.WBE.46.1 10.10 Repowering Ms. Mirrlees PLTD Mentok, BGK 14,500,000 1 unit 14,500,000 14,500,000 14,500,000 APLNPRK.2014.WBE.47.1 10.10 Pengadaan & Pemasangan Gearpump mesin Mirless Merawang, BGK 4,500,000 1 lot 4,500,000 4,500,000 4,500,000 APLN

10.13 SCADA TRANSMISI 57,226,112 57,226,112 37,212,365 20,013,748 APLNBasket 2 - Peningkatan Mutu & Keandalan (SAIDI-SAIFI) APLN

PRK.2014.WBE.48.1 10.13 Perbaikan titik kontrol SCADA 16,524,127 1 lot 16,524,127 16,524,127 16,524,127 - APLNPRK.2014.WBE.48.2 10.13 Jasa Konsultasi Pembangunan SCADA Titik Kontrol 674,490 1 lot 674,490 674,490 674,490 APLNPRK.2014.WBE.48.3 10.13 Pembangunan Prasarana SCADA, BGK 12,718,491 1 lot 12,718,491 12,718,491 6,359,246 6,359,246 APLNPRK.2014.WBE.48.4 10.13 Pembangunan Prasarana SCADA, TJP 3,250,683 1 lot 3,250,683 3,250,683 1,625,341 1,625,342 APLN

PRK.2014.WBE.48.5 10.13 Pembangunan SCADA Sistem kelistrikan Bangka Belitung (Master Station) 24,058,321 1 lot 24,058,321 24,058,321 12,029,161 12,029,161 APLN

A. Jumlah APLN 248,187,748 - - 248,187,748 226,511,500 - 21,676,248 - - - - Murni 238,302,993 238,302,993 216,626,746 21,676,248

Jasa + Material Pelengkap Penarikan SUTM PLTU Jangkang - Kelapa Kampit untuk Perbaikan Tegangan, TJP

Pengadaan LVTC 3 x 70 + 50 mm² Pembangunan Jaringan SUTR Tanjung Pandan,Kelapa Kampit,Tanjung Kelumpang, Tanjung Binga, Sijuk, Membalong & Gantung untuk Perbaikan Tegangan, TJP

Jasa + Material Pelengkap Pembangunan Jaringan SUTR Tanjung Pandan Kelapa Kampit,Tanjung Kelumpang, Tanjung Binga, Sijuk, Membalong & Gantung untuk Perbaikan Tegangan, TJP

Pengadaan LVTC 3 x 70 + 50 mm2 Perluasan SUTR Manggar, Kelapa Kampit, Membalong &Tanjung Pandan, TJP

Pengadaan Tiang Beton 9 m 200 daN Perluasan SUTR Manggar, Kelapa Kampit, Membalong &Tanjung Pandan, TJP

Jasa + Material Pelengkap Perluasan SUTR Manggar, Kelapa Kampit, Membalong &Tanjung Pandan, TJP

Pengadaan MCB 3 Pole 240/400 V 20 A s/d 300 A u/ Sambungan 3 Phasa, TJP

Pengadaan kWh Meter Elektronik 3 Phasa langsung + Smart Panel Boks Phasa 5/100 A 230/400 V, TJP

Pengadaan kWh Meter 3 Phasa Tak langsung + Box AMR Combo lengkap (Modem+CT), TJP

Page 96: Babel - Lkai 2014 v14

hal. 96 / 103

PT PLN (PERSERO)PT PLN (PERSERO)WILAYAH BANGKA BELITUNG

LEMBAR KERJA ANGGARAN INVESTASI (LKAI) TAHUN 2014KODE PRK UNIT : WBE dalam ribuan Rp

No. PRK SCORE URAIAN KEGIATANANGGARAN 2014

RENCANA ANGGARAN KAS INVESTASI2014 2015 2016

Vol Sat Harga Satuan Total Rupiah Valas Rupiah Valas Rupiah Valas

1 2 3 4 5 6 7 8=(5-6-7) 9 10 11 12 13 14 15

No. RUPTL

TOTAL NILAI /ANGGARAN

REALISASI PEMBAYARAN

S/D 2013

PREDIKSI REALISASI

PEMBAYARAN 2013

SUMBER DANA

Lampiran 4.1Surat no : 1468/520/DIRUT/2013Tanggal : 10 Oktober 2013

- Lanjutan 9,884,754 9,884,754 9,884,754 - B. Jumlah APBN - - - - - - - - - -

- Murni- Lanjutan

C. Jumlah SLA - - - - - - - - - - - Murni- Lanjutan

D. Jumlah Commited Bank Loan - - - - - - - - - - - Murni- Lanjutan

E. Jumlah Seluruhnya (A+B+C+D) 248,187,748 - - 248,187,748 226,511,500 - 21,676,248 - - - - Murni 238,302,993 - - 238,302,993 216,626,746 - 21,676,248 - - - - Lanjutan 9,884,754 - - 9,884,754 9,884,754 - - - - -

Pangkalpinang, Desember 2013Mengetahui,

GENERAL MANAGER

I.B. ARI WARDANA

Page 97: Babel - Lkai 2014 v14

PT PLN (PERSERO)WILAYAH BANGKA BELITUNG

LEMBAR REKAPITULASI ANGGARAN INVESTASI APLN TAHUN 2014RUTIN

No. FUNGSIANGGARAN INVESTASI (xRp.1000) ANGGARAN KAS INVESTASI (xRp.1000)

KDIV TEKNISLANJUTAN MURNI TOTAL LANJUTAN MURNI TOTAL

1 2 3 4 5 = 3+4 6 7 8 = 6+7 9 10

1 Pembangkit 2,176,127 31,561,901 33,738,028 2,176,127 31,550,401 33,726,528 - KDIV KIT SUM

2 Transmisi & GI 764,314 59,108,648 59,872,962 764,314 39,094,901 39,859,214 - KDIV TRS

3 Distribusi 6,228,300 147,632,444 153,860,744 6,228,300 145,969,944 152,198,244 - KDIV DIS SUM

4 Sarana - - -

5 Rutin Konstruksi - - -

JUMLAH APLN 9,168,741 238,302,993 247,471,734 9,168,741 216,615,246 225,783,987 -

Pangkalpinang, Desember 2013

Mengetahui,

KDIV DIS SUMATERA KDIV KIT SUMATERA KDIV TRS JAWA BALI SUMATERA GENERAL MANAGER

DANIEL S. BANGUN ISHVANDONO YUNAINI AGOES PRIAMBODO I.B. ARI WARDANA

UNSUR VALAS AKI

Lampiran 4.3Surat no : 1468/520/DIRUT/2013Tanggal : 10 Oktober 2013

Page 98: Babel - Lkai 2014 v14

PT PLN (PERSERO)WILAYAH BANGKA BELITUNG

ARUS KAS BULANAN (AKB) INVESTASI APLN TAHUN 2014

No. BULAN UNSUR VALAS AKI

1 2 3 4

1 Januari 1,103,400

2 Februari 4,102,942

3 Maret 6,685,655

4 April 9,128,065

5 Mei 64,795,748

6 Juni 21,566,860

7 Juli 10,785,913

8 Agustus 14,142,016

9 September 14,358,023

10 Oktober 32,409,164

11 Nopember 30,410,286

12 Desember 17,011,929

JUMLAH APLN 226,500,000

Pangkalpinang, Desember 2013Mengetahui,

GENERAL MANAGER

I.B. ARI WARDANA

NILAI AKI(x Rp. 1000)

Lampiran 4.4Surat no : 1468/520/DIRUT/2013Tanggal : 10 Oktober 2013

Page 99: Babel - Lkai 2014 v14

PT PLN (PERSERO)WILAYAH BANGKA BELITUNG

REKAPITULASI PER PROGRAM KEGIATAN INVESTASI TAHUN 2014

RUTIN dalam ribu rupiah

SCORE URUTAN KEGIATAN REKAPITULASI

1 10 1 Kegiatan yang sudah kontrak Rp 9,884,754

2 10 2 Rp 14,229,748

3 10 4 PLTU-PLTM-PLTA-PLTP-PLTGB-PLTG gas/Trans/GI yang menurunkan BBM Rp 44,149,401

4 10 7 Penyambungan Pelanggan untuk menuju minimum RE 60% per provinsi (Roadmap menuju 100%) Rp 39,557,993

5 10 8 Mengatasi overload pada Trafo, transmisi dan GI Rp 3,479,256

6 10 9 Perkuatan distribusi untuk penyambungan pelanggan Rp 58,997,984

7 10 10 Memenuhi pembangkit peaking Rp 19,000,000

8 10 13 SCADA Transmisi Rp 37,212,365

T O T A L Rp 226,511,500

Pangkalpinang, Desember 2013 Mengetahui, Mengetahui,

KDIV DIS SUMATERA KDIV KIT SUMATERA KDIV TRS JAWA BALI SUMATERA GENERAL MANAGER

DANIEL S. BANGUN ISHVANDONO YUNAINI AGOES PRIAMBODO I.B. ARI WARDANA

NO. PROGRAM/KELOMPOK KEGIATAN

Kegiatan terkait PLTU FTP 1 yang ada progresnya, termasuk perluasan fasilitas batubara dan evakuasi daya

Page 100: Babel - Lkai 2014 v14

LEMBAR KERJA ANGGARAN INVESTASI APLN TAHUN 2014 - PER BASKETPT PLN (PERSERO) WILAYAH BANGKA BELITUNG

B A S K E T

Basket 1 - Perbaikan Tegangan Rp 9,654,527 Rp 9,654,527 Rp -

Basket 2 - Peningkatan Mutu & Keandalan (SAIDI-SAIFI) Rp 151,650,572 Rp 129,962,824 Rp 21,687,747

Basket 3 - Perbaikan Susut Jaringan Rp 25,722,805 Rp 25,722,805 Rp -

Basket 4 - Rehab Instalasi & Jaringan Distribusi Rp 2,613,300 Rp 2,613,300 Rp -

Basket 5 - Perluasan Jaringan untuk Perluasan Pelayanan Rp 58,546,544 Rp 58,546,544 Rp -

T O T A L Rp 248,187,747 Rp 226,500,000 Rp 21,687,747

Pangkalpinang, Desember 2013Mengetahui,

GENERAL MANAGER

I.B. ARI WARDANA

ANGGARAN2014

(x Rp. 1000)

AKI2014

(x Rp. 1000)

AKI2015

(x Rp. 1000)

Page 101: Babel - Lkai 2014 v14

FUNGSIANGGARAN INVESTASI

LANJUTAN MURNI

Pembangkit Rp 2,176,127 Rp 31,561,901

Transmisi & GI Rp 764,314 Rp 59,108,648

Distribusi Rp 6,228,300 Rp 147,632,444

Sarana Rp - Rp -

Rutin Konstruksi Rp - Rp -

T O T A L Rp 9,168,741 Rp 238,302,993

Page 102: Babel - Lkai 2014 v14

ANGGARAN INVESTASI ANGGARAN KAS INVESTASI

TOTAL LANJUTAN MURNI TOTAL

Rp 33,738,028 Rp 2,176,127 Rp 31,550,401 Rp 33,726,528

Rp 59,872,962 Rp 764,314 Rp 39,094,901 Rp 39,859,214

Rp 153,860,744 Rp 6,228,300 Rp 145,969,944 Rp 152,198,244

Rp - Rp - Rp - Rp -

Rp - Rp - Rp - Rp -

Rp 247,471,734 Rp 9,168,741 Rp 216,615,246 Rp 225,783,987

Page 103: Babel - Lkai 2014 v14

BULAN NILAI AKI

JANUARI 1,103,400

FEBRUARI 4,102,942

MARET 6,685,655

APRIL 9,128,065

MEI 64,795,748

JUNI 21,566,860

JULI 10,785,913

AGUSTUS 14,142,016

SEPTEMBER 14,358,023

OKTOBER 32,409,164

NOVEMBER 30,410,286

DESEMBER 17,011,929

TOTAL 226,500,000