ASSALAMUALAIKUM WR.WB SALAM SEJAHTERA · 6. Biaya sewa alat = Biaya sewa per jam x Lama pekerjaan = Rp 150.000,00 x 22,06 jam = Rp 3.309.604,00 7. Biaya tenaga : 1 Mandor = 1 x 3,15

Sep 20, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ASSALAMUALAIKUM WR.WB SALAM SEJAHTERA · 6. Biaya sewa alat = Biaya sewa per jam x Lama pekerjaan = Rp 150.000,00 x 22,06 jam = Rp 3.309.604,00 7. Biaya tenaga : 1 Mandor = 1 x 3,15

ASSALAMUALAIKUM WR.WBASSALAMUALAIKUM WR.WBSALAM SEJAHTERASALAM SEJAHTERA

Page 2: ASSALAMUALAIKUM WR.WB SALAM SEJAHTERA · 6. Biaya sewa alat = Biaya sewa per jam x Lama pekerjaan = Rp 150.000,00 x 22,06 jam = Rp 3.309.604,00 7. Biaya tenaga : 1 Mandor = 1 x 3,15

METODE PELAKSANAANMETODE PELAKSANAANPEMBANGUNAN INTAKE DAN JARINGAN PIPA TRANSMISINYAPEMBANGUNAN INTAKE DAN JARINGAN PIPA TRANSMISINYA

DI KECAMATAN BALONGBENDO,DI KECAMATAN BALONGBENDO,KABUPATEN SIDOARJOKABUPATEN SIDOARJO –– JAWA TIMURJAWA TIMUR

1. Esti Yuvita 31080300012. Rendi Candrawitadi 3108030099

Oleh :

Page 3: ASSALAMUALAIKUM WR.WB SALAM SEJAHTERA · 6. Biaya sewa alat = Biaya sewa per jam x Lama pekerjaan = Rp 150.000,00 x 22,06 jam = Rp 3.309.604,00 7. Biaya tenaga : 1 Mandor = 1 x 3,15

PENDAHULUANPENDAHULUAN

LATARBELAKANG

TUJUAN

RUMUSANMASALAH

BATASANMASALAH

1. Kurangnya persediaan air bakuuntuk penduduk di KabupatenBalongbendo dan sekitarnya.

2. Metode pelaksanaan di lapangankurang optimal.

Page 4: ASSALAMUALAIKUM WR.WB SALAM SEJAHTERA · 6. Biaya sewa alat = Biaya sewa per jam x Lama pekerjaan = Rp 150.000,00 x 22,06 jam = Rp 3.309.604,00 7. Biaya tenaga : 1 Mandor = 1 x 3,15

PENDAHULUANPENDAHULUAN

LATARBELAKANG

TUJUAN

RUMUSANMASALAH

BATASANMASALAH

1. Menganalisis produksi alat berat baikdari segi kualitas, kuantitas dankontinuitasnya.

2. Mengkaji letak alat-alat yang akandigunakan dalam proyek denganmemberi usulan perbandinganlapangan, alternatif-1 (menurutwaktu), alternatif-2 (menurut biaya).

Page 5: ASSALAMUALAIKUM WR.WB SALAM SEJAHTERA · 6. Biaya sewa alat = Biaya sewa per jam x Lama pekerjaan = Rp 150.000,00 x 22,06 jam = Rp 3.309.604,00 7. Biaya tenaga : 1 Mandor = 1 x 3,15

PENDAHULUANPENDAHULUAN

LATARBELAKANG

TUJUAN

RUMUSANMASALAH

BATASANMASALAH

1. Apa jenis dan jumlah alat beratyang dibutuhkan agar proyek dapatterlaksana secara efektif?

2. Bagaimana mengatur penempatanalat-alat dan bangunan sementarayang diperlukan untuk mendukungjalannya proyek agar terlaksanatepat waktu?

Page 6: ASSALAMUALAIKUM WR.WB SALAM SEJAHTERA · 6. Biaya sewa alat = Biaya sewa per jam x Lama pekerjaan = Rp 150.000,00 x 22,06 jam = Rp 3.309.604,00 7. Biaya tenaga : 1 Mandor = 1 x 3,15

PENDAHULUANPENDAHULUAN

LATARBELAKANG

TUJUAN

RUMUSANMASALAH

BATASANMASALAH

1. Metode pelaksanaan pembangunanbangunan intake.

2. Metode pelaksanaan pembangunanjaringan pipa transmisi.

3. Perhitungan analisis alat berat, pekerja,bahan material dan jadwal pelaksanaan.

Page 7: ASSALAMUALAIKUM WR.WB SALAM SEJAHTERA · 6. Biaya sewa alat = Biaya sewa per jam x Lama pekerjaan = Rp 150.000,00 x 22,06 jam = Rp 3.309.604,00 7. Biaya tenaga : 1 Mandor = 1 x 3,15

LOKASI STUDILOKASI STUDI

Lokasi Proyek

Peta Kabupaten Sidoarjo

Page 8: ASSALAMUALAIKUM WR.WB SALAM SEJAHTERA · 6. Biaya sewa alat = Biaya sewa per jam x Lama pekerjaan = Rp 150.000,00 x 22,06 jam = Rp 3.309.604,00 7. Biaya tenaga : 1 Mandor = 1 x 3,15

METODOLOGIMETODOLOGI

Page 9: ASSALAMUALAIKUM WR.WB SALAM SEJAHTERA · 6. Biaya sewa alat = Biaya sewa per jam x Lama pekerjaan = Rp 150.000,00 x 22,06 jam = Rp 3.309.604,00 7. Biaya tenaga : 1 Mandor = 1 x 3,15

MULAI

PENGUMPULAN DATA

TAHAPAN PEKERJAAN

ANALISIS PEKERJAAN

ANALISIS HARGA SATUAN

RENCANA ANGGARAN BIAYA NETWORK PLANNING

TIME SCHEDULE (KURVA S)

PILIHAN / KEPUTUSAN

KESIMPULAN

SELESAI

LAPA

NG

AN

, ALT

ERN

ATIF

-1, A

LTER

NAT

IF-2

Page 10: ASSALAMUALAIKUM WR.WB SALAM SEJAHTERA · 6. Biaya sewa alat = Biaya sewa per jam x Lama pekerjaan = Rp 150.000,00 x 22,06 jam = Rp 3.309.604,00 7. Biaya tenaga : 1 Mandor = 1 x 3,15

ANALISIS DATAANALISIS DATA Flowchart alat berat excavator (backhoe) Analisis hitungan backhoe

Diketahui : Volume tanah galian = 630,43 m³Kondisi pekerjaan dan tata laksana (KT) = 0,75Efisiensi kerja (EK) = 0,83Kapasitas bucket (KB) = 1 m³Cycle time (CT) = 60 detik = 1 menitKedalaman optimum (KO) = 0,85Faktor pengisian (FP) = 0,90Sewa backhoe per jam = Rp 150.000,00 (KOMATSU PC-200)

Ditanya : a. Produksi sebenarnya ?b. Waktu yang dibutuhkan ?c. Total biaya sewa backhoe ?d. Total biaya tenaga kerja ?e. Total biaya pekerjaan galian ?

Page 11: ASSALAMUALAIKUM WR.WB SALAM SEJAHTERA · 6. Biaya sewa alat = Biaya sewa per jam x Lama pekerjaan = Rp 150.000,00 x 22,06 jam = Rp 3.309.604,00 7. Biaya tenaga : 1 Mandor = 1 x 3,15

Jawab :

1. Banyak siklus pergerakan = 60Ct

= 601

= 60 siklus/jam

2. Produksi teoritis = Kap. bucket x Banyak siklus= 1 m³ x 60 = 60 m³/jam

3. Faktor koreksi total = EK x KO x KT x FP= 0,83 x 0,85 x 0,75 x 0,90 = 0,48

4. Produksi sebenarnya = Produksi teoritis x faktor koreksi= 60 m³/jam x 0,48 = 28,57 m³/jam

5. Waktu yang dibutuhkan = VolumeProd.sebenarnya

630,34 m³28,57 m³/jam

=

= 22,06 jam = 3,15 hari

Page 12: ASSALAMUALAIKUM WR.WB SALAM SEJAHTERA · 6. Biaya sewa alat = Biaya sewa per jam x Lama pekerjaan = Rp 150.000,00 x 22,06 jam = Rp 3.309.604,00 7. Biaya tenaga : 1 Mandor = 1 x 3,15

6. Biaya sewa alat = Biaya sewa per jam x Lama pekerjaan= Rp 150.000,00 x 22,06 jam= Rp 3.309.604,00

7. Biaya tenaga :1 Mandor = 1 x 3,15 x Rp 55.000,00 = Rp 173.250,001 Pekerja = 1 x 3,15 x Rp 37.500,00 = Rp 118.125,00

Total = Rp 291.375,00

8. Total biaya pekerjaan galian tanah :Biaya sewa alat (I) = Rp 3.309.604,00Biaya tenaga kerja (II) = Rp 291.375,00Total biaya (I + II) = Rp 3.600.979,00Biaya tak langsung (III) = Rp 3.600.979,00 x 0,05

= Rp 180.048,95Total keseluruhan (I+II+III) = Rp 3.781.027,95

Page 13: ASSALAMUALAIKUM WR.WB SALAM SEJAHTERA · 6. Biaya sewa alat = Biaya sewa per jam x Lama pekerjaan = Rp 150.000,00 x 22,06 jam = Rp 3.309.604,00 7. Biaya tenaga : 1 Mandor = 1 x 3,15

Flowchart alat berat vibro roller Analisis hitungan vibro roller

Diketahui : Volume tanah yang dipadatkan = 324,76 m³Lebar gilas efektif (W) = 1,09 mKecepatan gilas (V) = 1,50 km/jamTebal lapisan timbunan (H) = 0,30 mJumlah lintasan (N) = 10 lintasanJob efesiensi (E) = 0,65Sewa vibro roller per jam = Rp 135.000,00 (Komatsu JV25W)

Ditanya : a. Produksi sebenarnya ?b. Waktu yang dibutuhkan ?c. Total biaya sewa vibro roller ?d. Total biaya tenaga ?e. Total biaya pekerjaan timbunan ?

Page 14: ASSALAMUALAIKUM WR.WB SALAM SEJAHTERA · 6. Biaya sewa alat = Biaya sewa per jam x Lama pekerjaan = Rp 150.000,00 x 22,06 jam = Rp 3.309.604,00 7. Biaya tenaga : 1 Mandor = 1 x 3,15

Jawab :

1. Produksi sebenarnya (Q) = W x V x H x E x 1000N

= 1,09 x 1,50 x 0,30 x 0,65 x 100010

= 31,88 m³/jam

2. Waktu yang dibutuhkan = VolumeProd. sebenarnya

= 324,76 m³31,88 m³/jam = 10,19 jam = 1,46 hari

3. Biaya sewa alat = Biaya sewa per jam x Lama pekerjaan= Rp 135.000,00 x 10,19 jam= Rp 1.375.130,56

Page 15: ASSALAMUALAIKUM WR.WB SALAM SEJAHTERA · 6. Biaya sewa alat = Biaya sewa per jam x Lama pekerjaan = Rp 150.000,00 x 22,06 jam = Rp 3.309.604,00 7. Biaya tenaga : 1 Mandor = 1 x 3,15

5. Total biaya pekerjaan timbunan tanah :Biaya sewa alat (I) = Rp 1.375.130,56Biaya tenaga kerja (II) = Rp 135.050,00Total biaya (I + II) = Rp 1.510.180,56Biaya tak langsung (III) = Rp 1.510.180,56 x 0,05

= Rp 75.509,03Total keseluruhan (I+II+III) = Rp 1.585.689,59

4. Biaya tenaga :1 Mandor = 1 x 1,46 x Rp 55.000,00 = Rp 80.300,001 Pekerja = 1 x 1,46 x Rp 37.500,00 = Rp 54.750,00

Total = Rp 135.050,00

Page 16: ASSALAMUALAIKUM WR.WB SALAM SEJAHTERA · 6. Biaya sewa alat = Biaya sewa per jam x Lama pekerjaan = Rp 150.000,00 x 22,06 jam = Rp 3.309.604,00 7. Biaya tenaga : 1 Mandor = 1 x 3,15

Flowchart alat berat tandem roller Analisis hitungan tandem roller

Diketahui : Volume perkerasan aspal = 956,75 m²Lebar gilas efektif (W) = 1,0 mKecepatan gilas (V) = 5,0 km/jamTebal lapisan perkerasan (H) = 0,10 mJumlah lintasan (N) = 4 lintasanJob efisiensi (E) = 0,65Sewa tandem roller per jam = Rp 135.000,00 (ATLAS W-260)

Ditanya : a. Produksi sebenarnya ?b. Waktu yang dibutuhkan ?c. Total biaya sewa tandem roller ?d. Total biaya tenaga ?e. Total biaya pekerjaan perkerasan ?

Page 17: ASSALAMUALAIKUM WR.WB SALAM SEJAHTERA · 6. Biaya sewa alat = Biaya sewa per jam x Lama pekerjaan = Rp 150.000,00 x 22,06 jam = Rp 3.309.604,00 7. Biaya tenaga : 1 Mandor = 1 x 3,15

Jawab :

1. Produksi sebenarnya (Q) = W x V x H x E x 1000N

= 1,0 x 5,0 x 0,10 x 0,65 x 10004

= 81,25 m³/jam

2. Waktu yang dibutuhkan = VolumeProd. sebenarnya

= 956,75 m³81,25 m³/jam = 11,78 jam = 1,68 hari

3. Biaya sewa alat = Biaya sewa per jam x Lama pekerjaan= Rp 135.000,00 x 11,78 jam= Rp 1.589.676,92

Page 18: ASSALAMUALAIKUM WR.WB SALAM SEJAHTERA · 6. Biaya sewa alat = Biaya sewa per jam x Lama pekerjaan = Rp 150.000,00 x 22,06 jam = Rp 3.309.604,00 7. Biaya tenaga : 1 Mandor = 1 x 3,15

4. Biaya tenaga :1 Mandor = 1 x 1,68 x Rp 55.000,00 = Rp 92.400,001 T. aspal = 1 x 1,68 x Rp 40.000,00 = Rp 67.200,001 Pekerja = 1 x 1,68 x Rp 37.500,00 = Rp 63.000,00

Total = Rp 222.600,005. Total biaya pekerjaan timbunan tanah :

Biaya sewa alat (I) = Rp 1.589.676,00Biaya tenaga kerja (II) = Rp 222.600,00Biaya bahan (III) = Rp 42.604.078,00Biaya asphalt sprayer (IV) = Rp. 133.945,00Total biaya (I+II+III+IV) = Rp 44.550.299,00Biaya tak langsung (V) = Rp 44.550.299,00 x 0,05

= Rp 2.227.514,95Total keseluruhan (I+II+III+IV) = Rp 46.777.813,95

Page 19: ASSALAMUALAIKUM WR.WB SALAM SEJAHTERA · 6. Biaya sewa alat = Biaya sewa per jam x Lama pekerjaan = Rp 150.000,00 x 22,06 jam = Rp 3.309.604,00 7. Biaya tenaga : 1 Mandor = 1 x 3,15

KESIMPULANKESIMPULAN

Berdasar kenyataan yang terjadi dilapangan dan setelahmengkaji ulang mengenai produksi alat berat yang dibutuhkanmaka telah dibuat beberapa alternatif yang mampu menekanwaktu dan biaya dalam pelaksanaan. Berikut adalah total waktudan biaya :

1. LapanganTotal biaya = Rp 7.421.895.626,00Total waktu = 7,50 bulan

2. Alternatif menurut waktuTotal biaya = Rp 7.230.556.697,00Total waktu = 3,30 bulan

3. Alternatif menurut biayaTotal biaya = Rp 7.255.182.204,00Total waktu = 4 bulan