52735366 Step by Step Auto CAD Land Desktop 2009

Oct 24, 2015

Download

Documents

foursh4red

Step Auto CAD Land
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 52735366 Step by Step Auto CAD Land Desktop 2009

MANUAL DASAR

RAYA MENGGUNAKAN AutoCAd LAND DESKTOP

2009 DAN MANUAL AASHTO 2001

Magister

Fakultas

Institut

DASAR PERENCANAAN DESAIN JALAN

RAYA MENGGUNAKAN AutoCAd LAND DESKTOP

DAN MANUAL AASHTO 2001

Disusun Oleh:

Ir. Welly Pradipta

Magister Sistem dan Teknik Jalan Raya

Fakultas Teknik Sipil dan Lingkungan

Institut Teknologi Bandung

2010

PERENCANAAN DESAIN JALAN

RAYA MENGGUNAKAN AutoCAd LAND DESKTOP

DAN MANUAL AASHTO 2001

an Teknik Jalan Raya

Page 2: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e1

Daftar Isi

1. Welcome to AutoCAD Land Desktop Companion 2009 2

2. Menu awal AutoCAD Land Desktop Development 2009 3

3. Penyesuaian kontur 7

4. Alinemen horizontal 11

5. Stationing 17

6. Alinemen vertikal 21

7. Potongan melintang 38

8. Menghitung volume galian dan timbunan 80

9. Membuka surface locked 85

10. Daftar sumber 88

Page 3: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e2

1. Welcome to AutoCAD Land Desktop Companion 2009

Page 4: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e3

2. Menu awal AutoCAD Land Desktop Development 2009

Page 5: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e4

Page 6: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e5

Page 7: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e6

Page 8: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e7

3. Penyesuaian kontur

(Klik kanan pada kontur > Properties > Elevation)

Page 9: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e8

(Klik kanan pada Terrain > Create New Surface)

Page 10: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e9

(Klik kanan Contours > Add Contour Data...)

Page 11: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e10

Blok layer kontur

Cek elevasi maksimum dan elevasi minimum layer kontur

Page 12: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e11

4. Alinemen Horizontal

Buat trase jalan rencana dengan menggunakan polyline

(Klik pada polyline > Enter)

Page 13: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e12

Membuat lengkung horizontal

Blok pada PI yang akan di edit

Keterangan :

Edit Curve = Untuk Lengkung Full Circle (FC)

Edit Spiral = Untuk Lengkung Spiral – Spiral (SS)

Edit Curve dan Spiral = Untuk lengkung Spiral – Circle – Spiral (SCS)

Page 14: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e13

Input data sesuai metode perhitungan AASHTO 2001.

Keterangan :

Radius = Jari – jari lengkung lingkaran

L1 & L2 = Panjang lengkung spiral

Page 15: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e14

Lakukan hal yang sama untuk semua tikungan.

(Klik OK)

Page 16: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e15

Membuat offset jalan rencana

Input data offset

Misal :

- Ruwasja/ruang pengawasan jalan

- Batas drainase/Rumija/ruang milik jalan

- Bahu jalan/Rumaja/ruang manfaat jalan

- Badan jalan

Page 17: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e16

Page 18: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e17

5. Stationing

Page 19: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e18

Membuat label stationing

Input tanda ( *- ) pada kotak layer profile

Page 20: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e19

Men-setting label stationing

Page 21: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e20

(Enter, Enter, Yes)

Page 22: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e21

6. Alinemen Vertikal

Membuat profil muka tanah asli berdasarkan trase jalan rencana

Klik pada awal dan akhir trase jalan rencana

Page 23: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e22

(Enter, Enter, Enter, klik Left)

Page 24: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e23

Input tanda ( *- ) pada kotak layer profile

Page 25: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e24

Cek Serface1

Status : NOT LOCKED

Jika dalam keadaan : LOCKED By...... (Lihat petunjuk no 8. Membuka Surface Locked)

Page 26: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e25

Page 27: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e26

Page 28: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e27

Page 29: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e28

(Klik di dalam profile)

Membuat muka trase jalan rencana

Page 30: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e29

Page 31: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e30

(Enter)

Page 32: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e31

Klik pada tangen pertama, lalu blok seluruh tangen.

Page 33: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e32

(Enter)

(wait....)

Page 34: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e33

Page 35: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e34

Input kecepatan rencana

Input panjang lengkung vertikal.

Perhatikan range “Maximum recomended length” dan “Minimum recomended length” pada

pojok kanan bawah.

Page 36: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e35

Page 37: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e36

Page 38: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e37

Page 39: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e38

7. Potongan Melintang

Membuat potongan melintang.

Page 40: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e39

(Enter, Enter)

Page 41: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e40

Gambar potongan perkerasan terlebih dahulu

Cek skala horizontal (1:100)

Page 42: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e41

Page 43: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e42

(Klik)

Page 44: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e43

Blok seluruh potongan perkerasan.

(Enter)

Page 45: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e44

Bahan perkeraan pada jalan utama : aspal.

Page 46: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e45

Bahan perkerasan pada bahu jalan : granular.

(Klik)

Page 47: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e46

Datum number : 1.

(Enter)

(Klik)

Page 48: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e47

(Klik)

(Klik)

Page 49: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e48

(Klik)

(Klik, Enter)

Page 50: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e49

Page 51: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e50

Isi nama template (misal : normal crown)

Page 52: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e51

Jika memiliki template lain, klik Yes.

Page 53: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e52

(Klik)

Page 54: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e53

Lanjutkan dengan langsung membuat template untuk superelevasi.

Page 55: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e54

(Klik)

(Klik)

Page 56: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e55

(Klik)

(Klik)

Page 57: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e56

(Klik)

(Klik, Enter)

Page 58: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e57

Page 59: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e58

Overwrite template Normal Crown (agar tidak terlalu banyak data template).

(Enter)

(Enter)

Page 60: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e59

Page 61: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e60

Pilih template Normal Crown.

Page 62: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e61

Perhatikan Pivot Left dan Right telah otomatis terisi -0,02.

Page 63: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e62

Page 64: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e63

Page 65: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e64

Page 66: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e65

Menggabungkan potongan Emaks ke Enormal (Edesign to Normal Crown).

(Enter)

Page 67: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e66

Plih method A jika trase jalan merupakan titik putar saat superlevasi.

Input E maksimum design sesuai perhitungan metode AASHTO 2001

Page 68: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e67

Input E maksimum design sesuai perhitungan metode AASHTO 2001

Page 69: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e68

Page 70: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e69

Page 71: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e70

Page 72: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e71

Page 73: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e72

Page 74: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e73

Mengecek potongan melintang

Page 75: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e74

Periksa pada setiap stationing Left EOP dan Right EOP.

Saat Normal Crown : -0,02 (E normal)

Saat Superelevasi : -0,097 (E design)

Page 76: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e75

Page 77: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e76

Setting tampilan output sesuai yang diinginkan.

Setting ukuran kertas sesuai yang diinginkan.

Page 78: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e77

Menampilkan hasil potongan melintang secara multipage.

Page 79: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e78

(Enter, Enter)

Klik di tempat yang diinginkan

Page 80: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e79

Urutan stationing dari kiri bawah ke kanan atas.

Page 81: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e80

8. Menghitung volume galian dan timbunan

Page 82: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e81

(Enter, Enter, Enter, Enter, Klik)

Page 83: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e82

Menyimpan data galian dan timbunan dalam file

Page 84: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e83

(Enter, Enter, Enter, Enter)

Masukkan nama file. Misal : galian-timbunan.prn

File dapat dilihat pada folder kerja. Misal : C:\Land Projects 2009\welly.mpradipta

Page 85: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e84

Open with notepad, excel, or word.

Hasil output file galian dan timbunan

Page 86: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e85

9. Membuka surface locked

Kalau “Surface1=Locked”

Page 87: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e86

Page 88: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e87

Page 89: 52735366 Step by Step Auto CAD Land Desktop 2009

Ir. Welly PradiptaSTJR 2010 -ITB

Pag

e88

10. Daftar sumber

Terima kasih kepada :

1. Gugun Guntara, ST. (STJR ITB 2008)